ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
CP05-GWP-21JUL ARCHITECTURAL WORKS OF DEPOT
05A1001000
END CP05
525 25-Jul-21
0
Finish
31-Dec-22
Remaining
Duration
525
Manpower
Qtr 3, 2021
Aug
Oct
Nov
Dec
Jan
Feb
0
CP05-GWP-21JUL.B CONSTRUCTION DESIGN / THIET KE
14-Nov-21
75
148
CP05-GWP-21JUL.B.1 DESIGN DRAWINGS / CAC BAN VE THIET KE
75 31-Aug-21
14-Nov-21
75
136
15-Oct-21
31-Aug-21*
45
0
88
4
31-Aug-21*
0
4
Approval Door Design,
05B1219060
Approval False Floor Design
0
31-Aug-21*
0
4
Approval False Floor Design,
05B1219070
Approval Gypsum ceiling Design
0
31-Aug-21*
0
4
Approval Gypsum ceiling Design,
05B1219090
Approval LPS3 Design
0
25-Sep-21*
0
12
Approval LPS3 Design,
05B1219100
Approval Low Volatage Design
0
25-Sep-21*
0
12
Approval Low Volatage Design,
05B1219110
Approval MSB Design
0
25-Sep-21*
0
12
Approval MSB Design,
05B1219120
Approval BMS Design
0
15-Sep-21*
0
8
05B1219130
Approval Fire Fighting System Design
0
30-Sep-21*
0
12
05B1219140
Approval Land Scape Design
0
15-Oct-21*
0
4
0
30 15-Oct-21
0
25-Sep-21*
0
12
14-Nov-21
25-Oct-21
30
0
48
6
05B1223010
MAR & ITP for Low Volatage
0
25-Oct-21
0
6
05B1223020
MAR & ITP for MSB
0
25-Oct-21
0
6
05B1223030
MAR & ITP for BMS
0
15-Oct-21
0
6
05B1223040
MAR & ITP for Fire Fighting System
0
30-Oct-21
0
6
05B1223050
MAR & ITP for Land Scape
0
14-Nov-21
0
6
14-Nov-21, CP05-GWP-21JUL.B.1.7 MAR & ITP Remaining
MAR & ITP for LPS3,
MAR & ITP for Low Volatage,
MAR & ITP for MSB,
MAR & ITP for BMS,
MAR & ITP for Fire Fighting System,
MAR & ITP for Land Scape,
0
24-Oct-21
0
6
MAR & ITP for Elevator
0
25-Oct-21*
0
6
MAR & ITP for Elevator,
30-Oct-21
30
12
05B1219010
Appoval Variation Request (VR) for Civil Part
0
30-Sep-21*
0
4
05B1219020
Appoval Variation Request (VR) for MEPF Part
0
30-Oct-21*
0
8
18-May-22
230
96
MEPF Part Procurement Procedure
05B1219150
Sanitary equipment
05B1219155
Equipment (Fan, Chiller, AHU,AC,...)
05B1219170
3 31-Oct-21
02-Nov-21
3
6
84 03-Nov-21
25-Jan-22
84
6
120 03-Nov-21
02-Mar-22
120
6
HVAC materials Group 1 (OCC, 4, 6, 7, 8-11, 17-19, 21A&B, 24, 23-27)
95 03-Nov-21
05-Feb-22
95
6
05B1219180
HVAC materials Group 2 (3, 5, 12, 13, 15, 20, 25, 28-29, 31B)
84 03-Dec-21
24-Feb-22
84
6
05B1219210
Elec Conduit, Cable tray Group 1
80 03-Nov-21
21-Jan-22
80
6
05B1219230
Elec Conduit, Cable tray Group 2
80 03-Dec-21
20-Feb-22
80
6
05B1219231
Plumb Group 1
40 31-Oct-21
09-Dec-21
40
6
05B1219232
Plumb Group 2
05B1219235
Elevator
05B1219240
40 10-Dec-21
18-Jan-22
40
6
120 03-Nov-21
02-Mar-22
120
6
Pump
90 03-Nov-21
31-Jan-22
90
6
05B1219250
MSB Procurement
84 03-Nov-21
25-Jan-22
84
6
05B1219260
LPS3 Procurement
150 03-Nov-21
01-Apr-22
150
6
05B1219270
Generator
150 31-Oct-21
29-Mar-22
150
6
05B1219280
Water tank
84 31-Oct-21
22-Jan-22
84
6
05B1219320
Fire Fighting system Equipment
200 31-Oct-21
18-May-22
200
6
05B1219330
Fire Fighting system Material
120 31-Oct-21
27-Feb-22
120
05B1219340
Fire rated cable
84 01-Oct-21*
23-Dec-21
84
201 01-Sep-21
20-Mar-22
201
40
CP05-GWP-21JUL.D SITE PREPARATION / CHUAN BI
Sep
Approval Land Scape Design,
MAR & ITP for DB (Distribution Box)
05B1219030
Aug
Approval DB (Distribution Box) Design,
05B1223070
230 01-Oct-21
CP05-GWP-21JUL.C PROCUREMENTS (More detail in the attachment of documents)
Jul
Approval Fire Fighting System Design,
05B1223060
30 30-Sep-21
Jun
Approval BMS Design,
MAR & ITP for DB (Distribution Box),
CP05-GWP-21JUL.B.4 VARIATION REQUEST (VR)
May
14-Nov-21, CP05-GWP-21JUL.B.1 DESIGN DRAWINGS / CAC BAN VE THIET KE
0
Approval DB (Distribution Box) Design
Apr
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
31-Dec-22, CP05-GWP-21J
15-Oct-21, CP05-GWP-21JUL.B.1.6 Design Remaining
Approval Aluminum Window Design,
Approval Door Design
05B1219160
Mar
Qtr 3, 2022
14-Nov-21, CP05-GWP-21JUL.B CONSTRUCTION DESIGN / THIET KE
05B1219050
CP05-GWP-21JUL.B.1.7 MAR & ITP Remaining
05B1219290
MAR & ITP for LPS3
Qtr 2, 2022
END CP05,
31-Dec-22
45 31-Aug-21
0
Sep
Qtr 1, 2022
5078
75 31-Aug-21
CP05-GWP-21JUL.B.1.6 Design Remaining
05B1219040
Approval Aluminum Window Design
Qtr 4, 2021
30-Oct-21, CP05-GWP-21JUL.B.4 VARIATION REQUEST (VR)
Appoval Variation Request (VR) for Civil Part,
Appoval Variation Request (VR) for MEPF Part,
18-May-22, CP05-GWP-21JUL.C PROCUREMENTS (More detail in the attachment of doc
MEPF Part Procurement Procedure
Sanitary equipment
Equipment (Fan, Chiller, AHU,AC,...)
HVAC materials Group 1 (OCC, 4, 6, 7, 8-11, 17-19, 21A&B, 24, 23-27)
HVAC materials Group 2 (3, 5, 12, 13, 15, 20, 25, 28-29, 31B)
Elec Conduit, Cable tray Group 1
Elec Conduit, Cable tray Group 2
Plumb Group 1
Plumb Group 2
Elevator
Pump
MSB Procurement
LPS3 Procurement
Generator
Water tank
Fire Fighting system Equipment
Fire Fighting system Material
Fire rated cable
20-Mar-22, CP05-GWP-21JUL.D SITE PREPARATION / CHUAN BI
C1000
Aluminum Window Fabrication
75 01-Sep-21
14-Nov-21
75
10
Aluminum Window Fabrication
C1010
Steel Door Fabrication
75 01-Sep-21
14-Nov-21
75
10
Steel Door Fabrication
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Page 1 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
C1030
HVAC materials, equipments Group 1 (Material Input Test)
21 06-Feb-22
26-Feb-22
21
4
C1040
HVAC materials, equipments Group 2 (Material Input Test)
21 25-Feb-22
17-Mar-22
21
4
C1050
Elec Conduit, Cable tray Group 1 (Material Input Test)
21 22-Jan-22
11-Feb-22
21
4
C1060
Elec Conduit, Cable tray Group 2 (Material Input Test)
21 21-Feb-22
13-Mar-22
21
4
C1070
Fire Fighting system (Material Input Test)
21 28-Feb-22
20-Mar-22
21
4
C1080
Plumbing (Material Input Test)
21 01-Feb-22
21-Feb-22
21
25-Nov-22
489
489 25-Jul-21
CP05-GWP-21JUL.E CONSTRUCTION / XAY LAP
05E1001000
Finish construction stage
0
CP05-GWP-21JUL.E.6 Building Group 1 (OCC, 4, 6, 7, 8-11, 17-19, 21A&B, 24, 23-27)
CP05-GWP-21JUL.E.6.4 Depot lower voltage general distribution network / Dien ha ap
05E2134100
Start LV work
352 25-Jul-21
01-Sep-22
11-Jul-22
216 26-Sep-21
0 26-Sep-21
30-Apr-22
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
Feb
Qtr 2, 2022
Mar
Apr
May
Qtr 3, 2022
Jun
Jul
Aug
Sep
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
HVAC materials, equipments Group 1 (Material Input Test)
HVAC materials, equipments Group 2 (Material Input Test)
Elec Conduit, Cable tray Group 1 (Material Input Test)
Elec Conduit, Cable tray Group 2 (Material Input Test)
Fire Fighting system (Material Input Test)
Plumbing (Material Input Test)
25-Nov-22, CP05-GWP-21JUL.E CON
4280
Finish construction stage,
0
1924
11-Jul-22, CP05-GWP-21JUL.E.6 Building Group 1 (OCC, 4, 6, 7, 8-11, 17-1
216
0
60
30-Apr-22, CP05-GWP-21JUL.E.6.4 Depot lower voltage general distribution network / Dien ha a
352
Start LV work, 26-Sep-21
05E2135000
Install MSB
60 26-Jan-22
26-Mar-22
60
15
05E2136000
Low voltage cable running
120 24-Dec-21
22-Apr-22
120
15
05E2136010
Connect Low voltage cable
7 23-Apr-22
30-Apr-22
7
15
05E2137000
Finish LV work
0
30-Apr-22
0
15
346 25-Jul-21
0
05-Jul-22
05-Jul-22
346
0
833
05-Jul-22, CP05-GWP-21JUL.E.6.5 Administrative Building - OCC (No. 1, 2, 14
Finish Buildings No.1,2,14,31A,
293 16-Sep-21
20 09-Jun-22
05-Jul-22
28-Jun-22
293
20
333
5
05-Jul-22, CP05-GWP-21JUL.E.6.5.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.6.5.4.1 Building OCC 1
CP05-GWP-21JUL.E.6.5.4.1.1 Electrical parts & equipments installation
05E1913000 Elec. Wiring, Cable tray, conduit (remain) (Tested continuity, insulation )
265 16-Sep-21
138 01-Dec-21
93 01-Dec-21
07-Jun-22
17-Apr-22
03-Mar-22
265
138
93
101
30
15
05E1914000 Cabinet, ECB installation, Lamps, sockets, switches installation
18 31-Mar-22
17-Apr-22
18
15
CP05-GWP-21JUL.E.6.5.4.1.5 Fire Fighting Systems
05E1914010 Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
79 21-Mar-22
18 21-Mar-22
07-Jun-22
07-Apr-22
79
18
41
8
05E1914020 Fire Fighting System: Installation of Steel pipes
10 08-Apr-22
17-Apr-22
10
8
05E1914030 Fire Fighting System : Foam fire fighting system
10 19-May-22
28-May-22
10
15
05E1914040 Fire Fighting System : Install Equipment
10 29-May-22
07-Jun-22
10
10
75 27-Feb-22
55 27-Feb-22
12-May-22
22-Apr-22
75
55
20
10
20 23-Apr-22
12-May-22
20
10
CP05-GWP-21JUL.E.6.5.4.1.3 Windows & Doors installation
05E1917000 Install doors and glass wall (remain)
10 16-Sep-21
10 16-Sep-21
25-Sep-21
25-Sep-21
10
10
5
5
CP05-GWP-21JUL.E.6.5.4.1.4 Plumbing & equipments installation
05E1922000 Install sanitary equipment
10 22-Feb-22
10 22-Feb-22
03-Mar-22
03-Mar-22
10
10
5
5
283 26-Sep-21
125 03-Mar-22
30 18-Apr-22
05-Jul-22
05-Jul-22
17-May-22
283
125
30
116
45
15
CP05-GWP-21JUL.E.6.5 Administrative Building - OCC (No. 1, 2, 14, 31A)
05E1748000
Finish Buildings No.1,2,14,31A
CP05-GWP-21JUL.E.6.5.4 Fit-out works / cong tac lap dat
05E1911000
Installl of aluminium shader
CP05-GWP-21JUL.E.6.5.4.1.2 HVAC & equipments installation
05E1915000 Install air ducts, PVC, copper, steel pipe (Check tighntess & pipe cleanse)
05E1916000 Instal HVAC equipments
CP05-GWP-21JUL.E.6.5.4.2 Buildings 2, 31A
CP05-GWP-21JUL.E.6.5.4.2.1 Electrical parts & equipments installation
05E1925000 Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
05E1926000 Lamps, sockets installation
20 16-Jun-22
05-Jul-22
20
15
05E1927000 Elevator installation (Including Test, Register)
70 03-Mar-22
11-May-22
70
15
61 18-Apr-22
20 18-Apr-22
17-Jun-22
07-May-22
61
20
41
8
05E2154810 Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
25 18-Apr-22
12-May-22
25
8
05E2155180 Fire Fighting System : Foam fire fighting system
5 29-May-22
03-Jun-22
5
15
10 08-Jun-22
17-Jun-22
10
10
112 27-Feb-22
80 27-Feb-22
18-Jun-22
17-May-22
112
80
20
10
20 30-May-22
18-Jun-22
20
10
CP05-GWP-21JUL.E.6.5.4.2.3 Windows & Doors installation
05E1930000 Install doors and glass wall (remain)
10 26-Sep-21
10 26-Sep-21
05-Oct-21
05-Oct-21
10
10
5
5
CP05-GWP-21JUL.E.6.5.4.2.4 Plumbing & equipments installation
05E1935000 Install sanitary equipment
15 17-Feb-22
15 17-Feb-22
03-Mar-22
03-Mar-22
15
15
5
5
CP05-GWP-21JUL.E.6.5.4.2.5 Fire Fighting Systems
05E2154800 Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
05E2155210 Fire Fighting System : Install Equipment
CP05-GWP-21JUL.E.6.5.4.2.2 HVAC & equipments installation
05E1928000 Install air ducts, PVC, copper, steel pipe (Check tighntess & pipe cleanse)
05E1929000 Installation of HVAC equipments
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Install MSB
Low voltage cable running
Connect Low voltage cable
Finish LV work,
Installl of aluminium shader
07-Jun-22, CP05-GWP-21JUL.E.6.5.4.1 Building OCC 1
17-Apr-22, CP05-GWP-21JUL.E.6.5.4.1.1 Electrical parts & equipments installation
Elec. Wiring, Cable tray, conduit (remain) (Tested continuity, insulation )
Cabinet, ECB installation, Lamps, sockets, switches installation
07-Jun-22, CP05-GWP-21JUL.E.6.5.4.1.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes
Fire Fighting System : Foam fire fighting system
Fire Fighting System : Install Equipment
12-May-22, CP05-GWP-21JUL.E.6.5.4.1.2 HVAC & equipments installation
Install air ducts, PVC, copper, steel pipe (Check tighntess & pipe cleanse)
Instal HVAC equipments
25-Sep-21, CP05-GWP-21JUL.E.6.5.4.1.3 Windows & Doors installation
Install doors and glass wall (remain)
03-Mar-22, CP05-GWP-21JUL.E.6.5.4.1.4 Plumbing & equipments installation
Install sanitary equipment
05-Jul-22, CP05-GWP-21JUL.E.6.5.4.2 Buildings 2, 31A
05-Jul-22, CP05-GWP-21JUL.E.6.5.4.2.1 Electrical parts & equipments install
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
Lamps, sockets installation
Elevator installation (Including Test, Register)
17-Jun-22, CP05-GWP-21JUL.E.6.5.4.2.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Foam fire fighting system
Fire Fighting System : Install Equipment
18-Jun-22, CP05-GWP-21JUL.E.6.5.4.2.2 HVAC & equipments installation
Install air ducts, PVC, copper, steel pipe (Check tighntess & pipe cleanse)
Installation of HVAC equipments
05-Oct-21, CP05-GWP-21JUL.E.6.5.4.2.3 Windows & Doors installation
Install doors and glass wall (remain)
03-Mar-22, CP05-GWP-21JUL.E.6.5.4.2.4 Plumbing & equipments installation
Install sanitary equipment
Page 2 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
287 16-Sep-21
158 01-Dec-21
87 01-Dec-21
29-Jun-22
07-May-22
25-Feb-22
287
158
87
111
30
15
20 18-Apr-22
07-May-22
20
15
101 21-Mar-22
10 21-Mar-22
29-Jun-22
30-Mar-22
101
10
41
8
05E2154830 Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
15 31-Mar-22
14-Apr-22
15
8
05E2155190 Fire Fighting System : Foam fire fighting system
5 03-Jun-22
08-Jun-22
5
15
12 17-Jun-22
29-Jun-22
12
10
40 27-Feb-22
25 27-Feb-22
07-Apr-22
23-Mar-22
40
25
20
10
15 24-Mar-22
07-Apr-22
15
10
39 16-Sep-21
5 06-Oct-21
24-Oct-21
10-Oct-21
39
5
15
5
5 16-Sep-21
20-Sep-21
5
5
24-Oct-21
14
5
23-Feb-22
23-Feb-22
2
2
5
5
333 25-Jul-21
238 25-Jul-21
14 25-Jul-21
22-Jun-22
19-Mar-22
07-Aug-21
333
238
14
CP05-GWP-21JUL.E.6.5.4.3 Building 14
CP05-GWP-21JUL.E.6.5.4.3.1 Electrical parts & equipments installation
05E1938000 Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
05E1939000 Lamps, sockets installation
CP05-GWP-21JUL.E.6.5.4.3.5 Fire Fighting Systems
05E2154820 Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
05E2155200 Fire Fighting System : Install Equipment
CP05-GWP-21JUL.E.6.5.4.3.2 HVAC & equipments installation
05E1940000 Install air ducts, PVC, copper, steel pipe (Check tighntess & pipe cleanse)
05E1941000 Installation of HVAC equipments
CP05-GWP-21JUL.E.6.5.4.3.3 Windows & Doors installation
05E1942000 Install doors and glass wall (remain)
05E1943000 Install windows (remain)
05E1944000 Instal glazing skylight
14 11-Oct-21
CP05-GWP-21JUL.E.6.5.4.3.4 Plumbing & equipments installation
05E1948000 Install sanitary equipment
CP05-GWP-21JUL.E.6.5.5 Finishes / Hoan thien
CP05-GWP-21JUL.E.6.5.5.1 Building OCC 1
05E1950000
Plaster ceiling
2 22-Feb-22
2 22-Feb-22
Qtr 4, 2021
Sep
Oct
Nov
Qtr 4, 2022 Qtr 1, 2023
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec Jan
29-Jun-22, CP05-GWP-21JUL.E.6.5.4.3 Building 14
07-May-22, CP05-GWP-21JUL.E.6.5.4.3.1 Electrical parts & equipments installation
Qtr 1, 2022
Dec
Jan
Feb
Qtr 2, 2022
Mar
Apr
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
Lamps, sockets installation
29-Jun-22, CP05-GWP-21JUL.E.6.5.4.3.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Foam fire fighting system
Fire Fighting System : Install Equipment
07-Apr-22, CP05-GWP-21JUL.E.6.5.4.3.2 HVAC & equipments installation
Install air ducts, PVC, copper, steel pipe (Check tighntess & pipe cleanse)
Installation of HVAC equipments
24-Oct-21, CP05-GWP-21JUL.E.6.5.4.3.3 Windows & Doors installation
Install doors and glass wall (remain)
Install windows (remain)
Instal glazing skylight
23-Feb-22, CP05-GWP-21JUL.E.6.5.4.3.4 Plumbing & equipments installation
Install sanitary equipment
22-Jun-22, CP05-GWP-21JUL.E.6.5.5 Finishes / Hoan thien
19-Mar-22, CP05-GWP-21JUL.E.6.5.5.1 Building OCC 1
500
195
10 Plaster ceiling
05E1952000
Plaster column, vertical strip
24 25-Jul-21
17-Aug-21
24
05E1955000
Instal glazing skylight
14 25-Jul-21
07-Aug-21
14
05E1956000
Tiling of anti-kidding 250x250 floor tile
2 25-Jul-21
26-Jul-21
2
05E1959000
Gypsum ceiling
60 01-Sep-21
30-Oct-21
60
10 of anti-kidding 250x250 floor tile
Tiling
15
Gypsum ceiling
05E1960000
Gypsum drywall
15 31-Oct-21
05E1961000
Install MDF wall for WC
10
05E1962000
Plaster column, vertical strip
5 Instal glazing skylight
14-Nov-21
15
15
5 01-Sep-21
05-Sep-21
5
10
Exterior Plaster with ventonite
30 15-Nov-21
14-Dec-21
30
15
05E1963000
Painting of plastered indoor wall
12 04-Mar-22
15-Mar-22
12
15
05E1964000
Painting of plastered outdoor wall
4 16-Mar-22
19-Mar-22
4
20
05E1965000
Granite tiling the steps of stair
5 25-Jul-21
29-Jul-21
5
05E1966000
Instal metal false floor
70 01-Sep-21
09-Nov-21
70
10
Granite tiling the steps of stair
5
Instal metal false floor
05E1967000
Install inox handrail for staircase
3 10-Nov-21
12-Nov-21
3
5
Install inox handrail for staircase
05E1968000
Lining concrete of three-steps entrance
1 10-Nov-21
10-Nov-21
1
5
Lining concrete of three-steps entrance
05E1969000
Brick work of three-steps entrance
3 11-Nov-21
13-Nov-21
3
5
05E1970000
Ground grading with surface cement finishing, M50
1 14-Nov-21
14-Nov-21
1
15
Ground grading with surface cement finishing, M50
05E1971000
Ground grading with surface cement finishing, M75
1 15-Nov-21
15-Nov-21
1
15
Ground grading with surface cement finishing, M75
05E1972000
Granite tiling the entrance steps
3 16-Nov-21
18-Nov-21
3
10
333 25-Jul-21
5 25-May-22
22-Jun-22
29-May-22
333
5
175
10
11 25-Jul-21
04-Aug-21
11
2
CP05-GWP-21JUL.E.6.5.5.2 Buildings 2, 31A
05E1973000
Paint epoxy onto floor
Gypsum drywall
Install MDF wall for WC
Exterior Plaster with ventonite
Painting of plastered indoor wall
Painting of plastered outdoor wall
Brick work of three-steps entrance
Granite tiling the entrance steps
22-Jun-22, CP05-GWP-21JUL.E.6.5.5.2 Buildings 2, 31A
Paint epoxy onto floor
05E1974000
Plaster ceiling
05E1976000
Plaster column, vertical strip
2 25-Jul-21
26-Jul-21
05E1979000
Tiling of anti-kidding 250x250 floor tile
5 25-Jul-21
29-Jul-21
5
05E1982000
Gypsum ceiling
30 07-Oct-21
05-Nov-21
30
10
Tiling of anti-kidding 250x250 floor tile
15
Gypsum ceiling
05E1983000
Gypsum drywall
16 06-Nov-21
21-Nov-21
16
15
Gypsum drywall
05E1984000
Install removable partition
1 06-Nov-21
06-Nov-21
1
5
Install removable partition
05E1985000
Install glass wall
20 06-Nov-21
25-Nov-21
20
5
Install glass wall
05E1986000
Install MDF wall for WC
5 26-Nov-21
30-Nov-21
5
5
05E1987000
Exterior Plaster with ventonite
30 01-Dec-21
30-Dec-21
30
10
05E1988000
Painting of plastered indoor wall
15 25-May-22
08-Jun-22
15
10
05E1989000
Painting of plastered outdoor wall
9 31-May-22
08-Jun-22
9
15
05E1990000
Granite tiling outside of elevator
15 12-May-22
26-May-22
15
10
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Qtr 3, 2022
10Plaster ceiling
10
Plaster column, vertical strip
Install MDF wall for WC
Exterior Plaster with ventonite
Painting of plastered indoor wall
Painting of plastered outdoor wall
Granite tiling outside of elevator
Page 3 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
Feb
Qtr 2, 2022
Mar
Apr
May
Qtr 3, 2022
Jun
Jul
Aug
Sep
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
05E1991000
Granite tiling the steps of stair
10 25-Jul-21
03-Aug-21
10
05E1992000
Install inox handrail for staircase
10 04-Aug-21
13-Aug-21
10
05E1993000
Lining concrete of three-steps entrance
1 09-Jun-22
09-Jun-22
1
5
05E1994000
Brick work of three-steps entrance
4 10-Jun-22
13-Jun-22
4
5
05E1995000
Ground grading with surface cement finishing, M50
2 14-Jun-22
15-Jun-22
2
10
Ground grading with surface cement finishing, M50
05E1996000
Ground grading with surface cement finishing, M75
1 16-Jun-22
16-Jun-22
1
10
Ground grading with surface cement finishing, M75
05E1997000
Granite tiling the entrance steps
6 17-Jun-22
22-Jun-22
6
5
13-Mar-22
25-Jul-21
232
1
232 25-Jul-21
1 25-Jul-21
CP05-GWP-21JUL.E.6.5.5.3 Building 14
05E1998000
Plastering ceiling
5Granite tiling the steps of stair
5 Install inox handrail for staircase
Lining concrete of three-steps entrance
Brick work of three-steps entrance
Granite tiling the entrance steps
13-Mar-22, CP05-GWP-21JUL.E.6.5.5.3 Building 14
130
10
Plastering
ceiling
05E2000000
Plaster column, vertical strip
5 25-Jul-21
29-Jul-21
5
05E2003000
Tiling of anti-kidding 250x250 floor tile
2 25-Jul-21
26-Jul-21
2
05E2006000
Gypsum ceiling
32 31-Oct-21
01-Dec-21
32
10
05E2007000
Gypsum drywall
8 02-Dec-21
09-Dec-21
8
10
05E2008000
Install MDF wall for WC
5 02-Dec-21
06-Dec-21
5
5
05E2009000
Exterior Plaster with ventonite
33 10-Dec-21
11-Jan-22
33
10
05E2010000
Painting of plastered indoor wall
6 26-Feb-22
03-Mar-22
6
10
Painting of plastered indoor wall
05E2012000
Painting of plastered outdoor wall
2 04-Mar-22
05-Mar-22
2
15
Painting of plastered outdoor wall
05E2013000
Lining concrete of three-steps entrance
1 06-Mar-22
06-Mar-22
1
5
Lining concrete of three-steps entrance
05E2014000
Brick work of three-steps entrance
2 07-Mar-22
08-Mar-22
2
5
Brick work of three-steps entrance
05E2015000
Ground grading with surface cement finishing, M50
1 09-Mar-22
09-Mar-22
1
15
Ground grading with surface cement finishing, M50
05E2016000
Ground grading with surface cement finishing, M75
1 10-Mar-22
10-Mar-22
1
15
Ground grading with surface cement finishing, M75
05E2017000
Granite tiling the entrance steps
3 11-Mar-22
13-Mar-22
3
5
Granite tiling the entrance steps
112 15-Mar-22
0
05-Jul-22
15-Mar-22
112
0
0
05-Jul-22, CP05-GWP-21JUL.E.6.5.6 TAW to/from other CP / Ban giao tam ch
TAW05 - CP05/CP06 - Building OCC Room 1.4,
CP05-GWP-21JUL.E.6.5.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD05O02
TAW05 - CP05/CP06 - Building OCC Room 1.4
10
Plaster column, vertical strip
5 of anti-kidding 250x250 floor tile
Tiling
Gypsum ceiling
Gypsum drywall
Install MDF wall for WC
Exterior Plaster with ventonite
05EKD05O22
TAW05 - CP05/CP06 - Building OCC Room 2.3
0
15-Mar-22
0
TAW05 - CP05/CP06 - Building OCC Room 2.3,
05EKD05O32
TAW05 - CP05/CP06 - Building OCC Room 1.6
0
15-Mar-22
0
TAW05 - CP05/CP06 - Building OCC Room 1.6,
05EKD05O42
TAW05 - CP05/CP06 - Building OCC Room 2.4
0
15-Mar-22
0
TAW05 - CP05/CP06 - Building OCC Room 2.4,
05EKD05O52
TAW05 - CP05/CP06 - Building OCC Room 1.3
0
15-Mar-22
0
TAW05 - CP05/CP06 - Building OCC Room 1.3,
05EKD05O62
TAW05 - CP05/CP06 - Building OCC Room other areas
0
05-Jul-22
0
TAW05 - CP05/CP06 - Building OCC Room other areas,
295 25-Jul-21
0
15-May-22
15-May-22
295
0
141
214 21-Sep-21
25 21-Sep-21
5 11-Oct-21
22-Apr-22
15-Oct-21
15-Oct-21
214
25
5
95
10
5
5 21-Sep-21
25-Sep-21
5
5
135 01-Dec-21
111 01-Dec-21
14-Apr-22
21-Mar-22
135
111
24
12
15 31-Mar-22
14-Apr-22
15
12
33 21-Mar-22
15 21-Mar-22
22-Apr-22
04-Apr-22
33
15
26
8
05E2154850
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 05-Apr-22
14-Apr-22
10
8
05E2155220
Fire Fighting System : Install Equipment
8 15-Apr-22
22-Apr-22
8
10
35 27-Feb-22
25 27-Feb-22
02-Apr-22
23-Mar-22
35
25
20
10
10 24-Mar-22
02-Apr-22
10
10
33 01-Feb-22
4 08-Feb-22
05-Mar-22
11-Feb-22
33
4
15
5
7 01-Feb-22
07-Feb-22
7
5
10 24-Feb-22
05-Mar-22
10
15-May-22
08-Aug-21
295
15
10-Aug-21
1
CP05-GWP-21JUL.E.6.7 Works Train Workshop (No.4)
05E1003000
Finish Building No.4
CP05-GWP-21JUL.E.6.7.4 Fit-out works / Cac cong tac lap dat
CP05-GWP-21JUL.E.6.7.4.1 Windows & Doors
05E1061000
Doors installation
05E1062000
Windows installation
CP05-GWP-21JUL.E.6.7.4.2 Electrical parts & equipments installation
05E1064000
Wiring & install ECB, electrical box (Tested continuity, insulation )
05E1065000
Install Lights, sockets, switches
CP05-GWP-21JUL.E.6.7.4.5 Fire Fighting Systems
05E2154840
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
CP05-GWP-21JUL.E.6.7.4.3 HVAC & equipments installation
05E1066000
Install air ducts, PVC, copper, steel pipe (Check tighntess & pipe cleanse)
05E1067000
Installation of HVAC equipment
CP05-GWP-21JUL.E.6.7.4.4 Plumbing & equipments installation
05E1071000
Industrial sewage
05E1072000
Pump
05E1073000
Install sanitary equipment
295 25-Jul-21
15 25-Jul-21
CP05-GWP-21JUL.E.6.7.5 Finishes works / Hoan thien
05E1084000
Gypsum ceiling installation
05E1085000
Fabricatrion+excution of staircase handrail
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
1 09-Aug-21
15-May-22, CP05-GWP-21JUL.E.6.7 Works Train Workshop (No.4)
Finish Building No.4,
22-Apr-22, CP05-GWP-21JUL.E.6.7.4 Fit-out works / Cac cong tac lap dat
15-Oct-21, CP05-GWP-21JUL.E.6.7.4.1 Windows & Doors
Doors installation
Windows installation
5
46
5 Gypsum ceiling installation
3 Fabricatrion+excution of staircase handrail
14-Apr-22, CP05-GWP-21JUL.E.6.7.4.2 Electrical parts & equipments installation
Wiring & install ECB, electrical box (Tested continuity, insulation )
Install Lights, sockets, switches
22-Apr-22, CP05-GWP-21JUL.E.6.7.4.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
02-Apr-22, CP05-GWP-21JUL.E.6.7.4.3 HVAC & equipments installation
Install air ducts, PVC, copper, steel pipe (Check tighntess & pipe cleanse)
Installation of HVAC equipment
05-Mar-22, CP05-GWP-21JUL.E.6.7.4.4 Plumbing & equipments installation
Industrial sewage
Pump
Install sanitary equipment
15-May-22, CP05-GWP-21JUL.E.6.7.5 Finishes works / Hoan thien
Page 4 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
Qtr 4, 2021
Sep
Oct
Nov
Dec
Jan
Feb
Qtr 2, 2022
Mar
Apr
May
Qtr 3, 2022
Jun
Jul
Aug
Sep
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
05E1085010
Instal false floor
8 10-Nov-21
17-Nov-21
8
05E1086000
80x40 wooden staircase handrail
1 10-Aug-21
11-Aug-21
1
05E1087000
Granite
1 11-Aug-21
12-Aug-21
1
05E1088000
Painting of unplastered indoor wall
20 22-Mar-22
10-Apr-22
20
5
05E1089000
Painting of unplastered outdoor wall
9 11-Apr-22
19-Apr-22
9
5
05E1090000
Stell slab sheet axis
9 25-Apr-22
03-May-22
9
5
05E1091000
Epoxy paint
5 11-May-22
15-May-22
5
5
0 04-Apr-22
0
04-Apr-22
04-Apr-22
0
0
0
191 01-Dec-21
0
09-Jun-22
09-Jun-22
191
0
87
09-Jun-22, CP05-GWP-21JUL.E.6.1 Stabling Area (No.6)
Finish Building No.6,
191 01-Dec-21
191 01-Dec-21
171 01-Dec-21
09-Jun-22
09-Jun-22
20-May-22
191
191
171
87
46
23
09-Jun-22, CP05-GWP-21JUL.E.6.1.4 Fit-out works / Cac cong tac lap dat
09-Jun-22, CP05-GWP-21JUL.E.6.1.4.1 Electrical parts & equipments installation
20 21-May-22
09-Jun-22
20
23
62 21-Mar-22
25 21-Mar-22
21-May-22
14-Apr-22
62
25
26
8
05E2154870
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
25 15-Apr-22
09-May-22
25
8
05E2155230
Fire Fighting System : Install Equipment
12 10-May-22
21-May-22
12
10
90 02-Jan-22
4 02-Jan-22
01-Apr-22
05-Jan-22
90
4
15
5
CP05-GWP-21JUL.E.6.7.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD08O01
TAW08 - CP05/CP06 - Building No.04
CP05-GWP-21JUL.E.6.1 Stabling Area (No.6)
05E1098000
Finish Building No.6
CP05-GWP-21JUL.E.6.1.4 Fit-out works / Cac cong tac lap dat
CP05-GWP-21JUL.E.6.1.4.1 Electrical parts & equipments installation
05E1122000
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
05E1123000
Lamps, sockets installation
CP05-GWP-21JUL.E.6.1.4.3 Fire Fighting Systems
05E2154860
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
CP05-GWP-21JUL.E.6.1.4.2 Plumbing & equipments installation
05E1124000
Water supply
10
Qtr 1, 2022
5 80x40 wooden staircase handrail
3 Granite
05E1125000
Sewage
35 08-Feb-22
14-Mar-22
35
5
05E1126000
Industrial drainage
18 15-Mar-22
01-Apr-22
18
5
285 25-Jul-21
0
05-May-22
05-May-22
285
0
152
210 05-Oct-21
19 05-Oct-21
5 19-Oct-21
02-May-22
23-Oct-21
23-Oct-21
210
19
5
96
10
5
CP05-GWP-21JUL.E.6.3 Pit Wheel Lathe Building (area No 7)
05E1134000
Finish Building No.7
CP05-GWP-21JUL.E.6.3.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.6.3.4.1 Windows & Doors installation
05E1169000
Install doors
05E1170000
Install windows
Instal false floor
Painting of unplastered indoor wall
Painting of unplastered outdoor wall
Stell slab sheet axis
Epoxy paint
04-Apr-22, CP05-GWP-21JUL.E.6.7.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
TAW08 - CP05/CP06 - Building No.04,
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
Lamps, sockets installation
21-May-22, CP05-GWP-21JUL.E.6.1.4.3 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
01-Apr-22, CP05-GWP-21JUL.E.6.1.4.2 Plumbing & equipments installation
Water supply
Sewage
Industrial drainage
05-May-22, CP05-GWP-21JUL.E.6.3 Pit Wheel Lathe Building (area No 7)
Finish Building No.7,
02-May-22, CP05-GWP-21JUL.E.6.3.4 Fit-out works / cong tac lap dat
23-Oct-21, CP05-GWP-21JUL.E.6.3.4.1 Windows & Doors installation
Install doors
5 05-Oct-21
09-Oct-21
5
5
143 01-Dec-21
128 01-Dec-21
22-Apr-22
07-Apr-22
143
128
30
15
15 08-Apr-22
22-Apr-22
15
15
37 21-Mar-22
15 21-Mar-22
26-Apr-22
04-Apr-22
37
15
26
8
05E2154890
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 05-Apr-22
14-Apr-22
10
8
05E2155240
Fire Fighting System : Install Equipment
12 15-Apr-22
26-Apr-22
12
10
CP05-GWP-21JUL.E.6.3.4.3 HVAC & equipments installation
05E1174000
Installation HAVC equipments
10 23-Apr-22
10 23-Apr-22
02-May-22
02-May-22
10
10
10
10
CP05-GWP-21JUL.E.6.3.4.4 Plumbing & equipments installation
05E1175000
Install sleeve for sewage
16 07-Apr-22
5 07-Apr-22
22-Apr-22
11-Apr-22
16
5
20
5
Install sleeve for sewage
CP05-GWP-21JUL.E.6.3.4.2 Electrical parts & equipments installation
05E1172000
Wiring & install electrical box, ECB (Tested continuity, insulation )
05E1173000
Install lights, sockets, switches
CP05-GWP-21JUL.E.6.3.4.5 Fire Fighting Systems
05E2154880
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Install windows
22-Apr-22, CP05-GWP-21JUL.E.6.3.4.2 Electrical parts & equipments installation
Wiring & install electrical box, ECB (Tested continuity, insulation )
Install lights, sockets, switches
26-Apr-22, CP05-GWP-21JUL.E.6.3.4.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
02-May-22, CP05-GWP-21JUL.E.6.3.4.3 HVAC & equipments installation
Installation HAVC equipments
22-Apr-22, CP05-GWP-21JUL.E.6.3.4.4 Plumbing & equipments installation
05E1176000
Install sewage system
3 12-Apr-22
14-Apr-22
3
5
Install sewage system
05E1177000
Plumbing work for Supply water
3 15-Apr-22
17-Apr-22
3
5
Plumbing work for Supply water
05E1178000
Install sanitary equipment
5 18-Apr-22
22-Apr-22
5
5
CP05-GWP-21JUL.E.6.3.5 Finishes works / cong tac hoan thien
05E1182000
Ground grading for floor
285 25-Jul-21
1 25-Jul-21
05-May-22
25-Jul-21
285
1
Install sanitary equipment
05-May-22, CP05-GWP-21JUL.E.6.3.5 Finishes works / cong tac hoan thien
56
10
Ground
grading for floor
05E1183000
Floor tiling for WC
1 26-Jul-21
26-Jul-21
1
05E1184000
Floor tiling 500x500
1 27-Jul-21
27-Jul-21
1
05E1185000
Ceremic tiling to wall wall, column, tile 400x400mm
4 28-Jul-21
31-Jul-21
4
05E1186000
Handrail made of steel D60
1 01-Aug-21
01-Aug-21
1
05E1187000
Indoor wall painting
7 16-Apr-22
22-Apr-22
7
10
05E1188000
Outdoor wall painting
4 23-Apr-22
26-Apr-22
4
10
Outdoor wall painting
05E1189000
Painting of ground
9 27-Apr-22
05-May-22
9
10
Painting of ground
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
3 tiling for WC
Floor
5 tiling 500x500
Floor
5
Ceremic tiling to wall wall, column, tile 400x400mm
3Handrail made of steel D60
Indoor wall painting
Page 5 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
CP05-GWP-21JUL.E.6.3.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD09O02
TAW09 - CP05/CP06 - Building No.7
CP05-GWP-21JUL.E.6.8 Light, Heavy & Bogie Overhaul Maintenance Workshop (No. 8, 9, 10, 11)
05E1195000
Finish Buildings No.8,9,10,11
CP05-GWP-21JUL.E.6.8.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.6.8.4.1 Windows & Doors installation
05E1234000
Install door
05E1234010
Install Window
CP05-GWP-21JUL.E.6.8.4.2 Electrical parts & equipments installation
05E1235000
Wiring & install electrical box, ECB (Tested continuity, insulation )
05E1236000
Install lights, sockets, switches
0 22-Apr-22
0
Finish
22-Apr-22
22-Apr-22
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
0
0
0
275 10-Oct-21
0
11-Jul-22
11-Jul-22
275
0
144
275 10-Oct-21
31 10-Oct-21
17 24-Oct-21
11-Jul-22
09-Nov-21
09-Nov-21
275
31
17
114
10
5
11 10-Oct-21
21-Oct-21
11
5
223 01-Dec-21
163 01-Dec-21
11-Jul-22
12-May-22
223
163
48
24
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
Feb
Qtr 4, 2022 Qtr 1, 2023
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec Jan
22-Apr-22, CP05-GWP-21JUL.E.6.3.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
TAW09 - CP05/CP06 - Building No.7,
Qtr 2, 2022
Mar
Qtr 3, 2022
11-Jul-22, CP05-GWP-21JUL.E.6.8 Light, Heavy & Bogie Overhaul Mainten
Finish Buildings No.8,9,10,11,
11-Jul-22, CP05-GWP-21JUL.E.6.8.4 Fit-out works / cong tac lap dat
09-Nov-21, CP05-GWP-21JUL.E.6.8.4.1 Windows & Doors installation
Install door
Install Window
11-Jul-22, CP05-GWP-21JUL.E.6.8.4.2 Electrical parts & equipments installa
Wiring & install electrical box, ECB (Tested continuity, insulation )
30 12-Jun-22
11-Jul-22
30
24
86 21-Mar-22
45 21-Mar-22
14-Jun-22
04-May-22
86
45
26
8
05E2154910
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
70 21-Mar-22
29-May-22
70
8
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
05E2155250
Fire Fighting System : Install Equipment
16 30-May-22
14-Jun-22
16
10
128 27-Feb-22
70 27-Feb-22
04-Jul-22
07-May-22
128
70
20
10
Fire Fighting System : Install Equipment
04-Jul-22, CP05-GWP-21JUL.E.6.8.4.3 HVAC & equipments installation
CP05-GWP-21JUL.E.6.8.4.5 Fire Fighting Systems
05E2154900
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
CP05-GWP-21JUL.E.6.8.4.3 HVAC & equipments installation
05E1237000
Installation of air duct (Check tighntess & pipe cleanse)
05E1238000
Installation of HVAC equipment
CP05-GWP-21JUL.E.6.8.4.4 Plumbing & equipments installation
05E1241000
Plumbing work for Supply water Remain
05E1243000
Install sanitary equipment
CP05-GWP-21JUL.E.6.8.5 Finishes works / hoan thien
05E1249000
Painting of indoor wall
05E1250000
Painting of outdoor wall
CP05-GWP-21JUL.E.6.8.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD09I03
TAW09 - CP05/CP06 - Building No.8-11 OCC/SCADA/TEL
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Installation of air duct (Check tighntess & pipe cleanse)
35 31-May-22
04-Jul-22
35
10
60 18-Apr-22
12 18-Apr-22
16-Jun-22
29-Apr-22
60
12
10
5
20 28-May-22
16-Jun-22
20
5
17 13-May-22
15 13-May-22
29-May-22
27-May-22
17
15
30
15
15 15-May-22
29-May-22
15
15
0
0
0
Painting of outdoor wall
11-Jul-22, CP05-GWP-21JUL.E.6.8.6 TAW to/from other CP / Ban giao tam c
TAW09 - CP05/CP06 - Building No.8-11 OCC/SCADA/TEL,
14-May-22
14-May-22
294
0
229
14-May-22, CP05-GWP-21JUL.E.6.19 Wayside Equip. Maintenance Workshop and Gener
Finish Buildings No.17,19,
165 01-Dec-21
45 03-Dec-21
30 18-Dec-21
14-May-22
16-Jan-22
16-Jan-22
165
45
30
115
24
7
0 11-Jul-22
0
294 25-Jul-21
CP05-GWP-21JUL.E.6.19 Wayside Equip. Maintenance Workshop and General Material Store (No. 17, 19)
05E1570000
Finish Buildings No.17,19
0
CP05-GWP-21JUL.E.6.19.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.6.19.4.1 Windows & Doors installation
05E1612000
Glass aluminium door
Install lights, sockets, switches
14-Jun-22, CP05-GWP-21JUL.E.6.8.4.5 Fire Fighting Systems
11-Jul-22
11-Jul-22
Installation of HVAC equipment
16-Jun-22, CP05-GWP-21JUL.E.6.8.4.4 Plumbing & equipments installation
Plumbing work for Supply water Remain
Install sanitary equipment
29-May-22, CP05-GWP-21JUL.E.6.8.5 Finishes works / hoan thien
Painting of indoor wall
14-May-22, CP05-GWP-21JUL.E.6.19.4 Fit-out works / cong tac lap dat
16-Jan-22, CP05-GWP-21JUL.E.6.19.4.1 Windows & Doors installation
Glass aluminium door
05E1613000
Glass aluminium window
6 03-Dec-21
08-Dec-21
6
7
Glass aluminium window
05E1614000
Glass aluminium wall
7 09-Dec-21
15-Dec-21
7
7
Glass aluminium wall
05E1615000
Door lock
2 16-Dec-21
17-Dec-21
2
3
Door lock
159 01-Dec-21
133 01-Dec-21
08-May-22
12-Apr-22
159
133
30
15
16 23-Apr-22
08-May-22
16
15
42 21-Mar-22
25 21-Mar-22
01-May-22
14-Apr-22
42
25
26
8
CP05-GWP-21JUL.E.6.19.4.2 Electrical parts & equipments installation
05E1616000
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
05E1617000
Lamps, sockets installation
CP05-GWP-21JUL.E.6.19.4.5 Fire Fighting Systems
05E2154920
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
08-May-22, CP05-GWP-21JUL.E.6.19.4.2 Electrical parts & equipments installation
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
Lamps, sockets installation
01-May-22, CP05-GWP-21JUL.E.6.19.4.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
05E2154930
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
30 21-Mar-22
19-Apr-22
30
8
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
05E2155260
Fire Fighting System : Install Equipment
12 20-Apr-22
01-May-22
12
10
77 27-Feb-22
60 27-Feb-22
14-May-22
27-Apr-22
77
60
20
10
Fire Fighting System : Install Equipment
14-May-22, CP05-GWP-21JUL.E.6.19.4.3 HVAC & equipments installation
35 10-Apr-22
14-May-22
35
10
43 27-Feb-22
7 27-Feb-22
10-Apr-22
05-Mar-22
43
7
15
5
CP05-GWP-21JUL.E.6.19.4.3 HVAC & equipments installation
05E1618000
installation air duct (Check tighntess & pipe cleanse)
05E1619000
Installation of HVAC equipment
CP05-GWP-21JUL.E.6.19.4.4 Plumbing & equipments installation
05E1621000
Plumbing work for Supply water
05E1622000
Sewage
14 06-Mar-22
19-Mar-22
14
5
05E1623000
Install sanitary equipment
15 27-Mar-22
10-Apr-22
15
5
282 25-Jul-21
2 19-Aug-21
02-May-22
20-Aug-21
282
2
114
7
9 21-Aug-21
29-Aug-21
9
7
03-Aug-21
10
26-Aug-21
2
CP05-GWP-21JUL.E.6.19.5 Finishes works / hoan thien
05E1626000
Plaster column
05E1627000
Plaster column, vertical strip
05E1630000
Decor
05E1631000
Painting with waterproof glue
10 25-Jul-21
2 25-Aug-21
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
installation air duct (Check tighntess & pipe cleanse)
Installation of HVAC equipment
10-Apr-22, CP05-GWP-21JUL.E.6.19.4.4 Plumbing & equipments installation
Plumbing work for Supply water
Sewage
Install sanitary equipment
02-May-22, CP05-GWP-21JUL.E.6.19.5 Finishes works / hoan thien
Plaster column
Plaster column, vertical strip
5Decor
10
Painting with waterproof glue
Page 6 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
05E1632000
Handrail by INOX
05E1633000
Floor tiling with anti-skidding tile 250x250mm for WC
05E1634000
Ground grading, cement mortar M100, thk 0.3cm
05E1635000
Ceremic tiling to wall, column, tile 250x250mm
05E1636000
Finish
Remaining
Duration
Aug
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
Feb
Mar
Apr
May
Qtr 3, 2022
Jun
Jul
19-Dec-21
5 20-Dec-21
24-Dec-21
5
5
20 25-Dec-21
13-Jan-22
20
10
Ground grading, cement mortar M100, thk 0.3cm
15 07-Jan-22
21-Jan-22
15
7
Ceremic tiling to wall, column, tile 250x250mm
Floor tiling, tile 500x500mm
6 22-Jan-22
27-Jan-22
6
10
05E1637000
Ceremic tiling to wall, column, tile250x400mm
4 28-Jan-22
31-Jan-22
4
10
Ceremic tiling to wall, column, tile250x400mm
05E1638000
Making of ceiling with gypsum board
14 01-Feb-22
14-Feb-22
14
10
Making of ceiling with gypsum board
05E1639000
Painting of unplastered indoor wall, beam, ceiling, culumn , 1 linen, 2 covered layers
10 13-Apr-22
22-Apr-22
10
15
05E1640000
Painting of plastered outdoor wall, 1 linen, 2 covered layers
10 23-Apr-22
02-May-22
10
15
294 25-Jul-21
0
14-May-22
25-Jul-21
294
0
05EKD09O7
TAW09 - CP05/CP06 - Building 17-19
0
CP05-GWP-21JUL.E.6.18 Lighting & Power Substation (No. 21A)
05E1522000
Finish Building No.21A
CP05-GWP-21JUL.E.6.18.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.6.18.4.2 Electrical parts & equipments installation
05E1553000
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
05E1554000
Lamps, sockets installation
CP05-GWP-21JUL.E.6.18.4.4 Fire Fighting Systems
05E2154940
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
3
Qtr 2, 2022
2 18-Dec-21
CP05-GWP-21JUL.E.6.19.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD09O07
TAW09 - CP05/CP06 - Building 17-19
2
Manpower
Qtr 3, 2021
Aug
Sep
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
Handrail by INOX
Floor tiling with anti-skidding tile 250x250mm for WC
Floor tiling, tile 500x500mm
Painting of unplastered indoor wall, beam, ceiling, culumn , 1 linen, 2 covered layers
Painting of plastered outdoor wall, 1 linen, 2 covered layers
14-May-22, CP05-GWP-21JUL.E.6.19.6 TAW to/from other CP / Ban giao tam cho/tu CP kha
0
TAW09 - CP05/CP06 - Building 17-19,
TAW09 - CP05/CP06 - Building 17-19,
14-May-22
0
281 25-Jul-21
0
01-May-22
01-May-22
281
0
76
151 02-Dec-21
139 02-Dec-21
90 02-Dec-21
01-May-22
19-Apr-22
01-Mar-22
151
139
90
76
30
15
10 10-Apr-22
19-Apr-22
10
15
42 21-Mar-22
25 21-Mar-22
01-May-22
14-Apr-22
42
25
26
8
01-May-22, CP05-GWP-21JUL.E.6.18 Lighting & Power Substation (No. 21A)
Finish Building No.21A,
01-May-22, CP05-GWP-21JUL.E.6.18.4 Fit-out works / cong tac lap dat
19-Apr-22, CP05-GWP-21JUL.E.6.18.4.2 Electrical parts & equipments installation
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
Lamps, sockets installation
01-May-22, CP05-GWP-21JUL.E.6.18.4.4 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
05E2154950
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
30 21-Mar-22
19-Apr-22
30
8
05E2155270
Fire Fighting System : Install Equipment
12 20-Apr-22
01-May-22
12
10
25 27-Feb-22
15 09-Mar-22
23-Mar-22
23-Mar-22
25
15
20
10
20 27-Feb-22
18-Mar-22
20
10
45 25-Jul-21
0 08-Sep-21
08-Sep-21
45
0
0
25-Jul-21
0
272 25-Jul-21
0
22-Apr-22
22-Apr-22
272
0
76
22-Apr-22, CP05-GWP-21JUL.E.6.2 Lighting & Power Substation, Traction Rectifier Substation (No
Finish Buildings 21B,22,24,
143 01-Dec-21
143 01-Dec-21
123 01-Dec-21
22-Apr-22
22-Apr-22
02-Apr-22
143
143
123
76
30
15
22-Apr-22, CP05-GWP-21JUL.E.6.2.4 Fit-out works / cong tac lap dat
22-Apr-22, CP05-GWP-21JUL.E.6.2.4.3 Electrical parts & equipments installation
20 03-Apr-22
22-Apr-22
20
15
22 21-Mar-22
15 21-Mar-22
11-Apr-22
04-Apr-22
22
15
26
8
05E2154970
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 21-Mar-22
30-Mar-22
10
8
05E2155280
Fire Fighting System : Install Equipment
12 31-Mar-22
11-Apr-22
12
10
24 27-Feb-22
12 27-Feb-22
22-Mar-22
10-Mar-22
24
12
20
10
installation HAVC equipments
10 13-Mar-22
22-Mar-22
10
10
CP05-GWP-21JUL.E.6.2.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD07I01
TAW07 - CP06/CP05 - Building No.21B-22-24
45 25-Jul-21
0 08-Sep-21
08-Sep-21
45
0
0
25-Jul-21
0
261 25-Jul-21
0
11-Apr-22
11-Apr-22
261
0
126
132 01-Dec-21
128 01-Dec-21
101 01-Dec-21
11-Apr-22
07-Apr-22
11-Mar-22
132
128
101
71
30
15
20 19-Mar-22
07-Apr-22
20
15
22 21-Mar-22
15 21-Mar-22
11-Apr-22
04-Apr-22
22
15
26
8
CP05-GWP-21JUL.E.6.18.4.3 HVAC & equipments installation
05E1555000
Installation HAVC materilas
05E1556000
Installation of HVAC equipment (remain) (Check tighntess & pipe cleanse)
CP05-GWP-21JUL.E.6.18.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD07I03
TAW07 - CP06/CP05 - Building No.21A
05EKD07O03
TAW07 - CP05/CP06 - Building No.21A
0
CP05-GWP-21JUL.E.6.2 Lighting & Power Substation, Traction Rectifier Substation (No.21B, 22, 24)
05E1428000
Finish Buildings 21B,22,24
CP05-GWP-21JUL.E.6.2.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.6.2.4.3 Electrical parts & equipments installation
05E1462000
Wiring, installaltion of cabinet, aptomat (Tested continuity, insulation )
05E1463000
Lamps, sockets installation
CP05-GWP-21JUL.E.6.2.4.4 Fire Fighting Systems
05E2154960
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
CP05-GWP-21JUL.E.6.2.4.1 HVAC & equipments installation
05E1459001
installation air duct (Check tighntess & pipe cleanse)
05E1460000
05EKD07O01
TAW07 - CP05/CP06 - Building No.21B-22-24
CP05-GWP-21JUL.E.6.13 Signaling Equip. Room and Industrial Water Treatment Plant (No.23, 27)
05E1697000
Finish Buildings No. 23, 27
CP05-GWP-21JUL.E.6.13.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.6.13.4.2 Electrical parts & equipments installation
05E1729000
Wiring, installaltion of cabinet, aptomat (Tested continuity, insulation )
05E1730000
Lamps, sockets installation
CP05-GWP-21JUL.E.6.13.4.5 Fire Fighting Systems
05E2154980
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
0
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
23-Mar-22, CP05-GWP-21JUL.E.6.18.4.3 HVAC & equipments installation
Installation HAVC materilas
Installation of HVAC equipment (remain) (Check tighntess & pipe cleanse)
08-Sep-21, CP05-GWP-21JUL.E.6.18.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
TAW07 - CP06/CP05 - Building No.21A, 08-Sep-21
TAW07 - CP05/CP06 - Building No.21A,
Wiring, installaltion of cabinet, aptomat (Tested continuity, insulation )
Lamps, sockets installation
11-Apr-22, CP05-GWP-21JUL.E.6.2.4.4 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
22-Mar-22, CP05-GWP-21JUL.E.6.2.4.1 HVAC & equipments installation
installation air duct (Check tighntess & pipe cleanse)
installation HAVC equipments
08-Sep-21, CP05-GWP-21JUL.E.6.2.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
TAW07 - CP06/CP05 - Building No.21B-22-24, 08-Sep-21
TAW07 - CP05/CP06 - Building No.21B-22-24,
11-Apr-22, CP05-GWP-21JUL.E.6.13 Signaling Equip. Room and Industrial Water Treatment Plant (N
Finish Buildings No. 23, 27,
11-Apr-22, CP05-GWP-21JUL.E.6.13.4 Fit-out works / cong tac lap dat
07-Apr-22, CP05-GWP-21JUL.E.6.13.4.2 Electrical parts & equipments installation
Wiring, installaltion of cabinet, aptomat (Tested continuity, insulation )
Lamps, sockets installation
11-Apr-22, CP05-GWP-21JUL.E.6.13.4.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Page 7 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
05E2154990
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 21-Mar-22
30-Mar-22
10
8
05E2155290
Fire Fighting System : Install Equipment
12 31-Mar-22
11-Apr-22
12
10
7 27-Feb-22
7 27-Feb-22
05-Mar-22
05-Mar-22
7
7
10
10
10 15-Mar-22
10 15-Mar-22
24-Mar-22
24-Mar-22
10
10
5
5
07-Apr-22
26-Jul-21
257
2
CP05-GWP-21JUL.E.6.13.4.3 HVAC & equipments installation
05E1731000
Installation of HVAC equipment (Check tighntess & pipe cleanse)
CP05-GWP-21JUL.E.6.13.4.4 Plumbing & equipments installation
05E1732000
Sewage
257 25-Jul-21
2 25-Jul-21
CP05-GWP-21JUL.E.6.13.5 Finishes / Hoan thien
05E1739000
Paiting with waterproof glue
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
12 01-Sep-21
12-Sep-21
12
3 27-Jul-21
29-Jul-21
3
05E1741000
Roof insulation foam
2 25-Jul-21
26-Jul-21
2
Install False Floor
5
Ground
grading with surface cement finshing
5 insulation foam
Roof
05E1742000
Painting of plastered indoor wall
8 12-Mar-22
19-Mar-22
8
10
05E1743000
Painting of unplastered outdoor wall
7 01-Apr-22
07-Apr-22
7
10
05E1743010
Install False Floor
8 18-Nov-21
25-Nov-21
8
10
45 25-Jul-21
0 08-Sep-21
08-Sep-21
45
0
0
25-Jul-21
0
05EKD06I01
TAW06 - CP09/CP05 - Building No.23-27
0 08-Sep-21
05EKD06O01
TAW06 - CP05/CP09 - Building No.23-27
CP05-GWP-21JUL.E.5 Building Group 2 (3, 5, 12, 13, 15, 20, 25, 28-29, 31B)
CP05-GWP-21JUL.E.5.15 Car Park (No. 3)
05E2073000
Start Building No.3
05E2074000
Finish Building No.3
0
Painting of unplastered outdoor wall
TAW05 - CP05/CP06 - Building No.23-27,
TAW06 - CP09/CP05 - Building No.23-27, 08-Sep-21
TAW06 - CP05/CP09 - Building No.23-27,
09-Aug-22, CP05-GWP-21JUL.E.5 Building Group 2 (3, 5, 12, 13, 1
381
1895
280 25-Jul-21
0 25-Jul-21
30-Apr-22
280
0
30-Apr-22
0
Finish Building No.3,
25-Sep-21
14-Aug-21
63
21
55
3
25-Sep-21, CP05-GWP-21JUL.E.5.15.1 Structure Construction / Thi cong ket cau
Excavation of foundation
Transportation of waste soil
1 15-Aug-21
15-Aug-21
1
3
Transportation of waste soil
05E2077000
Foundation lining concrete #100
2 15-Aug-21
16-Aug-21
2
7
Foundation lining concrete #100
05E2078000
Rebar fabrication & installation of foundation
6 17-Aug-21
22-Aug-21
6
5
05E2079000
Foundation concrete
3 23-Aug-21
25-Aug-21
3
5
05E2080000
Backfill
3 26-Aug-21
28-Aug-21
3
3
05E2081000
Column concrete
10 29-Aug-21
07-Sep-21
10
5
05E2082000
Erection of steel frame
6 08-Sep-21
13-Sep-21
6
7
05E2083000
Erection of steel beam
6 14-Sep-21
19-Sep-21
6
7
05E2084000
Roofing
6 20-Sep-21
25-Sep-21
6
10
23 08-Apr-22
9 08-Apr-22
30-Apr-22
16-Apr-22
23
9
45
15
05E2086000
Wiring, install electrical box, ECB (Tested continuity, insulation )
7 17-Apr-22
23-Apr-22
7
15
05E2087000
Install light, switches
7 24-Apr-22
30-Apr-22
7
15
343 25-Jul-21
0
02-Jul-22
02-Jul-22
343
0
149
275 01-Oct-21
86 08-Apr-22
35 08-Apr-22
02-Jul-22
02-Jul-22
12-May-22
275
86
35
90
45
15
CP05-GWP-21JUL.E.5.10 Washing Machine Area & Tech. Room (No. 5)
05E1317000
Finish Building No.5
CP05-GWP-21JUL.E.5.10.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.5.10.4.1 Electrical & equipments installation / Lap dien
05E1340000
Install electrical conduit
30-Apr-22, CP05-GWP-21JUL.E.5.15 Car Park (No. 3)
100
Start Building No.3, 25-Jul-21
05E2076000
CP05-GWP-21JUL.E.5.15.2 Electric installation / Lap dien
05E2085000
Install electrical conduit
Sep
Install False Floor
08-Sep-21, CP05-GWP-21JUL.E.6.13.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
TAW05 - CP06/CP05 - Building No.23-27, 08-Sep-21
09-Aug-22
63 25-Jul-21
21 25-Jul-21
Aug
Painting of plastered indoor wall
381 25-Jul-21
0
CP05-GWP-21JUL.E.5.15.1 Structure Construction / Thi cong ket cau
05E2075000
Excavation of foundation
0
Jul
10
0
25-Jul-21
Jun
Sewage
07-Apr-22, CP05-GWP-21JUL.E.6.13.5 Finishes / Hoan thien
55
5
Paiting
with waterproof glue
Ground grading with surface cement finshing
0
May
Installation of HVAC equipment (Check tighntess & pipe cleanse)
24-Mar-22, CP05-GWP-21JUL.E.6.13.4.4 Plumbing & equipments installation
Install False Floor
TAW05 - CP05/CP06 - Building No.23-27
Apr
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
Fire Fighting System : Install Equipment
05-Mar-22, CP05-GWP-21JUL.E.6.13.4.3 HVAC & equipments installation
05E1740000
05EKD05O01
Mar
Qtr 3, 2022
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
05E1739010
CP05-GWP-21JUL.E.6.13.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD05I01
TAW05 - CP06/CP05 - Building No.23-27
Feb
Qtr 2, 2022
Rebar fabrication & installation of foundation
Foundation concrete
Backfill
Column concrete
Erection of steel frame
Erection of steel beam
Roofing
30-Apr-22, CP05-GWP-21JUL.E.5.15.2 Electric installation / Lap dien
Install electrical conduit
Wiring, install electrical box, ECB (Tested continuity, insulation )
Install light, switches
02-Jul-22, CP05-GWP-21JUL.E.5.10 Washing Machine Area & Tech. Room (N
Finish Building No.5,
02-Jul-22, CP05-GWP-21JUL.E.5.10.4 Fit-out works / cong tac lap dat
02-Jul-22, CP05-GWP-21JUL.E.5.10.4.1 Electrical & equipments installation / L
Install electrical conduit
05E1341000
Wiring, installaltion of cabinet, aptomat (Tested continuity, insulation )
10 13-May-22
22-May-22
10
15
Wiring, installaltion of cabinet, aptomat (Tested continuity, insulation )
05E1342000
Lamps, sockets installation
16 17-Jun-22
02-Jul-22
16
15
22 13-May-22
15 13-May-22
03-Jun-22
27-May-22
22
15
26
8
Lamps, sockets installation
03-Jun-22, CP05-GWP-21JUL.E.5.10.4.4 Fire Fighting Systems
05E2155010
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 13-May-22
22-May-22
10
8
05E2155300
Fire Fighting System : Install Equipment
12 23-May-22
03-Jun-22
12
10
18 01-Oct-21
2 17-Oct-21
18-Oct-21
18-Oct-21
18
2
14
7
4 01-Oct-21
04-Oct-21
4
7
CP05-GWP-21JUL.E.5.10.4.4 Fire Fighting Systems
05E2155000
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
CP05-GWP-21JUL.E.5.10.4.2 Doors & Windows installation / Lap cua
05E1343000
Steel door
05E1344000
Aluminium glass door
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
18-Oct-21, CP05-GWP-21JUL.E.5.10.4.2 Doors & Windows installation / Lap cua
Steel door
Aluminium glass door
Page 8 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
CP05-GWP-21JUL.E.5.10.4.3 Plumbing & equipments installation / cap thoat nuoc
05E1346000
Industrial sewage
CP05-GWP-21JUL.E.5.10.5 Finishes / Hoan thien
05E1348000
Plaster ceiling
05E1349000
Plaster indoor wall
05E1351000
Roof insulation foam
05E1352000
Finish
Remaining
Duration
5 02-Apr-22
5 02-Apr-22
06-Apr-22
06-Apr-22
5
5
343 25-Jul-21
9 25-Jul-21
02-Jul-22
02-Aug-21
343
9
Manpower
Qtr 3, 2021
Aug
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
Feb
Qtr 4, 2022 Qtr 1, 2023
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec Jan
06-Apr-22, CP05-GWP-21JUL.E.5.10.4.3 Plumbing & equipments installation / cap thoat nuoc
Qtr 2, 2022
Mar
5
5
Qtr 3, 2022
Industrial sewage
02-Jul-22, CP05-GWP-21JUL.E.5.10.5 Finishes / Hoan thien
59
5Plaster ceiling
7 13-May-22
19-May-22
7
7
25 23-May-22
16-Jun-22
25
10
Ground grading
2 17-Jun-22
18-Jun-22
2
7
Ground grading
05E1353000
Cement floating
1 19-Jun-22
19-Jun-22
1
5
Cement floating
05E1354000
Paiting with waterproof glue
2 20-Jun-22
21-Jun-22
2
10
05E1356000
Painting of unplastered outdoor wall
5 28-Jun-22
02-Jul-22
5
10
05E1357000
Water gutter
7 25-Jul-21
31-Jul-21
7
343 25-Jul-21
0
02-Jul-22
02-Jul-22
343
0
25-Jul-21
0
CP05-GWP-21JUL.E.5.10.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD09O05
TAW09 - CP05/CP06 - Builiding No.5 Early Access Installation
05EKD11O02
TAW11 - CP05/CP08 - Builiding No.5
0
CP05-GWP-21JUL.E.5.9 Overhaul Maintenance Workshop (No. 12)
05E1256000
Finish Building No.12
CP05-GWP-21JUL.E.5.9.3 Shell & core works / Thi cong loi va bao che
CP05-GWP-21JUL.E.5.9.3.2 Upper structure - steel / KC thep
05E1272000
Erection of steel beam
Plaster indoor wall
Roof insulation foam
Paiting with waterproof glue
Painting of unplastered outdoor wall
5
Water
gutter
0
02-Jul-22, CP05-GWP-21JUL.E.5.10.6 TAW to/from other CP / Ban giao tam ch
TAW09 - CP05/CP06 - Builiding No.5 Early Access Installation,
TAW11 - CP05/CP08 - Builiding No.5,
321 23-Sep-21
0
09-Aug-22
09-Aug-22
321
0
392
98 23-Sep-21
44 27-Sep-21
15 27-Sep-21
29-Dec-21
09-Nov-21
11-Oct-21
98
44
15
171
50
10
09-Aug-22, CP05-GWP-21JUL.E.5.9 Overhaul Maintenance Work
Finish Building No.12,
29-Dec-21, CP05-GWP-21JUL.E.5.9.3 Shell & core works / Thi cong loi va bao che
09-Nov-21, CP05-GWP-21JUL.E.5.9.3.2 Upper structure - steel / KC thep
Erection of steel beam
05E1273000
Erection of steel girder
15 12-Oct-21
26-Oct-21
15
10
05E1274000
Erection of steel beam for travelling crane
12 12-Oct-21
23-Oct-21
12
10
05E1275000
Erection of roof louver
12 27-Oct-21
07-Nov-21
12
10
05E1276000
Erection of eaves
14 27-Oct-21
09-Nov-21
14
10
24 23-Sep-21
5 23-Sep-21
16-Oct-21
27-Sep-21
24
5
37
10
4 28-Sep-21
01-Oct-21
4
10
14 02-Oct-21
15-Oct-21
14
7
4 13-Oct-21
16-Oct-21
4
10
34 10-Nov-21
14 10-Nov-21
13-Dec-21
23-Nov-21
34
14
73
12
24 13-Nov-21
06-Dec-21
24
12
Roofing with corrugated metal sheet and insulation layer
CP05-GWP-21JUL.E.5.9.3.3 Upper structure - concrete / KC be tong
05E1278000
Column concrete, #250
05E1279000
Column concrete, #300
05E1280000
Rebar fabrication & installation of of beam
05E1281000
Concrete of beam, girder, truss, #300
CP05-GWP-21JUL.E.5.9.3.4 Roof / mai
05E1282000
Roofing with corrugated metal sheet thk 0.47mm
Erection of steel girder
Erection of steel beam for travelling crane
Erection of roof louver
Erection of eaves
16-Oct-21, CP05-GWP-21JUL.E.5.9.3.3 Upper structure - concrete / KC be tong
Column concrete, #250
Column concrete, #300
Rebar fabrication & installation of of beam
Concrete of beam, girder, truss, #300
13-Dec-21, CP05-GWP-21JUL.E.5.9.3.4 Roof / mai
Roofing with corrugated metal sheet thk 0.47mm
05E1283000
Roofing with corrugated metal sheet and insulation layer
05E1284000
Roofing with polycarbonate transparent sheet
3 05-Dec-21
07-Dec-21
3
12
Roofing with polycarbonate transparent sheet
05E1285000
roof/side covering sheet
2 08-Dec-21
09-Dec-21
2
12
roof/side covering sheet
05E1286000
Install trough
4 10-Dec-21
13-Dec-21
4
5
05E1287000
Roofing with corrugated metal sheet thk 0.47mm - metal wall
4 24-Nov-21
27-Nov-21
4
10
05E1288000
Roofing with polycarbonate transparent sheet - metal wall
4 28-Nov-21
01-Dec-21
4
10
28 02-Dec-21
1 02-Dec-21
29-Dec-21
02-Dec-21
28
1
11
5
CP05-GWP-21JUL.E.5.9.3.5 Intermediate / KC trung gian
05E1289000
Cover wall with metal sheet
05E1290000
Brick masonry thk<=33cm
10 10-Dec-21
19-Dec-21
10
3
05E1291000
Brick masonry thk<=11cm
10 20-Dec-21
29-Dec-21
10
3
273 10-Nov-21
12 10-Nov-21
12 10-Nov-21
09-Aug-22
21-Nov-21
21-Nov-21
273
12
12
110
10
5
9 10-Nov-21
18-Nov-21
9
5
149 14-Mar-22
90 14-Mar-22
09-Aug-22
11-Jun-22
149
90
30
15
30 11-Jul-22
09-Aug-22
30
15
42 14-Mar-22
25 14-Mar-22
24-Apr-22
07-Apr-22
42
25
26
8
05E2155030
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
30 14-Mar-22
12-Apr-22
30
8
05E2155310
Fire Fighting System : Install Equipment
12 13-Apr-22
24-Apr-22
12
10
97 18-Mar-22
22-Jun-22
97
20
CP05-GWP-21JUL.E.5.9.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.5.9.4.1 Windows & Doors installation
05E1292000
Install doors
05E1293000
Install windows
CP05-GWP-21JUL.E.5.9.4.2 Electrical parts & equipments installation
05E1294000
Wiring & install electrical box, ECB (Tested continuity, insulation )
05E1295000
Install lights, sockets, switches
CP05-GWP-21JUL.E.5.9.4.5 Fire Fighting Systems
05E2155020
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
CP05-GWP-21JUL.E.5.9.4.3 HVAC & equipments installation
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Install trough
Roofing with corrugated metal sheet thk 0.47mm - metal wall
Roofing with polycarbonate transparent sheet - metal wall
29-Dec-21, CP05-GWP-21JUL.E.5.9.3.5 Intermediate / KC trung gian
Cover wall with metal sheet
Brick masonry thk<=33cm
Brick masonry thk<=11cm
09-Aug-22, CP05-GWP-21JUL.E.5.9.4 Fit-out works / cong tac lap d
21-Nov-21, CP05-GWP-21JUL.E.5.9.4.1 Windows & Doors installation
Install doors
Install windows
09-Aug-22, CP05-GWP-21JUL.E.5.9.4.2 Electrical parts & equipme
Wiring & install electrical box, ECB (Tested continuity, insulation )
Install lights, sockets, switches
24-Apr-22, CP05-GWP-21JUL.E.5.9.4.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
22-Jun-22, CP05-GWP-21JUL.E.5.9.4.3 HVAC & equipments installation
Page 9 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
05E1296000
installation air duct (Check tighntess & pipe cleanse)
05E1297000
Installation of HVAC equipment
CP05-GWP-21JUL.E.5.9.4.4 Plumbing & equipments installation
05E1298000
Install sleeve for sewage
Finish
75 18-Mar-22
31-May-22
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
75
10
35 19-May-22
22-Jun-22
35
10
106 18-Mar-22
15 08-Apr-22
01-Jul-22
22-Apr-22
106
15
24
5
15 18-Mar-22
01-Apr-22
15
4
05E1299000
Install sewage system
05E1300000
Industry sewage
3 05-Apr-22
07-Apr-22
3
5
05E1301000
Plumbing work for Supply water
2 18-Mar-22
19-Mar-22
2
5
05E1302000
Install sanitary equipment
CP05-GWP-21JUL.E.5.9.5 Finished works / hoan thien
05E1303000
Plaster ceiling, cement mortar M75
15 17-Jun-22
01-Jul-22
15
5
203 20-Dec-21
20 20-Dec-21
10-Jul-22
08-Jan-22
203
20
111
10
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
Feb
Qtr 2, 2022
Mar
Apr
May
Qtr 3, 2022
Jun
Jul
Aug
Sep
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
installation air duct (Check tighntess & pipe cleanse)
Installation of HVAC equipment
01-Jul-22, CP05-GWP-21JUL.E.5.9.4.4 Plumbing & equipments installation
Install sleeve for sewage
Install sewage system
Industry sewage
Plumbing work for Supply water
Install sanitary equipment
10-Jul-22, CP05-GWP-21JUL.E.5.9.5 Finished works / hoan thien
Plaster ceiling, cement mortar M75
05E1304000
Plaster beam, cement mortar M75
25 20-Dec-21
13-Jan-22
25
10
05E1305000
Plaster column, thk 1.5cm, cement mortar M75
16 09-Jan-22
24-Jan-22
16
7
Plaster column, thk 1.5cm, cement mortar M75
05E1306000
Plaster indoor wall, thk 1.5cm, cement mortar M50
16 09-Jan-22
24-Jan-22
16
7
Plaster indoor wall, thk 1.5cm, cement mortar M50
05E1307000
Plaster outdoor wall, thk 1.5cm, cement mortar M50
16 09-Jan-22
24-Jan-22
16
7
Plaster outdoor wall, thk 1.5cm, cement mortar M50
05E1308000
Making of gypsum ceiling
15 25-Jan-22
08-Feb-22
15
15
05E1309000
Painting of plastered indoor wall, 1 linen, 2 covered layers
10 12-Jun-22
21-Jun-22
10
20
Painting of plastered indoor wall, 1 linen, 2 covered layers
05E1310000
Painting of plastered outdoor wall, 1 linen, 2 covered layers
15 07-Jun-22
21-Jun-22
15
20
Painting of plastered outdoor wall, 1 linen, 2 covered layers
05E1311000
Epoxy paint floor
14 27-Jun-22
10-Jul-22
14
15
229 23-Dec-21
0
09-Aug-22
23-Dec-21
229
0
0
09-Aug-22
0
CP05-GWP-21JUL.E.5.9.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD09O04
TAW09 - CP05/CP06 - Builidng No.12
05EKD13O02
TAW13 - CP05/CP08 - Builidng No.12
0
CP05-GWP-21JUL.E.5.2 Traction Sectioning Technical Room (No. 13)
05E1477000
Finish Building No.13
CP05-GWP-21JUL.E.5.2.2 Shell & core works / Thi cong loi va bao che
CP05-GWP-21JUL.E.5.2.2.4 Roof / Mai
05E1499000
Roof grading
17-Jul-22
17-Jul-22
358
0
152
4 25-Jul-21
4 25-Jul-21
1 25-Jul-21
28-Jul-21
28-Jul-21
25-Jul-21
4
4
1
28-Jul-21, CP05-GWP-21JUL.E.5.2.2 Shell & core works / Thi cong loi va bao che
15
28-Jul-21, CP05-GWP-21JUL.E.5.2.2.4 Roof / Mai
15
5 grading
Roof
5
Fabrication
+ installation of other steel structure, cover structures
5
Water gutter
1 25-Jul-21
25-Jul-21
1
Water gutter
3 26-Jul-21
28-Jul-21
3
CP05-GWP-21JUL.E.5.2.3 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.5.2.3.1 Windows & Doors installation
05E1502000
Steel door
295 26-Sep-21
21 26-Sep-21
1 16-Oct-21
17-Jul-22
16-Oct-21
16-Oct-21
295
21
1
90
14
7
5 26-Sep-21
30-Sep-21
5
7
25 14-Mar-22
15 14-Mar-22
07-Apr-22
28-Mar-22
25
15
30
15
7 01-Apr-22
07-Apr-22
7
15
22 14-Mar-22
15 14-Mar-22
04-Apr-22
28-Mar-22
22
15
26
8
05E2155050
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 14-Mar-22
23-Mar-22
10
8
05E2155320
Fire Fighting System : Install Equipment
12 24-Mar-22
04-Apr-22
12
10
25 23-Jun-22
10 23-Jun-22
17-Jul-22
02-Jul-22
25
10
20
10
5 13-Jul-22
17-Jul-22
5
10
05E1506000
Lamps, sockets installation
CP05-GWP-21JUL.E.5.2.3.4 Fire Fighting Systems
05E2155040
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
CP05-GWP-21JUL.E.5.2.3.3 HVAC & equipments installation
05E1507000
installation air duct (Check tighntess & pipe cleanse)
05E1508000
Installation of HVAC equipment
CP05-GWP-21JUL.E.5.2.4 Finishes / Hoan thien
05E1513000
Roof insulation foam
17-Jul-22, CP05-GWP-21JUL.E.5.2 Traction Sectioning Technical Room (
Finish Building No.13,
358 25-Jul-21
0
Fabrication + installation of other steel structure, cover structures
CP05-GWP-21JUL.E.5.2.3.2 Electrical parts & equipments installation
05E1505000
Elec. wiring & cabinet installation (Tested continuity, insulation )
Epoxy paint floor
09-Aug-22, CP05-GWP-21JUL.E.5.9.6 TAW to/from other CP / Ban
TAW13 - CP05/CP08 - Builidng No.12,
05E1501000
Alum. Window
Making of gypsum ceiling
TAW09 - CP05/CP06 - Builidng No.12,
05E1500000
05E1503000
Plaster beam, cement mortar M75
182 01-Oct-21
14 01-Oct-21
31-Mar-22
14-Oct-21
182
14
47
7
17-Jul-22, CP05-GWP-21JUL.E.5.2.3 Fit-out works / cong tac lap dat
16-Oct-21, CP05-GWP-21JUL.E.5.2.3.1 Windows & Doors installation
Steel door
Alum. Window
07-Apr-22, CP05-GWP-21JUL.E.5.2.3.2 Electrical parts & equipments installation
Elec. wiring & cabinet installation (Tested continuity, insulation )
Lamps, sockets installation
04-Apr-22, CP05-GWP-21JUL.E.5.2.3.4 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
17-Jul-22, CP05-GWP-21JUL.E.5.2.3.3 HVAC & equipments installation
installation air duct (Check tighntess & pipe cleanse)
Installation of HVAC equipment
31-Mar-22, CP05-GWP-21JUL.E.5.2.4 Finishes / Hoan thien
Roof insulation foam
05E1514000
Ground grading with surface cement finshing
1 14-Oct-21
15-Oct-21
1
5
Ground grading with surface cement finshing
05E1515000
Cement floating
1 15-Oct-21
16-Oct-21
1
5
Cement floating
05E1516000
Paiting with waterproof glue
1 16-Oct-21
17-Oct-21
1
10
05E1517000
Painting of plastered indoor wall
1 29-Mar-22
29-Mar-22
1
10
05E1518000
Painting of unplastered outdoor wall
2 30-Mar-22
31-Mar-22
2
0 25-Jul-21
0 25-Jul-21
25-Jul-21
0
0
349 25-Jul-21
08-Jul-22
349
CP05-GWP-21JUL.E.5.2.5 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD07I02
TAW07 - CP06/CP05 - Building No.13
CP05-GWP-21JUL.E.5.11 Traction Maintenance Workshop (No. 15)
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Paiting with waterproof glue
Painting of plastered indoor wall
10
Painting of unplastered outdoor wall
25-Jul-21,
CP05-GWP-21JUL.E.5.2.5 TAW to/from other CP / Ban giao tam cho/tu CP khac
0
TAW07 - CP06/CP05 - Building No.13, 25-Jul-21
08-Jul-22, CP05-GWP-21JUL.E.5.11 Traction Maintenance Workshop (No. 1
188
Page 10 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
05E1363000
At Completion Start
Duration
Finish Building No.15
CP05-GWP-21JUL.E.5.11.2 Foundation & Under ground structure / Thi cong mong - nen
CP05-GWP-21JUL.E.5.11.2.2 Under ground structure / KC ngam
05E1376000
Brick masonry for Drain ditch
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
Feb
Qtr 2, 2022
Mar
Apr
May
Qtr 3, 2022
Jun
Jul
Aug
Sep
Finish Building No.15,
0
08-Jul-22
0
8 25-Jul-21
8 25-Jul-21
1 25-Jul-21
01-Aug-21
01-Aug-21
25-Jul-21
8
8
1
2701-Aug-21, CP05-GWP-21JUL.E.5.11.2 Foundation & Under ground structure / Thi cong mong - nen
2701-Aug-21, CP05-GWP-21JUL.E.5.11.2.2 Under ground structure / KC ngam
5 masonry for Drain ditch
Brick
1 26-Jul-21
5
Cable
trench grading
7
Rebar
fabication & installation of precast concrete components (cover, fence, window, shader etc)
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
05E1377000
Cable trench grading
26-Jul-21
1
05E1378000
Rebar fabication & installation of precast concrete components (cover, fence, window,
1 27-Jul-21
shader etc)
27-Jul-21
1
05E1379000
Installation of precast componenets (cover, projection roof, lintel)
28-Jul-21
1
05E1380000
Rebar fabication & installation of precast concrete (cover rebar, fence, window, shader
4 29-Jul-21
etc.)
01-Aug-21
4
232 19-Nov-21
16 19-Nov-21
13 22-Nov-21
08-Jul-22
04-Dec-21
04-Dec-21
232
16
13
96
10
5
14 19-Nov-21
02-Dec-21
14
5
104 14-Mar-22
50 14-Mar-22
25-Jun-22
02-May-22
104
50
30
15
20 06-Jun-22
25-Jun-22
20
15
22 14-Mar-22
15 14-Mar-22
04-Apr-22
28-Mar-22
22
15
26
8
05E2155070
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 14-Mar-22
23-Mar-22
10
8
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
05E2155330
Fire Fighting System : Install Equipment
12 24-Mar-22
04-Apr-22
12
10
42 18-Mar-22
30 18-Mar-22
28-Apr-22
16-Apr-22
42
30
20
10
Fire Fighting System : Install Equipment
28-Apr-22, CP05-GWP-21JUL.E.5.11.4.3 HVAC & equipments installation
15 14-Apr-22
28-Apr-22
15
10
111 20-Mar-22
4 20-Mar-22
08-Jul-22
23-Mar-22
111
4
10
5
7 02-Jul-22
08-Jul-22
7
5
CP05-GWP-21JUL.E.5.11.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.5.11.4.1 Windows & Doors installation
05E1400000
Install doors
05E1401000
Install alum. window
CP05-GWP-21JUL.E.5.11.4.2 Electrical parts & equipments installation
05E1403000
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
05E1404000
Lamps, sockets installation
CP05-GWP-21JUL.E.5.11.4.5 Fire Fighting Systems
05E2155060
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
CP05-GWP-21JUL.E.5.11.4.3 HVAC & equipments installation
05E1405000
Installation air duct (Check tighntess & pipe cleanse)
05E1406000
Installation of HVAC equipments
CP05-GWP-21JUL.E.5.11.4.4 Plumbing & equipments installation
05E1408000
Plumbing work for Supply water (remain)
05E1409000
Install sanitary equipment
1 28-Jul-21
5
Installation
of precast componenets (cover, projection roof, lintel)
5Rebar fabication & installation of precast concrete (cover rebar, fence, window, shader etc.)
08-Jul-22, CP05-GWP-21JUL.E.5.11.4 Fit-out works / cong tac lap dat
04-Dec-21, CP05-GWP-21JUL.E.5.11.4.1 Windows & Doors installation
Install doors
Install alum. window
25-Jun-22, CP05-GWP-21JUL.E.5.11.4.2 Electrical parts & equipments installati
Elec. Wiring & Cabinet, aptomats installation (Tested continuity, insulation )
Lamps, sockets installation
04-Apr-22, CP05-GWP-21JUL.E.5.11.4.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Installation air duct (Check tighntess & pipe cleanse)
Installation of HVAC equipments
08-Jul-22, CP05-GWP-21JUL.E.5.11.4.4 Plumbing & equipments installation
Plumbing work for Supply water (remain)
Install sanitary equipment
05-Jun-22, CP05-GWP-21JUL.E.5.11.5 Finishes works / hoan thien
195 23-Nov-21
2 03-Dec-21
05-Jun-22
04-Dec-21
195
2
65
10
8 23-Nov-21
30-Nov-21
8
10
15 03-May-22
17-May-22
15
15
Indoor wall painting
6 14-May-22
19-May-22
6
15
Outdoor wall painting
15 22-May-22
05-Jun-22
15
15
0 16-Dec-21
0
16-Dec-21
16-Dec-21
0
0
0
295 25-Jul-21
0
15-May-22
15-May-22
295
0
108
149 18-Dec-21
3 18-Dec-21
3 18-Dec-21
15-May-22
20-Dec-21
20-Dec-21
149
3
3
64
5
5
25 14-Mar-22
15 14-Mar-22
07-Apr-22
28-Mar-22
25
15
30
15
10 29-Mar-22
07-Apr-22
10
15
22 14-Mar-22
15 14-Mar-22
04-Apr-22
28-Mar-22
22
15
26
8
05E2155090
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 14-Mar-22
23-Mar-22
10
8
05E2155340
Fire Fighting System : Install Equipment
04-Apr-22
12
10
15-May-22
15-May-22
1
1
3
3
CP05-GWP-21JUL.E.5.11.5 Finishes works / hoan thien
05E1414000
Paiting with waterproof glue
05E1416000
Ground grading with surface cement finshing
05E1420000
Indoor wall painting
05E1421000
Outdoor wall painting
05E1422000
Painting of ground
CP05-GWP-21JUL.E.5.11.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD09O06
TAW09 - CP05/CP06 - Building No.15
CP05-GWP-21JUL.E.5.16 Hazardous Product Storage (No. 20)
05E2089000
Finish Building No.20
CP05-GWP-21JUL.E.5.16.3 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.5.16.3.1 Windows & Doors installation
05E2111000
Install doors
CP05-GWP-21JUL.E.5.16.3.2 Electrical parts & equipments installation
05E2112000
Wiring & install electrical box, ECB (Tested continuity, insulation )
05E2113000
Install lights, sockets, switches
CP05-GWP-21JUL.E.5.16.3.4 Fire Fighting Systems
05E2155080
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
12 24-Mar-22
CP05-GWP-21JUL.E.5.16.3.3 HVAC & equipments installation
05E2114000
Exhaust fan
1 15-May-22
1 15-May-22
267 25-Jul-21
4 25-Jul-21
CP05-GWP-21JUL.E.5.16.4 Finishes / Hoan thien
05E2115000
Roof insulation foam
17-Apr-22
28-Jul-21
267
4
Paiting with waterproof glue
1 21-Dec-21
21-Dec-21
1
7
05E2120000
Indoor wall painting
5 08-Apr-22
12-Apr-22
5
10
05E2121000
Outdoor wall painting
3 13-Apr-22
15-Apr-22
3
10
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Ground grading with surface cement finshing
Painting of ground
16-Dec-21, CP05-GWP-21JUL.E.5.11.6 TAW to/from other CP / Ban giao tam cho/tu CP khac
TAW09 - CP05/CP06 - Building No.15,
15-May-22, CP05-GWP-21JUL.E.5.16 Hazardous Product Storage (No. 20)
Finish Building No.20,
15-May-22, CP05-GWP-21JUL.E.5.16.3 Fit-out works / cong tac lap dat
20-Dec-21, CP05-GWP-21JUL.E.5.16.3.1 Windows & Doors installation
Install doors
07-Apr-22, CP05-GWP-21JUL.E.5.16.3.2 Electrical parts & equipments installation
Wiring & install electrical box, ECB (Tested continuity, insulation )
Install lights, sockets, switches
04-Apr-22, CP05-GWP-21JUL.E.5.16.3.4 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
15-May-22, CP05-GWP-21JUL.E.5.16.3.3 HVAC & equipments installation
Exhaust fan
17-Apr-22, CP05-GWP-21JUL.E.5.16.4 Finishes / Hoan thien
44
7 insulation foam
Roof
05E2119000
Primary Baseline
Paiting with waterproof glue
Paiting with waterproof glue
Indoor wall painting
Outdoor wall painting
Page 11 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
05E2122000
At Completion Start
Duration
Ground grading
CP05-GWP-21JUL.E.5.17 Building Pump house (No. 25)
05E2154020
Finish Building No.25
CP05-GWP-21JUL.E.5.17.1 Foundation / Thi cong mong
05E2154130
Excavation of foundation
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
2 16-Apr-22
17-Apr-22
2
10
263 25-Jul-21
0
13-Apr-22
13-Apr-22
263
0
302
15 25-Jul-21
1 25-Jul-21
08-Aug-21
25-Jul-21
15
1
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
Feb
Qtr 2, 2022
Mar
Apr
2 26-Jul-21
27-Jul-21
2
05E2154150
Sand Backfill of foundation, K=0.98
4 30-Jul-21
02-Aug-21
4
05E2154160
Foundation concrete
1 08-Aug-21
08-Aug-21
1
05E2154170
Foundation lining concrete #100
1 03-Aug-21
03-Aug-21
1
7 Foundation concrete
7Foundation lining concrete #100
05E2154180
Rebar fabrication & installation for foundation, foundation beam
1 05-Aug-21
05-Aug-21
1
7 Rebar fabrication & installation for foundation, foundation beam
05E2154190
Backfill of foundation, K=0.90
05E2154330
Rebar fabrication
2 28-Jul-21
29-Jul-21
03-Feb-22
09-Sep-21
09-Sep-21
2
159
12
1
7 29-Aug-21
04-Sep-21
7
7
03-Feb-22
03-Feb-22
12
12
10
10
CP05-GWP-21JUL.E.5.17.2.2 Upper structure - Concrete / Ket cau BTCT
05E2154250
Rebar fabrication & installation for floor
25 10-Sep-21
7 24-Sep-21
04-Oct-21
30-Sep-21
25
7
61
10
05E2154260
Column concrete, #250
1 19-Sep-21
19-Sep-21
1
7
05E2154270
Concrete of beam #250
1 02-Oct-21
02-Oct-21
1
7
05E2154280
Rebar fabrication & installation of column
7 10-Sep-21
16-Sep-21
7
10
05E2154290
Rebar fabrication & installation for beam
05E2154300
Fabrication +installation of embeded steel details
05E2154310
Concrete of roof/slab, #250
Rebar fabrication
03-Feb-22, CP05-GWP-21JUL.E.5.17.2.5 Water tank Structure / Ket cau be nuoc
Water tank installation
04-Oct-21, CP05-GWP-21JUL.E.5.17.2.2 Upper structure - Concrete / Ket cau BTCT
Rebar fabrication & installation for floor
Column concrete, #250
Concrete of beam #250
Rebar fabrication & installation of column
7 22-Sep-21
28-Sep-21
7
10
Rebar fabrication & installation for beam
10 22-Sep-21
01-Oct-21
10
10
Fabrication +installation of embeded steel details
1 04-Oct-21
04-Oct-21
1
7
6 17-Oct-21
3 17-Oct-21
22-Oct-21
19-Oct-21
6
3
14
7
3 20-Oct-21
22-Oct-21
3
7
7 05-Oct-21
7 05-Oct-21
11-Oct-21
11-Oct-21
7
7
5
5
171 25-Oct-21
6 25-Oct-21
1 25-Oct-21
13-Apr-22
30-Oct-21
25-Oct-21
171
6
1
91
10
5
5 26-Oct-21
30-Oct-21
5
5
31 14-Mar-22
20 14-Mar-22
13-Apr-22
02-Apr-22
31
20
30
15
10 04-Apr-22
13-Apr-22
10
15
22 14-Mar-22
15 14-Mar-22
04-Apr-22
28-Mar-22
22
15
26
8
05E2155110
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 14-Mar-22
23-Mar-22
10
8
05E2155350
Fire Fighting System : Install Equipment
12 24-Mar-22
04-Apr-22
12
10
15 18-Mar-22
5 18-Mar-22
01-Apr-22
22-Mar-22
15
5
20
10
3 30-Mar-22
01-Apr-22
3
10
34 28-Feb-22
34 28-Feb-22
02-Apr-22
02-Apr-22
34
34
5
5
185 03-Oct-21
2 23-Oct-21
05-Apr-22
24-Oct-21
185
2
74
5
Brick masonry for straight wall, thk<=11cm
CP05-GWP-21JUL.E.5.17.2.4 Roof / Mai
05E2154340
Roofing
CP05-GWP-21JUL.E.5.17.3 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.5.17.3.1 Windows & Doors installation
05E2154420
Door
05E2154430
Window
CP05-GWP-21JUL.E.5.17.3.2 Electrical parts & equipments installation
05E2154390
Elec. wiring & cabinet installation (Tested continuity, insulation )
05E2154400
Lamps, sockets installation
CP05-GWP-21JUL.E.5.17.3.5 Fire Fighting Systems
05E2155100
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
CP05-GWP-21JUL.E.5.17.3.3 HVAC & equipments installation
05E2154370
Installation air duct (Check tighntess & pipe cleanse)
05E2154380
Installation of HVAC equipment
CP05-GWP-21JUL.E.5.17.3.4 Fire Fighting Equipment installation
05E2154410
Pump installtion
CP05-GWP-21JUL.E.5.17.4 Finishes / Hoan thien
05E2154030
Plaster indoor wall
Concrete of roof/slab, #250
22-Oct-21, CP05-GWP-21JUL.E.5.17.2.3 Intermediate / KC trung gian
Brick masonry for straight wall, thk<=33cm
Brick masonry for straight wall, thk<=11cm
11-Oct-21, CP05-GWP-21JUL.E.5.17.2.4 Roof / Mai
Roofing
13-Apr-22, CP05-GWP-21JUL.E.5.17.3 Fit-out works / cong tac lap dat
30-Oct-21, CP05-GWP-21JUL.E.5.17.3.1 Windows & Doors installation
Door
Window
13-Apr-22, CP05-GWP-21JUL.E.5.17.3.2 Electrical parts & equipments installation
Elec. wiring & cabinet installation (Tested continuity, insulation )
Lamps, sockets installation
04-Apr-22, CP05-GWP-21JUL.E.5.17.3.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
01-Apr-22, CP05-GWP-21JUL.E.5.17.3.3 HVAC & equipments installation
Installation air duct (Check tighntess & pipe cleanse)
Installation of HVAC equipment
02-Apr-22, CP05-GWP-21JUL.E.5.17.3.4 Fire Fighting Equipment installation
Pump installtion
05-Apr-22, CP05-GWP-21JUL.E.5.17.4 Finishes / Hoan thien
Plaster indoor wall
05E2154040
Plaster ceiling
3 21-Nov-21
24-Nov-21
3
5
05E2154050
Ground grading with surface cement finshing
1 13-Nov-21
14-Nov-21
1
7
Ground grading with surface cement finshing
05E2154060
Cement floating
1 14-Nov-21
15-Nov-21
1
5
Cement floating
05E2154070
Painting of unplastered outdoor wall
2 04-Apr-22
05-Apr-22
2
10
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Sep
3
Backfill
of foundation, K=0.90
03-Feb-22, CP05-GWP-21JUL.E.5.17.2 Shell & core works / Thi cong loi va bao che
104
09-Sep-21,
CP05-GWP-21JUL.E.5.17.2.1
Ground / Nen
14
7
Concrete ground, #250
12 23-Jan-22
12 23-Jan-22
05E2154230
Aug
3
Removal
of waste soil
3Sand Backfill of foundation, K=0.98
CP05-GWP-21JUL.E.5.17.2.5 Water tank Structure / Ket cau be nuoc
05E2154350
Water tank installation
CP05-GWP-21JUL.E.5.17.2.3 Intermediate / KC trung gian
05E2154220
Brick masonry for straight wall, thk<=33cm
Jul
33 08-Aug-21, CP05-GWP-21JUL.E.5.17.1 Foundation / Thi cong mong
3
Excavation
of foundation
Removal of waste soil
159 29-Aug-21
12 29-Aug-21
1 09-Sep-21
Jun
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
Ground grading
13-Apr-22, CP05-GWP-21JUL.E.5.17 Building Pump house (No. 25)
Finish Building No.25,
05E2154140
CP05-GWP-21JUL.E.5.17.2 Shell & core works / Thi cong loi va bao che
CP05-GWP-21JUL.E.5.17.2.1 Ground / Nen
05E2154320
Concrete ground, #250
May
Qtr 3, 2022
Plaster ceiling
Painting of unplastered outdoor wall
Page 12 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
05E2154080
Painting of plastered indoor wall
1 03-Apr-22
03-Apr-22
1
10
05E2154090
Paiting with waterproof glue
1 15-Nov-21
16-Nov-21
1
10
05E2154100
Waterproof Plaster of roof wall
5 16-Nov-21
21-Nov-21
5
10
05E2154110
Roof insulation foam
14 31-Oct-21
13-Nov-21
14
7
05E2154120
Plaster beam
1 03-Oct-21
03-Oct-21
1
0 25-Jul-21
0 25-Jul-21
25-Jul-21
0
0
0
CP05-GWP-21JUL.E.5.17.5 TAW to/from other CP / Ban giao tam cho/tu CP khac
05EKD07I3
TAW07 - CP06/CP05 - Building No.25
05EKD07O3
TAW07 - CP05/CP06 - Building No.25
CP05-GWP-21JUL.E.5.12 Drivers and Cleaners Staff Rooms (No.28, 29)
05E1644000
Finish Buildings No. 28, 29
CP05-GWP-21JUL.E.5.12.4 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.5.12.4.1 Windows & Doors installation
05E1667000
Install doors
05E1668000
Install windows
05E1669000
Glass wall, high glass thk 10mm
CP05-GWP-21JUL.E.5.12.4.2 Electrical parts & equipments installation
05E1671000
Wiring, installaltion of cabinet, aptomat (Tested continuity, insulation )
05E1672000
Lamps, sockets installation
CP05-GWP-21JUL.E.5.12.4.5 Fire Fighting Systems
05E2155120
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
0
18-Jul-22
18-Jul-22
355
0
177
215 16-Dec-21
12 16-Dec-21
7 21-Dec-21
18-Jul-22
27-Dec-21
27-Dec-21
215
12
7
106
15
5
5 16-Dec-21
20-Dec-21
5
5
3 21-Dec-21
23-Dec-21
3
5
35 14-Apr-22
25 14-Apr-22
18-May-22
08-May-22
35
25
30
15
10 09-May-22
18-May-22
10
15
22 14-Apr-22
15 14-Apr-22
05-May-22
28-Apr-22
22
15
26
8
23-Apr-22
10
8
05E2155360
Fire Fighting System : Install Equipment
12 24-Apr-22
05-May-22
12
10
9 14-Apr-22
7 14-Apr-22
22-Apr-22
20-Apr-22
9
7
20
10
5 18-Apr-22
22-Apr-22
5
10
121 20-Mar-22
5 20-Mar-22
18-Jul-22
24-Mar-22
121
5
15
5
3 25-Mar-22
27-Mar-22
3
5
18-Jul-22
10
5
Installation of HVAC equipment
CP05-GWP-21JUL.E.5.12.4.4 Plumbing & equipments installation
05E1675000
Sewage
05E1676000
Plumbing work for Supply water
05E1677000
Install sanitary equipment
10 09-Jul-22
CP05-GWP-21JUL.E.5.12.5 Finishes / Hoan thien
05E1685000
Paiting with waterproof glue
299 29-Jul-21
1 29-Jul-21
23-May-22
29-Jul-21
299
1
Oct
Nov
Dec
Jan
Feb
Install doors
Glass wall, high glass thk 10mm
18-May-22, CP05-GWP-21JUL.E.5.12.4.2 Electrical parts & equipments installation
Wiring, installaltion of cabinet, aptomat (Tested continuity, insulation )
Lamps, sockets installation
05-May-22, CP05-GWP-21JUL.E.5.12.4.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
Fire Fighting System : Install Equipment
22-Apr-22, CP05-GWP-21JUL.E.5.12.4.3 HVAC & equipments installation
Installation air duct (Check tighntess & pipe cleanse)
Installation of HVAC equipment
18-Jul-22, CP05-GWP-21JUL.E.5.12.4.4 Plumbing & equipments installa
Sewage
Plumbing work for Supply water
Install sanitary equipment
23-May-22, CP05-GWP-21JUL.E.5.12.5 Finishes / Hoan thien
71
5
Paiting
with waterproof glue
3
03-Aug-21
2
5Making toilet partition with MDF
5Ground grading, cement mortar M75, thk 2.0cm
05E1688000
Floor tiling with anti-skidding tile 300x300mm
2 04-Aug-21
05-Aug-21
2
7 Floor tiling with anti-skidding tile 300x300mm
05E1689000
Ceremic tiling to wall wall, column, tile 250x250mm
3 06-Aug-21
08-Aug-21
3
05E1690000
Floor tiling, tile 500x500mm
7 09-Aug-21
15-Aug-21
7
5 Ceremic tiling to wall wall, column, tile 250x250mm
7 Floor tiling, tile 500x500mm
05E1691000
Insullation foam layer thk1cm for roof
1 16-Aug-21
16-Aug-21
1
7
05E1692000
Making of ceiling with gypsum board WC
3 17-Aug-21
19-Aug-21
3
5
Making of ceiling with gypsum board WC
05E1693000
Making of ceiling with gypsum board
10 20-Aug-21
29-Aug-21
10
5
Making of ceiling with gypsum board
05E1694000
Painting of unplastered indoor wall, beam, ceiling, column
14 05-May-22
18-May-22
14
10
05E1695000
Painting of plastered outdoor wall, 1 linen, 2 covered layers
5 19-May-22
23-May-22
5
10
378 25-Jul-21
0
06-Aug-22
06-Aug-22
378
0
145
229 21-Dec-21
9 21-Dec-21
2 28-Dec-21
06-Aug-22
29-Dec-21
29-Dec-21
229
9
2
81
10
5
5 21-Dec-21
25-Dec-21
5
5
40 28-Jun-22
21 28-Jun-22
06-Aug-22
18-Jul-22
40
21
30
15
10 28-Jul-22
06-Aug-22
10
15
40 28-Jun-22
40 28-Jun-22
06-Aug-22
06-Aug-22
40
40
16
3
CP05-GWP-21JUL.E.5.14.3.5 Fire Fighting Systems
05E2155160
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Sep
Install windows
01-Aug-21
Install lights, sockets, switches
Aug
18-Jul-22, CP05-GWP-21JUL.E.5.12.4 Fit-out works / cong tac lap dat
27-Dec-21, CP05-GWP-21JUL.E.5.12.4.1 Windows & Doors installation
2 02-Aug-21
05E2055000
Jul
18-Jul-22, CP05-GWP-21JUL.E.5.12 Drivers and Cleaners Staff Rooms (
Finish Buildings No. 28, 29,
3 30-Jul-21
CP05-GWP-21JUL.E.5.14.3.2 Electrical parts & equipments installation
05E2054000
Wiring & install electrical box, ECB (Tested continuity, insulation )
Jun
Waterproof Plaster of roof wall
Ground grading, cement mortar M75, thk 2.0cm
Install aluminium window
May
Roof insulation foam
Making toilet partition with MDF
05E2052000
Apr
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
Paiting with waterproof glue
05E1687000
CP05-GWP-21JUL.E.5.14.3 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.5.14.3.1 Windows & Doors installation
05E2051000
Install door
Mar
Qtr 3, 2022
Painting of plastered indoor wall
05E1686000
CP05-GWP-21JUL.E.5.14 Staff Canteen (No. 31B)
05E2022000
Finish Building No.31B
Qtr 2, 2022
TAW07 - CP05/CP06 - Building No.25,
25-Jul-21
355 29-Jul-21
0
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
10 14-Apr-22
05E1674000
Sep
Qtr 1, 2022
5
Plaster beam
25-Jul-21,
CP05-GWP-21JUL.E.5.17.5 TAW to/from other CP / Ban giao tam cho/tu CP khac
0
TAW07 - CP06/CP05 - Building No.25, 25-Jul-21
05E2155130
CP05-GWP-21JUL.E.5.12.4.3 HVAC & equipments installation
05E1673000
Installation air duct (Check tighntess & pipe cleanse)
Qtr 4, 2021
Insullation foam layer thk1cm for roof
Painting of unplastered indoor wall, beam, ceiling, column
Painting of plastered outdoor wall, 1 linen, 2 covered layers
06-Aug-22, CP05-GWP-21JUL.E.5.14 Staff Canteen (No. 31B)
Finish Building No.31B,
06-Aug-22, CP05-GWP-21JUL.E.5.14.3 Fit-out works / cong tac lap d
29-Dec-21, CP05-GWP-21JUL.E.5.14.3.1 Windows & Doors installation
Install door
Install aluminium window
06-Aug-22, CP05-GWP-21JUL.E.5.14.3.2 Electrical parts & equipme
Wiring & install electrical box, ECB (Tested continuity, insulation )
Install lights, sockets, switches
06-Aug-22, CP05-GWP-21JUL.E.5.14.3.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Page 13 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
Finish
05E2155170
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
27 28-Jun-22
24-Jul-22
05E2155380
Fire Fighting System : Install Equipment
8 24-Jul-22
20 18-Jul-22
15 18-Jul-22
CP05-GWP-21JUL.E.5.14.3.3 HVAC & equipments installation
05E2056000
installation air duct (Check tighntess & pipe cleanse)
05E2057000
Installation of HVAC equipment
CP05-GWP-21JUL.E.5.14.4 Finishes / Hoan thien
05E2061000
Brick work for three-step entrance
Manpower
Qtr 3, 2021
Aug
01-Aug-22
01-Aug-22
10
10
5
5
364 25-Jul-21
1 25-Jul-21
23-Jul-22
25-Jul-21
364
1
1
05E2068000
Floor tiling with anti-skidding tile 300x300mm for WC
3 01-Aug-21
03-Aug-21
3
05E2069000
Ceremic tiling to wall, column, tile 250x250mm
8 04-Aug-21
11-Aug-21
8
05E2070000
Making of ceiling with gypsum board
10 26-Dec-21
04-Jan-22
10
05E2071000
Painting of plastered indoor wall
4 19-Jul-22
22-Jul-22
4
10
05E2072000
Painting of unplastered outdoor wall
1 23-Jul-22
23-Jul-22
1
10
212
0
182
212 28-Nov-21
0 28-Nov-21
0
27-Jun-22
7 Ceremic tiling to wall, column, tile 250x250mm
7
Making of ceiling with gypsum board
0
25 28-Nov-21
7 28-Nov-21
22-Dec-21
04-Dec-21
25
7
29
3
3
3
05E2154560
Sand Backfill of foundation, K=0.98
7 10-Dec-21
16-Dec-21
7
3
05E2154570
Foundation concrete
1 22-Dec-21
22-Dec-21
1
7
05E2154580
Foundation lining concrete #100
1 17-Dec-21
17-Dec-21
1
5
05E2154590
Rebar fabrication & installation for foundation, foundation beam
1 19-Dec-21
19-Dec-21
1
5
05E2154600
Backfill of foundation, K=0.90
2 08-Dec-21
09-Dec-21
2
3
86 28-Nov-21
12 12-Jan-22
1 23-Jan-22
21-Feb-22
23-Jan-22
23-Jan-22
86
12
1
59
14
7
7 12-Jan-22
18-Jan-22
7
7
68 28-Nov-21
1 02-Feb-22
03-Feb-22
02-Feb-22
68
1
26
5
7 24-Jan-22
30-Jan-22
7
7
10 28-Nov-21
07-Dec-21
10
7
1 03-Feb-22
03-Feb-22
1
7
6 16-Feb-22
3 16-Feb-22
21-Feb-22
18-Feb-22
6
3
14
7
3 19-Feb-22
21-Feb-22
3
7
7 04-Feb-22
7 04-Feb-22
10-Feb-22
10-Feb-22
7
7
5
5
137 11-Feb-22
5 11-Feb-22
5 11-Feb-22
27-Jun-22
15-Feb-22
15-Feb-22
137
5
5
61
5
5
40 19-May-22
10 19-May-22
27-Jun-22
28-May-22
40
10
30
15
3 25-Jun-22
27-Jun-22
3
15
40 19-May-22
40 19-May-22
27-Jun-22
27-Jun-22
40
40
16
3
05E2155150
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightness...)
27 19-May-22
14-Jun-22
27
3
05E2155370
Fire Fighting System : Install Equipment
22-Jun-22
8
10
CP05-GWP-21JUL.E.5.1.3 Fit-out works / cong tac lap dat
CP05-GWP-21JUL.E.5.1.3.1 Windows & Doors installation
05E2154770
Door
CP05-GWP-21JUL.E.5.1.3.2 Electrical parts & equipments installation
05E2154750
Elec. wiring & cabinet installation (Tested continuity, insulation )
05E2154760
Lamps, sockets installation
CP05-GWP-21JUL.E.5.1.3.5 Fire Fighting Systems
05E2155140
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
8 14-Jun-22
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
Painting of unplastered outdoor wall
27-Jun-22, CP05-GWP-21JUL.E.5.1 Back-up Generator for LPS 1 ( 21 C)
Finish Building 21C,
27-Jun-22
07-Dec-21
CP05-GWP-21JUL.E.5.1.2.4 Roof / Mai
05E2154720
Roofing
Painting of plastered indoor wall
Start Building 21C, 28-Nov-21
3 05-Dec-21
Brick masonry for straight wall, thk<=11cm
Install sanitary equipment
23-Jul-22, CP05-GWP-21JUL.E.5.14.4 Finishes / Hoan thien
5
Ceremic tiling to wall wall, column, tile120x500mm
7Floor tiling with anti-skidding tile 300x300mm for WC
Removal of waste soil
05E2154620
Installation of HVAC equipment
01-Aug-22, CP05-GWP-21JUL.E.5.14.3.4 Plumbing & equipments in
5 with mozaic tiles
Tiling
10
Floor tiling, tile 500x500mm
05E2154550
Concrete of roof/slab, #250
installation air duct (Check tighntess & pipe cleanse)
64
3 work for three-step entrance
Brick
31-Jul-21
05E2154690
Sep
10 23-Jul-22
10 23-Jul-22
1 31-Jul-21
CP05-GWP-21JUL.E.5.1.2.3 Intermediate / KC trung gian
05E2154610
Brick masonry for straight wall, thk<=33cm
Aug
10
Ceremic tiling to wall wall, column, tile120x500mm
Fabrication +installation of embeded steel details
Jul
5
05E2067000
05E2154680
Jun
06-Aug-22
4
Rebar fabrication & installation of column
May
Fire Fighting System : Install Equipment
06-Aug-22, CP05-GWP-21JUL.E.5.14.3.3 HVAC & equipments insta
1
05E2154660
Apr
20
10
30-Jul-21
CP05-GWP-21JUL.E.5.1.2.2 Upper structure - Concrete / Ket cau BTCT
05E2154640
Column concrete, #250
Mar
10
26-Jul-21
Rebar fabrication
Feb
8
4 27-Jul-21
05E2154710
Jan
20
15
1 26-Jul-21
CP05-GWP-21JUL.E.5.1.2 Shell & core works / Thi cong loi va bao che
CP05-GWP-21JUL.E.5.1.2.1 Ground / Nen
05E2154700
Concrete ground, #250
Dec
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
06-Aug-22
01-Aug-22
Floor tiling, tile 500x500mm
CP05-GWP-21JUL.E.5.1.1 Foundation / Thi cong mong
05E2154540
Excavation of foundation
Nov
Qtr 3, 2022
01-Aug-22
Tiling with mozaic tiles
Finish Building 21C
Oct
Qtr 2, 2022
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressu
05E2066000
05EKD07O23
Sep
Qtr 1, 2022
3
05E2065000
CP05-GWP-21JUL.E.5.1 Back-up Generator for LPS 1 ( 21 C)
05EKD07O13
Start Building 21C
Qtr 4, 2021
27
5 02-Aug-22
CP05-GWP-21JUL.E.5.14.3.4 Plumbing & equipments installation
05E2060000
Install sanitary equipment
Remaining
Duration
22-Dec-21, CP05-GWP-21JUL.E.5.1.1 Foundation / Thi cong mong
Excavation of foundation
Removal of waste soil
Sand Backfill of foundation, K=0.98
Foundation concrete
Foundation lining concrete #100
Rebar fabrication & installation for foundation, foundation beam
Backfill of foundation, K=0.90
21-Feb-22, CP05-GWP-21JUL.E.5.1.2 Shell & core works / Thi cong loi va bao che
23-Jan-22, CP05-GWP-21JUL.E.5.1.2.1 Ground / Nen
Concrete ground, #250
Rebar fabrication
03-Feb-22, CP05-GWP-21JUL.E.5.1.2.2 Upper structure - Concrete / Ket cau BTCT
Column concrete, #250
Rebar fabrication & installation of column
Fabrication +installation of embeded steel details
Concrete of roof/slab, #250
21-Feb-22, CP05-GWP-21JUL.E.5.1.2.3 Intermediate / KC trung gian
Brick masonry for straight wall, thk<=33cm
Brick masonry for straight wall, thk<=11cm
10-Feb-22, CP05-GWP-21JUL.E.5.1.2.4 Roof / Mai
Roofing
27-Jun-22, CP05-GWP-21JUL.E.5.1.3 Fit-out works / cong tac lap dat
15-Feb-22, CP05-GWP-21JUL.E.5.1.3.1 Windows & Doors installation
Door
27-Jun-22, CP05-GWP-21JUL.E.5.1.3.2 Electrical parts & equipments installatio
Elec. wiring & cabinet installation (Tested continuity, insulation )
Lamps, sockets installation
27-Jun-22, CP05-GWP-21JUL.E.5.1.3.5 Fire Fighting Systems
Fire Fighting System: Installation of Conduit (Incl. Wiring & Test)
Fire Fighting System: Installation of Steel pipes (Incl. Wiring & Test pressure, tightnes
Fire Fighting System : Install Equipment
Page 14 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
CP05-GWP-21JUL.E.5.1.3.4 Plumbing & equipments installation / cap thoat nuoc
05E2154790
Install drainage pipe
CP05-GWP-21JUL.E.5.1.3.3 Generator Installation
05E2154780
Install Generator
CP05-GWP-21JUL.E.5.1.4 Finishes / Hoan thien
05E2154450
Plaster
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
8 11-Feb-22
8 11-Feb-22
18-Feb-22
18-Feb-22
8
8
5
5
24 30-Mar-22
24 30-Mar-22
22-Apr-22
22-Apr-22
24
24
5
5
16 11-Feb-22
3 22-Feb-22
26-Feb-22
24-Feb-22
16
3
33
5
05E2154480
Painting
2 25-Feb-22
26-Feb-22
2
7
05E2154500
Paiting with waterproof glue
1 11-Feb-22
11-Feb-22
1
7
05E2154510
Waterproof Plaster of roof wall
5 12-Feb-22
16-Feb-22
5
7
05E2154520
Roof insulation foam
7 17-Feb-22
23-Feb-22
7
7
489 25-Jul-21
25-Nov-22
489
461
24 02-Apr-22
24 02-Apr-22
25-Apr-22
25-Apr-22
24
24
15
15
202 12-Feb-22
0 12-Feb-22
01-Sep-22
202
0
60
CP05-GWP-21JUL.E.4 Building services
CP05-GWP-21JUL.E.4.7 LPS3
05E2134610
Install LPS3
CP05-GWP-21JUL.E.4.2 BMS system / He thong BMS
05E2138000
Start installation work BMS
Qtr 4, 2021
Sep
Oct
Nov
Qtr 4, 2022 Qtr 1, 2023
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec Jan
18-Feb-22, CP05-GWP-21JUL.E.5.1.3.4 Plumbing & equipments installation / cap thoat nuoc
Qtr 1, 2022
Dec
Jan
Qtr 2, 2022
Qtr 3, 2022
Install drainage pipe
22-Apr-22, CP05-GWP-21JUL.E.5.1.3.3 Generator Installation
Install Generator
26-Feb-22, CP05-GWP-21JUL.E.5.1.4 Finishes / Hoan thien
Plaster
Painting
Paiting with waterproof glue
Waterproof Plaster of roof wall
Roof insulation foam
25-Nov-22, CP05-GWP-21JUL.E.4 Bu
25-Apr-22, CP05-GWP-21JUL.E.4.7 LPS3
Install LPS3
01-Sep-22, CP05-GWP-21JUL.E.4.2 BMS system / He thong
Start installation work BMS, 12-Feb-22
05E2139000
BMS system
84 12-Feb-22
06-May-22
84
10
05E2140000
DDC (direct digital control) controller atAdministrative Building
30 06-Jul-22
04-Aug-22
30
10
DDC (direct digital control) controller atAdministrative Building
05E2141000
DDC controller at Building No 6
24 12-Jul-22
04-Aug-22
24
10
DDC controller at Building No 6
05E2142000
DDC controller at Building No 8
14 22-Jul-22
04-Aug-22
14
10
DDC controller at Building No 8
05E2143000
DDC controller at Building No 19
14 22-Jul-22
04-Aug-22
14
10
DDC controller at Building No 19
05E2144000
Field devices & accessorie
42 21-Jul-22
31-Aug-22
42
10
05E2145000
Finish BMS
01-Sep-22
0
127 22-Jul-22
0 22-Jul-22
25-Nov-22
127
0
90
0
CP05-GWP-21JUL.E.4.4 Lanscape Item / Canh quan
05E2150000
Start Landscape work
Construction work
65 22-Jul-22
24-Sep-22
65
30
05E2152000
Planting
12 10-Oct-22
21-Oct-22
12
30
05E2153000
Clean up
20 06-Nov-22
25-Nov-22
20
30
05E2154000
Finish Landscape item
25-Nov-22
0
09-Dec-21
138
0
138 25-Jul-21
0 25-Jul-21
CP05-GWP-21JUL.E.4.6 Lightning
05E2123000
Start work
Field devices & accessorie
Finish BMS,
25-Nov-22, CP05-GWP-21JUL.E.4.4
Start Landscape work, 22-Jul-22
05E2151000
0
BMS system
Construction work
Planting
Clean up
Finish Landscape item,
09-Dec-21, CP05-GWP-21JUL.E.4.6 Lightning
66
Start work, 25-Jul-21
05E2124000
Pole foundation excavation
3 25-Jul-21
27-Jul-21
3
05E2125000
Lean concrete for foundation #100
1 28-Jul-21
28-Jul-21
1
05E2126000
Concrete for foundation, width<= 250cm, #250
3 05-Aug-21
07-Aug-21
3
7 Concrete for foundation, width<= 250cm, #250
05E2127000
Foundation backfill, K=0.95
1 22-Aug-21
22-Aug-21
1
3
Foundation backfill, K=0.95
05E2129000
Install lightning arrested unit - protection radius 120m
30 25-Jul-21
23-Aug-21
30
5
Install lightning arrested unit - protection radius 120m
05E2130000
Install copper earthing rod, D16 L2.5m
15 24-Aug-21
07-Sep-21
15
7
05E2131000
Testing box for earthing
30 08-Sep-21
07-Oct-21
30
5
Testing box for earthing
05E2132000
Install copper cable
6 08-Oct-21
13-Oct-21
6
5
Install copper cable
05E2133000
Install accessories of lightning cable on roof
35 14-Oct-21
17-Nov-21
35
7
05E2134000
Connect lightning to earthing pole
7 18-Nov-21
24-Nov-21
7
5
05E2134500
Erect steel pole
15 25-Nov-21
09-Dec-21
15
7
05E2134600
Finish work Lightning
09-Dec-21
0
7
0
CP05-GWP-21JUL.E.4.5 Infrastructure
CP05-GWP-21JUL.E.4.5.7 CP04 Remaining Work
A1780
Finish CP04 Remaining Work
CP05-GWP-21JUL.E.4.5.7.1 Drainage-Water supply-Troughs for Services
CP05-GWP-21JUL.E.4.5.7.1.1 Road N01
A1370
Subbase & Base Course
A1880
Geo-textile linning
CP05-GWP-21JUL.E.4.5.7.1.2 Road N02
A1430
Domestic water supply
A1440
Fire-fighting water supply
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
3 foundation excavation
Pole
5
Lean
concrete for foundation #100
359 25-Jul-21
359 25-Jul-21
0
19-Jul-22
19-Jul-22
19-Jul-22
359
359
0
230
230
216 25-Jul-21
20 10-Sep-21
20 10-Sep-21
26-Feb-22
29-Sep-21
29-Sep-21
216
20
20
156
17
5
3 10-Sep-21
13-Sep-21
3
12
74 03-Aug-21
11 03-Aug-21
15-Oct-21
14-Aug-21
74
11
11 03-Aug-21
14-Aug-21
11
Install copper earthing rod, D16 L2.5m
Install accessories of lightning cable on roof
Connect lightning to earthing pole
Erect steel pole
Finish work Lightning,
19-Jul-22, CP05-GWP-21JUL.E.4.5 Infrastructure
19-Jul-22, CP05-GWP-21JUL.E.4.5.7 CP04 Remaining Work
Finish CP04 Remaining Work,
26-Feb-22, CP05-GWP-21JUL.E.4.5.7.1 Drainage-Water supply-Troughs for Services
29-Sep-21, CP05-GWP-21JUL.E.4.5.7.1.1 Road N01
Subbase & Base Course
Geo-textile linning
15-Oct-21, CP05-GWP-21JUL.E.4.5.7.1.2 Road N02
27
5 Domestic water supply
5 Fire-fighting water supply
Page 15 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
A1460
Subbase & Base Course
A1900
Geo-textile linning
At Completion Start
Duration
CP05-GWP-21JUL.E.4.5.7.1.4 Road N03
A1600
Domestic water supply
Finish
16 30-Sep-21
15-Oct-21
1 30-Sep-21
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
16
5
12
30-Sep-21
1
105 30-Jul-21
11 30-Jul-21
11-Nov-21
10-Aug-21
105
11
Fire-fighting water supply
11 30-Jul-21
10-Aug-21
11
A1620
Sand Fill K98
19 10-Aug-21
28-Aug-21
19
3
A1630
Subbase & Base Course
27 16-Oct-21
11-Nov-21
27
3
A1910
Geo-textile linning
1 16-Oct-21
16-Oct-21
1
12
136 25-Jul-21
16 25-Jul-21
08-Dec-21
09-Aug-21
136
16
Oct
Nov
Fire-fighting water supply
7 25-Jul-21
31-Jul-21
7
A1670
Sand Fill K98
19 01-Aug-21
19-Aug-21
19
3
A1680
Subbase & Base Course
26 11-Nov-21
08-Dec-21
26
3
A1690
Geo-textile linning
1 11-Nov-21
12-Nov-21
1
12
189 25-Jul-21
48 25-Jul-21
30-Jan-22
10-Sep-21
189
48
33
5
Fire-fighting water supply
16 10-Aug-21
25-Aug-21
16
A1540
Sand Fill K98
19 26-Aug-21
13-Sep-21
19
3
A1550
Subbase & Base Course (remain)
53 08-Dec-21
30-Jan-22
53
3
A1890
Geo-textile linning (remain)
3 08-Dec-21
11-Dec-21
3
12
216 25-Jul-21
48 24-Aug-21
26-Feb-22
10-Oct-21
216
48
21
5
Subbase & Base Course (remain)
16 25-Jul-21
09-Aug-21
16
A1980
Fire-fighting water supply
16 10-Aug-21
25-Aug-21
16
Industrial water pipe
5 Domestic water supply
5
Fire-fighting water supply
A1990
Sand Fill K98
19 26-Aug-21
13-Sep-21
19
3
A2000
Subbase & Base Course
27 30-Jan-22
26-Feb-22
27
3
359 25-Jul-21
48 26-Feb-22
48 26-Feb-22
19-Jul-22
15-Apr-22
15-Apr-22
359
48
48
74
12
5
34 08-Mar-22
11-Apr-22
34
7
96 25-Jul-21
53 25-Jul-21
28-Oct-21
16-Sep-21
96
53
20
3
16 16-Sep-21
02-Oct-21
16
5
8 09-Oct-21
17-Oct-21
8
7
11 17-Oct-21
28-Oct-21
11
5
55 08-Mar-22
17 08-Mar-22
02-May-22
25-Mar-22
55
17
31
7
A1760
Plastering
CP05-GWP-21JUL.E.4.5.7.3.3 Internal Roads Finalize
A1800
Asphalt Concrete Binder Course
Sand Fill K98
Subbase & Base Course
19-Jul-22, CP05-GWP-21JUL.E.4.5.7.3 Finish Works Items
15-Apr-22, CP05-GWP-21JUL.E.4.5.7.3.1 Fence
Brick masonry (remain)
Plastering
28-Oct-21, CP05-GWP-21JUL.E.4.5.7.3.2 Security check building
Foundation
Structure
Brick masonry
Plastering
02-May-22, CP05-GWP-21JUL.E.4.5.7.3.3 Internal Roads Finalize
Asphalt Concrete Binder Course
A1810
Asphalt Concrete Surface Course
17 25-Mar-22
11-Apr-22
17
7
A1820
Brick tile
24 25-Mar-22
18-Apr-22
24
7
A1830
Painting
8 21-Apr-22
29-Apr-22
8
5
Painting
A1840
Sign Installation
11 21-Apr-22
02-May-22
11
5
Sign Installation
99 11-Apr-22
24 11-Apr-22
19-Jul-22
05-May-22
99
24
11
5
CP05-GWP-21JUL.E.4.5.7.3.4 External Lighting
A1850
Pole Foundation
Sep
Geo-textile linning (remain)
26-Feb-22, CP05-GWP-21JUL.E.4.5.7.1.6 Road N08
Domestic water supply
Brick masonry
Aug
Sand Fill K98
A1970
A1750
Jul
30-Jan-22, CP05-GWP-21JUL.E.4.5.7.1.3 Road N05
A1530
Structure
Jun
Geo-textile linning
Industrial water pipe
5 Domestic water supply
5
Fire-fighting water supply
A1740
May
Subbase & Base Course
16
CP05-GWP-21JUL.E.4.5.7.3.2 Security check building
A1730
Foundation
Apr
Sand Fill K98
09-Aug-21
Plastering
Mar
Subbase & Base Course
16 25-Jul-21
A1720
Feb
Asphalt Concrete Surface Course
Brick tile
19-Jul-22, CP05-GWP-21JUL.E.4.5.7.3.4 External Lighting
Pole Foundation
A1860
Pole Erection
19 30-Jun-22
19-Jul-22
19
3
Pole Erection
A1870
Line connection & Test
80 11-Apr-22
30-Jun-22
80
3
Line connection & Test
246 30-Apr-22
31-Dec-22
246
514
CP05-GWP-21JUL.F Test & Commissioning (T&C) and TOC
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
Sand Fill K98
Domestic water supply
CP05-GWP-21JUL.E.4.5.7.3 Finish Works Items
CP05-GWP-21JUL.E.4.5.7.3.1 Fence
A1710
Brick masonry (remain)
Jan
Qtr 3, 2022
Subbase & Base Course
A1520
CP05-GWP-21JUL.E.4.5.7.1.6 Road N08
A1930
Industrial water pipe
Dec
Qtr 2, 2022
Geo-textile linning
08-Dec-21, CP05-GWP-21JUL.E.4.5.7.1.5 Road N04
30
7 Surface drainage
5
Fire-fighting
water supply
A1660
CP05-GWP-21JUL.E.4.5.7.1.3 Road N05
A1480
Industrial water pipe
Sep
Qtr 1, 2022
Geo-textile linning
11-Nov-21, CP05-GWP-21JUL.E.4.5.7.1.4 Road N03
28
5 Domestic water supply
5 Fire-fighting water supply
A1610
CP05-GWP-21JUL.E.4.5.7.1.5 Road N04
A1640
Surface drainage
Qtr 4, 2021
05F1000010
B21C Standalone Test
21 28-Jun-22
18-Jul-22
21
12
05F1000020
B21C Static Integration & Performance Tests (CP5)
21 19-Jul-22
08-Aug-22
21
12
05F1000030
B04 Standalone Test
21 16-May-22
05-Jun-22
21
12
05F1000040
B04 Static Integration & Performance Tests (CP5)
21 06-Jun-22
26-Jun-22
21
12
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
31-Dec-22, CP05-GWP-21J
B21C Standalone Test
B21C Static Integration & Performance Tests (CP5)
B04 Standalone Test
B04 Static Integration & Performance Tests (CP5)
Page 16 of 17
ARCHITECTURAL WORKS OF DEPOT
Activity ID
Activity Name
At Completion Start
Duration
Finish
Remaining
Duration
Manpower
Qtr 3, 2021
Aug
05F1000050
B03 Standalone Test
21 01-May-22
21-May-22
21
12
05F1000060
B03 Static Integration & Performance Tests (CP5)
21 22-May-22
11-Jun-22
21
12
05F1000070
B13 Standalone Test
21 18-Jul-22
07-Aug-22
21
12
05F1000080
B13 Static Integration & Performance Tests (CP5)
21 08-Aug-22
28-Aug-22
21
12
05F1000090
OCC Standalone Test
21 06-Jul-22
26-Jul-22
21
12
05F1000100
OCC Static Integration & Performance Tests (CP5)
21 27-Jul-22
16-Aug-22
21
12
05F1000110
B07 Standalone Test
21 06-May-22
26-May-22
21
12
05F1000120
B07 Static Integration & Performance Tests (CP5)
21 27-May-22
16-Jun-22
21
12
05F1000130
B21A Standalone Test
21 02-May-22
22-May-22
21
12
05F1000140
B21A Static Integration & Performance Tests (CP5)
21 23-May-22
12-Jun-22
21
12
05F1000150
B06 Standalone Test
21 10-Jun-22
30-Jun-22
21
12
05F1000160
B06 Static Integration & Performance Tests (CP5)
21 01-Jul-22
21-Jul-22
21
12
05F1000170
B21B Standalone Test
21 30-Apr-22
21-May-22
21
12
05F1000180
B21B Static Integration & Performance Tests (CP5)
21 21-May-22
11-Jun-22
21
12
05F1000190
B23 Standalone Test
21 30-Apr-22
21-May-22
21
12
05F1000200
B23 Static Integration & Performance Tests (CP5)
21 21-May-22
11-Jun-22
21
12
05F1000210
B05 Standalone Test
21 03-Jul-22
23-Jul-22
21
12
05F1000220
B05 Static Integration & Performance Tests (CP5)
21 24-Jul-22
13-Aug-22
21
12
05F1000230
B20 Standalone Test
21 16-May-22
05-Jun-22
21
12
05F1000240
B20 Static Integration & Performance Tests (CP5)
21 06-Jun-22
26-Jun-22
21
12
05F1000250
B08 Standalone Test
21 12-Jul-22
01-Aug-22
21
12
05F1000260
B08 Static Integration & Performance Tests (CP5)
21 02-Aug-22
22-Aug-22
21
12
05F1000270
B17 Standalone Test
21 15-May-22
04-Jun-22
21
12
05F1000280
B17 Static Integration & Performance Tests (CP5)
21 05-Jun-22
25-Jun-22
21
12
05F1000290
B31B Standalone Test
21 07-Aug-22
27-Aug-22
21
12
05F1000300
B31B Static Integration & Performance Tests (CP5)
21 28-Aug-22
17-Sep-22
21
12
05F1000310
B15 Standalone Test
21 09-Jul-22
29-Jul-22
21
12
05F1000320
B15 Static Integration & Performance Tests (CP5)
21 30-Jul-22
19-Aug-22
21
12
05F1000330
B12 Standalone Test
21 10-Aug-22
30-Aug-22
21
12
05F1000340
B12 Static Integration & Performance Tests (CP5)
21 31-Aug-22
20-Sep-22
21
12
05F1000350
B28 Standalone Test
21 19-Jul-22
08-Aug-22
21
12
05F1000360
B28 Static Integration & Performance Tests (CP5)
21 09-Aug-22
29-Aug-22
21
12
05F1001000
Static Integration & Performance Tests (CP5/CP6)
80 02-Sep-22
20-Nov-22
80
20
05F1001020
Dynamic Integration Tests
80 22-Sep-22
10-Dec-22
80
20
05F1001030
Industrial Cleaning
21 11-Dec-22
31-Dec-22
21
30
05F1002000
Hand over Depot to MRB
31-Dec-22
0
12
Primary Baseline
Remaining Work
Milestone
Actual Work
Critical Remaining Work
summary
0
Qtr 4, 2021
Sep
Oct
Nov
Qtr 1, 2022
Dec
Jan
Feb
Qtr 2, 2022
Mar
Apr
May
Qtr 3, 2022
Jun
Jul
Aug
Sep
Qtr 4, 2022 Qtr 1, 2023
Oct
Nov
Dec Jan
B03 Standalone Test
B03 Static Integration & Performance Tests (CP5)
B13 Standalone Test
B13 Static Integration & Performance Tests (CP5)
OCC Standalone Test
OCC Static Integration & Performance Tests (CP5)
B07 Standalone Test
B07 Static Integration & Performance Tests (CP5)
B21A Standalone Test
B21A Static Integration & Performance Tests (CP5)
B06 Standalone Test
B06 Static Integration & Performance Tests (CP5)
B21B Standalone Test
B21B Static Integration & Performance Tests (CP5)
B23 Standalone Test
B23 Static Integration & Performance Tests (CP5)
B05 Standalone Test
B05 Static Integration & Performance Tests (CP5)
B20 Standalone Test
B20 Static Integration & Performance Tests (CP5)
B08 Standalone Test
B08 Static Integration & Performance Tests (CP5)
B17 Standalone Test
B17 Static Integration & Performance Tests (CP5)
B31B Standalone Test
B31B Static Integration & Performance Tests (CP5)
B15 Standalone Test
B15 Static Integration & Performance Tests (CP5)
B12 Standalone Test
B12 Static Integration & Performance Tests (CP5)
B28 Standalone Test
B28 Static Integration & Performance Tests (CP5)
Static Integration & Performance Tests (
Dynamic Integration Tests
Industrial Cleaning
Hand over Depot to MRB,