Grid-connected PV installation
Best practice guidelines

AuSES PV Installation Best Practice Workshop

1


Why best practice?
AS/NZS mandate minimum requirements
 Best practices go above and beyond and
include non-technical aspects
 Improve the quality/reputation of the PV
industry
 Some best practices may be included in
new versions of AS/NZS


AuSES PV Installation Best Practice Workshop

2


Before installation
Visit customer’s site before preparing
quote, don’t use satellite imagery
 Watch out for shading


◦ Solar Pathfinder, SunEye, mobile phone apps,
visual estimate




Plan cable routes, inverter location, panel
layout
◦ Minimize effect of shading

AuSES PV Installation Best Practice Workshop

3


Before installation
Watch out for meter box upgrades
 Give a firm quote, no hidden costs
 Give a timeline to installation and stick to
it
 Assist with regulatory approvals


◦ Grid connection, planning, RECs

AuSES PV Installation Best Practice Workshop

4


Before installation


Give an accurate estimated energy yield

(in writing)
◦ PVSyst
◦ RETScreen
◦ Manual calculations using BOM or NASA or
the ASRDH

AuSES PV Installation Best Practice Workshop

5


Before installation

Inclination

Azimuth
-90°

-60°

-30°



30°

60°

90°




90%

90%

90%

90%

90%

90%

90%

15°

88%

93%

96%

98%

96%

93%


88%

30°

83%

92%

98%

100%

98%

92%

83%

45°

77%

88%

95%

97%

95%


88%

77%

60°

69%

80%

87%

90%

87%

80%

69%

75°

60%

70%

77%

78%


77%

70%

60%

90°

51%

59%

63%

63%

63%

59%

51%

AuSES PV Installation Best Practice Workshop

6


Health and Safety

AuSES PV Installation Best Practice Workshop


7


Health and Safety

AuSES PV Installation Best Practice Workshop

8


PV modules

AuSES PV Installation Best Practice Workshop

9


PV modules

AuSES PV Installation Best Practice Workshop

10


PV modules

AuSES PV Installation Best Practice Workshop

11



PV modules

AuSES PV Installation Best Practice Workshop

12


A note on fuses
Overcurrent protection may be required
when multiple stings are connected in
parallel
 AS/NZS 5033:2005 provides sizing
requirements for overcurrent protection
 AS/NZS 5033:2005 does not provide
mandatory trip times for protection


AuSES PV Installation Best Practice Workshop

13


A note on fuses


IEC 61730.2 tests modules to withstand
135% of the maximum series fuse rating
for 2 hours




=> size overcurrent protection so that it
does not trip under normal operation, but
trips within 2 hours of an overcurrent
situation. Look at fuse/MCB
manufacturer’s datasheets.
AuSES PV Installation Best Practice Workshop

14


A note on fuses

AuSES PV Installation Best Practice Workshop

15


Polarized DC circuit breakers
Pay attention to the
direction of current
 Generally speaking,
the PV array goes in
the terminals marked
+ and –
 Check wiring with
manufacturer



AuSES PV Installation Best Practice Workshop

16


DC cabling

AuSES PV Installation Best Practice Workshop

17


DC cabling

AuSES PV Installation Best Practice Workshop

18


DC cabling

AuSES PV Installation Best Practice Workshop

19


DC cabling

AuSES PV Installation Best Practice Workshop


20


DC cabling

AuSES PV Installation Best Practice Workshop

21


Inverters - good

AuSES PV Installation Best Practice Workshop

22


Inverters - good

AuSES PV Installation Best Practice Workshop

23


Inverters - better

AuSES PV Installation Best Practice Workshop

24



Inverters - best

AuSES PV Installation Best Practice Workshop

25


×