Employer Doc. No.

NSRP
Complex Project

Nghi Son Refinery and Petrochemical
Limited Liability Company

Nghi Son, Vietnam

Contractor Doc. No.

Employer Contract No.: , Contractor JOB Code: 0-6495-20

S-000-1133-1002V
Rev. 3

Page 1 of 3

Date: 11/MAR/14

Detail Engineering, Procurement and
Construction CPM Network Level-3
Unit No.: Not Applicable
Unit Abbreviation.: Not Applicable
Document Class: Z

Issue Purpose

Rev


Date

Page

3
2
1
0
A

11/MAR/14
05/MAR/14
02/DEC/13
22/NOV/13
31/JUL/13

ALL
ALL
ALL
ALL
ALL

Description
Update Marine Schedules
Issued as Baseline Schedule
Revised Issue for Construction
Issue for Construction
Issue for Approval

Operation Centre JOB Code:


Responsible Company

JVD

R-20A
14
D
R
IN
A
M
12

For Construction

Prep'd

Chk'd

App'd

C.Q.
C.Q.
C.Q.
C.Q.
C.Q.

T.H.
T.H.

T.H.
T.H.
T.H.

F.K.
F.K.
F.K.
F.K.
F.K.

Operation Centre Doc. No.:

Prepared by

C. Quicho

Checked by

T. Hinohara

Approved by

F. Kimura


Employer Doc. No.

NSRP Complex Project
Title: Detail Engineering, Procurement and Construction
CPM Network Level-3


Contractor Doc. No.

S-000-1133-1002V

Rev. 3
Page 2 of 3

CONTENTS
1

PURPOSE .............................................................................................................................................3

2

REFERENCE DOCUMENTS ................................................................................................................3

3

CONDITIONS ........................................................................................................................................3

4

ATTACHMENTS ...................................................................................................................................3

R-20A
14
D
R
IN

A
M
12


Employer Doc. No.

NSRP Complex Project
Title: Detail Engineering, Procurement and Construction
CPM Network Level-3
1

Contractor Doc. No.

S-000-1133-1002V

Rev. 3
Page 3 of 3

PURPOSE
This document contains all the Detail Engineering, Procurement and Construction CPM Network
(Level -3) Schedule of Joint Venture Directorate (JVD) and each JGCS Consortium Operation
Centers, namely JGC, GSEC, Chiyoda, SKEC, and Technip. This is for Employer to have a detail
view of the project and understand the scope of work within the JGCS Consortium.

2

REFERENCE DOCUMENTS



3

S-000-1132-0001V “Work Breakdown Structure”

CONDITIONS
The following conditions are considered in the preparation of the schedules:

4

R-20A
14
D
R
IN
A
M
12



Schedule is prepared using Primavera 6 version 7.0 SP3



Schedule is prepared in accordance with Attachment - 2 “H-000-1133-1001V Basic Rules for
Level-3 Schedule Development”



JVD and each operation centre prepare the schedule for his own scope of work, which is in

accordance with Contractor Scope Map in S-000-1132-0001V.



Data date is set at 22-Jul-13 as Commencement Date. Early works were also shown in the
schedule to support the ongoing activities in the schedule before the Commencement Date.



Mechanical Completion date is set at 22-Nov-16, 40 months after commencement date.



Total float of less than or equal to 12 days is considered for critical activities



Marine facilities are based on D-000-1225-1011V Rev.A Key Plan for Plot Plan Marine
Facility.



Buildings schedule is based on the Employer’s Requirement of 3550-8330-SP-0001 Rev.D5
Building Performance Specification.



UOP design package, P&Id No.953060-120-07-A1 Rev.3 and vessel data sheet for
028-V-051A/B, 953060-301 Rev.0 are basis for Unit 028 Indirect Alkylation (INALK unit)




Stick built is considered for interconnecting piperack. (SK scope area)



Solid sulfur system is considerd instead of liquid sulfur system. (GS scope area)

ATTACHMENTS


Attachment -1:

JGCS Level-3 Schedule



Attachment - 2:

H-000-1133-1001V “Basic Rules for Level-3 Schedule Development”


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1


Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Overall Baseline Schedule
Sch
07-Mar-14 (Rev. Marine Resource)
On-Shore Facilities 90%
90
Milestones
General Milestones
C0000M010

Project Base Date (Contract Signing Date)

Original Total Float Start
Duration

Finish

919

0 15-Jan-13 A

22-Jul-17

919


0 15-Jan-13 A

22-Jul-17

919

0 15-Jan-13 A

22-Jul-17

919
0

0 15-Jan-13 A

22-Jul-17
15-Jan-13 A

C0000M020

Contract Effective Date (Project Base Date +120)

0

10-Jun-13 A

C0000M030

Commencement Date


0

22-Jul-13 A

C0000M0A5

Issue System definition IFC & System completion schedule

0

25

29-Mar-16

C0000M0A6

All As -Built drawings and final documentation handover to employer

0

178

31-Oct-16

C0000M0A8

Vendor Training

0


68

19-Aug-15

G0000M0001

Letter of Award (LOA)

0

15-Jan-13 A

G0000M0002

Effective Date

0

10-Jun-13 A

G0000M0003

Commencement Date

0

G0000M0A05

Issue Sys. Definition Issued for FC & Sys. Completion Schedule


0

107

22-Sep-14

G0000M0A06

All As -Built DWG & Final Doc . H/O to Employer

0

43

22-Feb-17

G0000M0A08

Vendor Training

0

68 23-Nov-16

G0000M0A09

Initial acceptance

0


J0000M0001

Letter of Award (LOA)

0

J0000M0002

Effective Date

0

J0000M0003

Commencement Date

0

J0000M0A05

Issue Systems Definition (IFC) & Completion Schedule

0

180

30-Apr-14

J0000M0A08


Vendor training

0

132

19-Jan-16

S0000M0001

Letter of Award (LOA)

0

S0000M0002

Effective Date

0

S0000M0003

Commencement Date

0

S0000M0004

All Unit MC of 40 Month


0

0

22-Nov-16

S0000M0005

Initial Acceptance 48 Month

0

0

22-Jul-17

S0000M0A05

Issue systems definition Issued for Construction (IFC) & Systems completion Schedule

0

80

22-Nov-13

S0000M0A06

All As Built drawings and final documentation handover to Employer


0

48

22-Nov-16

S0000M0A08

Vendor training

0

40

26-Sep-16

T0000M0001

Letter of Award (LOA)

0

15-Jan-13 A

T0000M0003

Effective Date

0


10-Jun-13 A

T0000M0005

Commencement Date

0

22-Jul-13 A

T0000M0007

Completion of Early Works

0

22

31-Jul-13

T0000M0008

Engineering Complete - Technip

0

80

23-Jun-15


T0000M0010

Initial Acceptance

0

0

22-Jul-17

T0000M0A05

Issue systems definition issued for Construction (IFC) & Systems Completion Schedul

0

49

12-Sep-16

T0000M0A06

All As -Built drawings and final documentation handover to Employer

0

45

V0000M0001


Letter of Award (LOA)

0

15-Jan-13 A

V0000M0002

Effective Date

0

10-Jun-13 A

V0000M0003

Site Access for Soil Study

0

V0000M0004

Commencement Date

0

0 22-Jul-13

V0000M0005


Final Mechanical Completion

0

0

22-Nov-16

V0000M0006

Initial Acceptance

0

0

22-Jul-17

V0000M0A01

Issue Overall Project Execution Plan Etc. (Final Issue)

0

116

31-Jan-14

V0000M0A02


Issue Project Control Procedure, Etc. (Final)

0

114

13-Dec-13

V0000M0A03

Issue Construction Execution Plan, Etc. (Final)

0

63

31-Jan-14

V0000M0A04

Issue Pre-commissioning and Handover Procedures, Etc. (Final)

0

102

30-Sep-15

V0000M0A06


Issue All As-Built Dwgs & Final Documentation

0

28

17-Jan-17

V0000M0A07

Training programme for Employer's personnel (IFA)

0

113

16-Dec-13

Engineering Milestones
C0000MEB01

Issue Utility demands,associated line sizes and electrical load data & equipt. ratings fin

684
0

2013
2014
2015
2016

2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49

Project Base Date (Contract Signing Date)
Contract Effective Date (Project Base Date +120)
Commencement Date
Issue System definition IFC & System completion schedu
All As -Built drawings and final do
Vendor Training
Letter of Award (LOA)
Effective Date

0 22-Jul-13

0

Commencement Date
Issue Sys. Definition Issued for FC & Sys. Completion Schedule
All As -Built DWG & F
Vendor Training
22-Jul-17

15-Jan-13 A

Init
Letter of Award (LOA)

10-Jun-13 A


Effective Date

3 22-Jul-13

Commencement Date

15-Jan-13 A

Issue Systems Definition (IFC) & Completion Schedule
Vendor training
Letter of Award (LOA)

10-Jun-13 A

Effective Date

80 22-Jul-13

Commencement Date
All Unit MC of 40 Month
Init
Issue systems definition Issued for Construction (IFC) & Systems completion Schedule
All As Built drawings and final d
Vendor training
Letter of Award (LOA)
Effective Date
Commencement Date
Completion of Early Works
Engineering Complete - Technip
Init

Issue systems definition issued for Co

17-Jan-17

All As -Built drawings and
Letter of Award (LOA)
Effective Date

01-Jul-13 A

94 20-May-13 A
64

Site Access for Soil Study
Commencement Date
Final Mechanical Completion
Init
Issue Overall Project Execution Plan Etc. (Final Issue)
Issue Project Control Procedure, Etc. (Final)
Issue Construction Execution Plan, Etc. (Final)
Issue Pre-commissioning and Handover Procedures, Etc. (Final)
Issue All As-Built Dwgs
Training programme for Employer's personnel (IFA)

22-Nov-16
20-Mar-14

Issue Utility demands,associated line sizes and electrical load data & equipt. ratings final

C0000MEB02


Issue for Employer approval all documents for HAZOP review

0

122

08-Oct-13

C0000MEB03

Complete HAZOP Review and submit Report

0

27

02-Apr-14

Issue for Employer approval all documents for HAZOP review

C0000MEB04

Issue for Employer approval all documents for SIL review

0

69

13-Nov-13


C0000MEB05

Complete SIL Review and submit Report

0

46

16-Dec-13

C0000MEB06

Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporat

0

54

04-Apr-14

C0000MEB07

Issue IFC Plot Plans, Equipment Layouts etc. complete

0

31

04-Apr-14


C0000MEB08

Issue 1st Piling Drawings IFC

0

56

28-Feb-14

C0000MEB09

Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities

0

22

27-Mar-14

C0000MEB10

Issue Material Requsitions (MRs) for all Major Equipment & Packages (Refer Items C1

0

42

26-Sep-13


C0000MEB11

Receipt of key vendor data (by major equipment)

0

25

20-Jun-14

C0000MEB12

Issue IFC all underground services drawings

0

56

31-Jul-14

C0000MEB13

Issue IFC all foundation & superstructure drawings for all Equipment & Packages

0

178

26-Aug-14


C0000MEB14

Issue IFC 50% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers, e

0

161

02-May-14

C0000MEB15

Issue IFC 50% of Civil/ Structural drawings etc. for all Buildings

0

41

26-May-14

C0000MEB16

Complete 30% 3D-CAD model review

0

118

24-Oct-13


C0000MEB17

Complete 60% 3D-CAD model review

0

47

18-Mar-14

C0000MEB18

Complete 90% 3D-CAD model review

0

105

23-Jul-14

C0000MEB19

Start issue piping isometrics IFC

0

25 23-Jun-14

C0000MEB20


Issue 50% Piping Isometrics IFC

0

54

17-Nov-14

C0000MEB21

Complete Piping Isometrics IFC

0

66

18-Mar-15

C0000MEB22

Issue 1st MTO and MRs for piping bulk materials

0

139

03-Oct-13

C0000MEB23


Issue Intermediate MTO & MR's for piping bulk materials

0

89

18-Jun-14

C0000MEB24

Issue final MTO and MRs for piping bulk materials

0

57

03-Apr-15

C0000MEB25

Issue IFC Electrical cable schedules, cable layouts, equipment layouts, earthing layout

0

28

26-Sep-14

C0000MEB26


Issue 1st MTO and MRs for electrical bulk materials

0

112

06-Mar-14

C0000MEB27

Issue final MTO and MRs for electrical bulk materials

0

61

30-Sep-14

C0000MEB28

Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tre

0

22

23-Oct-14

C0000MEB29


Issue 1st MTO and MRs for instrument bulk materials

0

75

02-May-14

C0000MEB30

Issue final MTO and MRs for instrument bulk materials

0

85

03-Oct-14

C0000MEB31

Issue IFC Electrical/Instrument layouts, interconnection diagrams etc. including all build

0

22

23-Oct-14

C0000MEB32


Finalize and issue IFC all instrumentation loop diagrams

0

169

08-Dec-14

Finalize and issue IFC all instrumentation loop diagrams

C0000MEB33

Issue all IFC drawings for roads, fencing, paving, tiling and all other finishing works com

0

169

08-Dec-14

Issue all IFC drawings for roads, fencing, paving, tiling and all other finishing works complete

C0000MEB34

Final issue of Operation and Maintenance Manual

0

25


29-Mar-16

G0000MEB01

Issue Utility demands, associated line sizes and electrical load data and equipment rati

0

80

01-Sep-14

G0000MEB02

Issue for Employer approval all documents for HAZOP review

0

74

22-Nov-13

G0000MEB03

Complete HAZOP Review and submit Report

0

116


18-Feb-14

G0000MEB04

Issue for Employer approval all documents for SIL review

0

74

22-Nov-13

G0000MEB05

Complete SIL Review and submit Report

0

114

27-Nov-14

G0000MEB06

Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporat

0

63


17-Apr-14

G0000MEB07

Issue IFC Plot Plans, Equipment Layouts etc. complete

0

116

23-Oct-14

G0000MEB08

Issue 1st Piling Drawings IFC

0

40

03-Apr-14

G0000MEB09

Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities

0

99


04-Sep-14

G0000MEB11

Receipt of key vendor data (by major equipment)

0

125

24-Jul-14

G0000MEB12

Issue IFC all underground services drawings

0

165

13-Nov-14

G0000MEB13

Issue IFC all foundation & superstructure drawings for all Equipment & Packages

0

156


20-Nov-14

G0000MEB14

Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers e

0

88

07-Jan-15

G0000MEB15

Issue IFC 95% of Civil / Structural drawings etc for all Buildings.

0

133

17-Dec-14

G0000MEB16

Complete 30% 3D.CAD model review

0

72


28-Feb-14

G0000MEB17

Complete 60% 3D.CAD model review

0

119

07-Jul-14

G0000MEB18

Complete 90% 3D.CAD model review

0

50

05-Dec-14

G0000MEB19

Start issue piping isometrics IFC

0

G0000MEB20


Issue 50% Piping Isometrics IFC

0

84

02-Feb-15

G0000MEB21

Complete Piping Isometrics IFC

0

138

25-Mar-15

G0000MEB22

Issue 1st MTO and MRs for piping bulk materials

0

106

20-Jan-14

G0000MEB23


Issue Intermediate MTO and MR¡¯s for piping bulk materials

0

102

22-Jul-14

G0000MEB24

Issue final MTO and MRs for piping bulk materials

0

41

16-Feb-15

G0000MEB25

Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts

0

91

18-Mar-15

G0000MEB26


Issue 1st MTO and MRs for electrical bulk materials

0

121

29-Sep-14

G0000MEB27

Issue final MTO and MRs for electrical bulk materials

0

61

23-Jan-15

G0000MEB28

Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tre

0

70

16-Apr-15

G0000MEB29


Issue 1st MTO and MRs for instrument bulk materials

0

144

02-Dec-14

G0000MEB30

Issue final MTO and MRs for instrument bulk materials

0

92

19-Mar-15

G0000MEB31

Issue IFC Electrical/Instrument Layout, Diagram, etc. for all Buildings

0

96

11-Mar-15

G0000MEB32


Finalize and issue IFC all instrumentation loop diagrams.

0

114

05-Mar-15

G0000MEB33

Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works co

0

171

03-Nov-14

G0000MEB34

Final issue of Operation and Maintenance Manuals

0

125

22-Nov-16

J0000MEB01


Issue Utility Demands, Load , Ratings, Etc.

0

120

19-Aug-14

Complete HAZOP Review and submit Report
Issue for Employer approval all documents for SIL review
Complete SIL Review and submit Report
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporating HAZOP Comments
Issue IFC Plot Plans, Equipment Layouts etc. complete
Issue 1st Piling Drawings IFC
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities (complete).
Issue Material Requsitions (MRs) for all Major Equipment & Packages (Refer Items C1-C17 below for details).

Issue IFC 50% of Civil/ Structural drawings etc. for all Buildings
Complete 30% 3D-CAD model review
Complete 60% 3D-CAD model review
Complete 90% 3D-CAD model review
Issue 50% Piping Isometrics IFC
Complete Piping Isometrics IFC
Issue 1st MTO and MRs for piping bulk materials
Issue Intermediate MTO & MR's for piping bulk materials
Issue final MTO and MRs for piping bulk materials
Issue IFC Electrical cable schedules, cable layouts, equipment layouts, earthing layouts, lighting layouts, JB details
Issue 1st MTO and MRs for electrical bulk materials
Issue final MTO and MRs for electrical bulk materials

Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, trench details, etc. complete
Issue 1st MTO and MRs for instrument bulk materials
Issue final MTO and MRs for instrument bulk materials
Issue IFC Electrical/Instrument layouts, interconnection diagrams etc. including all buildings control systems, HVAC

Final issue of Operation and Maintenance Manual
Issue Utility demands, associated line sizes and electrical load data and equipment ratings final.
Issue for Employer approval all documents for HAZOP review
Complete HAZOP Review and submit Report
Issue for Employer approval all documents for SIL review
Complete SIL Review and submit Report
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporating HAZOP comments
Issue IFC Plot Plans, Equipment Layouts etc. complete
Issue 1st Piling Drawings IFC
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities (complete)
Receipt of key vendor data (by major equipment)
Issue IFC all underground services drawings
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers etc. complete.
Issue IFC 95% of Civil / Structural drawings etc for all Buildings.
Complete 30% 3D.CAD model review
Complete 60% 3D.CAD model review
Complete 90% 3D.CAD model review
Start issue piping isometrics IFC
Issue 50% Piping Isometrics IFC
Complete Piping Isometrics IFC
Issue 1st MTO and MRs for piping bulk materials
Issue Intermediate MTO and MR¡¯s for piping bulk materials
Issue final MTO and MRs for piping bulk materials
Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts, lighting layo

Issue 1st MTO and MRs for electrical bulk materials
Issue final MTO and MRs for electrical bulk materials
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, trench deta
Issue 1st MTO and MRs for instrument bulk materials
Issue final MTO and MRs for instrument bulk materials
Issue IFC Electrical/Instrument Layout, Diagram, etc. for all Buildings
Finalize and issue IFC all instrumentation loop diagrams.
Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works complete
Final issue of Operation and M
Issue Utility Demands, Load , Ratings, Etc.

Page 1 of 179

Detail Engineering, Procurement, and
Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

Issue IFC all foundation & superstructure drawings for all Equipment & Packages
Issue IFC 50% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers, etc. complete

139 01-Oct-14


Critical Remaining Work
Milestone

Issue IFC all underground services drawings

Start issue piping isometrics IFC

Actual Work
Remaining Work

Receipt of key vendor data (by major equipment)

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara

T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

Finish


2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
Issue Document for HAZOP

J0000MEB02

Issue Document for HAZOP

0

21

28-Oct-13

J0000MEB03

Complete HAZOP Review and Submit Report

0

124

22-Jan-14


J0000MEB04

Issue Document for SIL Review

0

184

28-Oct-13

J0000MEB05

Complete SIL Review and Submit Report

0

63

03-Sep-14

J0000MEB06

Issue PFD, P&ID, Etc., Incl. HAZOP Comments

0

97

26-Jun-14


Issue PFD, P&ID, Etc., Incl. HAZOP Comments

J0000MEB07

Issue Plot Plans, Etc. (FC)

0

95

30-Jun-14

Issue Plot Plans, Etc. (FC)

J0000MEB08

Issue 1st Piling Drawings (FC)

0

J0000MEB09

Issue Single Line Diagram, Etc. (FC)

0

J0000MEB10

Issue Requisition for Major Equipment


0

J0000MEB11

Receive Major Equipment Vendor Data

0

108

07-Feb-14

J0000MEB12

Issue U/G Drawings (FC)

0

103

16-Jan-15

Issue U/G Drawings (FC)

J0000MEB13

Issue Foundation Drawings, Etc. (FC)

0


115

01-Oct-14

Issue Foundation Drawings, Etc. (FC)

J0000MEB14

Issue 95% of Civil/Str Dwgs for Pipe Support(FC)

0

16

12-Jun-15

J0000MEB15

Issue 95% of Civil/Str Dwgs. for Buildings (FC)

0

70

20-Oct-14

J0000MEB16

Complete 30% 3D-CAD Model Review


0

86

31-Jan-14

J0000MEB17

Complete 60% 3D-CAD Model Review

0

61

01-Aug-14

J0000MEB18

Complete 90% 3D-CAD Model Review

0

46

20-Nov-14

J0000MEB19

Start Issue Piping Isometrics IFC


0

53 11-Nov-14

J0000MEB20

Issue 50% Piping Isometrics IFC

0

46

07-Apr-15

J0000MEB21

Complete Piping Isometrics IFC

0

46

18-Aug-15

J0000MEB22

Issue 1st MTO & MR's for Piping Bulk Materials

0


27

28-Feb-14

J0000MEB23

Issue Intermediate MTO & MR's for Piping Bulk

0

183

10-Jul-14

J0000MEB24

Issue Final MTO & MR's for Piping Bulk Materials

0

77

30-Apr-15

J0000MEB25

Issue IFC Electrical Cable Schedule, Layout, Etc

0


100

20-Oct-14

J0000MEB26

Issue 1st MTO & MR's for Electrical Bulk Mat'l

0

39

27-Jun-14

J0000MEB27

Issue Final MTO & MR's for Electrical Bulk Mat'l

0

18

26-Mar-15

J0000MEB28

Issue IFC Instrument Cable Schedule, Layout, Etc

0


169

07-Oct-14

J0000MEB29

Issue 1st MTO & MR's for Instrument Bulk Mat'l

0

30

27-Aug-14

J0000MEB30

Issue Final MTO & MR's for Instrument Bulk Mat'l

0

17

28-Jan-15

J0000MEB31

Issue IFC Electrical/Instrument Layout, Diagram

0


39

27-Jun-14

J0000MEB32

Finalize & Issue IFC All Instrument Loop Diagram

0

164

20-Oct-15

J0000MEB33

Issue All IFC Dwg. for Roads, Fence, Paving, Etc

0

191

08-Dec-14

J0000MEB34

Final Issue of Operation and Maintenance Manual

0


23

19-Oct-16

S0000MEB01

Issue Utility demands, associated line sizes and electrical load data and equipment rati

0

82

28-Feb-14

S0000MEB02

Issue for Employer approval all documents for HAZOP review

0

54

30-Sep-14

Issue for Employer approval all documents for HAZOP review

S0000MEB03

Complete HAZOP Review and submit Report.


0

54

30-Sep-14

Complete HAZOP Review and submit Report.

S0000MEB04

Issue for Employer approval all documents for SIL review

0

79

31-Mar-15

S0000MEB05

Complete SIL Review and submit Report.

0

79

31-Mar-15

S0000MEB06


Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporat

0

78

12-Jan-15

S0000MEB07

Issue IFC Plot Plans, Equipment Layouts etc. complete

0

87

29-Aug-14

S0000MEB08

Issue 1st Piling Drawings IFC

0

86

17-Feb-14

S0000MEB09


Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities

0

80

31-Dec-14

S0000MEB10

Issue Material Requisitions (MRs) for all Major Equipment & Packages (Refer Items C

0

34

30-Aug-13

S0000MEB11

Receipt of key vendor data (by major equipment)

0

68

31-Jul-14

S0000MEB12


Issue IFC all underground services drawings

0

82

04-Mar-15

S0000MEB13

Issue IFC all foundation & superstructure drawings for all Equipment & Packages

0

59

31-Oct-14

S0000MEB14

Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers e

0

61

28-Nov-14

S0000MEB15


Issue IFC 95% of Civil / Structural drawings etc for all Buildings.

0

98

14-Nov-14

S0000MEB16

Complete 30% 3D CAD model review

0

69

31-Mar-14

S0000MEB17

Complete 60% 3D CAD model review

0

50

31-Jul-14

S0000MEB18


Complete 90% 3D CAD model review

0

67

14-Nov-14

S0000MEB19

Start issue piping isometrics IFC

0

23 01-Jul-14

S0000MEB20

Issue 50% Piping Isometrics IFC

0

70

13-Feb-15

S0000MEB21

Complete Piping Isometrics IFC


0

45

30-Apr-15

S0000MEB22

Issue 1st MTO and MRs for piping bulk materials

0

74

28-Feb-14

S0000MEB23

Issue Intermediate MTO and MR's for piping bulk materials

0

94

29-Aug-14

S0000MEB24

Issue final MTO and MRs for piping bulk materials


0

45

30-Apr-15

S0000MEB25

Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts

0

88

31-Dec-14

S0000MEB26

Issue 1st MTO and MRs for electrical bulk materials

0

80

30-May-14

S0000MEB27

Issue final MTO and MRs for electrical bulk materials


0

80

30-Jan-15

S0000MEB28

Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tre

0

93

31-Mar-15

S0000MEB29

Issue 1st MTO and MRs for instrument bulk materials

0

84

07-Jul-14

S0000MEB30

Issue final MTO and MRs for instrument bulk materials


0

79

31-Mar-15

S0000MEB31

Issue IFC Electrical/Instrument layouts, interconnection diagrams etc including all build

0

58

15-Jan-15

S0000MEB32

Finalize and issue IFC all instrumentation loop diagrams.

0

55

30-Apr-15

S0000MEB33

Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works co


0

61

31-Mar-15

S0000MEB34

Final issue of Operation and Maintenance Manuals

0

84

31-Aug-15

T0000MEB01

Issue Utility demands, associated line sizes and electrical load data and equipment rati

0

82

30-Apr-15

T0000MEB02

Issue for Employer approval all documents for HAZOP review


0

27

01-Nov-13

T0000MEB03

Complete HAZOP Review and submit Report.

0

64

04-Feb-14

T0000MEB04

Issue for Employer approval all documents for SIL review

0

65

17-Jan-14

Issue for Employer approval all documents for SIL review

T0000MEB05


Complete SIL Review and submit Report.

0

88

03-Apr-14

Complete SIL Review and submit Report.

T0000MEB06

Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporat

0

82

19-May-15

T0000MEB07

Issue IFC Plot Plans, Equipment Layouts etc. complete

0

78

22-Apr-15


T0000MEB08

Issue 1st Piling Drawings IFC

0

45

31-Mar-14

T0000MEB09

Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities

0

32

11-May-15

T0000MEB10

Issue Material Requisitions (MRs) for all Major Equipment & Packages (Refer Items C

0

T0000MEB11

Receipt of key vendor data (by major equipment)


0

23

04-Jun-14

T0000MEB12

Issue IFC all underground services drawings

0

54

31-Jul-14

T0000MEB13

Issue IFC all foundation & superstructure drawings for all Equipment & Packages

0

62

21-Oct-14

T0000MEB14

Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers e


0

112

14-Jan-15

T0000MEB15

Issue IFC 95% of Civil / Structural drawings etc for all Buildings.

0

68

14-Jan-15

T0000MEB16

Complete 30% 3D-CAD model review

0

29

20-Dec-13

T0000MEB17

Complete 60% 3D-CAD model review


0

37

23-Jun-14

T0000MEB18

Complete 90% 3D-CAD model review

0

88

17-Dec-14

T0000MEB19

Start issue piping isometrics IFC

0

88

20-Oct-14

T0000MEB20

Issue 50% Piping Isometrics IFC


0

41

24-Feb-15

T0000MEB21

Complete Piping Isometrics IFC

0

44

22-Apr-15

T0000MEB22

Issue 1st MTO and RMLs for piping bulk materials

0

65

28-Feb-14

T0000MEB23

Issue Intermediate MTO and RMLs for piping bulk materials


0

51

04-Sep-14

T0000MEB24

Issue final MTO and RMLs for piping bulk materials

0

98

22-Apr-15

T0000MEB25

Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts

0

47

10-Jun-15

T0000MEB26

Issue 1st MTO and RMLs for electrical bulk materials


0

66

06-Aug-14

T0000MEB27

Issue final MTO and RMLs for electrical bulk materials

0

64

03-Dec-14

T0000MEB28

Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tre

0

80

23-Jun-15

T0000MEB29

Issue 1st MTO and RMLs for instrument bulk materials


0

117

24-Mar-14

T0000MEB30

Issue final MTO and RMLs for instrument bulk materials

0

99

26-Jan-15

T0000MEB31

Issue IFC Electrical/Instrument layouts, interconnection diagrams etc including all build

0

97

29-May-15

T0000MEB32

Finalize and issue IFC all instrumentation loop diagrams.


0

97

29-May-15

T0000MEB33

Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works co

0

32

04-Feb-15

T0000MEB34

Final issue of Operation and Maintenance Manuals

0

86

15-Jun-15

T0000MEB38

Final Issue of Chemical & Catalyst recommandation to JVD


0

76

03-Jun-14

V0000MEB34

Final Issue of Operation and Maintenance Manual

0

102

31-Mar-15

Procurement Service Milestones
Milest
C0000MPC02
Issue purchase order for RHDS Fixed Bed Reactors

624
0

Complete HAZOP Review and Submit Report
Issue Document for SIL Review
Complete SIL Review and Submit Report

38 14-Apr-14
167


Issue 1st Piling Drawings (FC)
14-Mar-14

Issue Single Line Diagram, Etc. (FC)

02-Jul-13 A

Issue Requisition for Major Equipment
Receive Major Equipment Vendor Data

Issue 95% of Civil/Str Dwgs for Pipe Support(FC)
Issue 95% of Civil/Str Dwgs. for Buildings (FC)
Complete 30% 3D-CAD Model Review
Complete 60% 3D-CAD Model Review
Complete 90% 3D-CAD Model Review
Start Issue Piping Isometrics IFC
Issue 50% Piping Isometrics IFC
Complete Piping Isometrics IFC
Issue 1st MTO & MR's for Piping Bulk Materials
Issue Intermediate MTO & MR's for Piping Bulk
Issue Final MTO & MR's for Piping Bulk Materials
Issue IFC Electrical Cable Schedule, Layout, Etc
Issue 1st MTO & MR's for Electrical Bulk Mat'l
Issue Final MTO & MR's for Electrical Bulk Mat'l
Issue IFC Instrument Cable Schedule, Layout, Etc
Issue 1st MTO & MR's for Instrument Bulk Mat'l
Issue Final MTO & MR's for Instrument Bulk Mat'l
Issue IFC Electrical/Instrument Layout, Diagram
Finalize & Issue IFC All Instrument Loop Diagram

Issue All IFC Dwg. for Roads, Fence, Paving, Etc
Final Issue of Operation and Main
Issue Utility demands, associated line sizes and electrical load data and equipment ratings final.

Issue for Employer approval all documents for SIL review
Complete SIL Review and submit Report.
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporating HAZOP commen
Issue IFC Plot Plans, Equipment Layouts etc. complete
Issue 1st Piling Drawings IFC
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities (complete).
Issue Material Requisitions (MRs) for all Major Equipment & Packages (Refer Items C1 C17 below for details).
Receipt of key vendor data (by major equipment)
Issue IFC all underground services drawings
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers etc. complete.
Issue IFC 95% of Civil / Structural drawings etc for all Buildings.
Complete 30% 3D CAD model review
Complete 60% 3D CAD model review
Complete 90% 3D CAD model review
Start issue piping isometrics IFC

20-May-13 A

33 30-Aug-13
17

22-Nov-16
30-Aug-13

C0000MPC03


Issue purchase order for RHDS Recycle Gas Compressors

0

34

03-Oct-13

C0000MPC18

Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment

0

90

13-Dec-13

C0000MPC19

Issue purchase order for all major Electrical Equipment

0

26

01-Jul-14

C0000MPC20


Issue purchase order for HVAC, Fire Detection and FF Systems for all buildings

0

107

28-Feb-14

C0000MPC21

Issue purchase order for all major Instrument Control Systems

0

55

10-Mar-14

C0000MPC22

Issue purchase order for all Field Instrument tagged materials

0

55

27-Jun-14

C0000MPC23


Issue 1st purchase orders for bulk piping materials

0

60

31-Jan-14

C0000MPC24

Issue 1st purchase orders for bulk electrical materials

0

52

24-Apr-14

C0000MPC25

Issue last purchase orders for bulk electrical materials

0

114

30-Mar-15

C0000MPC26


Issue 1st purchase orders for bulk instrument materials

0

96

26-May-14

C0000MPC27

Issue last purchase order for bulk instrument materials

0

93

29-Aug-14

C0000MPC28

Final listing of two year operation & maintenance spares per item of equipment, with pri

0

68

06-Jan-16

G0000MPC18


Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment

0

126

24-Jun-14

G0000MPC19

Issue purchase orders for all major electrical Equipment

0

118

12-Nov-14

G0000MPC20

Issue purchase orders for HVAC, Fire Detection and Fire Fighting Systems for all build

0

90

11-Dec-14

Issue 50% Piping Isometrics IFC

Complete Piping Isometrics IFC
Issue 1st MTO and MRs for piping bulk materials
Issue Intermediate MTO and MR's for piping bulk materials
Issue final MTO and MRs for piping bulk materials
Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts, lighting layouts, JB
Issue 1st MTO and MRs for electrical bulk materials
Issue final MTO and MRs for electrical bulk materials
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, trench details
Issue 1st MTO and MRs for instrument bulk materials
Issue final MTO and MRs for instrument bulk materials
Issue IFC Electrical/Instrument layouts, interconnection diagrams etc including all building control systems
Finalize and issue IFC all instrumentation loop diagrams.
Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works complete
Final issue of Operation and Maintenance Manuals
Issue Utility demands, associated line sizes and electrical load data and equipment ratings fina
Issue for Employer approval all documents for HAZOP review
Complete HAZOP Review and submit Report.

Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporating HA
Issue IFC Plot Plans, Equipment Layouts etc. complete
Issue 1st Piling Drawings IFC
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities (com
Issue Material Requisitions (MRs) for all Major Equipment & Packages (Refer Items C1-C17 below for details).
Receipt of key vendor data (by major equipment)
Issue IFC all underground services drawings
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers etc. complete.
Issue IFC 95% of Civil / Structural drawings etc for all Buildings.
Complete 30% 3D-CAD model review
Complete 60% 3D-CAD model review

Complete 90% 3D-CAD model review
Start issue piping isometrics IFC
Issue 50% Piping Isometrics IFC
Complete Piping Isometrics IFC
Issue 1st MTO and RMLs for piping bulk materials
Issue Intermediate MTO and RMLs for piping bulk materials
Issue final MTO and RMLs for piping bulk materials
Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts, lig
Issue 1st MTO and RMLs for electrical bulk materials
Issue final MTO and RMLs for electrical bulk materials
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tren
Issue 1st MTO and RMLs for instrument bulk materials
Issue final MTO and RMLs for instrument bulk materials
Issue IFC Electrical/Instrument layouts, interconnection diagrams etc including all building c
Finalize and issue IFC all instrumentation loop diagrams.
Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works complete
Final issue of Operation and Maintenance Manuals
Final Issue of Chemical & Catalyst recommandation to JVD
Final Issue of Operation and Maintenance Manual
Issue purchase order for RHDS Fixed Bed Reactors

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A

R
D
014
2
N
R
I 12-MA

Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment Packages
Issue purchase order for all major Electrical Equipment
Issue purchase order for HVAC, Fire Detection and FF Systems for all buildings
Issue purchase order for all major Instrument Control Systems
Issue purchase order for all Field Instrument tagged materials
Issue 1st purchase orders for bulk piping materials
Issue 1st purchase orders for bulk electrical materials
Issue last purchase orders for bulk electrical materials
Issue 1st purchase orders for bulk instrument materials
Issue last purchase order for bulk instrument materials
Final listing of two year operation & maintenance spares per item o
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment Packages
Issue purchase orders for all major electrical Equipment
Issue purchase orders for HVAC, Fire Detection and Fire Fighting Systems for all buildings.

Page 2 of 179

Actual Work
Remaining Work

Issue purchase order for RHDS Recycle Gas Compressors


Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project

Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

Finish

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
Issue purchase order for all major instrument control systems

G0000MPC21

Issue purchase order for all major instrument control systems


0

114

06-Nov-13

G0000MPC22

Issue purchase orders for all field instrument tagged items

0

110

22-Aug-14

G0000MPC23

Issue 1st purchase orders for bulk piping materials

0

169

05-Mar-14

G0000MPC24

Issue 1st purchase orders for bulk electrical materials


0

50

29-Oct-14

G0000MPC25

Issue last purchase orders for bulk electrical materials

0

57

25-Feb-15

G0000MPC26

Issue 1st purchase orders for bulk instrument materials

0

134

25-Nov-14

G0000MPC27

Issue last purchase orders for bulk instrument materials


0

85

16-Apr-15

G0000MPC28

Final listing of two year operation and maintenance spares per item of equipment, with

0

48

22-Nov-16

J0000MPC04

Issue purchase order for RFCC Air Blower

0

7

28-Nov-13

Issue purchase order for RFCC Air Blower

J0000MPC05


Issue purchase order for RFCC Wet Gas Compressors

0

72

28-Nov-13

Issue purchase order for RFCC Wet Gas Compressors

J0000MPC18

Issue POs for All Remaining Mechanical Equipment

0

77

12-Feb-14

J0000MPC19

Issue POs for All Major Elec trical Equipment

0

17

25-Jun-14


J0000MPC20

Issue POs for HVAC, Fire Fighting Equipment

0

52

04-Nov-14

J0000MPC21

Issue POs for Major Instrument Controls Systems

0

47

19-Nov-13

J0000MPC22

Issue POs for All F ield Ins trument Tagged Items

0

126

13-Mar-14


J0000MPC23

Issue 1st PO for Bulk Piping Materials

0

6

01-Apr-14

J0000MPC24

Issue 1st PO for Bulk Electrical Materials

0

80

28-Apr-14

J0000MPC25

Issue Last PO for Bulk Electrical Materials

0

110

03-Sep-14


J0000MPC26

Issue 1st PO for Bulk Instrument Materials

0

91

10-Oct-14

J0000MPC27

Issue Last PO for Bulk Instrument Materials

0

134

12-Mar-15

J0000MPC28

Final List of Two Years Operation & Maint. Spare

0

98

01-Jul-16


S0000MPC01

Issue purchase order for CDU Crude Distillation Column

0

0

17-Jan-14

S0000MPC06

Issue purchase order for KHDS Recycle Compressor

0

74

31-Dec-13

S0000MPC07

Issue purchase order for GO HDS Reactors

0

79

05-Dec-13


S0000MPC08

Issue purchase order for Ar omatics UOP Rotary valve

0

41

06-Dec-13

S0000MPC11

Issue purchase order for Polypropylene Loop Reactors

0

78

24-Oct-13

S0000MPC12

Issue purchase order for Polypropylene Pelletizer Unit

0

97

05-Dec-13


Issue purchase order for Polypropylene Pelletizer Unit

S0000MPC13

Issue purchase order for Utilities GTG Packages

0

72

29-Nov-13

Issue purchase order for Utilities GTG Packages

S0000MPC14

Issue purchase order for Utilities HHP MP Steam Turbine Generator

0

91

29-Nov-13

Issue purchase order for Utilities HHP MP Steam Turbine Generator

S0000MPC15

Issue purchase order for Utilities HRSG packages


0

75

17-Feb-14

Issue purchase order for Utilities HRSG packages

S0000MPC18

Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment

0

74

29-Aug-14

S0000MPC19

Issue purchase orders for all major electrical Equipment

0

96

31-Jul-14

S0000MPC21


Issue purchase order for all major instrument control systems

0

80

17-Jul-14

Issue purchase order for all major instrument control systems

S0000MPC22

Issue purchase orders for all field instrument tagged items

0

82

15-Jul-14

Issue purchase orders for all field instrument tagged items

S0000MPC23

Issue 1st purchase orders for bulk piping materials

0

60


29-Jan-14

S0000MPC24

Issue 1st purchase orders for bulk electrical materials

0

65

01-Jul-14

S0000MPC25

Issue last purchase orders for bulk electrical materials

0

62

28-Nov-14

S0000MPC26

Issue 1st purchase orders for bulk instrument materials

0

49


31-Oct-14

S0000MPC27

Issue last purchase orders for bulk instrument materials

0

87

31-Dec-14

S0000MPC28

Final listing of two year operation and maintenance spares per item of equipment, with

0

25

31-Aug-15

T0000MPC09

Issue purchase order Recovery plus system

0

16


29-Nov-13

T0000MPC10

Issue purchase order for CCR Regenerator

0

3

30-Dec-13

T0000MPC18

Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment

0

85

25-Apr-14

T0000MPC19

Issue purchase orders for all major electrical Equipment

0

13


22-Aug-14

T0000MPC21

Issue purchase order for all major instrument control systems

0

59

11-Mar-14

T0000MPC22

Issue purchase orders for all field instrument tagged items

0

46

17-Oct-14

T0000MPC23

Issue 1st purchase orders for bulk piping materials

0

71


27-Feb-14

T0000MPC24

Issue 1st purchase orders for bulk electrical materials

0

50

09-Sep-14

T0000MPC25

Issue last purchase orders for bulk electrical materials

0

63

01-Oct-14

T0000MPC26

Issue 1st purchase orders for bulk instrument materials

0

65


13-Aug-14

T0000MPC27

Issue last purchase orders for bulk instrument materials

0

84

19-Sep-14

T0000MPC28

Final listing of two year operation and maintenance spares per item of equipment, with

0

57

15-Jun-15

53 31-Jul-14
15

22-Nov-16
16-Apr-15

RHDS Fixed Bed Reactors delivered to site

RHDS Recycle Gas Compressors delivered to site

Manufacturing & Delivery Milestones
M
C0000MMD02
RHDS Fixed Bed Reactors delivered to site

450
0

Issue purchase orders for all field instrument tagged items
Issue 1st purchase orders for bulk piping materials
Issue 1st purchase orders for bulk electrical materials
Issue last purchase orders for bulk electrical materials
Issue 1st purchase orders for bulk instrument materials
Issue last purchase orders for bulk instrument materials
Final listing of two year operat

Issue POs for All Remaining Mechanical Equipment
Issue POs for All Major Elec trical Equipment
Issue POs for HVAC, Fire Fighting Equipment
Issue POs for Major Instrument Controls Systems
Issue POs for All F ield Ins trument Tagged Items
Issue 1st PO for Bulk Piping Materials
Issue 1st PO for Bulk Electrical Materials
Issue Last PO for Bulk Electrical Materials
Issue 1st PO for Bulk Instrument Materials
Issue Last PO for Bulk Instrument Materials
Final List of Two Years Operation & Maint. Spa
Issue purchase order for CDU Crude Distillation Column

Issue purchase order for KHDS Recycle Compressor
Issue purchase order for GO HDS Reactors
Issue purchase order for Ar omatics UOP Rotary valve
Issue purchase order for Polypropylene Loop Reactors

Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment Packages
Issue purchase orders for all major electrical Equipment

Issue 1st purchase orders for bulk piping materials
Issue 1st purchase orders for bulk electrical materials
Issue last purchase orders for bulk electrical materials
Issue 1st purchase orders for bulk instrument materials
Issue last purchase orders for bulk instrument materials
Final listing of two year operation and maintenance spares per item of equipment
Issue purchase order Recovery plus system
Issue purchase order for CCR Regenerator
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment Packages
Issue purchase orders for all major electrical Equipment
Issue purchase order for all major instrument control systems
Issue purchase orders for all field instrument tagged items
Issue 1st purchase orders for bulk piping materials
Issue 1st purchase orders for bulk electrical materials
Issue last purchase orders for bulk electrical materials
Issue 1st purchase orders for bulk instrument materials
Issue last purchase orders for bulk instrument materials
Final listing of two year operation and maintenance spares per item of equipment, with pri

C0000MMD03

RHDS Recycle Gas Compressors delivered to site


0

34

15-Apr-15

C0000MMD15

Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to site

0

69

17-Aug-15

C0000MMD16

All major Electrical Equipment delivered to site

0

154

02-Mar-15

C0000MMD17

HVAC, Fire Detection and Fire Fighting Systems for all buildings delivered to site


0

128

16-Mar-15

C0000MMD18

Major instrument control systems delivered to site

0

65

29-Sep-15

C0000MMD19

Instrument Control Systems for CCB delivered to site

0

65

29-Sep-15

C0000MMD20

Field instrument tagged items delivered to site


0

61

19-Jun-15

C0000MMD21

Bulk piping materials initial MTO delivered to site

0

86

29-Sep-14

C0000MMD22

Bulk piping materials final MTO delivered to site

0

59

28-Jan-16

C0000MMD23

Bulk electrical materials initial MTO delivered to site


0

67

01-Dec-14

C0000MMD24

Bulk instrument materials initial MTO delivered to site

0

98

29-Jul-15

C0000MMD25

Bulk instrument materials final MTO delivered to site

0

116

02-Jul-15

C0000MMD26

Insurance spares for all equipment & packages arrival at site and handover to Employe


0

69

16-Nov-15

C0000MMD27

Commissioning and Initial Operation Spares & Consumables arrival at site and handove

0

69

11-Aug-16

Commissioning and Initial Operation Spare

G0000MMD15

Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to site

0

75

14-Jan-16

Remaining Mechanical / Rotating Equipment & Equipment Packag


G0000MMD16

All major electrical Equipment delivered to site

0

144

07-Dec-15

G0000MMD17

HVAC, Fire Detection and Fire Fighting Systems for all buildings delivered to site

0

84

07-Sep-15

G0000MMD18

Major Instrument Control Systems Delivered to Site

0

128

18-Sep-15


G0000MMD19

Instrument Control Systems for CCB delivered to site

0

128

18-Sep-15

G0000MMD20

Field instrument tagged items delivered to site

0

165

18-Jun-15

G0000MMD21

Bulk piping materials initial MTO delivered to site

0

67

31-Oct-14


G0000MMD22

Bulk piping materials final MTO delivered to site

0

125

26-Nov-15

G0000MMD23

Bulk electrical materials initial MTO delivered to site

0

154

02-May-15

G0000MMD24

Bulk instrument materials initial MTO delivered to site

0

125

23-Jun-15


G0000MMD25

Bulk instrument materials final MTO delivered to site

0

118

12-Nov-15

G0000MMD26

Insurance spares for all equipment & packages arrival at site and handover to Employe

0

97

22-Nov-16

G0000MMD27

Commissioning and Initial Operation Spares and Consumables arrival at site and hando

0

97

22-Nov-16


J0000MMD04

RFCC Air Blower Delivered to Site

0

17

31-Oct-15

J0000MMD05

RFCC Wet Gas Compressor Delivered to Site

0

26

30-Jul-15

J0000MMD15

Remaining Mechanical Equipment Delivered to Site

0

114

29-Nov-15


J0000MMD16

All Major Electrical Equipment Delivered to Site

0

83

25-Jun-15

J0000MMD17

HVAC, Fire Fighting Systems Delivered to Site

0

185

29-Aug-15

J0000MMD18

Major Instrument Control Systems Delvd to Site

0

144

26-Nov-15


J0000MMD20

Field Instrument Tagged Items Delivered to Site

0

108

17-Aug-15

J0000MMD21

Bulk Piping Materials 1st MTO Delivered to Site

0

143

27-Nov-14

J0000MMD22

Bulk Piping Material Final MTO Delivered to Site

0

175

11-Oct-15


J0000MMD23

Bulk Electrical Matls 1st MTO Delivered to Site

0

158

22-Feb-15

J0000MMD24

Bulk Instrument Matls 1st MTO Delivered to Site

0

143

07-Jul-15

J0000MMD25

Bulk Instrument Matl Final MTO Delivered to Site

0

143

15-Oct-15


J0000MMD26

Insurance Spares for All Equipment Arrival @Site

0

145

01-Jul-16

J0000MMD27

Comm'ng & Initial Operation Spares Arr ival @Site

0

46

07-Oct-16

S0000MMD01

CDU Crude Distillation Column delivered to site

0

29

15-May-15


S0000MMD06

KHDS Recycle Compressor delivered to site

0

83

28-Feb-15

S0000MMD07

GO HDS Reactors delivered to site

0

64

30-Apr-15

S0000MMD08

AROMATICS UOP Rotary valve delivered to site

0

50

23-Sep-15


S0000MMD10

Polypropylene Loop Reactors delivered to site

0

0

30-Jun-15

S0000MMD11

Polypropylene Pelletizer Unit delivered to site

0

74

15-Jun-15

S0000MMD12

Utilities GTG Packages delivered to site

0

0

30-Jun-15


S0000MMD13

Utilities HHP MP Steam Turbine Generator delivered to site

0

74

31-May-15

S0000MMD14

Utilities HRSG packages delivered to site

0

84

17-Mar-15

S0000MMD15

Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to site

0

76

23-Sep-15


S0000MMD16

All major electrical Equipment delivered to site

0

44

30-Sep-15

S0000MMD18

Major instrument control systems delivered to site

0

83

31-Oct-15

S0000MMD20

Field instrument tagged items delivered to site

0

83

15-Mar-15


S0000MMD21

Bulk piping materials initial MTO delivered to site

0

67

31-Jul-14

S0000MMD22

Bulk piping materials final MTO delivered to site

0

89

13-Aug-15

S0000MMD23

Bulk electrical materials initial MTO delivered to site

0

85

28-Feb-15


S0000MMD24

Bulk instrument materials initial MTO delivered to site

0

49

31-May-15

S0000MMD25

Bulk instrument materials final MTO delivered to site

0

89

30-Nov-15

S0000MMD26

Insurance spares for all equipment & packages arrival at site and handover to Employe

0

42

22-Nov-16


S0000MMD27

Commissioning and Initial Operation Spares and Consumables arrival at site and hando

0

42

22-Nov-16

T0000MMD09

AROMATICS Recovery plus system delivered to site

0

64

17-Sep-15

T0000MMD15

Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to site

0

26

26-Nov-15


T0000MMD16

All major electrical Equipment delivered to site

0

30

26-Sep-15

All major electrical Equipment delivered to site

T0000MMD18

Major instrument control systems delivered to site

0

92

23-Sep-15

Major instrument control systems delivered to site

T0000MMD19

Instrument Control Systems for ISB delivered to site

0


92

23-Sep-15

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

HVAC, Fire Detection and Fire Fighting Systems for all buildings delivered to site
Major instrument control systems delivered to site
Instrument Control Systems for CCB delivered to site
Field instrument tagged items delivered to site
Bulk piping materials initial MTO delivered to site
Bulk piping materials final MTO delivered to site
Bulk electrical materials initial MTO delivered to site
Bulk instrument materials initial MTO delivered to site

Bulk instrument materials final MTO delivered to site
Insurance spares for all equipment & packages arrival at site and hando

All major electrical Equipment delivered to site
HVAC, Fire Detection and Fire Fighting Systems for all buildings delivered to site
Major Instrument Control Systems Delivered to Site
Instrument Control Systems for CCB delivered to site
Field instrument tagged items delivered to site
Bulk piping materials initial MTO delivered to site
Bulk piping materials final MTO delivered to site
Bulk electrical materials initial MTO delivered to site
Bulk instrument materials initial MTO delivered to site
Bulk instrument materials final MTO delivered to site
Insurance spares for all equip
Commissioning and Initial Ope
RFCC Air Blower Delivered to Site
RFCC Wet Gas Compressor Delivered to Site
Remaining Mechanical Equipment Delivered to Site
All Major Electrical Equipment Delivered to Site
HVAC, Fire Fighting Systems Delivered to Site
Major Instrument Control Systems Delvd to Site
Field Instrument Tagged Items Delivered to Site
Bulk Piping Materials 1st MTO Delivered to Site
Bulk Piping Material Final MTO Delivered to Site
Bulk Electrical Matls 1st MTO Delivered to Site
Bulk Instrument Matls 1st MTO Delivered to Site
Bulk Instrument Matl Final MTO Delivered to Site
Insurance Spares for All Equipment Arrival @S
Comm'ng & Initial Operation Spares
CDU Crude Distillation Column delivered to site

KHDS Recycle Compressor delivered to site
GO HDS Reactors delivered to site
AROMATICS UOP Rotary valve delivered to site
Polypropylene Loop Reactors delivered to site
Polypropylene Pelletizer Unit delivered to site
Utilities GTG Packages delivered to site
Utilities HHP MP Steam Turbine Generator delivered to site
Utilities HRSG packages delivered to site
Remaining Mechanical / Rotating Equipment & Equipment Packages delivered
All major electrical Equipment delivered to site
Major instrument control systems delivered to site
Field instrument tagged items delivered to site
Bulk piping materials initial MTO delivered to site
Bulk piping materials final MTO delivered to site
Bulk electrical materials initial MTO delivered to site
Bulk instrument materials initial MTO delivered to site
Bulk instrument materials final MTO delivered to site
Insurance spares for all equip
Commissioning and Initial Ope
AROMATICS Recovery plus system delivered to site
Remaining Mechanical / Rotating Equipment & Equipment Packages de

Instrument Control Systems for ISB delivered to site

Page 3 of 179

Actual Work
Remaining Work

Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to s

All major Electrical Equipment delivered to site

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura



NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

Finish

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
Field instrument tagged items delivered to site

T0000MMD20


Field instrument tagged items delivered to site

0

79

03-Oct-15

T0000MMD21

Bulk piping materials initial MTO delivered to site

0

88

01-Dec-14

T0000MMD22

Bulk piping materials final MTO delivered to site

0

97

17-Sep-15

T0000MMD23


Bulk electrical materials initial MTO delivered to site

0

71

23-Apr-15

T0000MMD24

Bulk instrument materials initial MTO delivered to site

0

97

20-May-15

T0000MMD25

Bulk instrument materials final MTO delivered to site

0

93

25-Sep-15

T0000MMD26


Insurance spares for all equipment & packages arrival at site and handover to Employe

0

64

17-Sep-15

Insurance spares for all equipment & packages arrival at site and handover to

T0000MMD27

Commissioning & Initial Operation Spares & Consumables arrival at site and handover

0

64

14-Feb-16

Commissioning & Initial Operation Spares & Consumables arr

38 23-Oct-13
98 23-Jan-14

17-Dec-16

Construction & Commissioning
Commissio

Milestones
C0000MCE01
Commence on site

614
0

Bulk piping materials initial MTO delivered to site
Bulk piping materials final MTO delivered to site
Bulk electrical materials initial MTO delivered to site
Bulk instrument materials initial MTO delivered to site
Bulk instrument materials final MTO delivered to site

Commence on site

C0000MCE03

Complete site preparation and ground improvement works

0

22

27-Jun-14

C0000MCE04

Complete construction of foundations for RHDS Reactor

0


44

14-Feb-15

C0000MCE05

Complete construction of foundations for RHDS Recycle Gas Compressor

0

105

06-Feb-15

C0000MCE10

Complete construction of foundations for all remaining mechanical, rotating & package

0

149

18-Sep-15

C0000MCE13

Complete construction of foundation and superstructure works for unit substation build

0


149

18-Sep-15

C0000MCE14

Complete all underground piping including Sea Cooling Water

0

92

16-May-15

C0000MCE15

Complete installation of all underground electrical cabling

0

135

03-Sep-15

C0000MCE16

Complete Installation of all underground instrument cabling

0


130

30-Nov-15

C0000MCE17

Complete construction of instrument satellite buildings to ready for installation of contro

0

154

31-Jul-15

C0000MCE18

Complete installation of steel structure works for compressor shelter and package unit

0

148

30-Nov-15

C0000MCE20

Complete installation of RHDS Reactors

0


111

16-Jun-15

C0000MCE26

Complete installation of all remaining mechanical, rotating & package equipment

0

152

15-Feb-16

C0000MCE27

Complete of Heavy Lifts

0

75

30-Oct-15

C0000MCE28

Start Piping Fabrication

0


C0000MCE29

Complete 50% piping prefabrication

0

118

16-Jun-15

C0000MCE30

Complete 100% piping prefabrication

0

66

02-Jan-16

C0000MCE31

Complete installation of pipe support, sleeper, tretle, etc.

0

113

27-May-16


C0000MCE32

Start piping erection

0

162 31-Mar-15

C0000MCE33

Piping erection 50% complete

0

118

16-Nov-15

C0000MCE34

Piping erection 100% complete

0

86

04-Jun-16

C0000MCE35


Piping hydrotesting commence

0

75 09-Nov-15

C0000MCE36

Piping hydrotesting 50% complete

0

32

29-Mar-16

C0000MCE37

Piping hydrotesting 100% complete

0

81

04-Jul-16

C0000MCE38

Complete all Piping tie-ins


0

118

16-Nov-15

C0000MCE39

Complete heat tracing, insulation, fireproofing and painting works

0

23

26-Oct-16

Complete heat tracing, insulation,

C0000MCE40

Complete installation of platform, walkways, cross-overs, etc.

0

118

26-Feb-16

Complete installation of platform, walkways, cross-overs, etc


C0000MCE41

Complete installation of substation electrical eqpt.

0

126

29-Feb-16

Complete installation of substation electrical eqpt.

C0000MCE42

Trenches for Main Electrical Feeder cables Main to Unit Substations available

0

105

22-Apr-15

C0000MCE43

Complete electrical cabling and termination work (field works) for all plant facilities inclu

0

114


13-May-16

Complete electrical cabling and termination work (fie

C0000MCE44

Complete lighting work

0

118

09-May-16

Complete lighting work

C0000MCE50

Complete installation termination & testing of 33KV Feeders to Process Substation rea

0

118

26-Feb-16

C0000MCE51

Complete motor runs


0

30

19-Oct-16

C0000MCE52

Complete installation of all instrumentation equipment in new Instrument Satellite buildin

0

130

04-Jan-16

Complete installation of all instrumentation equipment in new Instru

C0000MCE53

Complete installation package unit control system ready for precom. checks

0

117

04-Jan-16

Complete installation package unit control system ready for precom


C0000MCE54

Complete instrument cabling & termination work ready for precom. checks

0

128

25-Mar-16

C0000MCE55

Complete SAT on DCS/ESD

0

119

01-Feb-16

C0000MCE56

Complete Pre-commissioning checks

0

21

28-Oct-16


C0000MCE62

Sea Water / Closed circuit Cooling water Mechanical completion

0

198

17-Jun-15

G0000MCE01

Commence on site

0

G0000MCE03

Complete site preparation and ground improvement works

0

101

18-Apr-14

G0000MCE06

Complete construction of foundations for Flare package


0

106

01-Aug-15

G0000MCE08

Complete Foundations for Waste water treatment package

0

59

17-Jun-15

G0000MCE10

Complete construction of foundations for all remaining mechanical, rotating & packaged

0

151

17-Feb-16

Complete construction of foundations for all remaining mecha

G0000MCE13


Complete construction of foundation and superstructure works for unit substation build

0

148

18-Sep-15

Complete construction of foundation and superstructure works for unit substat

G0000MCE15

Complete installation of all underground electrical cabling

0

37

05-Sep-16

Complete installation of all underground

G0000MCE16

Complete installation of all underground instrument cabling

0

94


03-Aug-16

Complete installation of all underground ins

G0000MCE17

Complete construction of instrument satellite buildings to ready for installation of contro

0

55

18-Feb-16

Complete construction of instrument satellite buildings to read

G0000MCE18

Complete installation of steel structural works for Compressor shelters, and Package U

0

138

13-Jun-16

G0000MCE19

CCB completed for commencement of installation of Control Equipment


0

59

28-Aug-15

G0000MCE22

Complete installation of Flare package

0

82

24-Dec-15

G0000MCE23

Complete installation of Sea Water cooling water pumps

0

61

08-Mar-16

G0000MCE25

Complete installation of site erected tankage


0

139

11-Jun-16

G0000MCE26

Complete installation of all remaining mechanical, rotating & packaged equipment

0

15

10-Aug-16

G0000MCE27

Completion of Heavy Lifts

0

7

18-Feb-16

G0000MCE28

Start Piping Prefabrication


0

54 28-Nov-14

G0000MCE29

Complete Prefabrication 50% Piping.

0

76

19-Nov-15

G0000MCE30

Complete Prefabrication 100% Piping

0

78

03-Feb-16

G0000MCE31

Complete installation of pipe supports, sleepers, trestles etc

0


47

05-Sep-16

G0000MCE32

Start Piping erection

0

41 02-Apr-15

G0000MCE33

Piping Erection 50% Complete

0

117

07-Jul-16

G0000MCE34

Piping Erection 100% Complete

0

19


05-Sep-16

G0000MCE35

Piping Hydrotesting commence

0

G0000MCE36

Piping Hydrotesting 50% complete

0

37

14-Jun-16

G0000MCE37

Piping Hydrotesting 100% complete

0

47

28-Sep-16

G0000MCE38


Complete all piping tie.ins

0

19

05-Sep-16

G0000MCE39

Complete Heat Tr acing, Insulation, Fire Proofing and Painting works

0

68

01-Nov-16

Complete Heat Tr acing, Insulatio

G0000MCE40

Complete installation of platforms, walk.ways, cross.overs etc.

0

125

01-Mar-16


Complete installation of platforms, walk.ways, cross.overs e

G0000MCE41

Complete installation of all Substation electrical equipment.

0

52

02-Apr-16

Complete installation of all Substation electrical equipmen

G0000MCE42

Trenches for Main Electrical Feeder cables Main to Unit Substations available

0

44

02-Feb-16

Trenches for Main Electrical Feeder cables Main to Unit Substa

G0000MCE43

Complete electrical cabling and termination works (field works) for all plant facilities inc


0

52

22-Sep-16

Complete electrical cabling and termi

G0000MCE44

Complete Lighting

0

42

04-Oct-16

G0000MCE45

All service connections to new laboratory live

0

35

12-Oct-16

G0000MCE46


Complete CCB refurbishment ready for Control panel installation

0

19

28-Aug-15

G0000MCE48

11KV boards available for energisation in Utilities area substations SS U01 . U04

0

87

03-Nov-15

11KV boards available for energisation in Utilities area substations SS U0

G0000MCE49

11KV board available for energisation in Offsites area substations SS O01.O05

0

62

03-Nov-15


11KV board available for energisation in Offsites area substations SS O01

G0000MCE50

Complete Installation termination & testing of 33KV Feeders to Process Substations re

0

152

19-Dec-15

Complete Installation termination & testing of 33KV Feeders to Proce

G0000MCE51

Complete motor runs

0

122

31-May-16

G0000MCE52

Complete Installation of All ISB Instrument Eqpt

0


155

18-Apr-16

G0000MCE53

Complete installation of package unit control systems ready for Pre.commissioning che

0

161

14-Jul-16

G0000MCE54

Complete instrument cabling and termination works ready for Pre.commissioning chec

0

64

03-Aug-16

G0000MCE55

Complete SAT on DCS/ESD

0


155

18-Apr-16

G0000MCE56

Complete Pre.commissioning checks

0

70

22-Nov-16

G0000MCE60

Drainage & Effluent Treatment systems Mechanical Completion

0

107

07-Jul-16

G0000MCE62

Sea Water / Closed circuit Cooling water Mechanical Completion

0


13

20-May-16

Sea Water / Closed circuit Cooling water Mechanic

G0000MCE64

Fuel Gas available at battery limits all Flare systems R.F.S.U.

0

106

24-May-16

Fuel Gas available at battery limits all Flare system

G0000MCE65

Crude Oil SPM / Pipeline Crude oil Storage & Pumping Unit Mechanical Completion

0

54

20-Sep-16

G0000MCE66


Final Mechanical Completion Certificate issued

0

0

22-Nov-16

J0000MCE01

Construction Commence On Site

0

3 23-Oct-13

J0000MCE10

Complete Construction of All Foundations

0

50

14-Dec-15

J0000MCE13

Complete Const. of Unit S/S Superstructure Works


0

107

28-Feb-15

J0000MCE15

Complete Installation All U/G Electrical Cabling

0

70

20-Jan-16

J0000MCE16

Complete Installation All U/G Instrument Cabling

0

63

29-Apr-16

J0000MCE17

Complete Const. of ISB Ready for Control Install


0

113

04-Nov-15

J0000MCE18

Complete Inst'n of Steel Str'l Works Comp Shelters & Package Units etc.

0

118

31-Aug-15

J0000MCE26

Complete Instal of All Remaining Mec h, Rotary, Pkgs

0

41

09-Jun-16

J0000MCE27

Completion of Heavy Lifts


0

8

25-Mar-16

J0000MCE28

Start Piping Prefabrication

0

50 02-Jan-15

J0000MCE29

Complete Prefabrication 50% Piping.

0

50

04-May-15

J0000MCE30

Complete Prefabrication 100% Piping

0


2

20-Jan-16

J0000MCE31

Complete Installation of Pipe Supports, Sleeper

0

66

26-Aug-16

J0000MCE32

Start Piping Erection

0

26 23-Apr-15

J0000MCE33

Piping Erection 50% Complete

0

8


26-Apr-16

J0000MCE34

Piping Erection 100% Complete

0

55

20-Jun-16

J0000MCE35

Piping Hydrotesting Commence

0

163 29-Sep-15

J0000MCE36

Piping Hydrotesting 50% Complete

0

163

11-Feb-16


J0000MCE37

Piping Hydrotesting 100% Complete

0

66

26-Aug-16

J0000MCE39

Complete Heat Tr acing, Insulation, Fire Proofing

0

35

12-Oct-16

J0000MCE40

Complete Installation Platforms, Walk-ways, Etc.

0

40

07-Apr-16


J0000MCE41

Complete Installation of All S/S Electrical Eqpt

0

19

24-Oct-15

J0000MCE42

Trenches for Main Elec. Feeder Cables Available

0

95

15-Aug-15

Complete construction of foundation and superstructure works for unit substat
Complete all underground piping including Sea Cooling Water
Complete installation of all underground electrical cabling
Complete Installation of all underground instrument cabling
Complete construction of instrument satellite buildings to ready for installation of con
Complete installation of steel structure works for compressor shelter a
Complete installation of RHDS Reactors
Complete installation of all remaining mechanical, rotating & pa
Complete of Heavy Lifts

Complete 50% piping prefabrication
Complete 100% piping prefabrication
Complete installation of pipe support, sleeper, tretle
Start piping erection
Piping erection 50% complete
Piping erection 100% complete
Piping hydrotesting commence

49 19-Apr-14

Piping hydrotesting 50% complete
Piping hydrotesting 100% complete
Complete all Piping tie-ins

Trenches for Main Electrical Feeder cables Main to Unit Substations available

Complete installation termination & testing of 33KV Feeders t
Complete motor runs

Complete instrument cabling & termination work ready for
Complete SAT on DCS/ESD
Complete Pre-commissioning ch
Sea Water / Closed circuit Cooling water Mechanical completion
Commence on site
Complete site preparation and ground improvement works
Complete construction of foundations for Flare package
Complete Foundations for Waste water treatment package

Complete installation of steel structural works fo
CCB completed for commencement of installation of Control Equipment

Complete installation of Flare package
Complete installation of Sea Water cooling water pumps
Complete installation of site erected tankage
Complete installation of all remaining mech
Completion of Heavy Lifts
Start Piping Prefabrication
Complete Prefabrication 50% Piping.
Complete Prefabrication 100% Piping
Complete installation of pipe supports,
Start Piping erection
Piping Erection 50% Complete
Piping Erection 100% Complete

101 25-Nov-15

Piping Hydrotesting commence
Piping Hydrotesting 50% complete
Piping Hydrotesting 100% complete
Complete all piping tie.ins

Complete Lighting
All service connections to new labo
Complete CCB refurbishment ready for Control panel installation

Complete motor runs
Complete Installation of All ISB Instrument Eqpt
Complete installation of package unit control
Complete instrument cabling and terminatio
Complete SAT on DCS/ESD
Complete Pre.commissioning

Drainage & Effluent Treatment systems Mech

Crude Oil SPM / Pipeline Crude oil Sto
Final Mechanical Completion C
Construction Commence On Site
Complete Construction of All Foundations
Complete Const. of Unit S/S Superstructure Works
Complete Installation All U/G Electrical Cabling
Complete Installation All U/G Instrument Cabling
Complete Const. of ISB Ready for Control Install
Complete Inst'n of Steel Str'l Works Comp Shelters & Package Units etc.
Complete Instal of All Remaining Mec h, Rotary, P
Completion of Heavy Lifts
Start Piping Prefabrication
Complete Prefabrication 50% Piping.
Complete Prefabrication 100% Piping
Complete Installation of Pipe Supports, S
Start Piping Erection
Piping Erection 50% Complete
Piping Erection 100% Complete
Piping Hydrotesting Commence
Piping Hydrotesting 50% Complete
Piping Hydrotesting 100% Complete
Complete Heat Tr acing, Insulation,
Complete Installation Platforms, Walk-ways, Etc.
Complete Installation of All S/S Electrical Eqpt
Trenches for Main Elec. Feeder Cables Available

Page 4 of 179


Detail Engineering, Procurement, and
Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

Complete construction of foundations for all remaining mechanical, rotating & p

Start Piping Fabrication

Critical Remaining Work
Milestone

Complete construction of foundations for RHDS Reactor
Complete construction of foundations for RHDS Recycle Gas Compressor

33 01-Nov-14

Actual Work
Remaining Work

Complete site preparation and ground improvement works


Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project

Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

Finish

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
Complete Electrical Cabling & Termination Works

J0000MCE43

Complete Electrical Cabling & Termination Works


0

18

16-Mar-16

J0000MCE44

Complete Lighting

0

80

19-Aug-16

Complete Lighting

J0000MCE50

Comp. Termination & Testing of 33KV Feeders

0

28

05-Dec-15

Comp. Termination & Testing of 33KV Feeders


J0000MCE51

Complete Motor Runs

0

0

22-Nov-16

J0000MCE52

Complete Installation of All ISB Instrument Eqpt

0

48

21-Apr-16

J0000MCE54

Complete Instrument Cabling & Termination Wor ks

0

68

04-May-16


Complete Instrument Cabling & Termination Wor ks

J0000MCE55

Complete SAT on DCS/ESD

0

66

06-May-16

Complete SAT on DCS/ESD

J0000MCE56

Complete Pre-commissioning Works

0

0

22-Nov-16

S0000MCE01

Commence on site

0


43 10-Mar-14

S0000MCE03

Complete site preparation and ground improvement works

0

79

16-Sep-14

S0000MCE07

Complete Foundations for GTG's Utility unit

0

14

28-Aug-15

S0000MCE10

Complete construction of foundations for all remaining mechanical, rotating & packaged

0

57


15-Dec-15

S0000MCE11

Complete all interconnecting Piperack foundations

0

87

28-Feb-15

S0000MCE12

Complete construction of foundation and superstructure works for main Substation bui

0

15

30-Jun-15

S0000MCE13

Complete construction of foundation and superstructure works for unit substation build

0

55


30-Nov-15

Complete construction of foundation and superstructure works for uni

S0000MCE14

Complete all underground piping including Sea Cooling Water and closed circuit cooling

0

43

30-Jun-15

Complete all underground piping including Sea Cooling Water and closed circuit cooling

S0000MCE15

Complete installation of all underground electrical cabling

0

79

20-Feb-16

S0000MCE16

Complete installation of all underground instrument cabling


0

73

29-Feb-16

S0000MCE17

Complete construction of instrument satellite buildings to ready for installation of contro

0

27

01-Oct-15

S0000MCE18

Complete installation of steel structural works for Steel shelters, and Package Units etc

0

49

15-Mar-16

S0000MCE21

Complete installation of main air compressor package


0

38

01-Oct-15

S0000MCE24

Complete installation of GTG's

0

50

15-Oct-15

S0000MCE26

Complete installation of all remaining mechanical, rotating & packaged equipment

0

26

29-Feb-16

S0000MCE27

Completion of Heavy Lifts


0

49

30-Jan-16

S0000MCE28

Start Piping Prefabrication

0

46 01-Aug-14

S0000MCE29

Complete prefabrication 50% piping.

0

44

30-Sep-15

S0000MCE30

Complete prefabrication 100% piping

0


38

15-Mar-16

S0000MCE31

Complete installation of pipe supports, sleepers, trestles etc

0

58

14-May-16

S0000MCE32

Start Piping erection

0

71 01-Dec-14

S0000MCE33

Piping erection 50% Complete

0

73


28-Dec-15

S0000MCE34

Piping Erection 100% complete

0

60

15-Jul-16

S0000MCE35

Piping Hydrotesting commence

0

57 01-Sep-15

S0000MCE36

Piping Hydrotesting 50% complete

0

76

31-Mar-16


S0000MCE37

Piping Hydrotesting 100% complete

0

75

25-Aug-16

S0000MCE38

Complete all piping tie ins

0

73

30-Jun-16

S0000MCE39

Complete Heat Tr acing, Insulation, Fire Proofing and Painting works

0

45

30-Sep-16


S0000MCE40

Complete installation of platforms, walk ways, cross overs etc.

0

42

13-Jul-16

S0000MCE41

Complete installation of all Substation electrical equipment.

0

33

31-Mar-16

Complete installation of all Substation electrical equipmen

S0000MCE42

Trenches for Main Electrical Feeder cables Main to Unit Substations available

0

52


30-Sep-15

Trenches for Main Electrical Feeder cables Main to Unit Substations available

S0000MCE43

Complete electrical cabling and termination works (field works) for all plant facilities inc

0

50

24-Sep-16

S0000MCE44

Complete lighting

0

84

15-Aug-16

S0000MCE47

33KV board available for energisation in Main intake Substation

0


13

27-Nov-15

33KV board available for energisation in Main intake Substation

S0000MCE48

11KV boards available for energisation in Utilities area substations SS U01 - U04

0

13

27-Nov-15

11KV boards available for energisation in Utilities area substations SS U

S0000MCE50

Complete Installation termination & testing of 33KV Feeders to Process Substations re

0

35

29-Mar-16

Complete Installation termination & testing of 33KV Feede


S0000MCE51

Complete motor runs

0

48

27-Sep-16

S0000MCE52

Complete installation of all instrumentation equipment in the new instrument Satellite bu

0

71

29-Apr-16

S0000MCE53

Complete installation of package unit control systems ready for Pre commissioning che

0

45

30-Sep-16


Complete installation of package uni

S0000MCE54

Complete instrument cabling and termination works ready for Pre commissioning chec

0

58

15-Sep-16

Complete instrument cabling and term

S0000MCE55

Complete SAT on DCS/ESD

0

71

29-Apr-16

S0000MCE56

Complete Pre commissioning checks

0


70

22-Nov-16

S0000MCE57

Power Generation Unit and Main Substation Mechanical Completion

0

0

27-Sep-16

S0000MCE58

Plant Air, Instrument Air systems, Mechanical Completion

0

0

04-Jul-16

Plant Air, Instrument Air systems, Mechanical

S0000MCE59

Process water, Potable water, Demineralised water, Firewater systems Mechanical Co


0

0

09-Jul-16

Process water, Potable water, Demineralised

S0000MCE61

Nitrogen System Mechanical completion

0

20

03-Sep-16

Nitrogen System Mechanical completio

S0000MCE62

Sea Water / Closed circuit Cooling water Mechanical Completion

0

30

09-Aug-16


Sea Water / Closed circuit Cooling water M

S0000MCE63

Steam and Condensate Generation and Distribution Systems Mechanical Completion

0

0

27-Sep-16

T0000MCE01

Commence on site

0

51

28-Nov-13

T0000MCE03

Complete site preparation and ground improvement works

0

72


15-Nov-14

T0000MCE10

Complete construction of foundations for all remaining mechanical, rotating & packaged

0

66

22-Apr-15

T0000MCE11

Complete all interconnecting Piperack foundations

0

37

14-Feb-15

T0000MCE13

Complete construction of foundation and superstructure works for unit substation build

0

99


15-Jul-15

T0000MCE14

Complete all underground piping including Sea Cooling Water and closed circuit cooling

0

29

27-May-15

T0000MCE15

Complete installation of all underground electrical cabling

0

56

11-Feb-16

T0000MCE16

Complete installation of all underground instrument cabling

0

76


21-Nov-15

T0000MCE17

Complete construction of instrument satellite buildings to ready for installation of contro

0

73

21-Dec-15

T0000MCE18

Complete installation of steel structural works for Compressor shelters, and Package U

0

37

24-Dec-15

T0000MCE26

Complete installation of all remaining mechanical, rotating & packaged equipment

0

82


05-Oct-15

T0000MCE27

Completion of Heavy Lifts

0

79

12-Jan-16

T0000MCE28

Start Piping Prefabrication

0

66

16-Jan-15

T0000MCE29

Complete prefabrication 50% piping.

0

55


25-May-15

T0000MCE30

Complete prefabrication 100% piping

0

92

24-Aug-15

T0000MCE31

Complete installation of pipe supports, sleepers, trestles etc

0

78

19-Nov-15

T0000MCE32

Start Piping erection

0

69


11-May-15

T0000MCE33

Piping erection 50% Complete

0

70

01-Dec-15

T0000MCE34

Piping Erection 100% complete

0

58

23-Jun-16

T0000MCE35

Piping Hydrotesting commence

0

63


10-Dec-15

T0000MCE36

Piping Hydrotesting 50% complete

0

89

19-Mar-16

T0000MCE37

Piping Hydrotesting 100% complete

0

50

01-Aug-16

T0000MCE38

Complete all piping tie-ins

0

81


19-Dec-15

T0000MCE39

Complete Heat Tr acing, Insulation, Fire Proofing and Painting works

0

54

28-Jul-16

T0000MCE40

Complete installation of platforms, walk-ways, cross-overs etc.

0

61

09-Nov-15

T0000MCE41

Complete installation of all Substation electrical equipment.

0

75


30-Nov-15

T0000MCE42

Trenches for Main Electrical Feeder cables Main to Unit Substations available

0

85

15-Jan-15

T0000MCE43

Complete electrical cabling and termination works (field works) for all plant facilities inc

0

56

11-Feb-16

Complete electrical cabling and termination works (field works

T0000MCE44

Complete lighting

0


98

11-Feb-16

Complete lighting

T0000MCE48

11KV boards available for energisation in Utilities area substations SS U01 - U04

0

73

01-Mar-16

11KV boards available for energisation in Utilities area subst

T0000MCE50

Complete Installation termination & testing of 33KV Feeders to Process Substations re

0

56

11-Feb-16

Complete Installation termination & testing of 33KV Feeders to


T0000MCE51

Complete motor runs

0

20

01-Nov-16

T0000MCE52

Complete installation of all instrumentation equipment in the new instrument Satellite bu

0

77

23-Dec-15

Complete installation of all instrumentation equipment in the new inst

T0000MCE53

Complete installation of package unit control systems ready for Pre-commissioning che

0

60


21-Mar-16

Complete installation of package unit control systems read

T0000MCE54

Complete instrument cabling and termination works ready for Pre-commissioning chec

0

40

07-Apr-16

T0000MCE55

Complete SAT on Main Automation Sys tem/ESD

0

56

21-Mar-16

T0000MCE56

Complete Pre-commissioning checks

0


6

17-Nov-16

T0000MCE58

Plant Air, Instrument Air systems, Mechanical Completion

0

6

17-Nov-16

T0000MCE66

Final Mechanical Completion Certificate issued

0

6

17-Nov-16

V0000MCE02

Complete Const. of Temp. Facilities & Const. Jetty

0


61

29-Nov-14

V0000MCE66

Final Mechanical Completion Certificate Issued

4

17-Dec-16

Interface Milestones
Engineering Interface
Civil General
C0000MIDB10003

JVD Soil Improvement Method to OC - 3rd Priority Areas (Process & Utility Areas)

0
534
60
11
0

79 30-Sep-13
81 29-Nov-13
120 27-Dec-13
41


Complete Motor Runs
Complete Installation of All ISB Instrument Eqpt

Complete Pre-commissioning
Commence on site
Complete site preparation and ground improvement works
Complete Foundations for GTG's Utility unit
Complete construction of foundations for all remaining mechanical, ro
Complete all interconnecting Piperack foundations
Complete construction of foundation and superstructure works for main Substation build

Complete installation of all underground electrical cabling
Complete installation of all underground instrument cabling
Complete construction of instrument satellite buildings to ready for installation
Complete installation of steel structural works for Steel she
Complete installation of main air compressor package
Complete installation of GTG's
Complete installation of all remaining mechanical, rotating &
Completion of Heavy Lifts
Start Piping Prefabrication
Complete prefabrication 50% piping.
Complete prefabrication 100% piping
Complete installation of pipe supports, sleepers, tre
Start Piping erection
Piping erection 50% Complete
Piping Erection 100% complete
Piping Hydrotesting commence

01-Jul-16

22-Apr-14
31-Jan-14
31-Jan-14

Piping Hydrotesting 50% complete
Piping Hydrotesting 100% complete
Complete all piping tie ins
Complete Heat Tr acing, Insulation, F
Complete installation of platforms, walk ways

Complete electrical cabling and term
Complete lighting

Complete motor runs
Complete installation of all instrumentation equipment

Complete SAT on DCS/ESD
Complete Pre commissioning
Power Generation Unit and Main Sub

Steam and Condensate Generation a
Commence on site
Complete site preparation and ground improvement works
Complete construction of foundations for all remaining mechanical, rotating & packaged equipm
Complete all interconnecting Piperack foundations
Complete construction of foundation and superstructure works for unit substation buil
Complete all underground piping including Sea Cooling Water and closed circuit cooling wat
Complete installation of all underground electrical cabling
Complete installation of all underground instrument cabling
Complete construction of instrument satellite buildings to ready for in

Complete installation of steel structural works for Compressor shelt
Complete installation of all remaining mechanical, rotating & packaged equipm
Completion of Heavy Lifts
Start Piping Prefabrication
Complete prefabrication 50% piping.
Complete prefabrication 100% piping
Complete installation of pipe supports, sleepers, trestles etc
Start Piping erection
Piping erection 50% Complete
Piping Erection 100% complete
Piping Hydrotesting commence
Piping Hydrotesting 50% complete
Piping Hydrotesting 100% complete
Complete all piping tie-ins
Complete Heat Tr acing, Insulation, Fire Pro
Complete installation of platforms, walk-ways, cross-overs etc.
Complete installation of all Substation electrical equipment.
Trenches for Main Electrical Feeder cables Main to Unit Substations available

Complete motor runs

Complete instrument cabling and termination works read
Complete SAT on Main Automation Sys tem/ESD
Complete Pre-commissioning c
Plant Air, Instrument Air system
Final Mechanical Completion C
Complete Const. of Temp. Facilities & Const. Jetty
Final Mechanical Completio

JVD Soil Improvement Method to OC - 3rd Priority Areas (Process & Utility Areas)


G0000MIDB10001

Soil Improvement Method to OC - 1st Priority Ar eas (Crude Oil & Interconnecting Pipera

0

6

27-Dec-13

Soil Improvement Method to OC - 1st Priority Ar eas (Crude Oil & Interconnecting Piperack) by JVD

G0000MIDB10002

Soil Improvement Method to OC - 2nd Priority Areas (Other Tank Area & B400) by JVD

0

157

27-Dec-13

Soil Improvement Method to OC - 2nd Priority Areas (Other Tank Area & B400) by JVD

G0000MIDB10003

Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas) by JVD

0


179

31-Jan-14

J0000MIDB10003

Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas)

0

51

31-Jan-14

S0000MIDB10001

Soil Improvement Method to OC - 1st Priority Ar eas by JVD

0

19

27-Dec-13

Soil Improvement Method to OC - 1st Priority Ar eas by JVD

S0000MIDB10002

Soil Improvement Method to OC - 2nd Priority Areas by J VD (B400)


0

0

27-Dec-13

Soil Improvement Method to OC - 2nd Priority Areas by J VD (B400)

S0000MIDB10003

Soil Improvement Method to OC - 3rd Priority Areas by JVD ( Process & Utility Areas)

0

32

31-Jan-14

T0000MIDB10003

Soil Improvement Method confirmed with NSRP (By JVD) - 3rd Priority Areas (Process

0

41

31-Jan-14

V0000MIDB10001


Soil Improvement Method to OC - 1st Priority Ar eas (Crude Oil & IC Piperack)

0

6

27-Dec-13

Soil Improvement Method to OC - 1st Priority Ar eas (Crude Oil & IC Piperack)

V0000MIDB10002

Soil Improvement Method to OC - 2nd Priority Areas (Other Tank Area & B400)

0

0

27-Dec-13

Soil Improvement Method to OC - 2nd Priority Areas (Other Tank Area & B400)

V0000MIDB10003

Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas)

0

32


31-Jan-14

25 29-Nov-13
55

22-Apr-14
29-Nov-13

Conceptual Design for SS-P07 H/O - CYD to GS for Detail Engineering
Conceptual Design for ISB-02 H/O - CYD to GS for Detail Engineering

Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas) by JVD
Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas)

Soil Improvement Method to OC - 3rd Priority Areas by JVD ( Process & Utility Areas)
Soil Improvement Method confirmed with NSRP (By JVD) - 3rd Priority Areas (Process & Utility Areas)

Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas)

Building
CAC00MIDC4A010

Conceptual Design for SS-P07 H/O - CYD to GS for Detail Engineering

60
0

CAC00MIDC4B020


Conceptual Design for ISB-02 H/O - CYD to GS for Detail Engineering

0

55

29-Nov-13

GA200MIDC4B020

A200-Conceptual DWG for Control Building(ISB-05) from JGC

0

41

21-Feb-14

GA300MIDC4A010

A300-Conceptual DWG for Substation(SS-P03) from JGC

0

34

20-Dec-13

GA400MIDC4B010


A400-Conceptual DWG for Control Building(ISB-06) from JGC

0

40

20-Mar-14

A400-Conceptual DWG for Control Building(ISB-06) from JGC

GA900MIDC4A010

A900-Conceptual DWG for Substation(SS-P06) from TP

0

44

09-Apr-14

A900-Conceptual DWG for Substation(SS-P06) from TP

GA900MIDC4B010

A900-Conceptual DWG for Control Building(ISB-09) from TP

0

44


09-Apr-14

A900-Conceptual DWG for Control Building(ISB-09) from TP

Page 5 of 179

Actual Work
Remaining Work

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

A200-Conceptual DWG for Control Building(ISB-05) from JGC
A300-Conceptual DWG for Substation(SS-P03) from JGC

Date

31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3


S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

Finish

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
AC00-Conceptual DWG for Substation(SS-P07) from CYD

GAC00MIDC4A010

AC00-Conceptual DWG for Substation(SS-P07) from CYD


0

55

29-Nov-13

GAC00MIDC4B020

AC00-Conceptual DWG for Control Building(ISB-02) from CYD

0

55

29-Nov-13

AC00-Conceptual DWG for Control Building(ISB-02) from CYD

GAF00MIDC4A010

AF00-Conceptual DWG for Substation(SS-P02) from JGC

0

34

20-Dec-13

AF00-Conceptual DWG for Substation(SS-P02) from JGC


GAF00MIDC4B020

AF00-Conceptual DWG for Control Building(ISB-04) from JGC

0

31

22-Apr-14

JA200MIDC4B020

A200-Conceptual DWG for Control Building(ISB-05) to GSEC

0

41

21-Feb-14

JA300MIDC4A010

A300-Conceptual DWG for Substation(SS-P03) to GSEC

0

34

20-Dec-13


JA400MIDC4B010

A400-Conceptual DWG for Control Building(ISB-06) to GSEC

0

40

20-Mar-14

JAF00MIDC4A010

AF00-Conceptual DWG for Substation(SS-P02) to GSEC

0

34

20-Dec-13

JAF00MIDC4B020

AF00-Conceptual DWG for Control Building(ISB-04) to GSEC

0

31

22-Apr-14


TA900MIDC4A010

Conceptual Design for Substation (P 06) to GSEC

0

44

09-Apr-14

Conceptual Design for Substation (P 06) to GSEC

TA900MIDC4B010

Conceptual Design for Control Room Building (ISB 09) to GSEC

44

09-Apr-14

Conceptual Design for Control Room Building (ISB 09) to GSEC

Procurement Interface
Civil General
C0000MIEC2110002

JVD Blanket Order PO Issue for Non-pressured GRE Piping Material

0
197

0
0

AF00-Conceptual DWG for Control Building(ISB-04) from JGC
A200-Conceptual DWG for Control Building(ISB-05) to GSEC
A300-Conceptual DWG for Substation(SS-P03) to GSEC
A400-Conceptual DWG for Control Building(ISB-06) to GSEC
AF00-Conceptual DWG for Substation(SS-P02) to GSEC
AF00-Conceptual DWG for Control Building(ISB-04) to GSEC

158 06-Nov-13
62 20-Nov-13
119

31-Oct-14
20-Nov-13
20-Nov-13

JVD Blanket Order PO Issue for Non-pressured GRE Piping Material

G0000MIEC2110002

Blanket Order PO Issue for Non-pressured GRE Piping Material by JVD

0

153

20-Nov-13


Blanket Order PO Issue for Non-pressured GRE Piping Material by JVD

J0000MIEC2110002

Blanket Order PO Issue for Non-pressured GRE Piping Material from JVD

0

37

20-Nov-13

Blanket Order PO Issue for Non-pressured GRE Piping Material from JVD

S0000MIEC2110002

Blanket Order for Non-pressured GRP Piping Material by JVD

0

60

20-Nov-13

Blanket Order for Non-pressured GRP Piping Material by JVD

T0000MIEC2110002

U/G Non-pressured GRE Piping Material - PO by JVD (Frame Agreement)


0

131

20-Nov-13

U/G Non-pressured GRE Piping Material - PO by JVD (Frame Agreement)

V0000MIEC2110002

Blanket Order PO Issue for Non-pressured GRE Piping Material

0

37

20-Nov-13

Blanket Order PO Issue for Non-pressured GRE Piping Material

46 27-Dec-13
108

27-Dec-13
27-Dec-13

JVD Blanket Order PO Issue for Anchor Bolts

JVD Blanket Order PO Issue for Anchor Bolts


0
0

G0000MIEC2120001

Blanket Order PO Issue for Anchor Bolts by JVD

0

111

27-Dec-13

Blanket Order PO Issue for Anchor Bolts by JVD

J0000MIEC2120001

Blanket Order PO Issue for Anchor Bolts from JVD

0

43

27-Dec-13

Blanket Order PO Issue for Anchor Bolts from JVD

S0000MIEC2120001

Blanket Order for Anchor Bolts by JVD


0

37

27-Dec-13

Blanket Order for Anchor Bolts by JVD

T0000MIEC2120001

Anchor Bolts and Nuts - PO by JVD (Frame Agreement)

0

111

27-Dec-13

Anchor Bolts and Nuts - PO by JVD (Frame Agreement)

V0000MIEC2120001

Blanket Order PO Issue for Anchor Bolts

0

37

27-Dec-13


Concrete Structure
C0000MIEC2120001

Piping
C0000MIEC216A109

JVD Blanket Order PO Issue for GRP Pipes and Piping Components

36
0

226 18-Nov-13
61

12-Mar-14
18-Nov-13

Blanket Order PO Issue for Anchor Bolts
JVD Blanket Order PO Issue for GRP Pipes and Piping Components

C0000MIEC216A117

JVD Blanket Order PO Issue for CS Welded Pipes for U/G Piping

0

72

25-Dec-13


JVD Blanket Order PO Issue for CS Welded Pipes for U/G Piping

C0000MIEC216AXXX

JVD Blanket Order PO Issue for Pipes and Piping Components

0

74

25-Dec-13

JVD Blanket Order PO Issue for Pipes and Piping Components

C0000MIEC216BXXXA

JVD Blanket Order PO Issue for Valves (1st Blanket Order)

0

72

27-Dec-13

JVD Blanket Order PO Issue for Valves (1st Blanket Order)

C0000MIEC216BXXXB

JVD Blanket Order PO Issue for Valves (Last Blanket Order)


0

101

25-Feb-14

C0000MIEC216CXXX

JVD Blanket Order PO Issue for Fittings

0

74

25-Dec-13

JVD Blanket Order PO Issue for Fittings

C0000MIEC216D171

JVD Blanket Order PO Issue for Flanges

0

87

12-Dec-13

JVD Blanket Order PO Issue for Flanges


C0000MIEC216E181

JVD Blanket Order PO Issue for Bolts and Nuts

0

148

12-Mar-14

C0000MIEC216F191

JVD Blanket Order PO Issue for Gaskets

0

148

12-Mar-14

G0000MIEC216A109

Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil) by JVD

0

155

18-Nov-13


G0000MIEC216A117

Blanket Order for CS Welded Pipes for U/G by JVD

0

118

25-Dec-13

Blanket Order for CS Welded Pipes for U/G by JVD

G0000MIEC216AXXX

Blanket Order PO Issue for Pipes and Piping Components by JVD

0

105

25-Dec-13

Blanket Order PO Issue for Pipes and Piping Components by JVD

G0000MIEC216BXXXA

Blanket Order PO Issue for Valves(1st Blanket Order) by JVD

0


123

27-Dec-13

Blanket Order PO Issue for Valves(1st Blanket Order) by JVD

G0000MIEC216BXXXB

Blanket Order PO Issue for Valves(Last Blanket Order) by JVD

0

304

25-Feb-14

G0000MIEC216CXXX

Blanket Order Issue PO for Fittings by JVD

0

105

25-Dec-13

Blanket Order Issue PO for Fittings by JVD

G0000MIEC216D171


Blanket Order PO Issue for Flanges by JVD

0

118

12-Dec-13

Blanket Order PO Issue for Flanges by JVD

G0000MIEC216E181

Blanket Order PO Issue for Bolts and Nuts by JVD

0

263

12-Mar-14

G0000MIEC216F191

Blanket Order PO Issue for Gaskets by JVD

0

263

12-Mar-14


J0000MIEC216A109

Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil) from JVD

0

63

18-Nov-13

J0000MIEC216A117

Blanket Order for CS Welded Pipes for U/G from JVD

0

147

25-Dec-13

Blanket Order for CS Welded Pipes for U/G from JVD

J0000MIEC216AXXX

Blanket Order PO Issue for Pipes and Piping Components from JVD

0

75


25-Dec-13

Blanket Order PO Issue for Pipes and Piping Components from JVD

J0000MIEC216BXXX

Blanket Order PO Issue for Valves from JVD (1st Blanket Order)

0

73

27-Dec-13

Blanket Order PO Issue for Valves from JVD (1st Blanket Order)

J0000MIEC216BXXXB

Blanket Order PO Issue for Valves (Last Blanket Order) from JVD

0

421

25-Feb-14

J0000MIEC216CXXX

Blanket Order Issue PO for Fittings from JVD


0

75

25-Dec-13

Blanket Order Issue PO for Fittings from JVD

J0000MIEC216D171

Blanket Order PO Issue for Flanges from JVD

0

88

12-Dec-13

Blanket Order PO Issue for Flanges from JVD

J0000MIEC216E181

Blanket Order PO Issue for Bolts and Nuts from JVD

0

99

12-Mar-14


J0000MIEC216F191

Blanket Order PO Issue for Gaskets from JVD

0

99

12-Mar-14

S0000MIEC216A109

Blanket Order for GRP PIPES AND PIPING COMPONENTS by JVD

0

0

18-Nov-13

S0000MIEC216A117

Blanket Order for CS Welded Pipes for U/G by JVD

0

4

25-Dec-13


Blanket Order for CS Welded Pipes for U/G by JVD

S0000MIEC216AXXX

Blanket Order PO Issue for Pipes and Piping Components by JVD

0

2

25-Dec-13

Blanket Order PO Issue for Pipes and Piping Components by JVD

S0000MIEC216BXXXA

Blanket Order PO Issue for Valves (1st Blanket Order) by JVD

0

33

27-Dec-13

Blanket Order PO Issue for Valves (1st Blanket Order) by JVD

S0000MIEC216BXXXB

Blanket Order PO Issue for Valves (Last Blanket Order) by JVD


0

33

25-Feb-14

S0000MIEC216CXXX

Blanket Order Issue PO for Fittings by JVD

0

0

25-Dec-13

S0000MIEC216D171

Blanket Order for FLANGES by JVD

0

17

12-Dec-13

S0000MIEC216E181

Blanket Order PO Issue for Bolts and Nuts by JVD


0

41

12-Mar-14

S0000MIEC216F191

Blanket Order PO Issue for Gaskets by JVD

0

26

12-Mar-14

T0000MIEC216A109

U/G GRP Piping Material - PO by JVD (Frame Agreement)

0

131

18-Nov-13

T0000MIEC216A117

U/G CS Welded Piping Material - PO by JVD (Frame Agreement)


0

122

25-Dec-13

U/G CS Welded Piping Material - PO by JVD (Frame Agreement)

T0000MIEC216AXXX

Pipes - PO by JVD (Frame Agreement)

0

115

25-Dec-13

Pipes - PO by JVD (Frame Agreement)

T0000MIEC216BXXXA

Gate, Globe and Check Valves (1st Blanket Order) - PO by JVD (Blanket Order)

0

88

27-Dec-13


Gate, Globe and Check Valves (1st Blanket Order) - PO by JVD (Blanket Order)

T0000MIEC216BXXXB

Gate, Globe and Check Valves (Last Blanket Order) - PO by JVD (Blanket Order)

0

93

25-Feb-14

T0000MIEC216CXXX

Fittings - PO by JVD (Frame Agreement)

0

115

25-Dec-13

Fittings - PO by JVD (Frame Agreement)

T0000MIEC216D171

Flanges - PO by JVD (Frame Agreement)

0


98

12-Dec-13

Flanges - PO by JVD (Frame Agreement)

T0000MIEC216E181

Bolt & Nut - PO by JVD (Frame Agreement)

0

82

12-Mar-14

T0000MIEC216F191

Gaskets - PO by JVD (Frame Agreement)

0

82

12-Mar-14

V0000MIEC216A109

Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil)


0

0

18-Nov-13

V0000MIEC216A117

Blanket Order for CS Welded Pipes for U/G

0

4

25-Dec-13

Blanket Order for CS Welded Pipes for U/G

V0000MIEC216AXXX

Blanket Order PO Issue for Pipes and Piping Components

0

2

25-Dec-13

Blanket Order PO Issue for Pipes and Piping Components


V0000MIEC216BXXXA

Blanket Order PO Issue for Valves (1st Blanket Order)

0

33

27-Dec-13

Blanket Order PO Issue for Valves (1st Blanket Order)

V0000MIEC216BXXXB

Blanket Order PO Issue for Valves (Last Blanket Order)

0

33

25-Feb-14

V0000MIEC216CXXX

Blanket Order Issue PO for Fittings

0

0


25-Dec-13

Blanket Order Issue PO for Fittings

V0000MIEC216D171

Blanket Order PO Issue for Flanges

0

17

12-Dec-13

Blanket Order PO Issue for Flanges

V0000MIEC216E181

Blanket Order PO Issue for Bolts and Nuts

0

41

12-Mar-14

Blanket Order PO Issue for Bolts and Nuts

V0000MIEC216F191


Blanket Order PO Issue for Gaskets

0

26

12-Mar-14

Blanket Order PO Issue for Gaskets

Instrumentation
C0000MIEC2171101

JVD Frame Agr eement Placement -Main Automation System (DCS/SIS/FGS/Other Sys

197
0

158 06-Nov-13
74

31-Oct-14
06-Nov-13

JVD Blanket Order PO Issue for Valves (Last Blanket Order)

JVD Blanket Order PO Issue for Bolts and Nuts
JVD Blanket Order PO Issue for Gaskets
Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil) by JVD


Blanket Order PO Issue for Valves(Last Blanket Order) by JVD

Blanket Order PO Issue for Bolts and Nuts by JVD
Blanket Order PO Issue for Gaskets by JVD
Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil) from JVD

Blanket Order PO Issue for Valves (Last Blanket Order) from JVD

Blanket Order PO Issue for Bolts and Nuts from JVD
Blanket Order PO Issue for Gaskets from JVD
Blanket Order for GRP PIPES AND PIPING COMPONENTS by JVD

Blanket Order PO Issue for Valves (Last Blanket Order) by JVD
Blanket Order Issue PO for Fittings by JVD
Blanket Order for FLANGES by JVD
Blanket Order PO Issue for Bolts and Nuts by JVD
Blanket Order PO Issue for Gaskets by JVD
U/G GRP Piping Material - PO by JVD (Frame Agreement)

Gate, Globe and Check Valves (Last Blanket Order) - PO by JVD (Blanket Order)

Bolt & Nut - PO by JVD (Frame Agreement)
Gaskets - PO by JVD (Frame Agreement)
Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil)

Blanket Order PO Issue for Valves (Last Blanket Order)

JVD Frame Agr eement Placement -Main Automation System (DCS/SIS/FGS/Other System)


C0000MIEC2173XXXA

JVD Frame Agr eement - Local Instruments (1st Frame Agreement)

0

71

28-Feb-14

C0000MIEC2173XXXB

JVD Frame Agr eement - Local Instruments (Last Frame Agreement)

0

195

31-Oct-14

C0000MIEC2174101

JVD Frame Agr eement PO Issue for Control Valve (General)

0

81

20-Nov-13


JVD Frame Agr eement PO Issue for Control Valve (General)

C0000MIEC2174201

JVD Frame Agr eement PO Issue for On-Off Valve

0

96

20-Nov-13

JVD Frame Agr eement PO Issue for On-Off Valve

C0000MIEC2178101

JVD Blanket Order PO Issue for Instrument Cable

0

78

30-Jun-14

G0000MIEC2171101

Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System

0


39

06-Nov-13

Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System) by JVD

G0000MIEC2173XXXA

Frame Agreement PO Issue for Local Instruments (1st Frame Agreement) by JVD

0

263

28-Feb-14

Frame Agreement PO Issue for Local Instruments (1st Frame Agreement) by JVD

G0000MIEC2173XXXB

Frame Agreement PO Issue for Local Instruments (Last Frame Agreement) by JVD

0

281

31-Oct-14

G0000MIEC2174101


Frame Agreement PO Issue for Control Valve (General) by JVD

0

109

20-Nov-13

G0000MIEC2174201

Frame Agreement PO Issue for On-Off Valves by JVD

0

109

20-Nov-13

G0000MIEC2178101

Blanket Order PO Issue for Instrument Cables by JVD

0

199

30-Jun-14

J0000MIEC2171101


Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System

0

70

06-Nov-13

J0000MIEC2173XXXA

Blanket Order PO Issue for Local Instruments (1st Frame Agreement)

0

116

28-Feb-14

J0000MIEC2173XXXB

Blanket Order PO Issue for Local Instruments (Last Frame Agreement)

0

119

31-Oct-14

J0000MIEC2174101


Frame Agreement PO Issue for Control Valve (General) from JVD

0

16

20-Nov-13

Frame Agreement PO Issue for Control Valve (General) from JVD

J0000MIEC2174201

Frame Agreement PO Issue for On-Off Valves from JVD

0

68

20-Nov-13

Frame Agreement PO Issue for On-Off Valves from JVD

J0000MIEC2178101

Blanket Order PO Issue for Instrument Cables from JVD

0

72


30-Jun-14

S0000MIEC2171101

Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System

0

22

06-Nov-13

S0000MIEC2173XXXA

Frame Agreement PO Issue for Local Instruments (1st Frame Agreement) by JVD

0

38

28-Feb-14

S0000MIEC2174101

Frame Agreement PO Issue for Control Valve (General) by JVD

0

84


20-Nov-13

Frame Agreement PO Issue for Control Valve (General) by JVD

S0000MIEC2174201

Frame Agreement for On- Off Valves by JVD

0

63

20-Nov-13

Frame Agreement for On- Off Valves by JVD

S0000MIEC2178101

Blanket Order PO Issue for Instrument Cables by JVD

0

23

30-Jun-14

T0000MIEC2171101

Main Automation System (DCS/SIS/F GS/Other System) - Blanket Order PO Iss ued by J


0

107

06-Nov-13

T0000MIEC2173XXXA

Local Instrument - PO by JVD (1st Frame Agreement)

0

49

28-Feb-14

T0000MIEC2174101

Control valves - PO by JVD (Frame Agreement)

0

69

20-Nov-13

Control valves - PO by JVD (Frame Agreement)

T0000MIEC2174201


On-Off Valves - PO by JVD (Frame Agreement)

0

72

20-Nov-13

On-Off Valves - PO by JVD (Frame Agreement)

T0000MIEC2178101

Instrument Cables - PO by JVD (Frame Agreement)

0

98

30-Jun-14

V0000MIEC2171101

Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System

0

22

06-Nov-13


Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System)

V0000MIEC2173XXXA

Frame Agreement PO Issue for Local Instruments (1st Frame Agreement)

0

38

28-Feb-14

Frame Agreement PO Issue for Local Instruments (1st Frame Agreement)

V0000MIEC2173XXXB

Frame Agreement PO Issue for Local Instruments (Last Frame Agreement)

0

119

31-Oct-14

V0000MIEC2174101

Frame Agreement PO Issue for Control Valve (General)

0


16

20-Nov-13

Frame Agreement PO Issue for Control Valve (General)

V0000MIEC2174201

Frame Agreement PO Issue for On-Off Valves

0

63

20-Nov-13

Frame Agreement PO Issue for On-Off Valves

V0000MIEC2178101

Blanket Order PO Issue for Instrument Cables

0

23

30-Jun-14

Electrical
C0000MIEC2180001


JVD Blanket Order PO issue for Electrical Bulk Materials, Cable glands & Cable Trays

47
0

162 07-Nov-13
43

Frame Agreement PO Issue for Local Instruments (Last Frame Agreement) by JVD
Frame Agreement PO Issue for Control Valve (General) by JVD
Frame Agreement PO Issue for On-Off Valves by JVD
Blanket Order PO Issue for Instrument Cables by JVD
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System) from JVD
Blanket Order PO Issue for Local Instruments (1st Frame Agreement)
Blanket Order PO Issue for Local Instruments (Last Frame Agreement)

Blanket Order PO Issue for Instrument Cables from JVD
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System) by JVD
Frame Agreement PO Issue for Local Instruments (1st Frame Agreement) by JVD

Blanket Order PO Issue for Instrument Cables by JVD
Main Automation System (DCS/SIS/F GS/Other System) - Blanket Order PO Iss ued by JVD
Local Instrument - PO by JVD (1st Frame Agreement)

Instrument Cables - PO by JVD (Frame Agreement)

Frame Agreement PO Issue for Local Instruments (Last Frame Agreement)

Blanket Order PO Issue for Instrument Cables

JVD Blanket Order PO issue for Electrical Bulk Materials, Cable glands & Cable Trays

0

92

24-Mar-14

C0000MIEC2181XXX

JVD Frame Agr eement PO Issue for Substation Equipment

0

23

06-Jan-14

JVD Frame Agr eement PO Issue for Substation Equipment

Page 6 of 179

Actual Work

Detail Engineering, Procurement, and

Critical Remaining Work

Construction CPM Network
Level - 3 Overall Schedule


A
R
D
014
2
N
R
I 12-MA

JVD Blanket Order PO Issue for Instrument Cable

JVD Frame Agr eement PO Issue for AC UPS & DC Power Supply Unit

JVD Frame Agr eement PO Issue for AC UPS & DC Power Supply Unit

Milestone

JVD Frame Agr eement - Local Instruments (Last Frame Agreement)

28-Mar-14
28-Mar-14

C0000MIEC2181016

Remaining Work

JVD Frame Agr eement - Local Instruments (1st Frame Agreement)

Date

31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3


S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

Finish

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
JVD Blanket Order PO Issue for Power, Control and Communication Cables

C0000MIEC2182001

JVD Blanket Order PO Issue for Power, Control and Communication Cables


0

151

26-Feb-14

C0000MIEC2182XXX

JVD Frame Agr eement PO Issue for Motors

0

50

07-Nov-13

C0000MIEC2187001

JVD Blanket Order PO Issue for Cathodic Protection Materials

0

163

15-Jan-14

G0000MIEC2180001

Blanket Order PO Issue for Electrical Bulk Materials by JVD


0

257

28-Mar-14

G0000MIEC2181016

Frame Agreement PO Issue for AC UPS & DC Power Supply Unit by JVD

0

232

24-Mar-14

G0000MIEC2181XXX

Frame Agreement PO Issue for Substation Equipment by JVD

0

28

06-Jan-14

G0000MIEC2182001

Blanket Order PO Issue for Power, Control and Communic ation Cables by JVD


0

287

26-Feb-14

G0000MIEC2182XXX

Frame Agreement PO Issue for Motor by JVD

0

398

07-Nov-13

G0000MIEC2187001

Blanket Order PO Issue for Cathodic Protection Materials by JVD

0

118

15-Jan-14

J0000MIEC2180001

Blanket Order PO Issue for Electrical Bulk Materials


0

27

28-Mar-14

Blanket Order PO Issue for Electrical Bulk Materials

J0000MIEC2181016

Frame Agreement PO Issue for AC UPS & DC Power Supply Unit from JVD

0

97

24-Mar-14

Frame Agreement PO Issue for AC UPS & DC Power Supply Unit from JVD

J0000MIEC2181XXX

Frame Agreement PO Issue for Substation Equipment from JVD

0

84

06-Jan-14


J0000MIEC2182001

Blanket Order PO Issue for Power, Control and Communic ation Cables from JVD

0

126

26-Feb-14

J0000MIEC2182XXX

Frame Agreement PO Issue for Motor from JVD

0

81

07-Nov-13

J0000MIEC2187001

Blanket Order PO Issue for Cathodic Protection Materials from JVD

0

72

15-Jan-14


S0000MIEC2180001

Blanket Order PO Issue for Electrical Bulk Materials by JVD

0

36

28-Mar-14

Blanket Order PO Issue for Electrical Bulk Materials by JVD

S0000MIEC2181016

Frame Agreement PO Issue for AC UPS & DC Power Supply Unit by JVD

0

0

24-Mar-14

Frame Agreement PO Issue for AC UPS & DC Power Supply Unit by JVD

S0000MIEC2181XXX

Frame Agreement PO Issue for Substation Equipment by JVD

0


41

06-Jan-14

S0000MIEC2182001

Blanket Order PO Issue for Power, Control and Communic ation Cables by JVD

0

97

26-Feb-14

S0000MIEC2182XXX

Frame Agreement PO Issue for Motor by JVD

0

111

07-Nov-13

S0000MIEC2187001

Blanket Order PO Issue for Cathodic Protection Materials by JVD

0


39

15-Jan-14

T0000MIEC2180001

Electrical Bulk Materials - PO by JVD (Frame Agreement)

0

119

28-Mar-14

T0000MIEC2181016

AC UPS & DC POWER Supply Unit - PO by JVD (Frame Agr eement)

0

23

24-Mar-14

T0000MIEC2181XXX

Frame Agreement PO issue for Subs tation Equipment (J VD)

0


18

06-Jan-14

T0000MIEC2182001

Power, Control and Communic ation Cables - PO by JVD (Blanket Order)

0

90

26-Feb-14

T0000MIEC2182XXX

Motor - PO by JVD (Frame Agreement)

0

87

07-Nov-13

T0000MIEC2187001

Cathodic Protection System - PO by JVD (Frame Agreement)

0


125

15-Jan-14

V0000MIEC2180001

Blanket Order PO Issue for Electrical Bulk Materials

0

27

28-Mar-14

Blanket Order PO Issue for Electrical Bulk Materials

V0000MIEC2181016

Frame Agreement PO Issue for AC UPS & DC Power Supply Unit

0

0

24-Mar-14

Frame Agreement PO Issue for AC UPS & DC Power Supply Unit

V0000MIEC2181XXX


Frame Agreement PO Issue for Substation Equipment

0

18

06-Jan-14

V0000MIEC2182001

Blanket Order PO Issue for Power, Control and Communic ation Cables

0

90

26-Feb-14

V0000MIEC2182XXX

Frame Agreement PO Issue for Motor

0

50

07-Nov-13

V0000MIEC2187001


Blanket Order PO Issue for Cathodic Protection Materials

39

15-Jan-14

Subcontracting Interface
Civil General
C0000MIFC1400

Piling Subcontract

0
59
0
0

167 30-Sep-13
99 29-Nov-13
25

JVD Frame Agr eement PO Issue for Motors
JVD Blanket Order PO Issue for Cathodic Protection Materials
Blanket Order PO Issue for Electrical Bulk Materials by JVD
Frame Agreement PO Issue for AC UPS & DC Power Supply Unit by JVD
Frame Agreement PO Issue for Substation Equipment by JVD
Blanket Order PO Issue for Power, Control and Communic ation Cables by JVD
Frame Agreement PO Issue for Motor by JVD
Blanket Order PO Issue for Cathodic Protection Materials by JVD


Frame Agreement PO Issue for Substation Equipment from JVD
Blanket Order PO Issue for Power, Control and Communic ation Cables from JVD
Frame Agreement PO Issue for Motor from JVD
Blanket Order PO Issue for Cathodic Protection Materials from JVD

Frame Agreement PO Issue for Substation Equipment by JVD
Blanket Order PO Issue for Power, Control and Communic ation Cables by JVD
Frame Agreement PO Issue for Motor by JVD
Blanket Order PO Issue for Cathodic Protection Materials by JVD
Electrical Bulk Materials - PO by JVD (Frame Agreement)
AC UPS & DC POWER Supply Unit - PO by JVD (Frame Agr eement)
Frame Agreement PO issue for Subs tation Equipment (J VD)
Power, Control and Communic ation Cables - PO by JVD (Blanket Order)
Motor - PO by JVD (Frame Agreement)
Cathodic Protection System - PO by JVD (Frame Agreement)

Frame Agreement PO Issue for Substation Equipment
Blanket Order PO Issue for Power, Control and Communic ation Cables
Frame Agreement PO Issue for Motor
Blanket Order PO Issue for Cathodic Protection Materials

24-Mar-14
29-Nov-13
29-Nov-13

Piling Subcontract

G0000MIFC1400

Subcontract Award - Piling by JVD


0

32

29-Nov-13

Subcontract Award - Piling by JVD

J0000MIFC1400

Subcontract Award - Piling (by JVD)

0

192

29-Nov-13

Subcontract Award - Piling (by JVD)

S0000MIFC1400

Subcontract Award - Piling by JVD

0

1

29-Nov-13


Subcontract Award - Piling by JVD

T0000MIFC1400

Subcontract Award - Piling (By JVD)

0

108

29-Nov-13

Subcontract Award - Piling (By JVD)

V0000MIFC1400

Subcontract Award - Piling

0

1

29-Nov-13

Subcontract Award - Piling

Building
C0000MIFC40002


Building - Substations & ISBs (PC) Subcontract

50
0

167 30-Sep-13
160

26-Feb-14
26-Feb-14

Building - Substations & ISBs (PC) Subcontract

G0000MIFC40001

Subcontract Award - Building - Admin (EPC) by JVD

0

85

30-Sep-13

G0000MIFC40002

Subcontract Award - Building - Substations & ISBs (PC) by JVD

0

267


26-Feb-14

Subcontract Award - Building - Substations & ISBs (PC) by JVD

G0000MIFC40003

Subcontract Award - Building - Pre-Engineered Building (PEB) by JVD

0

137

06-Jan-14

Subcontract Award - Building - Pre-Engineered Building (PEB) by JVD

J0000MIFC40002

Subcontract Award - Building - Substations & ISBs (PC) (by JVD)

0

181

26-Feb-14

Subcontract Award - Building - Substations & ISBs (PC) (by JVD)

J0000MIFC40003


Subcontract Award - Building - Pre-Engineered Building (PEB) (by JVD)

0

301

06-Jan-14

Subcontract Award - Building - Pre-Engineered Building (PEB) (by JVD)

S0000MIFC4002

Subcontract Award - Building - Substations & ISBs (PC)

0

65

26-Feb-14

Subcontract Award - Building - Substations & ISBs (PC)

S0000MIFC4003

Subcontract Award - Building - Pre-Engineered Building (PEB)

0

99


06-Jan-14

Subcontract Award - Building - Pre-Engineered Building (PEB)

T0000MIFC40002

Subcontract Award - Building - Substations & ISBs (PC) (By JVD)

0

140

26-Feb-14

V0000MIFC40001

Subcontract Award - Building - Admin (EPC)

0

85

30-Sep-13

V0000MIFC40002

Subcontract Award - Building - Substations & ISBs (PC)

0


65

26-Feb-14

Subcontract Award - Building - Substations & ISBs (PC)

V0000MIFC40003

Subcontract Award - Building - Pre-Engineered Building (PEB)

0

99

06-Jan-14

Subcontract Award - Building - Pre-Engineered Building (PEB)

Tank Subcontract

0
0

G0000MIFC5400

Subcontract Award - Tank (EPC) by JVD

0


J0000MIFC5400

Subcontract Award - Tank (EPC) (by JVD)

S0000MIFC5400

Subcontract Award - Building - Substations & ISBs (PC) (By JVD)
Subcontract Award - Building - Admin (EPC)

05-Dec-13
05-Dec-13

Tank Subcontract

0

05-Dec-13

Subcontract Award - Tank (EPC) by JVD

0

152

05-Dec-13

Subcontract Award - Tank (EPC) (by JVD)

Subcontract Award - Tank (EPC) by JVD


0

90

05-Dec-13

Subcontract Award - Tank (EPC) by JVD

T0000MIFC5400

Subcontract Award - Tank (by JVD)

0

170

05-Dec-13

Subcontract Award - Tank (by JVD)

V0000MIFC5400

Subcontract Award - Tank (EPC)

0

0

05-Dec-13


Subcontract Award - Tank (EPC)

U/G SW Pipe Subcontract

0
0

167 24-Mar-14
110

24-Mar-14
24-Mar-14

U/G SW Pipe Subcontract

G0000MIFC6300

Subcontract Award for U/G Seawater Pipe Installation by JVD

0

269

24-Mar-14

Subcontract Award for U/G Seawater Pipe Installation by JVD

J0000MIFC6300

Subcontract Award for U/G Seawater Pipe Installation (by JVD)


0

183

24-Mar-14

Subcontract Award for U/G Seawater Pipe Installation (by JVD)

S0000MIFC6300

Subcontract Award for U/G Seawater Pipe Installation by JVD

0

84

24-Mar-14

Subcontract Award for U/G Seawater Pipe Installation by JVD

T0000MIFC6300

Subcontract Award - U/G Seawater Pipe Installation (by JVD)

0

127

24-Mar-14


Subcontract Award - U/G Seawater Pipe Installation (by JVD)

V0000MIFC6300

Subcontract Award for U/G Seawater Pipe Installation

0

84

24-Mar-14

Subcontract Award for U/G Seawater Pipe Installation

89 27-Feb-15
89 27-Feb-15
37

14-Jul-15
14-Jul-15
14-Mar-15

HVAC Equipt. for SS-P07 (RV2140-401) Handover to CYD
HVAC Equipt. for ISB-02 (RV2140-401) Handover to CYD

Mechanical Equipment
C0000MIFC5400

Piping

C0000MIFC6300

Manufacturing & Delivery Interface
I
Building
C0000MIEF2140401050
HVAC Equipt. for SS-P07 (RV2140-401) Handover to CYD

98
98
0

84 05-Dec-13
154

Subcontract Award - Building - Admin (EPC) by JVD

C0000MIEF2140401060

HVAC Equipt. for ISB-02 (RV2140-401) Handover to CYD

0

95

14-Mar-15

G0000MIEF2140401010

HVAC Equipment for ISB-05(RV2140-401) Handover to JGC


0

95

10-May-15

G0000MIEF2140401015

HVAC Equipment for SS-P03(RV2140-401) Handover to JGC

0

30

14-Mar-15

G0000MIEF2140401020

HVAC Equipment for ISB-06(RV2140-401) Handover to JGC

0

89

09-Jun-15

G0000MIEF2140401030

HVAC Equipment for SS-P02(RV2140-401) Handover to JGC


0

36

14-Mar-15

G0000MIEF2140401040

HVAC Equipment for ISB-04(RV2140-401) Handover to JGC

0

111

14-Jul-15

G0000MIEF2140401050

HVAC Equipment for SS-P07(RV2140-401) Handover to CYD

0

37

14-Mar-15

G0000MIEF2140401060

HVAC Equipment for ISB-02(RV2140-401) Handover to CYD


0

95

14-Mar-15

G0000MIEF2140401070

HVAC Equipment for SS-M01(RV2140-401) Handover to SK

0

0

27-Feb-15

HVAC Equipment for SS-M01(RV2140-401) Handover to SK

G0000MIEF2140401080

HVAC Equipment for SS-M02(RV2140-401) Handover to SK

0

0

27-Feb-15

HVAC Equipment for SS-M02(RV2140-401) Handover to SK


G0000MIEF2140401090

HVAC Equipment for SS-U01(RV2140-401) Handover to SK

0

0

27-Feb-15

HVAC Equipment for SS-U01(RV2140-401) Handover to SK

G0000MIEF2140401100

HVAC Equipment for ISB-12(RV2140-401) Handover to SK

0

0

27-Feb-15

HVAC Equipment for ISB-12(RV2140-401) Handover to SK

G0000MIEF2140401110

HVAC Equipment for SS-U04(RV2140-401) Handover to SK

0


0

27-Feb-15

HVAC Equipment for SS-U04(RV2140-401) Handover to SK

G0000MIEF2140401120

HVAC Equipment for ISB-11(RV2140-401) Handover to SK

0

0

27-Feb-15

HVAC Equipment for ISB-11(RV2140-401) Handover to SK

G0000MIEF2140401130

HVAC Equipment for SS-P01(RV2140-401) Handover to SK

0

45

10-May-15

HVAC Equipment for SS-P01(RV2140-401) Handover to SK


G0000MIEF2140401140

HVAC Equipment for ISB-01(RV2140-401) Handover to SK

0

45

10-May-15

HVAC Equipment for ISB-01(RV2140-401) Handover to SK

G0000MIEF2140401150

HVAC Equipment for SS-P04(RV2140-401) Handover to SK

0

45

10-May-15

HVAC Equipment for SS-P04(RV2140-401) Handover to SK

G0000MIEF2140401160

HVAC Equipment for ISB-03(RV2140-401) Handover to SK

0


45

10-May-15

HVAC Equipment for ISB-03(RV2140-401) Handover to SK

G0000MIEF2140401170

HVAC Equipment for SS-P08(RV2140-401) Handover to SK

0

58

09-Jun-15

HVAC Equipment for SS-P08(RV2140-401) Handover to SK

G0000MIEF2140401180

HVAC Equipment for ISB-10(RV2140-401) Handover to SK

0

42

09-Jun-15

HVAC Equipment for ISB-10(RV2140-401) Handover to SK


G0000MIEF2140401190

HVAC Equipment for SS-P05(RV2140-401) Handover to SK

0

38

14-Jul-15

HVAC Equipment for SS-P05(RV2140-401) Handover to SK

G0000MIEF2140401200

HVAC Equipment for ISB-07(RV2140-401) Handover to SK

0

31

14-Jul-15

HVAC Equipment for ISB-07(RV2140-401) Handover to SK

G0000MIEF2140401210

HVAC Equipment for SS-P06(RV2140-401) Handover to TP

0


45

14-Jul-15

HVAC Equipment for SS-P06(RV2140-401) Handover to TP

G0000MIEF2140401220

HVAC Equipment for ISB-09(RV2140-401) Handover to TP

0

93

14-Jul-15

J0000MIEF2140401010

HVAC Equipment for ISB-05(RV2140-401) Handover from GSEC

0

250

10-May-15

J0000MIEF2140401015

HVAC Equipment for SS-P03(RV2140-401) Handover from GSEC


0

30

14-Mar-15

J0000MIEF2140401020

HVAC Equipment for ISB-06(RV2140-401) Handover from GSEC

0

179

09-Jun-15

J0000MIEF2140401030

HVAC Equipment for SS-P02(RV2140-401) Handover from GSEC

0

36

14-Mar-15

J0000MIEF2140401040

HVAC Equipment for ISB-04(RV2140-401) Handover from GSEC


0

192

14-Jul-15

S0000MIEF2140401070

HVAC Equipment for SS-M01(RV2140-401) Handover by GS

0

0

27-Feb-15

HVAC Equipment for SS-M01(RV2140-401) Handover by GS

S0000MIEF2140401080

HVAC Equipment for SS-M02(RV2140-401) Handover by GS

0

0

27-Feb-15

HVAC Equipment for SS-M02(RV2140-401) Handover by GS


S0000MIEF2140401090

HVAC Equipment for SS-U01(RV2140-401) Handover by GS

0

0

27-Feb-15

HVAC Equipment for SS-U01(RV2140-401) Handover by GS

S0000MIEF2140401100

HVAC Equipment for ISB-12(RV2140-401) Handover by GS

0

0

27-Feb-15

HVAC Equipment for ISB-12(RV2140-401) Handover by GS

S0000MIEF2140401110

HVAC Equipment for SS-U04(RV2140-401) Handover by GS

0


0

27-Feb-15

HVAC Equipment for SS-U04(RV2140-401) Handover by GS

S0000MIEF2140401120

HVAC Equipment for ISB-11(RV2140-401) Handover by GS

0

0

27-Feb-15

HVAC Equipment for ISB-11(RV2140-401) Handover by GS

S0000MIEF2140401130

HVAC Equipment for SS-P01(RV2140-401) Handover by GS

0

45

10-May-15

HVAC Equipment for SS-P01(RV2140-401) Handover by GS


S0000MIEF2140401140

HVAC Equipment for ISB-01(RV2140-401) Handover by GS

0

45

10-May-15

HVAC Equipment for ISB-01(RV2140-401) Handover by GS

S0000MIEF2140401150

HVAC Equipment for SS-P04(RV2140-401) Handover by GS

0

45

10-May-15

HVAC Equipment for SS-P04(RV2140-401) Handover by GS

S0000MIEF2140401160

HVAC Equipment for ISB-03(RV2140-401) Handover by GS

0


45

10-May-15

HVAC Equipment for ISB-03(RV2140-401) Handover by GS

S0000MIEF2140401170

HVAC Equipment for SS-P08(RV2140-401) Handover by GS

0

58

09-Jun-15

HVAC Equipment for SS-P08(RV2140-401) Handover by GS

S0000MIEF2140401180

HVAC Equipment for ISB-10(RV2140-401) Handover by GS

0

42

09-Jun-15

HVAC Equipment for ISB-10(RV2140-401) Handover by GS


S0000MIEF2140401190

HVAC Equipment for SS-P05(RV2140-401) Handover by GS

0

38

14-Jul-15

HVAC Equipment for SS-P05(RV2140-401) Handover by GS

S0000MIEF2140401200

HVAC Equipment for ISB-07(RV2140-401) Handover by GS

0

31

14-Jul-15

HVAC Equipment for ISB-07(RV2140-401) Handover by GS

T0000MIEF2140401210

Handover of HVAC Materials for SS-P06 from GSEC

0


45

14-Jul-15

Handover of HVAC Materials for SS-P06 from GSEC

T0000MIEF2140401220

Handover of HVAC Materials for ISB-09 from GSEC

0

94

14-Jul-15

Handover of HVAC Materials for ISB-09 from GSEC

Construction Interface
Piping
CAB00MIH1630101

Hydrotest for SW U/G Pipe Completed from CDU

JAD00MIH1630101

Hydrotest for SW U/G Pipe Completed from KHDS

SAB00MIH1630101


AB10 - Hydrotest for SW U/G Pipe Completed from CDU

251
5
0

142 29-Nov-14
388 29-Nov-14
177

15-Apr-16
15-Dec-14
29-Nov-14

0

708

15-Dec-14

0

91

29-Nov-14

Detail Engineering, Procurement, and

Critical Remaining Work

Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

HVAC Equipment for ISB-06(RV2140-401) Handover to JGC
HVAC Equipment for SS-P02(RV2140-401) Handover to JGC
HVAC Equipment for ISB-04(RV2140-401) Handover to JGC
HVAC Equipment for SS-P07(RV2140-401) Handover to CYD
HVAC Equipment for ISB-02(RV2140-401) Handover to CYD

HVAC Equipment for ISB-09(RV2140-401) Handover to TP
HVAC Equipment for ISB-05(RV2140-401) Handover from GSEC
HVAC Equipment for SS-P03(RV2140-401) Handover from GSEC
HVAC Equipment for ISB-06(RV2140-401) Handover from GSEC
HVAC Equipment for SS-P02(RV2140-401) Handover from GSEC
HVAC Equipment for ISB-04(RV2140-401) Handover from GSEC

Hydrotest for SW U/G Pipe Completed from CDU
Hydrotest for SW U/G Pipe Completed from KHDS
AB10 - Hydrotest for SW U/G Pipe Completed from CDU


Page 7 of 179

Actual Work
Remaining Work

HVAC Equipment for ISB-05(RV2140-401) Handover to JGC
HVAC Equipment for SS-P03(RV2140-401) Handover to JGC

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara


Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

SAD00MIH1630101
Instrumentation
CAC00MIH17810

AD00 - Hydrotest for SW U/G Pipe Completed from KHDS
Main Instrument Cable Installation to ISB-02 completed

Original Total Float Start

Duration
0
79
0

CC600MIH171010

MAV Installation & SAT for Central Control Building

0

GA700MIH17810

Main Instrument Cable Installation to ISB-08 completed by JVD(JGC)

GC100MIH17810

Main Instrument Cable Installation to ISB-14 completed by JVD(JGC)

GC300MIH17810
GC300MIH17811

Finish

90

15-Dec-14

33 16-Sep-15
84


15-Apr-16
30-Nov-15

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
AD00 - Hydrotest for SW U/G Pipe Completed from KHDS
Main Instrument Cable Installation to ISB-02 completed

124

21-Oct-15

0

11

15-Apr-16

Main Instrument Cable Installation to ISB-08 completed

0

89


15-Jan-16

Main Instrument Cable Installation to ISB-14 completed by JVD(J

Main Instrument Cable Installation to ISB-13 (via ISB-15/16)completed by JVD(JGC)

0

82

24-Dec-15

Main Instrument Cable Installation to ISB-13 (via ISB-15/16)complet

Main Instrument Cable Installation to ISB-15 (via ISB-16)completed by JVD(JGC)

0

82

24-Dec-15

Main Instrument Cable Installation to ISB-15 (via ISB-16)completed

GC400MIH17810

Main Instrument Cable Installation to ISB-16 completed by JVD(JGC)

0


69

24-Dec-15

GC600MIH171010

MAV Installation & SAT for Central Control Building

0

16

21-Oct-15

GC600MIH17810

Main Instrument Cable Installation to Fire Station completed by JVD(JGC)

0

52

16-Sep-15

Main Instrument Cable Installation to Fire Station completed by JVD(JGC)

GC600MIH17811

Main Instrument Cable Installation to Main Gate completed by JVD(JGC)


0

52

16-Sep-15

Main Instrument Cable Installation to Main Gate completed by JVD(JGC)

GC700MIH17810

Main Instrument Cable Installation to ISB-17 (via ISB-14)completed by JVD(JGC)

0

23

15-Jan-16

GC700MIH17811

Main Instrument Cable Installation to JCB (via ISB-14/17)completed by JVD(JGC)

0

23

15-Jan-16

Main Instrument Cable Installation to JCB (via ISB-14/17)complet


GC700MIH17812

Main Instrument Cable Installation to TLB (via ISB-15/16)completed by JVD(JGC)

0

45

24-Dec-15

Main Instrument Cable Installation to TLB (via ISB-15/16)completed

GC700MIH17813

Main Instrument Cable Installation to SPM (via ISB-14/17/JCB)completed by JVD(JGC)

0

23

15-Jan-16

Main Instrument Cable Installation to SPM (via ISB-14/17/JCB)co

JA600MIH17810

Main Instrument Cable Installation to ISB-07 completed

0


69

30-Jan-16

JA700MIH17810

Main Instrument Cable Installation to ISB-08 completed

0

11

15-Apr-16

JA900MIH17810

Main Instrument Cable Installation from ISB-09 completed

0

111

30-Jan-16

JAA00MIH17810

Main Instrument Cable Installation to ISB-10 (via ISB-01) completed

0


98

28-Dec-15

JAB10MIH17810

Main Instrument Cable Installation to ISB-01 completed

0

48

28-Dec-15

JAC00MIH17810

Main Instrument Cable Installation to ISB-02 completed

0

84

30-Nov-15

JAD10MIH17810

Main Instrument Cable Installation to ISB-03 completed

0


48

28-Dec-15

JB100MIH17810

Main Instrument Cable Installation to ISB-11 completed

0

37

30-Sep-15

Main Instrument Cable Installation to ISB-11 completed

JB400MIH17810

Main Instrument Cable Installation to ISB-12 (via ISB-11) completed

0

53

30-Sep-15

Main Instrument Cable Installation to ISB-12 (via ISB-11) completed

JC100MIH17810


Main Instrument Cable Installation to ISB-14 completed

0

89

15-Jan-16

JC300MIH17810

Main Instrument Cable Installation to ISB-13 (via ISB-15/16) completed

0

82

24-Dec-15

Main Instrument Cable Installation to ISB-13 (via ISB-15/16) comple

JC300MIH17811

Main Instrument Cable Installation to ISB-15 (via ISB-16) completed

0

82

24-Dec-15


Main Instrument Cable Installation to ISB-15 (via ISB-16) completed

JC400MIH17810

Main Instrument Cable Installation to ISB-16 completed

0

69

24-Dec-15

JC600MIH171010

MAV Installation & SAT for Central Control Building (by GSEC)

0

218

21-Oct-15

JC600MIH17810

Main Instrument Cable Installation to Fire Station completed

0

52


16-Sep-15

Main Instrument Cable Installation to Fire Station completed

JC600MIH17811

Main Instrument Cable Installation to Main Gate completed

0

52

16-Sep-15

Main Instrument Cable Installation to Main Gate completed

JC700MIH17810

Main Instrument Cable Installation to ISB-17 (via ISB_14) completed

0

23

15-Jan-16

JC700MIH17811

Main Instrument Cable Installation to JCB (via ISB-14/17) completed


0

23

15-Jan-16

Main Instrument Cable Installation to JCB (via ISB-14/17) comple

JC700MIH17812

Main Instrument Cable Installation to TLB (via ISB-15/16) completed

0

45

24-Dec-15

Main Instrument Cable Installation to TLB (via ISB-15/16) completed

JC700MIH17813

Main Instrument Cable Installation to SPM (via ISB-14/17/JCB) completed

0

23

15-Jan-16


S0000MIH171010

MAV Installation & SAT for Central Control Building

0

16

21-Oct-15

SA600MIH17810

Main Instrument Cable Installation to ISB-07 completed

0

69

30-Jan-16

SAA00MIH17810

Main Instrument Cable Installation to ISB-10 completed

0

98

28-Dec-15


Main Instrument Cable Installation to ISB-10 completed

SAB10MIH17810

Main Instrument Cable Installation to ISB-01 completed

0

48

28-Dec-15

Main Instrument Cable Installation to ISB-01 completed

SAD10MIH17810

Main Instrument Cable Installation to ISB-03 completed

0

48

28-Dec-15

SB100MIH17810

Main Instrument Cable Installation to ISB-11 completed

0


37

30-Sep-15

Main Instrument Cable Installation to ISB-11 completed

SB400MIH17810

Main Instrument Cable Installation to ISB-12 (via ISB-11) completed

0

53

30-Sep-15

Main Instrument Cable Installation to ISB-12 (via ISB-11) completed

TA900MIH17810

Main Instrument Cable Installation from ISB-09 completed (by JVD/JGC)

0

111

30-Jan-16

TC600MIH171010


MAV Installation & SAT for Central Control Building (by GSEC)

0

126

21-Oct-15

37 31-Jul-15
114

30-Sep-15
31-Jul-15

Main Cable Installation Completed for Group-2 (SS-P04(SK), SS-P07(CYD), SS-P05

Electrical
C0000MIH1820074

Main Cable Installation Completed for Group-2 (SS-P04(SK), SS-P07(CYD), SS-P05(S

36
0

MAV Installation & SAT for Central Control Building

Main Instrument Cable Installation to ISB-16 completed by JVD(JGC
MAV Installation & SAT for Central Control Building

Main Instrument Cable Installation to ISB-17 (via ISB-14)complete


Main Instrument Cable Installation to ISB-07 completed
Main Instrument Cable Installation to ISB-08 completed
Main Instrument Cable Installation from ISB-09 completed
Main Instrument Cable Installation to ISB-10 (via ISB-01) completed
Main Instrument Cable Installation to ISB-01 completed
Main Instrument Cable Installation to ISB-02 completed
Main Instrument Cable Installation to ISB-03 completed

Main Instrument Cable Installation to ISB-14 completed

Main Instrument Cable Installation to ISB-16 completed
MAV Installation & SAT for Central Control Building (by GSEC)

Main Instrument Cable Installation to ISB-17 (via ISB_14) comple

Main Instrument Cable Installation to SPM (via ISB-14/17/JCB) co
MAV Installation & SAT for Central Control Building
Main Instrument Cable Installation to ISB-07 completed

Main Instrument Cable Installation to ISB-03 completed

Main Instrument Cable Installation from ISB-09 completed (by J
MAV Installation & SAT for Central Control Building (by GSEC)

G0000MIH1820072

Main Cable Instrallation Completed for SS-O02, SS-U03 by JVD(SK)

0


171

31-Jul-15

Main Cable Instrallation Completed for SS-O02, SS-U03 by JVD(SK)

G0000MIH1820074

Main Cable Instrallation Completed for SS-P09, SS-O03 by JVD(SK)

0

111

31-Jul-15

Main Cable Instrallation Completed for SS-P09, SS-O03 by JVD(SK)

G0000MIH1820078

Main Cable Instrallation Completed for SS-U02, SS-O01 by JVD(SK)

0

106

30-Sep-15

J0000MIH1820072


Main Cable Installation Completed for Group-1 (SS-O02(GS), SS-U03(GS), SS-P02(JG

0

70

31-Jul-15

J0000MIH1820076

Main Cable Installation Completed for Group-3 (SS-P03 (JGC))

0

40

30-Sep-15

S0000MIH1820072

Main Cable Instrallation Completed for Group-1 (SS-O02(GS), SS-U03(GS), SS-P02(JG

0

63

31-Jul-15

Main Cable Instrallation Completed for Group-1 (SS-O02(GS), SS-U03(GS), SS-P02


S0000MIH1820074

Main Cable Instrallation Completed for Group-2 (SS-P04(SK), SS-P07(CYD), SS-P05(S

0

98

31-Jul-15

Main Cable Instrallation Completed for Group-2 (SS-P04(SK), SS-P07(CYD), SS-P0

S0000MIH1820076

Main Cable Instrallation Completed for Group-3 (SS-P01 (SK), SS-P03 (JGC&CYD), S

0

40

30-Sep-15

S0000MIH1820078

Main Cable Instrallation Completed for Group-4 (SS-U02 (GS), SS-O01 (GS))

0

94


30-Sep-15

T0000MIH1820072

Main Cable Installation Completed for Group 1 (SS-002(GS), SS-U03(GS), SS-P02(JG

0

87

31-Jul-15

54 20-May-16
24

01-Jul-16
01-Jul-16

Pre-Commissioning Interface
Interfa
CAG00MIH2H20120
Steam available for Process Area steam blow

35
0

Main Cable Instrallation Completed for SS-U02, SS-O01 by JVD(SK)
Main Cable Installation Completed for Group-1 (SS-O02(GS), SS-U03(GS), SS-P02(
Main Cable Installation Completed for Group-3 (SS-P03 (JGC))


Main Cable Instrallation Completed for Group-3 (SS-P01 (SK), SS-P03 (JGC
Main Cable Instrallation Completed for Group-4 (SS-U02 (GS), SS-O01 (GS))
Main Cable Installation Completed for Group 1 (SS-002(GS), SS-U03(GS), SS-P02(J
Steam available for Process Area steam blow

GAG00MIH2H20120

Steam available for Process Area steam blow by SK

0

69

01-Jul-16

GB600MIH2H2040

Seawater Cooling Tower Ready for Service to SKEC

0

0

20-May-16

JAG00MIH2H20120

Steam available for Process Area steam blow (by SKEC)


0

0

01-Jul-16

S0000MIH2H2040

Seawater Cooling Tower Ready for Service by GSEC

0

0

20-May-16

SAG00MIJ1J10120

Steam available for Process Area Steam Blow

0

0

01-Jul-16

Steam available for Process Area Steam Blow

TAG00MIJ1J10120


Steam Available for Process Area Steam Blow (by SKEC)

0

48

01-Jul-16

Steam Available for Process Area Steam Blow

80 29-Nov-14
72

29-Feb-16
29-Nov-14

Marine Interface
C0000MIH1000010

Temporary Construction Jetty - Ready for Use

228
0

Steam available for Process Area steam blow
Seawater Cooling Tower Ready for Service to SKEC
Steam available for Process Area steam blow
Seawater Cooling Tower Ready for Service by GSE

Temporary Construction Jetty - Ready for Use


GC700MIH1100010

Handover of Seawater intake Basin for Equipment installation by Marine Subcontractor

0

69

30-May-15

GC700MIH1100020

Handover of Solid Berth (Berth 1B) by Marine Subcontractor

0

121

21-Dec-15

GC700MIH1100025

Handover of Solid Berth (Berth 1A) by Marine Subcontractor

0

116

29-Feb-16


GC700MIH1100030

Handover of Berth 2 incl. Piperack Tr estle by Mar ine Subcontractor

0

68

31-May-15

GC700MIH1100040

Handover of Berth 4 incl. Piperack Tr estle by Mar ine Subcontractor

0

7

31-Jul-15

GC700MIH1100050

Handover of Onshore Seawater Outfall Pipeline Rout by Marine Subcontractor

0

72

31-Aug-15


GC700MIH1100070

Handover of Temporary Construction Jetty by Marine Subcontractor

0

222

29-Nov-14

GC700MIH1100090

Handover Partially of Piperack Area by Marine Subcontractor

0

110

20-Jan-15

Handover Partially of Piperack Area by Marine Subcontractor

GC700MIH1100100

Handover of J-Area for Jetty Admin Building by Marine Subcontractor

0

0


20-Jan-15

Handover of J-Area for Jetty Admin Building by Marine Subcontractor

GC700MIH1100110

Handover of Jetty W/S, Etc. Area by Marine Subc ontractor

0

43

18-Jul-15

GC700MIH1100120

Handover of Onshore SW Intake Pipeline Rout by Marine Subcontractor

0

45

20-Jan-15

J0000MIFC40013

Handover of Temporary Construction Jetty

0


42

29-Nov-14

Handover of Temporary Construction Jetty

S0000MIMC008

Handover of Temporary Construction Jetty by JVD

0

46

29-Nov-14

Handover of Temporary Construction Jetty by JVD

TD200MIMC008

Handover of Temporary Construction Jetty (by Marine)

0

72

29-Nov-14

Handover of Temporary Construction Jetty (by Marine)


574

12 15-Jan-13 A

24-Dec-15

536
536
160
129
74

16
16
26
57

31-Aug-15
31-Aug-15
31-Oct-13
16-Aug-13
01-May-13 A

Engineering 8%
Basic Engineering
Basic Design
Process Design Basis
Common Area
J0000B2P22001

T0000B2P22001
Process Area
J0000B2P23060B

Design Basis & General Spec
Process Design Basis Update (Mark-Up to UOP)
Flare Load Summary

A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P22011
A100 - Design Basis_IFR
SA100B2P22017

18

31-Oct-13
04-Jun-13 A

146
97

44 01-Apr-13 A
13 01-Apr-13 A

31-Oct-13
16-Aug-13

44 19-Aug-13

31-Oct-13


26 15-Apr-13 A
0 15-Apr-13 A

31-Oct-13
24-Jul-13

26 25-Jul-13

31-Oct-13

24 15-Apr-13 A
0 15-Apr-13 A

31-Oct-13
09-Aug-13

24 12-Aug-13

31-Oct-13

44 01-Apr-13 A
0 01-Apr-13 A

31-Oct-13
16-Aug-13

A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B2P22011

A500 - Design Basis_IFR

136
71

A500 - Design Basis_IFC

65

AA00 - Polypropylene U
Unit (PPU)
SAA00B2P22011
AA00 - Design Basis_IFR

136
83

AA00 - Design Basis_IFC

53

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B2P22011
AB10 - Design Basis_IFR

146
97

SAB10B2P22017


AB10 - Design Basis_IFC

49

31 19-Aug-13

31-Oct-13

SAB20B2P22011

AB20 - Design Basis_IFR

97

13 01-Apr-13 A

16-Aug-13

SAB20B2P22017

AB20 - Design Basis_IFC

49

44 19-Aug-13

31-Oct-13

SAB30B2P22011


AB30 - Design Basis_IFR

97

13 01-Apr-13 A

16-Aug-13

SAB30B2P22017

AB30 - Design Basis_IFC

49

44 19-Aug-13

31-Oct-13

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B2P22010
Receipt of LICENSOR PACKAGE

Handover of Solid Berth (Berth 1B) by Marine Subcontractor
Handover of Solid Berth (Berth 1A) by Marine Subcontractor
Handover of Berth 2 incl. Piperack Tr estle by Mar ine Subcontractor
Handover of Berth 4 incl. Piperack Tr estle by Mar ine Subcontractor
Handover of Onshore Seawater Outfall Pipeline Rout by Marine Subcontractor

Handover of Temporary Construction Jetty by Marine Subcontractor

Handover of Jetty W/S, Etc. Area by Marine Subc ontractor
Handover of Onshore SW Intake Pipeline Rout by Marine Subcontractor

Design Basis & General Spec

16-Aug-13

21 31-Jan-13 A
01-May-13 A

49

SAA00B2P22017

104 22-Jul-13

150
22

A100 - Design Basis_IFC

SA500B2P22017

15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A


Handover of Seawater intake Basin for Equipment installation by Marine Subcontractor

105
0

31-Jan-13 A
31-Jan-13 A

03-Jul-13 A

Process Design Basis Update (Mark-Up to UOP)
Flare Load Summary
A100 - Design Basis_IFR
A100 - Design Basis_IFC
A500 - Design Basis_IFR
A500 - Design Basis_IFC
AA00 - Design Basis_IFR
AA00 - Design Basis_IFC
AB10 - Design Basis_IFR
AB10 - Design Basis_IFC
AB20 - Design Basis_IFR
AB20 - Design Basis_IFC
AB30 - Design Basis_IFR
AB30 - Design Basis_IFC
Receipt of LICENSOR PACKAGE

CAC00B2P22020

Process Description Review


23

31-Jan-13 A

05-Mar-13 A

CAC00B2P22025

Design Basis Preparation & Establish Philosophy

33

20-Feb-13 A

08-Apr-13 A

Design Basis Preparation & Establish Philosophy

CAC00B2P22040

Clarification with LICENSOR PACKAGE

82

06-Mar-13 A

03-Jul-13 A

Clarification with LICENSOR PACKAGE


146
97

31 01-Apr-13 A
0 01-Apr-13 A

31-Oct-13
16-Aug-13

31 19-Aug-13

31-Oct-13

31 01-Apr-13 A
0 01-Apr-13 A

31-Oct-13
16-Aug-13

31 19-Aug-13

31-Oct-13

43 01-Apr-13 A
27 01-Apr-13 A
0 01-Apr-13 A

30-Oct-13
30-Oct-13

24-Jul-13

27 25-Jul-13

30-Oct-13

27 01-Apr-13 A

30-Oct-13

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P22011
AD00 - Design Basis_IFR
SAD00B2P22017

AD00 - Design Basis_IFC

49

AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P22011
AE00 - Design Basis_IFR

146
97

SAE00B2P22017


AE00 - Design Basis_IFC

49

Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P22011
B100 - Design Basis_IFR

145
145
81

SB100B2P22017

B100 - Design Basis_IFC

B200 - Service / Potable / Fire Water

64
145

Process Description Review

AD00 - Design Basis_IFR
AD00 - Design Basis_IFC
AE00 - Design Basis_IFR
AE00 - Design Basis_IFC


B100 - Design Basis_IFR

Page 8 of 179

Actual Work
Remaining Work

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

B100 - Design Basis_IFC

Date
31-Jul-13
22-Nov-13
02-Dec-13

20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3


ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

SB200B2P22011

B200 - Design Basis_IFR

81

SB200B2P22017

B200 - Design Basis_IFC

64

B300 - Design Basis_IFR

145
81

B300 - Demine & Fuel

SB300B2P22011
SB300B2P22017
B400 - Steam & Power
SB400B2P22011
SB400B2P22017
B500 - Cooling Water
SB500B2P22011
SB500B2P22017

B300 - Design Basis_IFC

64

B400 - Design Basis_IFR

145
81

B400 - Design Basis_IFC

64

B500 - Design Basis_IFR

145
81

B500 - Design Basis_IFC

64


0 01-Apr-13 A

Finish

24-Jul-13

27 25-Jul-13

30-Oct-13

27 01-Apr-13 A
0 01-Apr-13 A

30-Oct-13
24-Jul-13

27 25-Jul-13

30-Oct-13

27 01-Apr-13 A
0 01-Apr-13 A

30-Oct-13
24-Jul-13

27 25-Jul-13

30-Oct-13


43 01-Apr-13 A
13 01-Apr-13 A

30-Oct-13
24-Jul-13

43 25-Jul-13

30-Oct-13

16 15-Jan-13 A
57 11-Mar-13 A
80 22-Jul-13

31-Aug-15
15-Jun-15
20-Sep-13

Process Design
Common Area
T0000B2P23001B

PFDs & UFDs - IFR

536
566
42

T0000B2P23001C


PFDs & UFDs - IFC

40

57 19-Jan-15

18-Mar-15

T0000B2P23010B

Heat And Mater ial Balance - F ir st Issue

10

80 23-Sep-13

04-Oct-13

T0000B2P23010C

Heat And Mater ial Balance - F inal Iss ue

25

57 10-Feb-15

18-Mar-15

T0000B2P23020A


Update Utility Summary

29

T0000B2P23020B

Utility Summary - FR

17

45 01-Jul-13 A

23-Jul-13

T0000B2P23020C

Utility Summary - FC

22

57 27-Feb-15

30-Mar-15

T0000B2P23030A

Update Effluent Summary

17


T0000B2P23030B

Effluent Summary - FR

22

45 25-Oct-13

26-Nov-13

T0000B2P23030C

Effluent Summary - FC

23

57 31-Mar-15

30-Apr-15

T0000B2P23040A

Flare Load Summary - First Issue

30

T0000B2P23040B

Flare Load Summary - Final Issue


22

T0000B2P23050A

Equipment List - First Issue

17

T0000B2P23050B

Equipment List - Intermediate Issue 1

38

71 16-Jul-13 A

09-Sep-13

T0000B2P23050C

Equipment List - Intermediate Issue 2

15

27 07-Mar-14

27-Mar-14

T0000B2P23050D


Equipment List - Final Issue (FC)

15

32 19-Mar-15

08-Apr-15

T0000B2P23060A

Line List - First Issue

20

72 16-Jul-13 A

14-Aug-13

T0000B2P23060B

Line List - Intermediate Issue 1

18

17 04-Nov-13

28-Nov-13

T0000B2P23060C


Line List - Intermediate Issue 2

19

31 03-Mar-14

27-Mar-14

T0000B2P23060D

Line List - Final Issue (FC)

19

80 07-Oct-14

03-Nov-14

T0000B2P23070A

Cause & Effect Charts - First Issue

59

39 22-Jul-13 A

16-Oct-13

T0000B2P23070B


Cause & Effect Charts - Final

19

103 08-Sep-14

03-Oct-14

T0000B2P23080A

Process Control Narrative - Prepare / Update

44

116 22-Jul-13 A

24-Sep-13

T0000B2P23090

Final Issue of Operation and Maintenance Manuals (process)

102

57 16-Jan-15

15-Jun-15

Heat and Material Balance


536
52

16 15-Jan-13 A
15-Jan-13 A

31-Aug-15
29-Mar-13 A

Process Area
J0000B2P23010

11-Mar-13 A

19-Apr-13 A

11-Mar-13 A
105 27-Feb-15
27-Mar-13 A

18-Apr-13 A

14-May-13 A

19-Apr-13 A
19-Apr-13 A

Utility Summary (Preliminary)


19

01-Apr-13 A

25-Apr-13 A

J0000B2P23020B

Utility Summary

54

01-May-13 A

19-Jul-13 A

J0000B2P23030

Material Selection Basis

53

15-Jan-13 A

01-Apr-13 A

J0000B2P23040

Cause and Effect


55

22-Feb-13 A

15-May-13 A

J0000B2P23050A

Effluent Summary (Preliminary)

19

01-Apr-13 A

25-Apr-13 A

J0000B2P23050B

Effluent Summary

25

J0000B2P23060A

Flare Load Summary (Preliminary)

20

01-Mar-13 A


604
40

25 01-Apr-13 A
25 01-Aug-14

31-Aug-15
30-Sep-14

A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P23051
A100 - Control Narrative_IFR

B200 - Design Basis_IFC
B300 - Design Basis_IFR
B300 - Design Basis_IFC
B400 - Design Basis_IFR
B400 - Design Basis_IFC
B500 - Design Basis_IFR
B500 - Design Basis_IFC

PFDs & UFDs - IFR
PFDs & UFDs - IFC
Heat And Mater ial Balance - F irst Issue
Heat And Mater ial Balance - F inal Iss ue
Update Utility Summary
Utility Summary - FR
Utility Summary - FC
Update Effluent Summary
Effluent Summary - FR

Effluent Summary - FC
Flare Load Summary - First Issue

30-Mar-15

J0000B2P23020A

52 21-Aug-13

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
B200 - Design Basis_IFR

Flare Load Summary - Final Issue
Equipment List - First Issue
Equipment List - Intermediate Issue 1
Equipment List - Intermediate Issue 2
Equipment List - Final Issue (FC)
Line List - First Issue
Line List - Intermediate Issue 1
Line List - Intermediate Issue 2
Line List - Final Issue (FC)
Cause & Effect Charts - First Issue
Cause & Effect Charts - Final
Process Control Narrative - Prepare / Update

Final Issue of Operation and Maintenance Manuals (process)
Heat and Material Balance
Utility Summary (Preliminary)
Utility Summary
Material Selection Basis
Cause and Effect
Effluent Summary (Preliminary)

26-Sep-13
29-Mar-13 A

Effluent Summary
Flare Load Summary (Preliminary)
A100 - Control Narrative_IFR

SA100B2P23057

A100 - Control Narrative_IFC

94

25 01-Oct-14

13-Feb-15

SA100B2P23071

A100 - Process Flow Diagrams (PFD)_IFR

59


37 01-May-13 A

24-Jul-13

SA100B2P23077

A100 - Process Flow Diagrams (PFD)_IFC

199

37 25-Jul-13

15-May-14

SA100B2P23111

A100 - Interlock Narrative_IFR

40

54 01-Aug-14

30-Sep-14

SA100B2P23117

A100 - Interlock Narrative_IFC

94


54 01-Oct-14

13-Feb-15

SA100B2P23131

A100 - Utility Summary_IFR

80

67 01-Apr-13 A

23-Jul-13

SA100B2P23137

A100 - Utility Summary_IFC

148

67 24-Jul-13

28-Feb-14

SA100B2P23171

A100 - Material Selection Diagram_IFR

73


37 16-Apr-13 A

29-Jul-13

SA100B2P23177

A100 - Material Selection Diagram_IFC

196

37 30-Jul-13

15-May-14

SA100B2P23191

A100 - Effluent Summary_IFR

26

88 25-Jul-13

30-Aug-13

SA100B2P23197

A100 - Effluent Summary_IFC

223


88 02-Sep-13

25-Jul-14

SA100B2P23311

A100 - Operating Manual_IFR

41

25 01-Apr-15

29-May-15

SA100B2P23317

A100 - Operating Manual_IFC

66

25 01-Jun-15

31-Aug-15

SA100B2P23931

A100 - Relief and Blowdown Summary_IFR

44


63 25-Jul-13

30-Sep-13

SA100B2P23937

A100 - Relief and Blowdown Summary_IFC

175

63 01-Oct-13

13-Jun-14

A100 - Relief and Blowdown Summary_IFC

594
29

25 15-Apr-13 A
25 01-Sep-14

31-Aug-15
15-Oct-14

A500 - Control Narrative_IFR

A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)

SA500B2P23051
A500 - Control Narrative_IFR

A100 - Control Narrative_IFC
A100 - Process Flow Diagrams (PFD)_IFR
A100 - Process Flow Diagrams (PFD)_IFC
A100 - Interlock Narrative_IFR
A100 - Interlock Narrative_IFC
A100 - Utility Summary_IFR
A100 - Utility Summary_IFC
A100 - Material Selection Diagram_IFR
A100 - Material Selection Diagram_IFC
A100 - Effluent Summary_IFR
A100 - Effluent Summary_IFC
A100 - Operating Manual_IFR
A100 - Operating Manual_IFC
A100 - Relief and Blowdown Summary_IFR

SA500B2P23057

A500 - Control Narrative_IFC

84

25 16-Oct-14

12-Feb-15

SA500B2P23061


A500 - Interlock Narrative_IFR

29

25 01-Sep-14

15-Oct-14

SA500B2P23067

A500 - Interlock Narrative_IFC

84

25 16-Oct-14

12-Feb-15

SA500B2P23071

A500 - Process Flow Diagrams (PFD)_IFR

69

22 15-Apr-13 A

22-Jul-13

SA500B2P23077


A500 - Process Flow Diagrams (PFD)_IFC

221

22 23-Jul-13

13-Jun-14

SA500B2P23091

A500 - Catalyst & Chemical Summary_IFR

28

60 23-Jul-13

30-Aug-13

SA500B2P23097

A500 - Catalyst & Chemical Summary_IFC

223

60 02-Sep-13

25-Jul-14

SA500B2P23131


A500 - Utility Summary_IFR

70

44 15-Apr-13 A

23-Jul-13

SA500B2P23137

A500 - Utility Summary_IFC

138

44 24-Jul-13

14-Feb-14

SA500B2P23151

A500 - Cause & Effect Diagram_IFR

125

53 01-Jul-13 A

31-Jul-14

SA500B2P23157


A500 - Cause & Effect Diagram_IFC

110

53 01-Aug-14

12-Jan-15

SA500B2P23171

A500 - Material Selection Diagram_IFR

57

22 01-May-13 A

22-Jul-13

SA500B2P23177

A500 - Material Selection Diagram_IFC

221

22 23-Jul-13

13-Jun-14

SA500B2P23191


A500 - Effluent Summary_IFR

97

60 15-Apr-13 A

30-Aug-13

SA500B2P23197

A500 - Effluent Summary_IFC

223

60 02-Sep-13

25-Jul-14

SA500B2P23311

A500 - Operating Manual_IFR

41

25 01-Apr-15

29-May-15

SA500B2P23317


A500 - Operating Manual_IFC

66

25 01-Jun-15

31-Aug-15

SA500B2P23931

A500 - Relief and Blowdown Summary_IFR

46

30 23-Jul-13

30-Sep-13

SA500B2P23937

A500 - Relief and Blowdown Summary_IFC

175

30 01-Oct-13

13-Jun-14

A500 - Relief and Blowdown Summary_IFC


594
29

25 15-Apr-13 A
25 01-Sep-14

31-Aug-15
15-Oct-14

A600 - Control Narrative_IFR

A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B2P23051
A600 - Control Narrative_IFR
SA600B2P23057

A600 - Control Narrative_IFC

84

25 16-Oct-14

12-Feb-15

SA600B2P23061

A600 - Interlock Narrative_IFR

29


25 01-Sep-14

15-Oct-14

SA600B2P23067

A600 - Interlock Narrative_IFC

84

25 16-Oct-14

12-Feb-15

SA600B2P23071

A600 - Process Flow Diagrams (PFD)_IFR

69

36 15-Apr-13 A

22-Jul-13

SA600B2P23077

A600 - Process Flow Diagrams (PFD)_IFC

221


36 23-Jul-13

13-Jun-14

SA600B2P23091

A600 - Catalyst & Chemical Summary_IFR

28

60 23-Jul-13

30-Aug-13

SA600B2P23097

A600 - Catalyst & Chemical Summary_IFC

223

60 02-Sep-13

25-Jul-14

SA600B2P23131

A600 - Utility Summary_IFR

70


58 15-Apr-13 A

23-Jul-13

SA600B2P23137

A600 - Utility Summary_IFC

138

58 24-Jul-13

14-Feb-14

SA600B2P23151

A600 - Cause & Effect Diagram_IFR

125

78 01-Jul-13 A

31-Jul-14

SA600B2P23157

A600 - Cause & Effect Diagram_IFC

110


78 01-Aug-14

12-Jan-15

SA600B2P23171

A600 - Material Selection Diagram_IFR

57

36 01-May-13 A

22-Jul-13

SA600B2P23177

A600 - Material Selection Diagram_IFC

221

36 23-Jul-13

13-Jun-14

SA600B2P23191

A600 - Effluent Summary_IFR

97


60 15-Apr-13 A

30-Aug-13

SA600B2P23197

A600 - Effluent Summary_IFC

223

60 02-Sep-13

25-Jul-14

SA600B2P23311

A600 - Operating Manual_IFR

41

25 01-Apr-15

29-May-15

SA600B2P23317

A600 - Operating Manual_IFC

66


25 01-Jun-15

31-Aug-15

SA600B2P23931

A600 - Relief and Blowdown Summary_IFR

46

30 23-Jul-13

30-Sep-13

SA600B2P23937

A600 - Relief and Blowdown Summary_IFC

175

30 01-Oct-13

13-Jun-14

324
40

93 24-Jun-13 A
87 24-Jun-13 A


14-Oct-14
19-Aug-13

A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B2P23010A
A700-Material Selection Diagram-FR
GA700B2P23010B

A700-Material Selection Diagram-FC

15

69 25-Jun-14

15-Jul-14

GA700B2P23030A

A700-Process Flow Diagram-FR

40

34 24-Jun-13 A

19-Aug-13

GA700B2P23030B


A700-Process Flow Diagram-FC

15

69 25-Jun-14

15-Jul-14

GA700B2P23050A

A700-Cause & Effect Diagram-FR rev.A

19

46 02-Aug-13

29-Aug-13

GA700B2P23050B

A700-Cause & Effect Diagram-FA rev.B

18

73 13-Nov-13

06-Dec-13

GA700B2P23050C


A700-Cause & Effect Diagram-FC rev.0 (W/ Hold)

18

40 08-Apr-14

01-May-14

GA700B2P23050D

A700-Cause & Effect Diagram-FC rev.1 (W/o Hold)

27

93 02-Sep-14

14-Oct-14

GA700B2P23090A

A700-Effluent Summary-FR

15

92 24-Sep-13

16-Oct-13

GA700B2P23090B


A700-Effluent Summary-FC

20

40 02-Jun-14

30-Jun-14

GA700B2P23110A

A700-Heat & Material Balance-FR

10

92 29-Jul-13

09-Aug-13

GA700B2P23110B

A700-Heat & Material Balance-FC

20

79 01-Nov-13

28-Nov-13

GA700B2P23130A


A700-Utility Summary-FR

20

124 02-Oct-13

31-Oct-13

GA700B2P23130B

A700-Utility Summary-FC

20

25 04-Aug-14

01-Sep-14

GA700B2P23150A

A700-Flare Load Summary-FR

33

79 10-Sep-13

31-Oct-13

A500 - Control Narrative_IFC

A500 - Interlock Narrative_IFR
A500 - Interlock Narrative_IFC
A500 - Process Flow Diagrams (PFD)_IFR
A500 - Process Flow Diagrams (PFD)_IFC
A500 - Catalyst & Chemical Summary_IFR
A500 - Catalyst & Chemical Summary_IFC
A500 - Utility Summary_IFR
A500 - Utility Summary_IFC
A500 - Cause & Effect Diagram_IFR
A500 - Cause & Effect Diagram_IFC
A500 - Material Selection Diagram_IFR
A500 - Material Selection Diagram_IFC
A500 - Effluent Summary_IFR
A500 - Effluent Summary_IFC
A500 - Operating Manual_IFR
A500 - Operating Manual_IFC
A500 - Relief and Blowdown Summary_IFR

A600 - Control Narrative_IFC
A600 - Interlock Narrative_IFR
A600 - Interlock Narrative_IFC
A600 - Process Flow Diagrams (PFD)_IFR
A600 - Process Flow Diagrams (PFD)_IFC
A600 - Catalyst & Chemical Summary_IFR
A600 - Catalyst & Chemical Summary_IFC
A600 - Utility Summary_IFR
A600 - Utility Summary_IFC
A600 - Cause & Effect Diagram_IFR
A600 - Cause & Effect Diagram_IFC
A600 - Material Selection Diagram_IFR

A600 - Material Selection Diagram_IFC
A600 - Effluent Summary_IFR
A600 - Effluent Summary_IFC
A600 - Operating Manual_IFR
A600 - Operating Manual_IFC
A600 - Relief and Blowdown Summary_IFR
A600 - Relief and Blowdown Summary_IFC
A700-Material Selection Diagram-FR
A700-Material Selection Diagram-FC
A700-Process Flow Diagram-FR
A700-Process Flow Diagram-FC
A700-Cause & Effect Diagram-FR rev.A
A700-Cause & Effect Diagram-FA rev.B
A700-Cause & Effect Diagram-FC rev.0 (W/ Hold)
A700-Cause & Effect Diagram-FC rev.1 (W/o Hold)
A700-Effluent Summary-FR
A700-Effluent Summary-FC
A700-Heat & Material Balance-FR

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D

014
2
N
R
I 12-MA

A700-Utility Summary-FC
A700-Flare Load Summary-FR

Page 9 of 179

Actual Work
Remaining Work

A700-Heat & Material Balance-FC
A700-Utility Summary-FR

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine


Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name


Original Total Float Start
Duration

Finish

GA700B2P23150B

A700-Flare Load Summary-FC

20

50 17-Jun-14

14-Jul-14

GA700B2P23170A

A700-Equipment List-FR

15

52 02-Oct-13

24-Oct-13

GA700B2P23170B

A700-Equipment List-FC

35


48 14-Aug-14

07-Oct-14

594
92

33 15-Apr-13 A
24 01-Apr-14

31-Aug-15
11-Aug-14

AA00 - Polypropylene U
Unit (PPU)
SAA00B2P23051
AA00 - Control Narrative_IFR
SAA00B2P23057

AA00 - Control Narrative_IFC

108

24 12-Aug-14

19-Jan-15

SAA00B2P23061


AA00 - Interlock Narrative_IFR

92

24 01-Apr-14

11-Aug-14

SAA00B2P23067

AA00 - Interlock Narrative_IFC

108

24 12-Aug-14

19-Jan-15

SAA00B2P23071

AA00 - Process Flow Diagrams (PFD)_IFR

66

15-Apr-13 A

SAA00B2P23077

AA00 - Process Flow Diagrams (PFD)_IFC


183

61 18-Jul-13 A

14-Apr-14

SAA00B2P23091

AA00 - Catalyst & Chemical Summary_IFR

26

15 25-Jul-13

30-Aug-13

SAA00B2P23097

AA00 - Catalyst & Chemical Summary_IFC

223

15 02-Sep-13

25-Jul-14

SAA00B2P23131

AA00 - Utility Summary_IFR


71

41 15-Apr-13 A

24-Jul-13

SAA00B2P23137

AA00 - Utility Summary_IFC

137

52 25-Jul-13

14-Feb-14

SAA00B2P23151

AA00 - Cause & Effect Diagram_IFR

230

45 25-Jul-13

30-Jun-14

SAA00B2P23157

AA00 - Cause & Effect Diagram_IFC


115

45 01-Jul-14

15-Dec-14

SAA00B2P23171

AA00 - Material Selection Diagram_IFR

55

30-Apr-13 A

SAA00B2P23177

AA00 - Material Selection Diagram_IFC

183

61 18-Jul-13 A

14-Apr-14

SAA00B2P23191

AA00 - Effluent Summary_IFR

40


65 05-Jul-13 A

30-Aug-13

SAA00B2P23197

AA00 - Effluent Summary_IFC

223

65 02-Sep-13

25-Jul-14

SAA00B2P23311

AA00 - Operating Manual_IFR

81

33 30-Jan-15

29-May-15

SAA00B2P23317

AA00 - Operating Manual_IFC

66


33 01-Jun-15

31-Aug-15

SAA00B2P23931

AA00 - Relief and Blowdown Summary_IFR

115

21 15-Apr-13 A

30-Sep-13

SAA00B2P23937

AA00 - Relief and Blowdown Summary_IFC

134

21 01-Oct-13

14-Apr-14

603
40

26 01-Apr-13 A
26 01-Aug-14


28-Aug-15
30-Sep-14

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B2P23051
AB10 - Control Narrative_IFR

A700-Equipment List-FC
AA00 - Control Narrative_IFR
AA00 - Control Narrative_IFC
AA00 - Interlock Narrative_IFR
AA00 - Interlock Narrative_IFC
AA00 - Process Flow Diagrams (PFD)_IFR
AA00 - Process Flow Diagrams (PFD)_IFC
AA00 - Catalyst & Chemical Summary_IFR
AA00 - Catalyst & Chemical Summary_IFC
AA00 - Utility Summary_IFR
AA00 - Utility Summary_IFC
AA00 - Cause & Effect Diagram_IFR
AA00 - Cause & Effect Diagram_IFC

17-Jul-13 A

AB10 - Control Narrative_IFC

94

26 01-Oct-14


13-Feb-15

SAB10B2P23071

AB10 - Process Flow Diagrams (PFD)_IFR

59

20 01-May-13 A

24-Jul-13

SAB10B2P23077

AB10 - Process Flow Diagrams (PFD)_IFC

199

20 25-Jul-13

15-May-14

SAB10B2P23091

AB10 - Catalyst & Chemical Summary_IFR

26

67 25-Jul-13


30-Aug-13

SAB10B2P23097

AB10 - Catalyst & Chemical Summary_IFC

223

67 02-Sep-13

25-Jul-14

SAB10B2P23111

AB10 - Interlock Narrative_IFR

40

55 01-Aug-14

30-Sep-14

SAB10B2P23117

AB10 - Interlock Narrative_IFC

94

55 01-Oct-14


13-Feb-15

SAB10B2P23131

AB10 - Utility Summary_IFR

80

50 01-Apr-13 A

23-Jul-13

SAB10B2P23137

AB10 - Utility Summary_IFC

148

50 24-Jul-13

28-Feb-14

SAB10B2P23151

AB10 - Cause & Effect Diagram_IFR

230

60 25-Jul-13


30-Jun-14

SAB10B2P23157

AB10 - Cause & Effect Diagram_IFC

126

60 01-Jul-14

31-Dec-14

SAB10B2P23171

AB10 - Material Selection Diagram_IFR

73

20 16-Apr-13 A

29-Jul-13

SAB10B2P23177

AB10 - Material Selection Diagram_IFC

196

20 30-Jul-13


15-May-14

SAB10B2P23191

AB10 - Effluent Summary_IFR

26

89 25-Jul-13

30-Aug-13

SAB10B2P23197

AB10 - Effluent Summary_IFC

223

89 02-Sep-13

25-Jul-14

SAB10B2P23311

AB10 - Operating Manual_IFR

41

26 01-Apr-15


29-May-15

SAB10B2P23317

AB10 - Operating Manual_IFC

65

26 01-Jun-15

28-Aug-15

SAB10B2P23931

AB10 - Relief and Blowdown Summary_IFR

44

64 25-Jul-13

30-Sep-13

SAB10B2P23937

AB10 - Relief and Blowdown Summary_IFC

175

64 01-Oct-13


13-Jun-14

SAB20B2P23051

AB20 - Control Narrative_IFR

40

26 01-Aug-14

30-Sep-14

SAB20B2P23057

AB20 - Control Narrative_IFC

94

26 01-Oct-14

13-Feb-15

SAB20B2P23071

AB20 - Process Flow Diagrams (PFD)_IFR

59

37 01-May-13 A


24-Jul-13

SAB20B2P23077

AB20 - Process Flow Diagrams (PFD)_IFC

199

37 25-Jul-13

15-May-14

SAB20B2P23091

AB20 - Catalyst & Chemical Summary_IFR

26

67 25-Jul-13

30-Aug-13

SAB20B2P23097

AB20 - Catalyst & Chemical Summary_IFC

223

67 02-Sep-13


25-Jul-14

SAB20B2P23111

AB20 - Interlock Narrative_IFR

40

55 01-Aug-14

30-Sep-14

SAB20B2P23117

AB20 - Interlock Narrative_IFC

94

55 01-Oct-14

13-Feb-15

SAB20B2P23131

AB20 - Utility Summary_IFR

80

67 01-Apr-13 A


23-Jul-13

SAB20B2P23137

AB20 - Utility Summary_IFC

148

67 24-Jul-13

28-Feb-14

SAB20B2P23151

AB20 - Cause & Effect Diagram_IFR

230

60 25-Jul-13

30-Jun-14

SAB20B2P23157

AB20 - Cause & Effect Diagram_IFC

126

60 01-Jul-14


31-Dec-14

SAB20B2P23171

AB20 - Material Selection Diagram_IFR

73

37 16-Apr-13 A

29-Jul-13

SAB20B2P23177

AB20 - Material Selection Diagram_IFC

196

37 30-Jul-13

15-May-14

SAB20B2P23191

AB20 - Effluent Summary_IFR

26

89 25-Jul-13


30-Aug-13

SAB20B2P23197

AB20 - Effluent Summary_IFC

223

89 02-Sep-13

25-Jul-14

SAB20B2P23311

AB20 - Operating Manual_IFR

41

26 01-Apr-15

29-May-15

SAB20B2P23317

AB20 - Operating Manual_IFC

65

26 01-Jun-15


28-Aug-15

SAB20B2P23931

AB20 - Relief and Blowdown Summary_IFR

44

64 25-Jul-13

30-Sep-13

SAB20B2P23937

AB20 - Relief and Blowdown Summary_IFC

175

64 01-Oct-13

13-Jun-14

SAB30B2P23051

AB30 - Control Narrative_IFR

40

26 01-Aug-14


30-Sep-14

SAB30B2P23057

AB30 - Control Narrative_IFC

94

26 01-Oct-14

13-Feb-15

SAB30B2P23071

AB30 - Process Flow Diagrams (PFD)_IFR

59

37 01-May-13 A

24-Jul-13

SAB30B2P23077

AB30 - Process Flow Diagrams (PFD)_IFC

199

37 25-Jul-13


15-May-14

SAB30B2P23091

AB30 - Catalyst & Chemical Summary_IFR

26

67 25-Jul-13

30-Aug-13

SAB30B2P23097

AB30 - Catalyst & Chemical Summary_IFC

223

67 02-Sep-13

25-Jul-14

SAB30B2P23111

AB30 - Interlock Narrative_IFR

40

55 01-Aug-14


30-Sep-14

SAB30B2P23117

AB30 - Interlock Narrative_IFC

94

55 01-Oct-14

13-Feb-15

SAB30B2P23131

AB30 - Utility Summary_IFR

80

67 01-Apr-13 A

23-Jul-13

SAB30B2P23137

AB30 - Utility Summary_IFC

148

67 24-Jul-13


28-Feb-14

SAB30B2P23151

AB30 - Cause & Effect Diagram_IFR

230

60 25-Jul-13

30-Jun-14

SAB30B2P23157

AB30 - Cause & Effect Diagram_IFC

126

60 01-Jul-14

31-Dec-14

SAB30B2P23171

AB30 - Material Selection Diagram_IFR

73

37 16-Apr-13 A


29-Jul-13

SAB30B2P23177

AB30 - Material Selection Diagram_IFC

196

37 30-Jul-13

15-May-14

SAB30B2P23191

AB30 - Effluent Summary_IFR

26

89 25-Jul-13

30-Aug-13

SAB30B2P23197

AB30 - Effluent Summary_IFC

223

89 02-Sep-13


25-Jul-14

SAB30B2P23311

AB30 - Operating Manual_IFR

41

26 01-Apr-15

29-May-15

SAB30B2P23317

AB30 - Operating Manual_IFC

65

26 01-Jun-15

28-Aug-15

SAB30B2P23931

AB30 - Relief and Blowdown Summary_IFR

44

64 25-Jul-13


30-Sep-13

SAB30B2P23937

AB30 - Relief and Blowdown Summary_IFC

175

64 01-Oct-13

13-Jun-14

386
20

62 06-Mar-13 A
06-Mar-13 A

30-Sep-14
03-Apr-13 A

CAC00B2P23010B

PFD IFA

114

19 04-Apr-13 A

17-Sep-13


CAC00B2P23010D

PFD IFC

23

19 28-Oct-13

28-Nov-13

CAC00B2P23015A

Line List (Conformity Check with P&ID) IFR

57

56 08-Jul-13 A

27-Sep-13

CAC00B2P23015B

Line List (Conformity Check with P&ID) IFA

9

49 09-Oct-13

22-Oct-13


CAC00B2P23015C

Line List (Conformity Check with P&ID) IFC

20

69 19-Mar-14

16-Apr-14

CAC00B2P23015D

Line List (Conformity Check with P&ID) Final

20

62 17-Jul-14

14-Aug-14

CAC00B2P23017A

Line List (Process Condition Input) IFR

20

45 18-Jul-13 A

14-Aug-13


CAC00B2P23017B

Line List (Process Condition Input) IFA

18

49 23-Oct-13

18-Nov-13

CAC00B2P23017C

Line List (Process Condition Input) IFC

15

47 14-Apr-14

07-May-14

CAC00B2P23017D

Line List (Process Condition Input) Final

20

62 15-Aug-14

11-Sep-14


CAC00B2P23018A

Line List (Piping Data Input) IFR

10

45 29-Aug-13

11-Sep-13

CAC00B2P23018B

Line List (Piping Data Input) IFA

28

49 19-Nov-13

27-Dec-13

CAC00B2P23018C

Line List (Piping Data Input) IFC

10

47 08-May-14

21-May-14


CAC00B2P23018D

Line List (Piping Data Input) Final

10

62 16-Sep-14

30-Sep-14

CAC00B2P23020A

H&MB (Heat & Material Balance) IFIR

20

06-Mar-13 A

CAC00B2P23020B

H&MB IFA

140

25 04-Apr-13 A

25-Oct-13

CAC00B2P23020D


H&MB IFC

24

31 28-Oct-13

29-Nov-13

CAC00B2P23030A

MSD (Material Selection Diagram) IFIR

20

06-Mar-13 A

CAC00B2P23030B

MSD IFA

114

40 04-Apr-13 A

17-Sep-13

CAC00B2P23030D

MSD IFC


50

50 18-Sep-13

29-Nov-13

CAC00B2P23040A

Utility Summary IFIR

20

CAC00B2P23040B

Utility Summary IFA

21

43 11-Jul-13 A

09-Aug-13

CAC00B2P23040C

Utility Summary IFC

21

52 20-Feb-14


20-Mar-14

CAC00B2P23050

Relief Load Summary

68

22 08-May-13 A

12-Aug-13

CAC00B2P23060

Operation Philosophy (Clarification to Employer)

122

40 28-Mar-13 A

20-Sep-13

CAC00B2P23070A

Cause & Effect IFR

123

40 04-Apr-13 A


01-Oct-13

CAC00B2P23070B

Cause & Effect IFA

25

51 02-Oct-13

07-Nov-13

CAC00B2P23070C

Cause & Effect IFC

40

46 09-Jan-14

07-Mar-14

CAC00B2P23080

Effluent Summary

108

40 06-Mar-13 A


09-Aug-13

CAC00B2P23090

Control Narrative

81

101 04-Jun-13 A

27-Sep-13

CAC00B2P23095

Safeguarding Narrative

58

52 08-Jul-13 A

30-Sep-13

CAC00B2P23100A

UHD (Utility Header Diagram) IFIR

20

08-May-13 A


04-Jun-13 A

CAC00B2P23100B

UHD IFIR Internal Review and Meeting

10

05-Jun-13 A

18-Jun-13 A

06-Mar-13 A

A700-Equipment List-FR

17-Jul-13 A

SAB10B2P23057

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B2P23010A
PFD (Process Flow Diagram) IFIR

2013
2014
2015

2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
A700-Flare Load Summary-FC

03-Apr-13 A

03-Apr-13 A

03-Apr-13 A

AA00 - Material Selection Diagram_IFR
AA00 - Material Selection Diagram_IFC
AA00 - Effluent Summary_IFR
AA00 - Effluent Summary_IFC
AA00 - Operating Manual_IFR
AA00 - Operating Manual_IFC
AA00 - Relief and Blowdown Summary_IFR
AA00 - Relief and Blowdown Summary_IFC
AB10 - Control Narrative_IFR
AB10 - Control Narrative_IFC
AB10 - Process Flow Diagrams (PFD)_IFR
AB10 - Process Flow Diagrams (PFD)_IFC
AB10 - Catalyst & Chemical Summary_IFR
AB10 - Catalyst & Chemical Summary_IFC
AB10 - Interlock Narrative_IFR
AB10 - Interlock Narrative_IFC
AB10 - Utility Summary_IFR
AB10 - Utility Summary_IFC

AB10 - Cause & Effect Diagram_IFR
AB10 - Cause & Effect Diagram_IFC
AB10 - Material Selection Diagram_IFR
AB10 - Material Selection Diagram_IFC
AB10 - Effluent Summary_IFR
AB10 - Effluent Summary_IFC
AB10 - Operating Manual_IFR
AB10 - Operating Manual_IFC
AB10 - Relief and Blowdown Summary_IFR
AB10 - Relief and Blowdown Summary_IFC
AB20 - Control Narrative_IFR
AB20 - Control Narrative_IFC
AB20 - Process Flow Diagrams (PFD)_IFR
AB20 - Process Flow Diagrams (PFD)_IFC
AB20 - Catalyst & Chemical Summary_IFR
AB20 - Catalyst & Chemical Summary_IFC
AB20 - Interlock Narrative_IFR
AB20 - Interlock Narrative_IFC
AB20 - Utility Summary_IFR
AB20 - Utility Summary_IFC
AB20 - Cause & Effect Diagram_IFR
AB20 - Cause & Effect Diagram_IFC
AB20 - Material Selection Diagram_IFR
AB20 - Material Selection Diagram_IFC
AB20 - Effluent Summary_IFR
AB20 - Effluent Summary_IFC
AB20 - Operating Manual_IFR
AB20 - Operating Manual_IFC
AB20 - Relief and Blowdown Summary_IFR
AB20 - Relief and Blowdown Summary_IFC

AB30 - Control Narrative_IFR
AB30 - Control Narrative_IFC
AB30 - Process Flow Diagrams (PFD)_IFR
AB30 - Process Flow Diagrams (PFD)_IFC
AB30 - Catalyst & Chemical Summary_IFR
AB30 - Catalyst & Chemical Summary_IFC
AB30 - Interlock Narrative_IFR
AB30 - Interlock Narrative_IFC
AB30 - Utility Summary_IFR
AB30 - Utility Summary_IFC
AB30 - Cause & Effect Diagram_IFR
AB30 - Cause & Effect Diagram_IFC
AB30 - Material Selection Diagram_IFR
AB30 - Material Selection Diagram_IFC
AB30 - Effluent Summary_IFR
AB30 - Effluent Summary_IFC
AB30 - Operating Manual_IFR
AB30 - Operating Manual_IFC
AB30 - Relief and Blowdown Summary_IFR
AB30 - Relief and Blowdown Summary_IFC
PFD (Process Flow Diagram) IFIR
PFD IFA
PFD IFC
Line List (Conformity Check with P&ID) IFR
Line List (Conformity Check with P&ID) IFA
Line List (Conformity Check with P&ID) IFC
Line List (Conformity Check with P&ID) Final
Line List (Process Condition Input) IFR
Line List (Process Condition Input) IFA
Line List (Process Condition Input) IFC

Line List (Process Condition Input) Final
Line List (Piping Data Input) IFR
Line List (Piping Data Input) IFA
Line List (Piping Data Input) IFC
Line List (Piping Data Input) Final
H&MB (Heat & Material Balance) IFIR
H&MB IFA
H&MB IFC
MSD (Material Selection Diagram) IFIR
MSD IFA
MSD IFC
Utility Summary IFIR
Utility Summary IFA
Utility Summary IFC
Relief Load Summary
Operation Philosophy (Clarification to Employer)
Cause & Effect IFR
Cause & Effect IFA
Cause & Effect IFC
Effluent Summary
Control Narrative
Safeguarding Narrative
UHD (Utility Header Diagram) IFIR
UHD IFIR Internal Review and Meeting

Page 10 of 179

Actual Work
Remaining Work


Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine


Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name


Original Total Float Start
Duration

UHD IFR

20

CAC00B2P23100D

UHD IFR Client Review

10

80 18-Jul-13 A

31-Jul-13

CAC00B2P23100F

UHD IFR Joint Review Meeting with Client

13

80 01-Aug-13

19-Aug-13

CAC00B2P23100G

UHD IFA


57

46 18-Jul-13 A

08-Oct-13

CAC00B2P23100G10

UHD IFC (w/ Hold)

62

47 09-Oct-13

15-Jan-14

UHD IFC (w/ Hold)

CAC00B2P23100H

UHD IFC

60

47 16-Jan-14

11-Apr-14

UHD IFC


CAC00B2P23100J

UHD IFC Rev.1

80

67 14-Apr-14

07-Aug-14

26 01-Apr-13 A
26 01-Aug-14

28-Aug-15
30-Sep-14

603
40

17-Jul-13 A

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
UHD IFR


CAC00B2P23100C

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P23051
AD00 - Control Narrative_IFR

19-Jun-13 A

Finish

SAD00B2P23057

AD00 - Control Narrative_IFC

94

26 01-Oct-14

13-Feb-15

SAD00B2P23071

AD00 - Process Flow Diagrams (PFD)_IFR

59

20 01-May-13 A


24-Jul-13

SAD00B2P23077

AD00 - Process Flow Diagrams (PFD)_IFC

199

20 25-Jul-13

15-May-14

SAD00B2P23091

AD00 - Catalyst & Chemical Summary_IFR

26

67 25-Jul-13

30-Aug-13

SAD00B2P23097

AD00 - Catalyst & Chemical Summary_IFC

223

67 02-Sep-13


25-Jul-14

SAD00B2P23111

AD00 - Interlock Narrative_IFR

40

55 01-Aug-14

30-Sep-14

SAD00B2P23117

AD00 - Interlock Narrative_IFC

94

55 01-Oct-14

13-Feb-15

SAD00B2P23131

AD00 - Utility Summary_IFR

80

50 01-Apr-13 A


23-Jul-13

SAD00B2P23137

AD00 - Utility Summary_IFC

148

50 24-Jul-13

28-Feb-14

SAD00B2P23151

AD00 - Cause & Effect Diagram_IFR

230

60 25-Jul-13

30-Jun-14

SAD00B2P23157

AD00 - Cause & Effect Diagram_IFC

126

60 01-Jul-14


31-Dec-14

SAD00B2P23171

AD00 - Material Selection Diagram_IFR

73

20 16-Apr-13 A

29-Jul-13

SAD00B2P23177

AD00 - Material Selection Diagram_IFC

196

20 30-Jul-13

15-May-14

SAD00B2P23191

AD00 - Effluent Summary_IFR

26

89 25-Jul-13


30-Aug-13

SAD00B2P23197

AD00 - Effluent Summary_IFC

223

89 02-Sep-13

25-Jul-14

SAD00B2P23311

AD00 - Operating Manual_IFR

41

26 01-Apr-15

29-May-15

SAD00B2P23317

AD00 - Operating Manual_IFC

65

26 01-Jun-15


28-Aug-15

SAD00B2P23931

AD00 - Relief and Blowdown Summary_IFR

44

64 25-Jul-13

30-Sep-13

SAD00B2P23937

AD00 - Relief and Blowdown Summary_IFC

175

64 01-Oct-13

13-Jun-14

603
40

26 01-Apr-13 A
26 01-Aug-14

28-Aug-15
30-Sep-14


94

26 01-Oct-14

13-Feb-15

AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P23051
AE00 - Control Narrative_IFR
SAE00B2P23057

AE00 - Control Narrative_IFC

SAE00B2P23071

AE00 - Process Flow Diagrams (PFD)_IFR

59

20 01-May-13 A

24-Jul-13

SAE00B2P23077

AE00 - Process Flow Diagrams (PFD)_IFC


199

20 25-Jul-13

15-May-14

SAE00B2P23091

AE00 - Catalyst & Chemical Summary_IFR

26

67 25-Jul-13

30-Aug-13

SAE00B2P23097

AE00 - Catalyst & Chemical Summary_IFC

223

67 02-Sep-13

25-Jul-14

SAE00B2P23111

AE00 - Interlock Narrative_IFR


40

55 01-Aug-14

30-Sep-14

SAE00B2P23117

AE00 - Interlock Narrative_IFC

94

55 01-Oct-14

13-Feb-15

SAE00B2P23131

AE00 - Utility Summary_IFR

80

50 01-Apr-13 A

23-Jul-13

SAE00B2P23137

AE00 - Utility Summary_IFC


148

50 24-Jul-13

28-Feb-14

SAE00B2P23151

AE00 - Cause & Effect Diagram_IFR

230

60 25-Jul-13

30-Jun-14

SAE00B2P23157

AE00 - Cause & Effect Diagram_IFC

126

60 01-Jul-14

31-Dec-14

SAE00B2P23171

AE00 - Material Selection Diagram_IFR


73

20 16-Apr-13 A

29-Jul-13

SAE00B2P23177

AE00 - Material Selection Diagram_IFC

196

20 30-Jul-13

15-May-14

SAE00B2P23191

AE00 - Effluent Summary_IFR

26

89 25-Jul-13

30-Aug-13

SAE00B2P23197

AE00 - Effluent Summary_IFC


223

89 02-Sep-13

25-Jul-14

SAE00B2P23311

AE00 - Operating Manual_IFR

41

26 01-Apr-15

29-May-15

SAE00B2P23317

AE00 - Operating Manual_IFC

65

26 01-Jun-15

28-Aug-15

SAE00B2P23931

AE00 - Relief and Blowdown Summary_IFR


44

64 25-Jul-13

30-Sep-13

SAE00B2P23937

AE00 - Relief and Blowdown Summary_IFC

175

64 01-Oct-13

13-Jun-14

603
603
85

26 01-Apr-13 A
26 01-Apr-13 A
44 28-Mar-14

28-Aug-15
28-Aug-15
29-Jul-14

118


46 30-Jul-14

20-Jan-15

22 01-May-13 A

24-Jul-13

Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P23051
B100 - Control Narrative_IFR

UHD IFR Client Review
UHD IFR Joint Review Meeting with Client
UHD IFA

UHD IFC Rev.1
AD00 - Control Narrative_IFR
AD00 - Control Narrative_IFC
AD00 - Process Flow Diagrams (PFD)_IFR
AD00 - Process Flow Diagrams (PFD)_IFC
AD00 - Catalyst & Chemical Summary_IFR
AD00 - Catalyst & Chemical Summary_IFC
AD00 - Interlock Narrative_IFR
AD00 - Interlock Narrative_IFC
AD00 - Utility Summary_IFR
AD00 - Utility Summary_IFC
AD00 - Cause & Effect Diagram_IFR
AD00 - Cause & Effect Diagram_IFC

AD00 - Material Selection Diagram_IFR
AD00 - Material Selection Diagram_IFC
AD00 - Effluent Summary_IFR
AD00 - Effluent Summary_IFC
AD00 - Operating Manual_IFR
AD00 - Operating Manual_IFC
AD00 - Relief and Blowdown Summary_IFR
AD00 - Relief and Blowdown Summary_IFC
AE00 - Control Narrative_IFR
AE00 - Control Narrative_IFC
AE00 - Process Flow Diagrams (PFD)_IFR
AE00 - Process Flow Diagrams (PFD)_IFC
AE00 - Catalyst & Chemical Summary_IFR
AE00 - Catalyst & Chemical Summary_IFC
AE00 - Interlock Narrative_IFR
AE00 - Interlock Narrative_IFC
AE00 - Utility Summary_IFR
AE00 - Utility Summary_IFC
AE00 - Cause & Effect Diagram_IFR
AE00 - Cause & Effect Diagram_IFC
AE00 - Material Selection Diagram_IFR
AE00 - Material Selection Diagram_IFC
AE00 - Effluent Summary_IFR
AE00 - Effluent Summary_IFC
AE00 - Operating Manual_IFR
AE00 - Operating Manual_IFC
AE00 - Relief and Blowdown Summary_IFR
AE00 - Relief and Blowdown Summary_IFC

B100 - Control Narrative_IFR


SB100B2P23057

B100 - Control Narrative_IFC

SB100B2P23071

B100 - Process Flow Diagrams (PFD)_IFR

59

B100 - Control Narrative_IFC

SB100B2P23077

B100 - Process Flow Diagrams (PFD)_IFC

168

22 25-Jul-13

31-Mar-14

SB100B2P23091

B100 - Catalyst & Chemical Summary_IFR

26

26 25-Jul-13


30-Aug-13

SB100B2P23097

B100 - Catalyst & Chemical Summary_IFC

223

26 02-Sep-13

25-Jul-14

SB100B2P23131

B100 - Utility Summary_IFR

81

43 01-Apr-13 A

24-Jul-13

SB100B2P23137

B100 - Utility Summary_IFC

147

43 25-Jul-13


28-Feb-14

SB100B2P23151

B100 - Cause & Effect Diagram_IFR

205

66 01-Aug-13

30-May-14

SB100B2P23157

B100 - Cause & Effect Diagram_IFC

139

66 02-Jun-14

19-Dec-14

SB100B2P23171

B100 - Material Selection Diagram_IFR

70

22 16-Apr-13 A


24-Jul-13

SB100B2P23177

B100 - Material Selection Diagram_IFC

168

22 25-Jul-13

31-Mar-14

SB100B2P23191

B100 - Effluent Summary_IFR

26

26 25-Jul-13

30-Aug-13

SB100B2P23197

B100 - Effluent Summary_IFC

223

26 02-Sep-13


25-Jul-14

B100 - Effluent Summary_IFC

SB100B2P23211

B100 - Interlock Narrative_IFR

83

44 01-Apr-14

29-Jul-14

B100 - Interlock Narrative_IFR

SB100B2P23217

B100 - Interlock Narrative_IFC

118

46 30-Jul-14

20-Jan-15

SB100B2P23311

B100 - Operating Manual_IFR


143

26 03-Nov-14

29-May-15

SB100B2P23317

B100 - Operating Manual_IFC

65

26 01-Jun-15

28-Aug-15

B200 - Service / Potable / Fire Water
SB200B2P23051
B200 - Control Narrative_IFR

603
85

26 01-Apr-13 A
38 28-Mar-14

28-Aug-15
29-Jul-14


118

38 30-Jul-14

20-Jan-15

22 01-May-13 A

24-Jul-13

B100 - Process Flow Diagrams (PFD)_IFR
B100 - Process Flow Diagrams (PFD)_IFC
B100 - Catalyst & Chemical Summary_IFR
B100 - Catalyst & Chemical Summary_IFC
B100 - Utility Summary_IFR
B100 - Utility Summary_IFC
B100 - Cause & Effect Diagram_IFR
B100 - Cause & Effect Diagram_IFC
B100 - Material Selection Diagram_IFR
B100 - Material Selection Diagram_IFC
B100 - Effluent Summary_IFR

B100 - Interlock Narrative_IFC
B100 - Operating Manual_IFR
B100 - Operating Manual_IFC
B200 - Control Narrative_IFR

SB200B2P23057

B200 - Control Narrative_IFC


SB200B2P23071

B200 - Process Flow Diagrams (PFD)_IFR

59

SB200B2P23077

B200 - Process Flow Diagrams (PFD)_IFC

168

22 25-Jul-13

31-Mar-14

SB200B2P23091

B200 - Catalyst & Chemical Summary_IFR

26

46 25-Jul-13

30-Aug-13

SB200B2P23097

B200 - Catalyst & Chemical Summary_IFC


223

46 02-Sep-13

25-Jul-14

SB200B2P23131

B200 - Utility Summary_IFR

81

63 01-Apr-13 A

24-Jul-13

SB200B2P23137

B200 - Utility Summary_IFC

147

63 25-Jul-13

28-Feb-14

SB200B2P23151

B200 - Cause & Effect Diagram_IFR


205

58 01-Aug-13

30-May-14

SB200B2P23157

B200 - Cause & Effect Diagram_IFC

139

58 02-Jun-14

19-Dec-14

SB200B2P23171

B200 - Material Selection Diagram_IFR

70

22 16-Apr-13 A

24-Jul-13

SB200B2P23177

B200 - Material Selection Diagram_IFC


168

22 25-Jul-13

31-Mar-14

SB200B2P23191

B200 - Effluent Summary_IFR

26

46 25-Jul-13

30-Aug-13

SB200B2P23197

B200 - Effluent Summary_IFC

223

46 02-Sep-13

25-Jul-14

B200 - Effluent Summary_IFC

SB200B2P23211


B200 - Interlock Narrative_IFR

83

38 01-Apr-14

29-Jul-14

B200 - Interlock Narrative_IFR

SB200B2P23217

B200 - Interlock Narrative_IFC

118

38 30-Jul-14

20-Jan-15

SB200B2P23311

B200 - Operating Manual_IFR

143

26 03-Nov-14

29-May-15


SB200B2P23317

B200 - Operating Manual_IFC

65

26 01-Jun-15

28-Aug-15

B300 - Control Narrative_IFR

603
85

26 01-Apr-13 A
51 28-Mar-14

28-Aug-15
29-Jul-14

SB300B2P23057

B300 - Control Narrative_IFC

118

51 30-Jul-14


20-Jan-15

SB300B2P23071

B300 - Process Flow Diagrams (PFD)_IFR

59

22 01-May-13 A

24-Jul-13

SB300B2P23077

B300 - Process Flow Diagrams (PFD)_IFC

168

22 25-Jul-13

31-Mar-14

SB300B2P23091

B300 - Catalyst & Chemical Summary_IFR

26

46 25-Jul-13


30-Aug-13

SB300B2P23097

B300 - Catalyst & Chemical Summary_IFC

223

46 02-Sep-13

25-Jul-14

SB300B2P23131

B300 - Utility Summary_IFR

81

43 01-Apr-13 A

24-Jul-13

SB300B2P23137

B300 - Utility Summary_IFC

147

43 25-Jul-13


28-Feb-14

SB300B2P23151

B300 - Cause & Effect Diagram_IFR

205

71 01-Aug-13

30-May-14

SB300B2P23157

B300 - Cause & Effect Diagram_IFC

139

71 02-Jun-14

19-Dec-14

SB300B2P23171

B300 - Material Selection Diagram_IFR

70

22 16-Apr-13 A


24-Jul-13

SB300B2P23177

B300 - Material Selection Diagram_IFC

168

22 25-Jul-13

31-Mar-14

SB300B2P23191

B300 - Effluent Summary_IFR

26

46 25-Jul-13

30-Aug-13

SB300B2P23197

B300 - Effluent Summary_IFC

223

46 02-Sep-13


25-Jul-14

B300 - Effluent Summary_IFC

SB300B2P23211

B300 - Interlock Narrative_IFR

83

51 01-Apr-14

29-Jul-14

B300 - Interlock Narrative_IFR

SB300B2P23217

B300 - Interlock Narrative_IFC

118

51 30-Jul-14

20-Jan-15

SB300B2P23311

B300 - Operating Manual_IFR


143

26 03-Nov-14

29-May-15

SB300B2P23317

B300 - Operating Manual_IFC

65

26 01-Jun-15

28-Aug-15

SB300B2P23931

B300 - Relief and Blowdown Summary_IFR

44

48 25-Jul-13

30-Sep-13

SB300B2P23937

B300 - Relief and Blowdown Summary_IFC


124

48 01-Oct-13

31-Mar-14

B300 - Relief and Blowdown Summary_IFC

B400 - Control Narrative_IFR

603
85

26 01-Apr-13 A
44 28-Mar-14

28-Aug-15
29-Jul-14

B400 - Control Narrative_IFR

SB400B2P23057

B400 - Control Narrative_IFC

118

62 30-Jul-14

20-Jan-15


SB400B2P23071

B400 - Process Flow Diagrams (PFD)_IFR

59

22 01-May-13 A

24-Jul-13

SB400B2P23077

B400 - Process Flow Diagrams (PFD)_IFC

168

22 25-Jul-13

31-Mar-14

SB400B2P23091

B400 - Catalyst & Chemical Summary_IFR

26

46 25-Jul-13

30-Aug-13


SB400B2P23097

B400 - Catalyst & Chemical Summary_IFC

223

46 02-Sep-13

25-Jul-14

SB400B2P23131

B400 - Utility Summary_IFR

81

43 01-Apr-13 A

24-Jul-13

SB400B2P23137

B400 - Utility Summary_IFC

147

43 25-Jul-13

28-Feb-14


SB400B2P23151

B400 - Cause & Effect Diagram_IFR

205

82 01-Aug-13

30-May-14

SB400B2P23157

B400 - Cause & Effect Diagram_IFC

139

82 02-Jun-14

19-Dec-14

SB400B2P23171

B400 - Material Selection Diagram_IFR

22 16-Apr-13 A

24-Jul-13

B300 - Demine & Fuel

SB300B2P23051

B400 - Steam & Power
SB400B2P23051

70

B200 - Control Narrative_IFC
B200 - Process Flow Diagrams (PFD)_IFR
B200 - Process Flow Diagrams (PFD)_IFC
B200 - Catalyst & Chemical Summary_IFR
B200 - Catalyst & Chemical Summary_IFC
B200 - Utility Summary_IFR
B200 - Utility Summary_IFC
B200 - Cause & Effect Diagram_IFR
B200 - Cause & Effect Diagram_IFC
B200 - Material Selection Diagram_IFR
B200 - Material Selection Diagram_IFC
B200 - Effluent Summary_IFR

B200 - Interlock Narrative_IFC
B200 - Operating Manual_IFR
B200 - Operating Manual_IFC
B300 - Control Narrative_IFR
B300 - Control Narrative_IFC
B300 - Process Flow Diagrams (PFD)_IFR
B300 - Process Flow Diagrams (PFD)_IFC
B300 - Catalyst & Chemical Summary_IFR
B300 - Catalyst & Chemical Summary_IFC
B300 - Utility Summary_IFR

B300 - Utility Summary_IFC
B300 - Cause & Effect Diagram_IFR
B300 - Cause & Effect Diagram_IFC
B300 - Material Selection Diagram_IFR
B300 - Material Selection Diagram_IFC
B300 - Effluent Summary_IFR

B300 - Interlock Narrative_IFC
B300 - Operating Manual_IFR
B300 - Operating Manual_IFC
B300 - Relief and Blowdown Summary_IFR

B400 - Control Narrative_IFC
B400 - Process Flow Diagrams (PFD)_IFR
B400 - Process Flow Diagrams (PFD)_IFC
B400 - Catalyst & Chemical Summary_IFR
B400 - Catalyst & Chemical Summary_IFC
B400 - Utility Summary_IFR
B400 - Utility Summary_IFC
B400 - Cause & Effect Diagram_IFR
B400 - Cause & Effect Diagram_IFC
B400 - Material Selection Diagram_IFR

Page 11 of 179

Actual Work
Remaining Work

Detail Engineering, Procurement, and


Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked

T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration


Finish

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
B400 - Material Selection Diagram_IFC

SB400B2P23177

B400 - Material Selection Diagram_IFC

168

22 25-Jul-13

31-Mar-14

SB400B2P23191

B400 - Effluent Summary_IFR

26

46 25-Jul-13


30-Aug-13

SB400B2P23197

B400 - Effluent Summary_IFC

223

46 02-Sep-13

25-Jul-14

B400 - Effluent Summary_IFC

SB400B2P23211

B400 - Interlock Narrative_IFR

83

44 01-Apr-14

29-Jul-14

B400 - Interlock Narrative_IFR

SB400B2P23217

B400 - Interlock Narrative_IFC


118

62 30-Jul-14

20-Jan-15

SB400B2P23311

B400 - Operating Manual_IFR

143

26 03-Nov-14

29-May-15

SB400B2P23317

B400 - Operating Manual_IFC

65

26 01-Jun-15

28-Aug-15

SB400B2P23931

B400 - Relief and Blowdown Summary_IFR


44

48 25-Jul-13

30-Sep-13

SB400B2P23937

B400 - Relief and Blowdown Summary_IFC

124

48 01-Oct-13

31-Mar-14

B400 - Relief and Blowdown Summary_IFC

26 01-Apr-13 A
47 28-Mar-14

28-Aug-15
29-Jul-14

B500 - Control Narrative_IFR

47 30-Jul-14

20-Jan-15


38 01-May-13 A

24-Jul-13

B400 - Effluent Summary_IFR

B400 - Interlock Narrative_IFC
B400 - Operating Manual_IFR
B400 - Operating Manual_IFC
B400 - Relief and Blowdown Summary_IFR

B500 - Control Narrative_IFR

603
85

SB500B2P23057

B500 - Control Narrative_IFC

118

SB500B2P23071

B500 - Process Flow Diagrams (PFD)_IFR

59

SB500B2P23077


B500 - Process Flow Diagrams (PFD)_IFC

168

38 25-Jul-13

31-Mar-14

SB500B2P23091

B500 - Catalyst & Chemical Summary_IFA

26

36 25-Jul-13

30-Aug-13

SB500B2P23097

B500 - Catalyst & Chemical Summary_IFC

223

36 02-Sep-13

25-Jul-14

SB500B2P23131


B500 - Utility Summary_IFR

81

36 01-Apr-13 A

24-Jul-13

SB500B2P23137

B500 - Utility Summary_IFC

147

36 25-Jul-13

28-Feb-14

SB500B2P23151

B500 - Cause & Effect Diagram_IFR

205

67 01-Aug-13

30-May-14

SB500B2P23157


B500 - Cause & Effect Diagram_IFC

139

67 02-Jun-14

19-Dec-14

SB500B2P23171

B500 - Material Selection Diagram_IFR

70

38 16-Apr-13 A

24-Jul-13

SB500B2P23177

B500 - Material Selection Diagram_IFC

168

38 25-Jul-13

31-Mar-14

SB500B2P23191


B500 - Effluent Summary_IFR

26

46 25-Jul-13

30-Aug-13

SB500B2P23197

B500 - Effluent Summary_IFC

223

46 02-Sep-13

25-Jul-14

B500 - Effluent Summary_IFC

SB500B2P23211

B500 - Interlock Narrative_IFR

83

47 01-Apr-14

29-Jul-14


B500 - Interlock Narrative_IFR

SB500B2P23217

B500 - Interlock Narrative_IFC

118

47 30-Jul-14

20-Jan-15

SB500B2P23311

B500 - Operating Manual_IFR

143

26 03-Nov-14

29-May-15

SB500B2P23317

B500 - Operating Manual_IFC

65

26 01-Jun-15


28-Aug-15

96 24-Jun-13 A
138 24-Jun-13 A

14-Oct-14
19-Aug-13

155 26-Jun-14

16-Jul-14

B500 - Cooling Water
SB500B2P23051

Offsites Area
GC000B2P23010A

C000-Material Selection Diagram-FR

324
40

GC000B2P23010B

C000-Material Selection Diagram-FC

15

GC000B2P23030A


C000-Process Flow Diagram-FR

40

GC000B2P23030B

C000-Process Flow Diagram-FC

15

112 26-Jun-14

16-Jul-14

GC000B2P23050A

C000-Cause & Effect Diagram-FR rev.A

19

112 02-Aug-13

29-Aug-13

GC000B2P23050B

C000-Cause & Effect Diagram-FA rev.B

18


64 13-Nov-13

06-Dec-13

GC000B2P23050C

C000-Cause & Effect Diagram-FC rev.0 (W/ Hold)

18

40 08-Apr-14

01-May-14

GC000B2P23050D

C000-Cause & Effect Diagram-FC rev.1 (W/o Hold)

27

25 02-Sep-14

14-Oct-14

GC000B2P23090A

C000-Effluent Summary-FR

15


71 24-Sep-13

16-Oct-13

GC000B2P23090B

C000-Effluent Summary-FC

20

40 02-Jun-14

30-Jun-14

GC000B2P23110A

C000-Heat & Material Balance(only for WWT Unit)-FR

10

71 10-Oct-13

23-Oct-13

GC000B2P23110B

C000-Heat & Material Balance(only for WWT Unit)-FC

15


71 07-Nov-13

27-Nov-13

GC000B2P23130A

C000-Utility Summary-FR

20

122 07-Oct-13

04-Nov-13

GC000B2P23130B

C000-Utility Summary-FC

20

25 04-Aug-14

01-Sep-14

GC000B2P23150A

C000-Flare Load Summary-FR

33


66 10-Sep-13

31-Oct-13

GC000B2P23150B

C000-Flare Load Summary-FC

20

59 17-Jun-14

14-Jul-14

GC000B2P23170A

C000-Equipment List-FR

15

39 02-Oct-13

24-Oct-13

GC000B2P23170B

C000-Equipment List-FC

35


Equipment Basic Design (Process Data Sheet)
Common Area
G0000B2P24010
Process Data Sheet for Reactor

34 24-Jun-13 A

B500 - Control Narrative_IFC
B500 - Process Flow Diagrams (PFD)_IFR
B500 - Process Flow Diagrams (PFD)_IFC
B500 - Catalyst & Chemical Summary_IFA
B500 - Catalyst & Chemical Summary_IFC
B500 - Utility Summary_IFR
B500 - Utility Summary_IFC
B500 - Cause & Effect Diagram_IFR
B500 - Cause & Effect Diagram_IFC
B500 - Material Selection Diagram_IFR
B500 - Material Selection Diagram_IFC
B500 - Effluent Summary_IFR

B500 - Interlock Narrative_IFC
B500 - Operating Manual_IFR
B500 - Operating Manual_IFC
C000-Material Selection Diagram-FR
C000-Material Selection Diagram-FC

19-Aug-13

57 14-Aug-14


07-Oct-14

424
424
20

92 27-Feb-13 A
92 27-Feb-13 A
02-Apr-13 A

19-May-15
19-May-15
30-Apr-13 A

C000-Process Flow Diagram-FR
C000-Process Flow Diagram-FC
C000-Cause & Effect Diagram-FR rev.A
C000-Cause & Effect Diagram-FA rev.B
C000-Cause & Effect Diagram-FC rev.0 (W/ Hold)
C000-Cause & Effect Diagram-FC rev.1 (W/o Hold)
C000-Effluent Summary-FR
C000-Effluent Summary-FC
C000-Heat & Material Balance(only for WWT Unit)-FR
C000-Heat & Material Balance(only for WWT Unit)-FC
C000-Utility Summary-FR
C000-Utility Summary-FC
C000-Flare Load Summary-FR
C000-Flare Load Summary-FC
C000-Equipment List-FR

C000-Equipment List-FC

Process Data Sheet for Reactor

G0000B2P24015

Process Data Sheet for Jetty Fire Water Pumps

20

14-Jun-13 A

11-Jul-13 A

G0000B2P24020

Process Data Sheet for Storage Tanks

20

29-Apr-13 A

27-May-13 A

Process Data Sheet for Storage Tanks

Process Data Sheet for Jetty Fire Water Pumps

G0000B2P24030


Process Data Sheet for Sphere Tanks

20

29-Apr-13 A

27-May-13 A

Process Data Sheet for Sphere Tanks

G0000B2P24040

Process Data Sheet for Air F in Cooler

20

28 08-Jul-13 A

02-Aug-13

G0000B2P24050

Process Data Sheet for Shell & Tube Heat Exchanger

28

33 22-Jul-13

29-Aug-13


G0000B2P24060

Process Data Sheet for Deareator

14

49 26-Aug-13

12-Sep-13

G0000B2P24070

Process Data Sheet for Pressure Ves sels

20

17 23-Sep-13

22-Oct-13

G0000B2P24080

Process Data Sheet for Electric Heater

15

57 23-Sep-13

15-Oct-13


G0000B2P24090

Process Data Sheet for Static Mixer

15

35 01-Oct-13

23-Oct-13

G0000B2P24100

Process Data Sheet for Filter & Canister

15

29 24-Oct-13

13-Nov-13

G0000B2P24110

Process Data Sheet for Marine Loading Arms

20

05-Mar-13 A

02-Apr-13 A


G0000B2P24120

Process Data Sheet for Hydrogen Compressor PKG

20

28-Mar-13 A

25-Apr-13 A

G0000B2P24130

Process Data Sheet for Feed Gas Compressor PKG

20

13-May-13 A

12-Jun-13 A

G0000B2P24140

Process Data Sheet for Sea Water Intake Pumps

24

31 29-Jul-13

30-Aug-13


G0000B2P24150

Process Data Sheet for Centrifugal Pumps(VS Type)

33

12 25-Jul-13

10-Sep-13

G0000B2P24160

Process Data Sheet for Sea Water Cooling Pumps

19

G0000B2P24170

Process Data Sheet for Centrifugal Pumps(OH Type)

G0000B2P24180

Process Data Sheet for Truc k Loading Arms

G0000B2P24190
G0000B2P24210

Process Data Sheet for Air F in Cooler
Process Data Sheet for Shell & Tube Heat Exchanger
Process Data Sheet for Deareator

Process Data Sheet for Pressure Ves sels
Process Data Sheet for Electric Heater
Process Data Sheet for Static Mixer
Process Data Sheet for Filter & Canister
Process Data Sheet for Marine Loading Arms
Process Data Sheet for Hydrogen Compressor PKG
Process Data Sheet for Feed Gas Compressor PKG
Process Data Sheet for Sea Water Intake Pumps
Process Data Sheet for Centrifugal Pumps(VS Type)

2 05-Aug-13

30-Aug-13

40

7 01-Aug-13

01-Oct-13

13

29 02-Sep-13

23-Sep-13

Process Data Sheet for Centrifugal Pumps(BB Type)

40


17 08-Aug-13

10-Oct-13

Process Data Sheet for Sanitary Pumps

20

29 01-Oct-13

30-Oct-13

Process Data Sheet for Sanitary Pumps

G0000B2P24220

Process Data Sheet for Progressive Cavity Pumps

20

34 07-Oct-13

04-Nov-13

Process Data Sheet for Progressive Cavity Pumps

G0000B2P24230

Process Data Sheet for Metering Pumps


20

46 07-Oct-13

04-Nov-13

G0000B2P24250

Process Data Sheet for Reformer PKG

20

27-Feb-13 A

28-Mar-13 A

G0000B2P24260

Process Data Sheet for PSA Unit

20

23-May-13 A

21-Jun-13 A

G0000B2P24270

Process Data Sheet for Waste Water Treatment Unit


20

30-May-13 A

27-Jun-13 A

Process Data Sheet for Waste Water Treatment Unit

G0000B2P24280

Process Data Sheet for Sludge Incineration PKG

20

04-Jun-13 A

02-Jul-13 A

Process Data Sheet for Sludge Incineration PKG

G0000B2P24290

Process Data Sheet for Flare PKG

21

G0000B2P24300

Process Data Sheet for Sea Water Screen & Trash Rack


24

G0000B2P24310

Process Data Sheet for Sea Water Cooling Tower

G0000B2P24320

Process Data Sheet for Condensate Treatment PKG

G0000B2P24330

Process Data Sheet for Filtration Package

G0000B2P24340

3 05-Aug-13

Process Data Sheet for Sea Water Cooling Pumps
Process Data Sheet for Centrifugal Pumps(OH Type)
Process Data Sheet for Truc k Loading Arms
Process Data Sheet for Centrifugal Pumps(BB Type)

Process Data Sheet for Metering Pumps
Process Data Sheet for Reformer PKG
Process Data Sheet for PSA Unit

03-Sep-13

Process Data Sheet for Flare PKG


70 29-Jul-13

30-Aug-13

Process Data Sheet for Sea Water Screen & Trash Rack

24

0 29-Jul-13

30-Aug-13

Process Data Sheet for Sea Water Cooling Tower

21

25 20-Aug-13

17-Sep-13

Process Data Sheet for Condensate Treatment PKG

15

27 28-Aug-13

17-Sep-13

Process Data Sheet for Filtration Package


Process Data Sheet for Electro-Chlorination PKG

15

17 28-Aug-13

17-Sep-13

Process Data Sheet for Electro-Chlorination PKG

G0000B2P24350

Process Data Sheet for Chemical Injection Package

15

25 06-Jan-14

24-Jan-14

G0000B2P24360

Process Data Sheet for Vapour Recovery PKG

15

17 17-Sep-13

14-Oct-13


Process Data Sheet for Vapour Recovery PKG

G0000B2P24370

Process Instrument Data Sheet for C/V

20

33 16-Oct-13

12-Nov-13

Process Instrument Data Sheet for C/V

G0000B2P24380

Process Instrument Data Sheet for On-Off Valve

20

33 16-Oct-13

12-Nov-13

Process Instrument Data Sheet for On-Off Valve

G0000B2P24390

Process Instrument Data Sheet for Pressure Relief Valve


20

33 06-Nov-13

03-Dec-13

G0000B2P24400

Process Instrument Data Sheet for Inline Instrument

40

33 27-Nov-13

23-Jan-14

G0000B2P24420

Process Data Sheet for Pig Launcher & Receiver

15

24 21-Oct-13

08-Nov-13

T0000B2P24001A

PDS - Charge Heater (42-H101/102/103/104) - First Issue


14

T0000B2P24001B

PDS - Charge Heater (42-H101/102/103/104) (FINAL)

43

T0000B2P24002A

PDS - Centrifugal Compressors - First Issue

14

T0000B2P24002B

PDS - Centrifugal Compressors (FINAL)

40

T0000B2P24003A

Design Dossier - CCR Catalyst regeneration modularized package - First Issue

14

T0000B2P24003B

Design Dossier - CCR Catalyst regeneration modularized package (FINAL)


40

T0000B2P24004A

PDS - Recovery Plus Package (UOP mandatory) - First Issue

14

T0000B2P24004B

PDS - Recovery Plus Package (UOP mandatory) (FINAL)

40

T0000B2P24005A

PDS - PSA package (UOP mandatory) / Tail Gas Compressor Package (future) - First

14

T0000B2P24005B

PDS - PSA package (UOP mandatory) / Tail Gas Compressor Package (future) (FINAL

40

85 19-Mar-15

14-May-15


T0000B2P24006A

PDS - Packinox exchangers - First Issue

9

15 15-Jul-13 A

25-Jul-13

T0000B2P24006B

PDS - Packinox exchangers - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24007A

PDS - Reactors (C.S.) - First Issue

13

33 08-Jul-13 A

24-Jul-13


T0000B2P24007B

PDS - Reactors (C.S.) - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24007C

PDS - Reactors (Low Alloy and Cladded) - First Issue

13

33 08-Jul-13 A

24-Jul-13

T0000B2P24007D

PDS - Reactors (Low Alloy and Cladded) - Final Issue

30

95 19-Mar-15

29-Apr-15


T0000B2P24008A

PDS - Columns (C.S.) - First Issue

30

T0000B2P24008B

PDS - Columns (C.S.) - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24010A

PDS - Large CS Vessels - First Issue

16

21 12-Aug-13

02-Sep-13

T0000B2P24010B

PDS - Large CS Vessels - Final Issue


16

87 19-Mar-15

09-Apr-15

T0000B2P24010C1

PDS - Trays & Packings ( UOP mandatory) - First Issue

9

21 22-Jul-13

01-Aug-13

T0000B2P24010C2

PDS - Trays & Packings ( UOP mandatory)- Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24011A

PDS - Trays & Packing (not UOP mandatory) - First Issue


9

51 27-Aug-13

06-Sep-13

T0000B2P24011B

PDS - Trays & Packing (not UOP mandatory) - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24012A

PDS - Aircoolers - First Issue

16

T0000B2P24012B

PDS - Aircoolers - Final Iss ue

30

95 19-Mar-15


29-Apr-15

T0000B2P24013A

PDS - Shell and tube exchangers (C.S.) - First Issue

45

15 22-Jul-13

25-Sep-13

T0000B2P24013B

PDS - Shell and tube exchangers (C.S.) - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24015A

PDS - Shell & Tube Heat Ex changers (H2S & H2 Service) - First Issue

30

29 14-Aug-13


25-Sep-13

T0000B2P24015B

PDS - Shell & Tube Heat Ex changers (H2S & H2 Service) - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24017A

PDS - Multi-tube Heat- exchangers - First Issue

6

15 29-Jul-13

05-Aug-13

22-Apr-13 A
82 19-Mar-15
22-Apr-13 A
67 19-Mar-15
22-Apr-13 A
85 19-Mar-15
22-Apr-13 A

85 19-Mar-15
22-Apr-13 A

4 08-Jul-13 A

4 15-Jul-13 A

10-May-13 A

Process Data Sheet for Chemical Injection Package

Process Instrument Data Sheet for Pressure Relief Valve
Process Instrument Data Sheet for Inline Instrument
Process Data Sheet for Pig Launcher & Receiver
PDS - Charge Heater (42-H101/102/103/104) - First Issue

19-May-15
10-May-13 A

PDS - Charge Heater (42-H101/102/103/104) (FINAL)
PDS - Centrifugal Compressors - First Issue

14-May-15
10-May-13 A

PDS - Centrifugal Compressors (FINAL)
Design Dossier - CCR Catalyst regeneration modularized package - First Issue

14-May-15
10-May-13 A


Design Dossier - CCR Catalyst regeneration modularized package (FINAL)
PDS - Recovery Plus Package (UOP mandatory) - First Issue

14-May-15
10-May-13 A

PDS - Recovery Plus Package (UOP mandatory) (FINAL)
PDS - PSA package (UOP mandatory) / Tail Gas Compressor Package (future) - First Issue

20-Aug-13

05-Aug-13

PDS - PSA package (UOP mandatory) / Tail Gas Compressor Package (future) (FINAL)
PDS - Packinox exchangers - First Issue
PDS - Packinox exchangers - Final Issue
PDS - Reactors (C.S.) - First Issue
PDS - Reactors (C.S.) - Final Issue
PDS - Reactors (Low Alloy and Cladded) - First Issue
PDS - Reactors (Low Alloy and Cladded) - Final Issue
PDS - Columns (C.S.) - First Issue
PDS - Columns (C.S.) - Final Issue
PDS - Large CS Vessels - First Issue
PDS - Large CS Vessels - Final Issue
PDS - Trays & Packings ( UOP mandatory) - First Issue
PDS - Trays & Packings ( UOP mandatory)- Final Issue
PDS - Trays & Packing (not UOP mandatory) - First Issue
PDS - Trays & Packing (not UOP mandatory) - Final Issue
PDS - Aircoolers - First Issue

PDS - Aircoolers - Final Iss ue
PDS - Shell and tube exchangers (C.S.) - First Issue
PDS - Shell and tube exchangers (C.S.) - Final Issue
PDS - Shell & Tube Heat Ex changers (H2S & H2 Service) - First Issue
PDS - Shell & Tube Heat Ex changers (H2S & H2 Service) - Final Issue
PDS - Multi-tube Heat- exchangers - First Issue

Page 12 of 179

Actual Work
Remaining Work

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

Date

31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3


S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

Finish

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
PDS - Multi-tube Heat- exchangers - Final Issue

T0000B2P24017B

PDS - Multi-tube Heat- exchangers - Final Issue


30

95 19-Mar-15

29-Apr-15

T0000B2P24018A

PDS - CCR Regeneration Section Elevator - First Issue (Not required)

10

17 11-Sep-13

25-Sep-13

T0000B2P24018B

PDS - CCR Regeneration Section Elevator - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24019A

PDS - Bridge (Gantry) Cranes - First Issue (PDS will not be issued)


17

17 17-Sep-13

09-Oct-13

T0000B2P24019B

PDS - Bridge (Gantry) Cranes - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24020A

PDS - Electric heaters - First Issue

8

15 25-Jul-13

05-Aug-13

T0000B2P24020B

PDS - Electric heaters - Final Issue


30

95 19-Mar-15

29-Apr-15

T0000B2P24023A

PDS - Pumps Centrifugal heavy duty (API 610 >100 kW) - First Issue

19

15 05-Aug-13

02-Sep-13

T0000B2P24023B

PDS - Pumps Centrifugal heavy duty (API 610 >100 kW) - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24024A

PDS - Centrifugal vertical pumps - First Issue


10

15 25-Oct-13

08-Nov-13

T0000B2P24024B

PDS - Centrifugal vertical pumps - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24025A

PDS - Centrifugal pumps (API 610 <100 kW) - First Issue

15

15 27-Aug-13

17-Sep-13

T0000B2P24025B

PDS - Centrifugal pumps (API 610 <100 kW) - Final Issue


30

95 19-Mar-15

29-Apr-15

T0000B2P24026A

PDS - Proportioning pumps - First Issue

15

20 27-Aug-13

17-Sep-13

T0000B2P24026B

PDS - Proportioning pumps - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24027A

PDS - High-Speed Centrifugal pumps (Sundyne) - First Issue


16

17 12-Aug-13

02-Sep-13

T0000B2P24027B

PDS - High-Speed Centrifugal pumps (Sundyne) - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24028A

PDS - Centrifugal pumps (Non- API 610) - Firs t Is sue

15

17 27-Aug-13

17-Sep-13

T0000B2P24028B

PDS - Centrifugal pumps (Non- API 610) - Final Issue


30

95 19-Mar-15

29-Apr-15

T0000B2P24029A

PDS - Reciprocating compressor - First Issue

12

11 27-Aug-13

11-Sep-13

T0000B2P24029B

PDS - Reciprocating compressor - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24034A

PDS - Chemical Injection Package - First Issue


20

28 27-Aug-13

24-Sep-13

T0000B2P24034B

PDS - Chemical Injection Package - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24035A

PDS - Regeneration Gas Dryer Package - First Issue

32

30 03-Sep-13

18-Oct-13

T0000B2P24035B

PDS - Regeneration Gas Dryer Package - Final Issue


30

95 19-Mar-15

29-Apr-15

T0000B2P24036A

PDS - Ejector - First Issue

14

18 05-Aug-13

26-Aug-13

T0000B2P24036B

PDS - Ejector - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24038A

PDS - Desuperheaters - First Issue


11

70 14-Aug-13

28-Aug-13

T0000B2P24038B

PDS - Desuperheaters - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24041A

PDS - Control Valves

24

34 26-Aug-13

27-Sep-13

PDS - Control Valves

T0000B2P24041B


PDS - Pressure Relief Valves

9

34 17-Sep-13

27-Sep-13

PDS - Pressure Relief Valves

T0000B2P24041C

PDS - All other Instr uments (Local etc)

63

34 16-Oct-13

16-Jan-14

T0000B2P24055A

PDS - Carbon steel drums ( include Dryers) - First Issue

11

15 27-Aug-13

10-Sep-13


T0000B2P24055B

PDS - Carbon steel drums ( include Dryers) - Final Issue

30

95 19-Mar-15

29-Apr-15

T0000B2P24060A

PDS - NHDS Charge Heater (040-H-101) - First Issue

7

23 15-Jul-13 A

23-Jul-13

T0000B2P24060B

PDS - NHDS Charge Heater (040-H-101) (FINAL)

43

82 19-Mar-15

19-May-15


T0000B2P24095A

PDS - Filters / Coalescer - First Issue

25

32 20-Aug-13

24-Sep-13

T0000B2P24095B

PDS - Filters / Coalescer - Final Issue

30

PDS - CCR Regeneration Section Elevator - First Issue (Not required)
PDS - CCR Regeneration Section Elevator - Final Issue
PDS - Bridge (Gantry) Cranes - First Issue (PDS will not be issued)
PDS - Bridge (Gantry) Cranes - Final Issue
PDS - Electric heaters - First Issue
PDS - Electric heaters - Final Issue
PDS - Pumps Centrifugal heavy duty (API 610 >100 kW) - First Issue
PDS - Pumps Centrifugal heavy duty (API 610 >100 kW) - Final Issue
PDS - Centrifugal vertical pumps - First Issue
PDS - Centrifugal vertical pumps - Final Issue
PDS - Centrifugal pumps (API 610 <100 kW) - First Issue
PDS - Centrifugal pumps (API 610 <100 kW) - Final Issue
PDS - Proportioning pumps - First Issue
PDS - Proportioning pumps - Final Issue

PDS - High-Speed Centrifugal pumps (Sundyne) - First Issue
PDS - High-Speed Centrifugal pumps (Sundyne) - Final Issue
PDS - Centrifugal pumps (Non- API 610) - Firs t Is sue
PDS - Centrifugal pumps (Non- API 610) - Final Issue
PDS - Reciprocating compressor - First Issue
PDS - Reciprocating compressor - Final Issue
PDS - Chemical Injection Package - First Issue
PDS - Chemical Injection Package - Final Issue
PDS - Regeneration Gas Dryer Package - First Issue
PDS - Regeneration Gas Dryer Package - Final Issue
PDS - Ejector - First Issue
PDS - Ejector - Final Issue
PDS - Desuperheaters - First Issue
PDS - Desuperheaters - Final Issue

PDS - All other Instr uments (Local etc)
PDS - Carbon steel drums ( include Dryers) - First Issue
PDS - Carbon steel drums ( include Dryers) - Final Issue
PDS - NHDS Charge Heater (040-H-101) - First Issue
PDS - NHDS Charge Heater (040-H-101) (FINAL)
PDS - Filters / Coalescer - First Issue

95 19-Mar-15

29-Apr-15

352
15

54 11-Mar-13 A

15-Apr-13 A

12-Jan-15
08-May-13 A

Process Data Sheet for Rx-Rg

11

15-Apr-13 A

30-Apr-13 A

Process Data Sheet for Colums & Tray

15

09-May-13 A

29-May-13 A

Process Data Sheet for Colums & Tray

8

24-Apr-13 A

08-May-13 A

Process Data Sheet for Main Fractionator


32

15-Apr-13 A

31-May-13 A

89

37 07-Jun-13 A

20

01-May-13 A

134

18 04-Apr-13 A

17-Oct-13

80

12 24-Jun-13 A

17-Oct-13

Process Data Sheet for Tanks

22


01-Apr-13 A

01-May-13 A

J0000B2P24138

Process Data Sheet for Combustion Eqpt

40

01-May-13 A

28-Jun-13 A

Process Data Sheet for Combustion Eqpt

J0000B2P24140

Process Data Sheet for Compressor

37

08-May-13 A

28-Jun-13 A

Process Data Sheet for Compressor

J0000B2P24150


Process Data Sheet for API 610 Pumps

111

10 02-May-13 A

10-Oct-13

J0000B2P24155

Process Data Sheet for Other Pumps

108

10 03-Jun-13 A

06-Nov-13

J0000B2P24170

Process Data Sheet for Package Equipment

54

12 14-Aug-13

31-Oct-13

J0000B2P24172


Process Data Sheet for Catalyst Feeder

42

55 02-Jul-13 A

30-Aug-13

J0000B2P24180

Process Data Sheet for Control Valve

19

15 26-Sep-13

23-Oct-13

Process Data Sheet for Control Valve

J0000B2P24185

Process Data Sheet for On-Off Valve

19

15 26-Sep-13

23-Oct-13


Process Data Sheet for On-Off Valve

J0000B2P24190

Process Data Sheet for Pressure Relief Valve (PRV)

64

46 24-Oct-13

31-Jan-14

Process Data Sheet for Pressure Relief Valve (PRV)

J0000B2P2425F

Process Data Sheet for Fire fighting Equipment

22

52 21-Jan-14

20-Feb-14

Process Data Sheet for Fire fighting Equipment

426
111


85 16-Apr-13 A
13 16-Apr-13 A

31-Dec-14
25-Sep-13

212

62 26-Sep-13

31-Jul-14

68 01-May-13 A

09-Aug-13

Process Area
J0000B2P24100

Process Data Sheet for Reactor

J0000B2P24105
J0000B2P24107
J0000B2P24110

Process Data Sheet for Main Fractionator

J0000B2P24118

Process Data Sheet for PP Splitter


J0000B2P24119

Process Data Sheet for Drums

J0000B2P24120

Process Data Sheet for AFC

J0000B2P24130

Process Data Sheet for Heat Exchanger

J0000B2P24132

Process Data Sheet for Furnace

J0000B2P24136

A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P24011
A100 - Process Equipment Data Sheet_IFR

30-May-13 A

A100 - Process Equipment Data Sheet_IFC

SA100B2P24031

A100 - Equipment List_IFR


71

SA100B2P24037

A100 - Equipment List_IFC

261

68 12-Aug-13

29-Aug-14

SA100B2P24051

A100 - Line List_IFR

26

60 25-Jul-13

30-Aug-13

SA100B2P24057

A100 - Line List_IFC

330

85 02-Sep-13


31-Dec-14

434
115

53 15-Apr-13 A
0 15-Apr-13 A

12-Jan-15
30-Sep-13

238

45 01-Oct-13

15-Sep-14

41 15-Apr-13 A

23-Jul-13

SA500B2P24017

A500 - Process Equipment Data Sheet_IFC

SA500B2P24031

A500 - Equipment List_IFR


70

SA500B2P24037

A500 - Equipment List_IFC

282

43 24-Jul-13

12-Sep-14

SA500B2P24051

A500 - Line List_IFR

46

53 23-Jul-13

30-Sep-13

SA500B2P24057

A500 - Line List_IFC

319

53 01-Oct-13


12-Jan-15

434
115

78 15-Apr-13 A
40 15-Apr-13 A

12-Jan-15
30-Sep-13

238

45 01-Oct-13

15-Sep-14

27 15-Apr-13 A

23-Jul-13

A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B2P24011
A600 - Process Equipment Data Sheet_IFR
SA600B2P24017

A600 - Process Equipment Data Sheet_IFC

SA600B2P24031


A600 - Equipment List_IFR

70

SA600B2P24037

A600 - Equipment List_IFC

282

27 24-Jul-13

12-Sep-14

SA600B2P24051

A600 - Line List_IFR

46

78 23-Jul-13

30-Sep-13

SA600B2P24057

A600 - Line List_IFC

319


78 01-Oct-13

12-Jan-15

411
99

32 22-Apr-13 A
0 30-Apr-13 A

15-Dec-14
23-Sep-13

214

76 24-Sep-13

31-Jul-14

25 22-Apr-13 A

26-Aug-13

61 27-Aug-13

11-Aug-14

32 25-Apr-13 A


26-Aug-13

AA00 - Polypropylene U
Unit (PPU)
SAA00B2P24011
AA00 - Process Equipment Data Sheet_IFR
SAA00B2P24017

AA00 - Process Equipment Data Sheet_IFC

SAA00B2P24031

AA00 - Equipment List_IFR

88

SAA00B2P24037

AA00 - Equipment List_IFC

238

SAA00B2P24051

AA00 - Line List_IFR

85

SAA00B2P24057


AA00 - Line List_IFC

323

32 27-Aug-13

15-Dec-14

426
111

85 16-Apr-13 A
0 16-Apr-13 A

31-Dec-14
25-Sep-13

212

77 26-Sep-13

31-Jul-14

32 01-May-13 A

09-Aug-13

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B2P24011

AB10 - Process Equipment Data Sheet_IFR

Process Data Sheet for Rx-Rg

Process Data Sheet for PP Splitter

15-Oct-13

SA100B2P24017

A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B2P24011
A500 - Process Equipment Data Sheet_IFR

PDS - Filters / Coalescer - Final Issue
Process Data Sheet for Reactor

SAB10B2P24017

AB10 - Process Equipment Data Sheet_IFC

SAB10B2P24031

AB10 - Equipment List_IFR

71

SAB10B2P24037


AB10 - Equipment List_IFC

261

32 12-Aug-13

29-Aug-14

SAB10B2P24051

AB10 - Line List_IFR

26

35 25-Jul-13

30-Aug-13

SAB10B2P24057

AB10 - Line List_IFC

330

85 02-Sep-13

31-Dec-14

SAB20B2P24011


AB20 - Process Equipment Data Sheet_IFR

111

13 16-Apr-13 A

25-Sep-13

SAB20B2P24017

AB20 - Process Equipment Data Sheet_IFC

212

49 26-Sep-13

31-Jul-14

SAB20B2P24031

AB20 - Equipment List_IFR

71

32 01-May-13 A

09-Aug-13

SAB20B2P24037


AB20 - Equipment List_IFC

261

32 12-Aug-13

29-Aug-14

SAB20B2P24051

AB20 - Line List_IFR

26

52 25-Jul-13

30-Aug-13

SAB20B2P24057

AB20 - Line List_IFC

330

85 02-Sep-13

31-Dec-14

SAB30B2P24011


AB30 - Process Equipment Data Sheet_IFR

111

13 16-Apr-13 A

25-Sep-13

SAB30B2P24017

AB30 - Process Equipment Data Sheet_IFC

212

30 26-Sep-13

31-Jul-14

SAB30B2P24031

AB30 - Equipment List_IFR

71

32 01-May-13 A

09-Aug-13

SAB30B2P24037


AB30 - Equipment List_IFC

261

32 12-Aug-13

29-Aug-14

SAB30B2P24051

AB30 - Line List_IFR

26

35 25-Jul-13

30-Aug-13

SAB30B2P24057

AB30 - Line List_IFC

330

85 02-Sep-13

31-Dec-14

AC00 - Residue Hydrodesulphuriser
Hydrod

(RHDS)
CAC00B2P24010A
Equipment List IFIR

215
21

62 11-Mar-13 A
11-Mar-13 A

27-Jan-14
09-Apr-13 A
08-Jul-13 A

Process Data Sheet for Drums
Process Data Sheet for AFC
Process Data Sheet for Heat Exchanger
Process Data Sheet for Furnace
Process Data Sheet for Tanks

Process Data Sheet for API 610 Pumps
Process Data Sheet for Other Pumps
Process Data Sheet for Package Equipment
Process Data Sheet for Catalyst Feeder

A100 - Process Equipment Data Sheet_IFR
A100 - Process Equipment Data Sheet_IFC
A100 - Equipment List_IFR
A100 - Equipment List_IFC
A100 - Line List_IFR

A100 - Line List_IFC
A500 - Process Equipment Data Sheet_IFR
A500 - Process Equipment Data Sheet_IFC
A500 - Equipment List_IFR
A500 - Equipment List_IFC
A500 - Line List_IFR
A500 - Line List_IFC
A600 - Process Equipment Data Sheet_IFR
A600 - Process Equipment Data Sheet_IFC
A600 - Equipment List_IFR
A600 - Equipment List_IFC
A600 - Line List_IFR
A600 - Line List_IFC
AA00 - Process Equipment Data Sheet_IFR
AA00 - Process Equipment Data Sheet_IFC
AA00 - Equipment List_IFR
AA00 - Equipment List_IFC
AA00 - Line List_IFR
AA00 - Line List_IFC
AB10 - Process Equipment Data Sheet_IFR
AB10 - Process Equipment Data Sheet_IFC
AB10 - Equipment List_IFR
AB10 - Equipment List_IFC
AB10 - Line List_IFR
AB10 - Line List_IFC
AB20 - Process Equipment Data Sheet_IFR
AB20 - Process Equipment Data Sheet_IFC
AB20 - Equipment List_IFR
AB20 - Equipment List_IFC
AB20 - Line List_IFR

AB20 - Line List_IFC
AB30 - Process Equipment Data Sheet_IFR
AB30 - Process Equipment Data Sheet_IFC
AB30 - Equipment List_IFR
AB30 - Equipment List_IFC
AB30 - Line List_IFR
AB30 - Line List_IFC
Equipment List IFIR

CAC00B2P24010B

Equipment List IFR

61

10-Apr-13 A

CAC00B2P24010C

Equipment List IFA

49

46 09-Jul-13 A

17-Sep-13

CAC00B2P24010D

Equipment List IFC


84

46 18-Sep-13

27-Jan-14

CAC00B2P24020

Process D/S for RHDS Recycle Compressor

15

21-Mar-13 A

10-Apr-13 A

Process D/S for RHDS Recycle Compressor

CAC00B2P24030

Process D/S for Make-up Compressor

15

21-Mar-13 A

10-Apr-13 A

Process D/S for Make-up Compressor


CAC00B2P24040

Process D/S (Data Sheet) for RHDS Fixed Bed Reactor

19

04-Apr-13 A

01-May-13 A

CAC00B2P24050

Process D/S for COLUMN (Large column)

24

20-May-13 A

20-Jun-13 A

CAC00B2P24060

Process D/S for Hot HP & LP Separator

12

08-May-13 A

23-May-13 A


CAC00B2P24070

Process D/S for Other Tower & Drum

30

15-May-13 A

25-Jun-13 A

Process D/S for Other Tower & Drum

CAC00B2P24080

Process D/S for HP S&T Heat Exchanger

21

02-May-13 A

03-Jun-13 A

Process D/S for HP S&T Heat Exchanger

CAC00B2P24090

Process D/S for Shell & Tube H/E

21


CAC00B2P24100

Process D/S for Air Fin Cooler

40

02-May-13 A

28-Jun-13 A

CAC00B2P24120

Process D/S for Fired Heater

20

17-May-13 A

13-Jun-13 A

43 02-Jul-13 A

Equipment List IFR
Equipment List IFA
Equipment List IFC

Process D/S (Data Sheet) for RHDS Fixed Bed Reactor
Process D/S for COLUMN (Large column)
Process D/S for Hot HP & LP Separator


31-Jul-13

Process D/S for Shell & Tube H/E
Process D/S for Air Fin Cooler
Process D/S for Fired Heater

Page 13 of 179

Actual Work
Remaining Work

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

Date

31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3


S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

CAC00B2P24130

Process D/S for Major Pump

22

02-May-13 A

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
04-Jun-13 A
Process D/S for Major Pump

CAC00B2P24140

Process D/S for Other Pump


22

02-May-13 A

04-Jun-13 A

CAC00B2P24210

Process D/S for Feed Filter

22

15-Apr-13 A

17-May-13 A

Process D/S for Feed Filter

CAC00B2P24220

Process D/S for Membrane Package

22

15-Apr-13 A

17-May-13 A

Process D/S for Membrane Package


CAC00B2P24250

Process D/S for Control Valve & On-Off Valve

39

25 08-Jul-13 A

30-Aug-13

Process D/S for Control Valve & On-Off Valve

CAC00B2P24270

Process D/S for Instrument Analyzer

13

58 25-Oct-13

13-Nov-13

Process D/S for Instrument Analyzer

CAC00B2P24280

Process D/S for Flow & Other Instrument

30


83 07-Nov-13

18-Dec-13

CAC00B2P24290

Process D/S for PSV / TSV

55

22 10-Sep-13

29-Nov-13

426
111

85 16-Apr-13 A
0 16-Apr-13 A

31-Dec-14
25-Sep-13

212

44 26-Sep-13

31-Jul-14

46 01-May-13 A


09-Aug-13

Activity ID

Activity Name

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P24011
AD00 - Process Equipment Data Sheet_IFR

Original Total Float Start
Duration

Finish

SAD00B2P24017

AD00 - Process Equipment Data Sheet_IFC

SAD00B2P24031

AD00 - Equipment List_IFR

71

SAD00B2P24037

AD00 - Equipment List_IFC


261

46 12-Aug-13

29-Aug-14

SAD00B2P24051

AD00 - Line List_IFR

26

60 25-Jul-13

30-Aug-13

SAD00B2P24057

AD00 - Line List_IFC

330

85 02-Sep-13

31-Dec-14

426
111


85 16-Apr-13 A
0 16-Apr-13 A

31-Dec-14
25-Sep-13

212

33 26-Sep-13

31-Jul-14

46 01-May-13 A

09-Aug-13

AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P24011
AE00 - Process Equipment Data Sheet_IFR
SAE00B2P24017

AE00 - Process Equipment Data Sheet_IFC

SAE00B2P24031

AE00 - Equipment List_IFR

71


SAE00B2P24037

AE00 - Equipment List_IFC

261

46 12-Aug-13

29-Aug-14

SAE00B2P24051

AE00 - Line List_IFR

26

35 25-Jul-13

30-Aug-13

SAE00B2P24057

AE00 - Line List_IFC

330

85 02-Sep-13

31-Dec-14


AG00 - Common Piperack
Pipera
SAG00B2P24051
AG00 - Line List_IFR

350
21

34 25-Jul-13
34 25-Jul-13

22-Dec-14
23-Aug-13

329

34 26-Aug-13

22-Dec-14

420
420
113

71 16-Apr-13 A
55 16-Apr-13 A
0 16-Apr-13 A

22-Dec-14

22-Dec-14
27-Sep-13

187

67 30-Sep-13

30-Jun-14

56 01-May-13 A

24-Jul-13

SAG00B2P24057

AG00 - Line List_IFC

Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P24011
B100 - Process Equipment Data Sheet_IFR
SB100B2P24017

B100 - Process Equipment Data Sheet_IFC

SB100B2P24031

B100 - Equipment List_IFR

59


SB100B2P24037

B100 - Equipment List_IFC

269

56 25-Jul-13

25-Aug-14

SB100B2P24051

B100 - Line List_IFR

21

55 25-Jul-13

23-Aug-13

SB100B2P24057

B100 - Line List_IFC

329

55 26-Aug-13

22-Dec-14


420
113

47 16-Apr-13 A
0 16-Apr-13 A

22-Dec-14
27-Sep-13

187

77 30-Sep-13

30-Jun-14

48 01-May-13 A

24-Jul-13

B200 - Service / Potable / Fire Water
SB200B2P24011
B200 - Process Equipment Data Sheet_IFR
SB200B2P24017

B200 - Process Equipment Data Sheet_IFC

SB200B2P24031

B200 - Equipment List_IFR


59

SB200B2P24037

B200 - Equipment List_IFC

269

48 25-Jul-13

25-Aug-14

SB200B2P24051

B200 - Line List_IFR

21

47 25-Jul-13

23-Aug-13

SB200B2P24057

B200 - Line List_IFC

329

47 26-Aug-13


22-Dec-14

60 16-Apr-13 A
0 16-Apr-13 A

22-Dec-14
27-Sep-13

72 30-Sep-13

30-Jun-14

61 01-May-13 A

24-Jul-13

B300 - Process Equipment Data Sheet_IFR

420
113

SB300B2P24017

B300 - Process Equipment Data Sheet_IFC

187

SB300B2P24031


B300 - Equipment List_IFR

59

SB300B2P24037

B300 - Equipment List_IFC

269

61 25-Jul-13

25-Aug-14

SB300B2P24051

B300 - Line List_IFR

21

60 25-Jul-13

23-Aug-13

SB300B2P24057

B300 - Line List_IFC

329


60 26-Aug-13

22-Dec-14

B400 - Process Equipment Data Sheet_IFR

420
113

71 16-Apr-13 A
0 16-Apr-13 A

22-Dec-14
27-Sep-13

SB400B2P24017

B400 - Process Equipment Data Sheet_IFC

187

71 30-Sep-13

30-Jun-14

SB400B2P24031

B400 - Equipment List_IFR

59


72 01-May-13 A

24-Jul-13

SB400B2P24037

B400 - Equipment List_IFC

269

72 25-Jul-13

25-Aug-14

SB400B2P24051

B400 - Line List_IFR

21

71 25-Jul-13

23-Aug-13

SB400B2P24057

B400 - Line List_IFC

329


71 26-Aug-13

22-Dec-14

56 16-Apr-13 A
13 16-Apr-13 A

22-Dec-14
27-Sep-13

66 30-Sep-13

30-Jun-14

57 01-May-13 A

24-Jul-13

B300 - Demine & Fuel
SB300B2P24011

B400 - Steam & Power
SB400B2P24011

B500 - Process Equipment Data Sheet_IFR

420
113


SB500B2P24017

B500 - Process Equipment Data Sheet_IFC

187

SB500B2P24031

B500 - Equipment List_IFR

59

SB500B2P24037

B500 - Equipment List_IFC

269

57 25-Jul-13

25-Aug-14

SB500B2P24051

B500 - Line List_IFR

21

56 25-Jul-13


23-Aug-13

SB500B2P24057

B500 - Line List_IFC

329

56 26-Aug-13

22-Dec-14

P&IDs
Common Area
T0000B2P2501A

P&IDs Issue for Review Rev A (FR)

379
501
92

32 28-Feb-13 A
32 15-Mar-13 A
17 15-Mar-13 A

18-Mar-15
18-Mar-15
24-Jul-13


T0000B2P2501B

P&IDs rev.A - Employer Joint Review

10

17 12-Aug-13

23-Aug-13

T0000B2P2501C

P&IDs Issue for Approval Rev.B (FA) (for HAZOP)

48

17 26-Aug-13

01-Nov-13

T0000B2P2501E

P&IDs Issue for Construction Rev.1 (Final) - (W/o Hold)

70

32 24-Jun-14

03-Oct-14


T0000B2P2501F

P&IDs Issue for Construction Rev.2 (Frozen)

104

32 16-Oct-14

18-Mar-15

Process Area
J0000B2P2501A

P&IDs Issue for Review rev.A (FR)

350
78

55 28-Feb-13 A
0 01-Apr-13 A

19-Dec-14
23-Jul-13

J0000B2P2501B

P&IDs Joint Review with Employer

28


0 24-Jul-13

30-Aug-13

J0000B2P2501C

P&IDs Issue for Approval rev.B(for HAZOP)

38

0 02-Sep-13

28-Oct-13

J0000B2P2501D

P&IDs Issue for Construction rev.0 (W/ Hold)

59

9 27-Dec-13

31-Mar-14

J0000B2P2501E

P&IDs Issue for Construction rev.1 (W/o Hold)

60


24 01-Apr-14

26-Jun-14

J0000B2P2501F

P&IDs Issue for Construction rev.2 (Frozen)

87

24 27-Jun-14

31-Oct-14

T0000B2P2501D

P&IDs Issue for Construction Rev.0 - (W/ Hold)

65

27 23-Dec-13

27-Mar-14

25 01-May-13 A
13 01-May-13 A

28-Nov-14
22-Jul-13


24

13 12-Aug-13

13-Sep-13

B500 - Cooling Water
SB500B2P24011

A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P25011
A100 - P&ID_IFR (before P&ID review meeting with Employer)

393
57

SA100B2P25014

A100 - P&ID_Joint Review with Employer

SA100B2P25015

A100 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

60

13 16-Sep-13

13-Dec-13


SA100B2P25018

A100 - P&ID_IFC (w/ hold)

123

17 16-Dec-13

13-Jun-14

SA100B2P25019

A100 - P&ID_IFC (w/o hold)

115

25 16-Jun-14

28-Nov-14

415
69

25 15-Apr-13 A
0 15-Apr-13 A

12-Dec-14
22-Jul-13

A500 - Xylene Frac./Pare

Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B2P25011
A500 - P&ID_IFR (before P&ID review meeting with Employer)
SA500B2P25014

A500 - P&ID_Joint Review with Employer

14

0 12-Aug-13

30-Aug-13

SA500B2P25015

A500 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

91

0 02-Sep-13

15-Jan-14

SA500B2P25018

A500 - P&ID_IFC (w/ hold)

124

0 16-Jan-14


15-Jul-14

SA500B2P25019

A500 - P&ID_IFC (w/o hold)

103

25 16-Jul-14

12-Dec-14

415
69

25 15-Apr-13 A
14 15-Apr-13 A

12-Dec-14
22-Jul-13

A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B2P25011
A600 - P&ID_IFR (before P&ID review meeting with Employer)
SA600B2P25014

A600 - P&ID_Joint Review with Employer


14

14 12-Aug-13

30-Aug-13

SA600B2P25015

A600 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

91

14 02-Sep-13

15-Jan-14

SA600B2P25018

A600 - P&ID_IFC (w/ hold)

124

14 16-Jan-14

15-Jul-14

SA600B2P25019

A600 - P&ID_IFC (w/o hold)


103

25 16-Jul-14

12-Dec-14

427
77

85 04-Apr-13 A
7 04-Apr-13 A

19-Dec-14
23-Jul-13

7

23 02-Sep-13

10-Sep-13

A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B2P25010A
A700-P&ID-FR rev.A
GA700B2P25010B

A700-P&ID-Joint Review with Employer


GA700B2P25010C

A700-P&ID-FA rev.B (for HAZOP)

33

23 08-Oct-13

22-Nov-13

GA700B2P25010D

A700-P&ID-FC rev.0 (W/ Hold)

40

23 21-Feb-14

17-Apr-14

GA700B2P25010E

A700-P&ID-FC rev.1 (W/o Hold)

40

23 24-Jul-14

22-Sep-14


GA700B2P25010F

A700-P&ID-FC rev.2 (Frozen)

40

85 27-Oct-14

19-Dec-14

391
67

35 19-Apr-13 A
0 19-Apr-13 A

14-Nov-14
24-Jul-13

AA00 - Polypropylene U
Unit (PPU)
SAA00B2P25011
AA00 - P&ID_IFR (before P&ID review meeting with Employer)
SAA00B2P25014

AA00 - P&ID_Joint Review with Employer

10

0 26-Aug-13


06-Sep-13

SAA00B2P25015

AA00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

56

0 09-Sep-13

02-Dec-13

SAA00B2P25018

AA00 - P&ID_IFC (w/ hold)

112

0 03-Dec-13

15-May-14

SAA00B2P25019

AA00 - P&ID_IFC (w/o hold)

125

35 16-May-14


14-Nov-14

393
57

26 01-May-13 A
0 01-May-13 A

28-Nov-14
22-Jul-13

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B2P25011
AB10 - P&ID_IFR (before P&ID review meeting with Employer)
SAB10B2P25014

AB10 - P&ID_Joint Review with Employer

24

0 12-Aug-13

13-Sep-13

SAB10B2P25015

AB10 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)


60

0 16-Sep-13

13-Dec-13

SAB10B2P25018

AB10 - P&ID_IFC (w/ hold)

123

0 16-Dec-13

13-Jun-14

SAB10B2P25019

AB10 - P&ID_IFC (w/o hold)

115

26 16-Jun-14

28-Nov-14

SAB20B2P25011

AB20 - P&ID_IFR (before P&ID review meeting with Employer)


57

13 01-May-13 A

22-Jul-13

SAB20B2P25014

AB20 - P&ID_Joint Review with Employer

24

13 12-Aug-13

13-Sep-13

SAB20B2P25015

AB20 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

60

13 16-Sep-13

13-Dec-13

SAB20B2P25018

AB20 - P&ID_IFC (w/ hold)


123

17 16-Dec-13

13-Jun-14

SAB20B2P25019

AB20 - P&ID_IFC (w/o hold)

115

26 16-Jun-14

28-Nov-14

SAB30B2P25011

AB30 - P&ID_IFR (before P&ID review meeting with Employer)

57

13 01-May-13 A

22-Jul-13

SAB30B2P25014

AB30 - P&ID_Joint Review with Employer


24

13 12-Aug-13

13-Sep-13

SAB30B2P25015

AB30 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

60

13 16-Sep-13

13-Dec-13

SAB30B2P25018

AB30 - P&ID_IFC (w/ hold)

123

17 16-Dec-13

13-Jun-14

Process D/S for Other Pump

Process D/S for Flow & Other Instrument
Process D/S for PSV / TSV

AD00 - Process Equipment Data Sheet_IFR
AD00 - Process Equipment Data Sheet_IFC
AD00 - Equipment List_IFR
AD00 - Equipment List_IFC
AD00 - Line List_IFR
AD00 - Line List_IFC
AE00 - Process Equipment Data Sheet_IFR
AE00 - Process Equipment Data Sheet_IFC
AE00 - Equipment List_IFR
AE00 - Equipment List_IFC
AE00 - Line List_IFR
AE00 - Line List_IFC
AG00 - Line List_IFR
AG00 - Line List_IFC

B100 - Process Equipment Data Sheet_IFR
B100 - Process Equipment Data Sheet_IFC
B100 - Equipment List_IFR
B100 - Equipment List_IFC
B100 - Line List_IFR
B100 - Line List_IFC
B200 - Process Equipment Data Sheet_IFR
B200 - Process Equipment Data Sheet_IFC
B200 - Equipment List_IFR
B200 - Equipment List_IFC
B200 - Line List_IFR
B200 - Line List_IFC
B300 - Process Equipment Data Sheet_IFR
B300 - Process Equipment Data Sheet_IFC
B300 - Equipment List_IFR

B300 - Equipment List_IFC
B300 - Line List_IFR
B300 - Line List_IFC
B400 - Process Equipment Data Sheet_IFR
B400 - Process Equipment Data Sheet_IFC
B400 - Equipment List_IFR
B400 - Equipment List_IFC
B400 - Line List_IFR
B400 - Line List_IFC
B500 - Process Equipment Data Sheet_IFR
B500 - Process Equipment Data Sheet_IFC
B500 - Equipment List_IFR
B500 - Equipment List_IFC
B500 - Line List_IFR
B500 - Line List_IFC

P&IDs Issue for Review Rev A (FR)
P&IDs rev.A - Employer Joint Review
P&IDs Issue for Approval Rev.B (FA) (for HAZOP)
P&IDs Issue for Construction Rev.1 (Final) - (W/o Hold)
P&IDs Issue for Construction Rev.2 (Frozen)
P&IDs Issue for Review rev.A (FR)
P&IDs Joint Review with Employer
P&IDs Issue for Approval rev.B(for HAZOP)
P&IDs Issue for Construction rev.0 (W/ Hold)
P&IDs Issue for Construction rev.1 (W/o Hold)
P&IDs Issue for Construction rev.2 (Frozen)
P&IDs Issue for Construction Rev.0 - (W/ Hold)
A100 - P&ID_IFR (before P&ID review meeting with Employer)
A100 - P&ID_Joint Review with Employer

A100 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
A100 - P&ID_IFC (w/ hold)
A100 - P&ID_IFC (w/o hold)
A500 - P&ID_IFR (before P&ID review meeting with Employer)
A500 - P&ID_Joint Review with Employer
A500 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
A500 - P&ID_IFC (w/ hold)
A500 - P&ID_IFC (w/o hold)
A600 - P&ID_IFR (before P&ID review meeting with Employer)
A600 - P&ID_Joint Review with Employer
A600 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
A600 - P&ID_IFC (w/ hold)
A600 - P&ID_IFC (w/o hold)
A700-P&ID-FR rev.A
A700-P&ID-Joint Review with Employer
A700-P&ID-FA rev.B (for HAZOP)
A700-P&ID-FC rev.0 (W/ Hold)
A700-P&ID-FC rev.1 (W/o Hold)
A700-P&ID-FC rev.2 (Frozen)
AA00 - P&ID_IFR (before P&ID review meeting with Employer)
AA00 - P&ID_Joint Review with Employer
AA00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AA00 - P&ID_IFC (w/ hold)
AA00 - P&ID_IFC (w/o hold)
AB10 - P&ID_IFR (before P&ID review meeting with Employer)
AB10 - P&ID_Joint Review with Employer
AB10 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AB10 - P&ID_IFC (w/ hold)
AB10 - P&ID_IFC (w/o hold)
AB20 - P&ID_IFR (before P&ID review meeting with Employer)

AB20 - P&ID_Joint Review with Employer
AB20 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AB20 - P&ID_IFC (w/ hold)
AB20 - P&ID_IFC (w/o hold)
AB30 - P&ID_IFR (before P&ID review meeting with Employer)
AB30 - P&ID_Joint Review with Employer

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

AB30 - P&ID_IFC (w/ hold)

Page 14 of 179

Actual Work
Remaining Work


AB30 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura



NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

SAB30B2P25019

AB30 - P&ID_IFC (w/o hold)

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B2P25025
SP P&ID Set-up & Alignment with JV Partners

Original Total Float Start
Duration

Finish


115

26 16-Jun-14

28-Nov-14

349
26

27 28-Feb-13 A
28-Feb-13 A

31-Jul-14
05-Apr-13 A

CAC00B2P25030

First Input To SP P&ID

66

08-Apr-13 A

11-Jul-13 A

CAC00B2P25040A

P&ID Issue (IFIR)


52

28-Feb-13 A

16-May-13 A

CAC00B2P25040B

P&ID IFIR Internal Review Meeting

12

17-May-13 A

03-Jun-13 A

CAC00B2P25040C

P&IDs Issue (IFR)

24

04-Jun-13 A

05-Jul-13 A

CAC00B2P25040D

P&ID Joint Review with Employer


10

29 29-Jul-13

09-Aug-13

CAC00B2P25040E

P&ID Issue (IFA)

39

36 13-Aug-13

08-Oct-13

CAC00B2P25040F

P&ID Issue (IFC w/ Hold)

26

30 21-Nov-13

27-Dec-13

CAC00B2P25040G

P&IDs Issue (IFC)


58

27 10-Jan-14

04-Apr-14

CAC00B2P25040H

P&IDs Final Issue (IFC, Rev.1)

80

27 07-Apr-14

31-Jul-14

393
57

26 01-May-13 A
0 01-May-13 A

28-Nov-14
22-Jul-13

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P25011
AD00 - P&ID_IFR (before P&ID review meeting with Employer)
SAD00B2P25014


AD00 - P&ID_Joint Review with Employer

24

0 12-Aug-13

13-Sep-13

SAD00B2P25015

AD00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

60

0 16-Sep-13

13-Dec-13

SAD00B2P25018

AD00 - P&ID_IFC (w/ hold)

123

0 16-Dec-13

13-Jun-14

SAD00B2P25019


AD00 - P&ID_IFC (w/o hold)

115

26 16-Jun-14

28-Nov-14

393
57

26 01-May-13 A
0 01-May-13 A

28-Nov-14
22-Jul-13

AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P25011
AE00 - P&ID_IFR (before P&ID review meeting with Employer)
SAE00B2P25014

AE00 - P&ID_Joint Review with Employer

24

0 12-Aug-13


13-Sep-13

SAE00B2P25015

AE00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

60

0 16-Sep-13

13-Dec-13

SAE00B2P25018

AE00 - P&ID_IFC (w/ hold)

123

0 16-Dec-13

13-Jun-14

SAE00B2P25019

AE00 - P&ID_IFC (w/o hold)

115

26 16-Jun-14


28-Nov-14

388
59

35 01-May-13 A
0 01-May-13 A

21-Nov-14
24-Jul-13

AG00 - Common Piperack
Pipera
SAG00B2P25011
AG00 - P&ID_IFR (before P&ID review meeting with Employer)
SAG00B2P25014

AG00 - P&ID_Joint Review with Employer

9

0 12-Aug-13

23-Aug-13

SAG00B2P25015

AG00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)


70

0 26-Aug-13

06-Dec-13

SAG00B2P25018

AG00 - P&ID_IFC (w/ hold)

99

0 09-Dec-13

30-Apr-14

SAG00B2P25019

AG00 - P&ID_IFC (w/o hold)

139

35 01-May-14

21-Nov-14

388
388
59


26 01-May-13 A
26 01-May-13 A
0 01-May-13 A

21-Nov-14
21-Nov-14
24-Jul-13

9

0 12-Aug-13

23-Aug-13

Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P25011
B100 - P&ID_IFR (before P&ID review meeting with Employer)
SB100B2P25014

B100 - P&ID_Joint Review with Employer

SB100B2P25015

B100 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

70

0 26-Aug-13


06-Dec-13

SB100B2P25018

B100 - P&ID_IFC (w/ hold)

99

0 09-Dec-13

30-Apr-14

SB100B2P25019

B100 - P&ID_IFC (w/o hold)

139

26 01-May-14

21-Nov-14

388
59

26 01-May-13 A
0 01-May-13 A

21-Nov-14
24-Jul-13


9

0 12-Aug-13

23-Aug-13

B200 - Service / Potable / Fire Water
SB200B2P25011
B200 - P&ID_IFR (before P&ID review meeting with Employer)
SB200B2P25014

B200 - P&ID_Joint Review with Employer

SB200B2P25015

B200 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

70

0 26-Aug-13

06-Dec-13

SB200B2P25018

B200 - P&ID_IFC (w/ hold)

99


0 09-Dec-13

30-Apr-14

SB200B2P25019

B200 - P&ID_IFC (w/o hold)

139

26 01-May-14

21-Nov-14

B300 - P&ID_IFR (before P&ID review meeting with Employer)

388
59

26 01-May-13 A
0 01-May-13 A

21-Nov-14
24-Jul-13

B300 - Demine & Fuel
SB300B2P25011
SB300B2P25014

B300 - P&ID_Joint Review with Employer


9

0 12-Aug-13

23-Aug-13

SB300B2P25015

B300 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

70

0 26-Aug-13

06-Dec-13

SB300B2P25018

B300 - P&ID_IFC (w/ hold)

99

0 09-Dec-13

30-Apr-14

SB300B2P25019

B300 - P&ID_IFC (w/o hold)


139

26 01-May-14

21-Nov-14

B400 - P&ID_IFR (before P&ID review meeting with Employer)

388
59

26 01-May-13 A
0 01-May-13 A

21-Nov-14
24-Jul-13

9

0 12-Aug-13

23-Aug-13

B400 - Steam & Power
SB400B2P25011
SB400B2P25014

B400 - P&ID_Joint Review with Employer


SB400B2P25015

B400 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

70

0 26-Aug-13

06-Dec-13

SB400B2P25018

B400 - P&ID_IFC (w/ hold)

99

0 09-Dec-13

30-Apr-14

SB400B2P25019

B400 - P&ID_IFC (w/o hold)

139

26 01-May-14

21-Nov-14


B500 - P&ID_IFR (before P&ID review meeting with Employer)

388
59

26 01-May-13 A
15 01-May-13 A

21-Nov-14
24-Jul-13

B500 - Cooling Water
SB500B2P25011
SB500B2P25014

B500 - P&ID_Joint Review with Employer

9

16 12-Aug-13

23-Aug-13

SB500B2P25015

B500 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)

70

16 26-Aug-13


06-Dec-13

SB500B2P25018

B500 - P&ID_IFC (w/ hold)

99

16 09-Dec-13

30-Apr-14

SB500B2P25019

B500 - P&ID_IFC (w/o hold)

139

26 01-May-14

21-Nov-14

C000-P&ID-FR rev.A

442
92

88 14-Mar-13 A
0 14-Mar-13 A


19-Dec-14
23-Jul-13

Offsites Area
GC000B2P25010A
GC000B2P25010B

C000-P&ID-Joint Review with Employer

15

13 21-Aug-13

10-Sep-13

GC000B2P25010C

C000-P&ID-FA rev.B (for HAZOP)

33

13 08-Oct-13

22-Nov-13

GC000B2P25010D

C000-P&ID-FC rev.0 (W/ Hold)


40

14 21-Feb-14

17-Apr-14

GC000B2P25010E

C000-P&ID-FC rev.1 (W/o Hold) for SWCT/Flare/Marine/Tank

40

17 26-Jun-14

21-Aug-14

GC000B2P25010F

C000-P&ID-FC rev.1 (W/o Hold) for WWT

40

17 24-Jul-14

22-Sep-14

GC000B2P25010G

C000-P&ID-FC rev.2 (Frozen) for SWCT/Flare/Marine/Tank


40

96 15-Oct-14

09-Dec-14

GC000B2P25010H

C000-P&ID-FC rev.2 (Frozen) for WWT

40

17 27-Oct-14

19-Dec-14

Plot Plans Issue for Approval rev.A (FR)

401
401
99

80 29-Jan-13 A
80 29-Jan-13 A
1 01-Apr-13 A

01-Apr-15
01-Apr-15
21-Aug-13


Plot Plan
Process Area
J0000B2P2502A
J0000B2P2502B

Plot Plans Issue for Approval rev.B (30% Model/ Piling)

75

1 22-Aug-13

10-Dec-13

J0000B2P2502C

Plot Plans Issue for Contruction rev.0 (FC for Piling 1st)

51

1 11-Dec-13

03-Mar-14

J0000B2P2502D

Plot Plans Issue for Construction rev.1 (FC for Piling 2nd)

81

16 04-Mar-14


30-Jun-14

J0000B2P2502E

Plot Plans Issue for Construction rev.2 (Frozen)

105

50 01-Jul-14

02-Dec-14

354
86

55 01-Apr-13 A
14 01-Apr-13 A

29-Aug-14
31-Jul-13

A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P25511
A100 - Plot Plan_IFR
SA100B2P25515

A100 - Plot Plan_IFA (after incorporating Employer's comments)

122


14 01-Aug-13

29-Jan-14

SA100B2P25518

A100 - Plot Plan_IFC (for piling)

52

28 03-Feb-14

15-Apr-14

SA100B2P25519

A100 - Plot Plan_IFC (for final)

94

55 16-Apr-14

29-Aug-14

344
97

18 15-Apr-13 A
0 15-Apr-13 A


29-Aug-14
30-Aug-13

111

0 02-Sep-13

14-Feb-14

A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B2P25511
A500 - Plot Plan_IFR
SA500B2P25515

A500 - Plot Plan_IFA (after incorporating Employer's comments)

SA500B2P25518

A500 - Plot Plan_IFC (for piling)

53

0 17-Feb-14

30-Apr-14

SA500B2P25519


A500 - Plot Plan_IFC (for final)

83

18 01-May-14

29-Aug-14

344
97

37 15-Apr-13 A
14 15-Apr-13 A

29-Aug-14
30-Aug-13

A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B2P25511
A600 - Plot Plan_IFR
SA600B2P25515

A600 - Plot Plan_IFA (after incorporating Employer's comments)

111

14 02-Sep-13

14-Feb-14


SA600B2P25518

A600 - Plot Plan_IFC (for piling)

53

19 17-Feb-14

30-Apr-14

SA600B2P25519

A600 - Plot Plan_IFC (for final)

83

37 01-May-14

29-Aug-14

434
102

115 23-Apr-13 A
30 23-Apr-13 A

20-Jan-15
16-Sep-13


A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B2P25070A
A700-Overall & Unit Plot Plan-FR rev.A
GA700B2P25070B

A700-Overall & Unit Plot Plan-Review by Employer

10

30 17-Sep-13

04-Oct-13

GA700B2P25070C

A700-Overall & Unit Plot Plan-FA rev.B

53

30 07-Oct-13

19-Dec-13

GA700B2P25070D

A700-Overall & Unit Plot Plan-FC rev.0 (for Piling)

60


30 20-Dec-13

19-Mar-14

GA700B2P25070E

A700-Overall & Unit Plot Plan-FC rev.1 (W/o Hold)

65

47 18-Jul-14

23-Oct-14

GA700B2P25070F

A700-Overall & Unit Plot Plan-FC rev.2 (Frozen)

60

115 27-Oct-14

20-Jan-15

A800 - Naphtha Hydrodesulphurizer
Hydrod
/ CCR (NHDS/CCR)
TA800B2P2502A
A800 - Plot Plans Issue for Review (FR)


490
53

40 15-Apr-13 A
15-Apr-13 A

01-Apr-15
28-Jun-13 A

TA800B2P2502B

A800 - Plot Plans Issue for Approval (FA) (30% Model/ Piling)

66

14 02-Oct-13

07-Jan-14

TA800B2P2502C

A800 - Plot Plans Issue for Contruction (FC for Piling - Rack)

26

14 08-Jan-14

14-Feb-14


TA800B2P2502D

A800 - Plot Plans Issue for Construction (FC for Piling - Remaining)

84

15 14-Mar-14

10-Jul-14

TA800B2P2502E

A800 - Plot Plans Issue for Construction (Frozen)

95

40 13-Nov-14

01-Apr-15

40 15-Apr-13 A
15-Apr-13 A

01-Apr-15
28-Jun-13 A

A900 - PENEX (PENX)
TA900B2P2502A

A900 - Plot Plans Issue for Review (FR)


490
53

TA900B2P2502B

A900 - Plot Plans Issue for Approval (FA) (30% Model/ Piling)

66

21 02-Oct-13

07-Jan-14

TA900B2P2502C

A900 - Plot Plans Issue for Contruction (FC for Piling - Rack)

26

34 08-Jan-14

14-Feb-14

TA900B2P2502D

A900 - Plot Plans Issue for Construction (FC for Piling - Remaining)

84


28 25-Feb-14

23-Jun-14

TA900B2P2502E

A900 - Plot Plans Issue for Construction (Frozen)

94

40 14-Nov-14

01-Apr-15

279
31

47 19-Jun-13 A
0 19-Jun-13 A

31-Jul-14
31-Jul-13

102

0 01-Aug-13

31-Dec-13

AA00 - Polypropylene U

Unit (PPU)
SAA00B2P25511
AA00 - Plot Plan_IFR
SAA00B2P25515

AA00 - Plot Plan_IFA (after incorporating Employer's comments)

SAA00B2P25518

AA00 - Plot Plan_IFC (for piling)

30

0 02-Jan-14

14-Feb-14

SAA00B2P25519

AA00 - Plot Plan_IFC (for final)

116

47 17-Feb-14

31-Jul-14

354
86


18 01-Apr-13 A
0 01-Apr-13 A

29-Aug-14
31-Jul-13

122

0 01-Aug-13

29-Jan-14

52

0 03-Feb-14

15-Apr-14

94

18 16-Apr-14

29-Aug-14

29 29-Jan-13 A

04-Apr-14

AB00 - Crude Distillatio
Distillation Unit (CDU)

SAB10B2P25511
AB10 - Plot Plan_IFR
SAB10B2P25515

AB10 - Plot Plan_IFA (after incorporating Employer's comments)

SAB10B2P25518

AB10 - Plot Plan_IFC (for piling)

SAB10B2P25519

AB10 - Plot Plan_IFC (for final)

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)

290

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
AB30 - P&ID_IFC (w/o hold)
SP P&ID Set-up & Alignment with JV Partners
First Input To SP P&ID

P&ID Issue (IFIR)
P&ID IFIR Internal Review Meeting
P&IDs Issue (IFR)
P&ID Joint Review with Employer
P&ID Issue (IFA)
P&ID Issue (IFC w/ Hold)
P&IDs Issue (IFC)
P&IDs Final Issue (IFC, Rev.1)
AD00 - P&ID_IFR (before P&ID review meeting with Employer)
AD00 - P&ID_Joint Review with Employer
AD00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AD00 - P&ID_IFC (w/ hold)
AD00 - P&ID_IFC (w/o hold)
AE00 - P&ID_IFR (before P&ID review meeting with Employer)
AE00 - P&ID_Joint Review with Employer
AE00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AE00 - P&ID_IFC (w/ hold)
AE00 - P&ID_IFC (w/o hold)
AG00 - P&ID_IFR (before P&ID review meeting with Employer)
AG00 - P&ID_Joint Review with Employer
AG00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AG00 - P&ID_IFC (w/ hold)
AG00 - P&ID_IFC (w/o hold)

B100 - P&ID_IFR (before P&ID review meeting with Employer)
B100 - P&ID_Joint Review with Employer
B100 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B100 - P&ID_IFC (w/ hold)
B100 - P&ID_IFC (w/o hold)
B200 - P&ID_IFR (before P&ID review meeting with Employer)

B200 - P&ID_Joint Review with Employer
B200 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B200 - P&ID_IFC (w/ hold)
B200 - P&ID_IFC (w/o hold)
B300 - P&ID_IFR (before P&ID review meeting with Employer)
B300 - P&ID_Joint Review with Employer
B300 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B300 - P&ID_IFC (w/ hold)
B300 - P&ID_IFC (w/o hold)
B400 - P&ID_IFR (before P&ID review meeting with Employer)
B400 - P&ID_Joint Review with Employer
B400 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B400 - P&ID_IFC (w/ hold)
B400 - P&ID_IFC (w/o hold)
B500 - P&ID_IFR (before P&ID review meeting with Employer)
B500 - P&ID_Joint Review with Employer
B500 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B500 - P&ID_IFC (w/ hold)
B500 - P&ID_IFC (w/o hold)
C000-P&ID-FR rev.A
C000-P&ID-Joint Review with Employer
C000-P&ID-FA rev.B (for HAZOP)
C000-P&ID-FC rev.0 (W/ Hold)
C000-P&ID-FC rev.1 (W/o Hold) for SWCT/Flare/Marine/Tank
C000-P&ID-FC rev.1 (W/o Hold) for WWT
C000-P&ID-FC rev.2 (Frozen) for SWCT/Flare/Marine/Tank
C000-P&ID-FC rev.2 (Frozen) for WWT

Plot Plans Issue for Approval rev.A (FR)
Plot Plans Issue for Approval rev.B (30% Model/ Piling)

Plot Plans Issue for Contruction rev.0 (FC for Piling 1st)
Plot Plans Issue for Construction rev.1 (FC for Piling 2nd)
Plot Plans Issue for Construction rev.2 (Frozen)
A100 - Plot Plan_IFR
A100 - Plot Plan_IFA (after incorporating Employer's comments)
A100 - Plot Plan_IFC (for piling)
A100 - Plot Plan_IFC (for final)
A500 - Plot Plan_IFR
A500 - Plot Plan_IFA (after incorporating Employer's comments)
A500 - Plot Plan_IFC (for piling)
A500 - Plot Plan_IFC (for final)
A600 - Plot Plan_IFR
A600 - Plot Plan_IFA (after incorporating Employer's comments)
A600 - Plot Plan_IFC (for piling)
A600 - Plot Plan_IFC (for final)
A700-Overall & Unit Plot Plan-FR rev.A
A700-Overall & Unit Plot Plan-Review by Employer
A700-Overall & Unit Plot Plan-FA rev.B
A700-Overall & Unit Plot Plan-FC rev.0 (for Piling)
A700-Overall & Unit Plot Plan-FC rev.1 (W/o Hold)
A700-Overall & Unit Plot Plan-FC rev.2 (Frozen)
A800 - Plot Plans Issue for Review (FR)
A800 - Plot Plans Issue for Approval (FA) (30% Model/ Piling)
A800 - Plot Plans Issue for Contruction (FC for Piling - Rack)
A800 - Plot Plans Issue for Construction (FC for Piling - Remaining)
A800 - Plot Plans Issue for Construction (Frozen)
A900 - Plot Plans Issue for Review (FR)
A900 - Plot Plans Issue for Approval (FA) (30% Model/ Piling)
A900 - Plot Plans Issue for Contruction (FC for Piling - Rack)
A900 - Plot Plans Issue for Construction (FC for Piling - Remaining)

A900 - Plot Plans Issue for Construction (Frozen)
AA00 - Plot Plan_IFR
AA00 - Plot Plan_IFA (after incorporating Employer's comments)
AA00 - Plot Plan_IFC (for piling)
AA00 - Plot Plan_IFC (for final)
AB10 - Plot Plan_IFR

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

AB10 - Plot Plan_IFC (for piling)
AB10 - Plot Plan_IFC (for final)

Page 15 of 179

Actual Work

Remaining Work

AB10 - Plot Plan_IFA (after incorporating Employer's comments)

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura

F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

CAC00B2P25020A

Plot Plans issue for IFIR

23

29-Jan-13 A

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
01-Mar-13 A
Plot Plans issue for IFIR


CAC00B2P25020B

Plot Plans issue for QRA

20

04-Mar-13 A

01-Apr-13 A

CAC00B2P25020C

Plot Plans issue for IFR

97

26 02-Apr-13 A

20-Aug-13

CAC00B2P25020C1

Plot Plans issue for IFA

46

29 29-Jul-13

02-Oct-13


CAC00B2P25020D

Plot Plans issue for IFC

46

29 03-Oct-13

09-Dec-13

CAC00B2P25020E

Plot Plans issue for IFC - Final issue

70

29 17-Dec-13

04-Apr-14

354
86

18 01-Apr-13 A
0 01-Apr-13 A

29-Aug-14
31-Jul-13


122

0 01-Aug-13

29-Jan-14

Activity ID

Activity Name

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P25511
AD00 - Plot Plan_IFR

Original Total Float Start
Duration

Finish

SAD00B2P25515

AD00 - Plot Plan_IFA (after incorporating Employer's comments)

SAD00B2P25518

AD00 - Plot Plan_IFC (for piling)

52


0 03-Feb-14

15-Apr-14

SAD00B2P25519

AD00 - Plot Plan_IFC (for final)

94

18 16-Apr-14

29-Aug-14

354
86

18 01-Apr-13 A
0 01-Apr-13 A

29-Aug-14
31-Jul-13

AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P25511
AE00 - Plot Plan_IFR
SAE00B2P25515


AE00 - Plot Plan_IFA (after incorporating Employer's comments)

122

0 01-Aug-13

29-Jan-14

SAE00B2P25518

AE00 - Plot Plan_IFC (for piling)

52

0 03-Feb-14

15-Apr-14

SAE00B2P25519

AE00 - Plot Plan_IFC (for final)

94

18 16-Apr-14

29-Aug-14

236
42


41 03-Jun-13 A
0 03-Jun-13 A

15-May-14
31-Jul-13

AG00 - Common Piperack
Pipera
SAG00B2P25511
AG00 - Plot Plan_IFR
SAG00B2P25515

AG00 - Plot Plan_IFA (after incorporating Employer's comments)

81

0 01-Aug-13

29-Nov-13

SAG00B2P25518

AG00 - Plot Plan_IFC (for piling)

41

0 02-Dec-13

29-Jan-14


SAG00B2P25519

AG00 - Plot Plan_IFC (for final)

72

41 03-Feb-14

15-May-14

236
236
42

72 03-Jun-13 A
72 03-Jun-13 A
0 03-Jun-13 A

15-May-14
15-May-14
31-Jul-13

Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P25511
B100 - Plot Plan_IFR
SB100B2P25515

B100 - Plot Plan_IFA (after incorporating Employer's comments)


81

0 01-Aug-13

29-Nov-13

SB100B2P25518

B100 - Plot Plan_IFC (for piling)

41

0 02-Dec-13

29-Jan-14

SB100B2P25519

B100 - Plot Plan_IFC (for final)

72

72 03-Feb-14

15-May-14

236
42


72 03-Jun-13 A
0 03-Jun-13 A

15-May-14
31-Jul-13

B200 - Service / Potable / Fire Water
SB200B2P25511
B200 - Plot Plan_IFR
SB200B2P25515

B200 - Plot Plan_IFA (after incorporating Employer's comments)

81

0 01-Aug-13

29-Nov-13

SB200B2P25518

B200 - Plot Plan_IFC (for piling)

41

0 02-Dec-13

29-Jan-14

SB200B2P25519


B200 - Plot Plan_IFC (for final)

72

72 03-Feb-14

15-May-14

236
42

32 03-Jun-13 A
0 03-Jun-13 A

15-May-14
31-Jul-13

B300 - Demine & Fuel
SB300B2P25511

B300 - Plot Plan_IFR

SB300B2P25515

B300 - Plot Plan_IFA (after incorporating Employer's comments)

81

0 01-Aug-13


29-Nov-13

SB300B2P25518

B300 - Plot Plan_IFC (for piling)

41

0 02-Dec-13

29-Jan-14

SB300B2P25519

B300 - Plot Plan_IFC (for final)

72

32 03-Feb-14

15-May-14

236
42

72 03-Jun-13 A
0 03-Jun-13 A

15-May-14

31-Jul-13

B400 - Steam & Power
SB400B2P25511

B400 - Plot Plan_IFR

SB400B2P25515

B400 - Plot Plan_IFA (after incorporating Employer's comments)

81

0 01-Aug-13

29-Nov-13

SB400B2P25518

B400 - Plot Plan_IFC (for piling)

41

0 02-Dec-13

29-Jan-14

SB400B2P25519

B400 - Plot Plan_IFC (for final)


72

72 03-Feb-14

15-May-14

32 03-Jun-13 A
16 03-Jun-13 A

15-May-14
31-Jul-13

B500 - Cooling Water
SB500B2P25511

B500 - Plot Plan_IFR

236
42

SB500B2P25515

B500 - Plot Plan_IFA (after incorporating Employer's comments)

81

17 01-Aug-13

29-Nov-13


SB500B2P25518

B500 - Plot Plan_IFC (for piling)

41

32 02-Dec-13

29-Jan-14

SB500B2P25519

B500 - Plot Plan_IFC (for final)

72

32 03-Feb-14

15-May-14

424
102

88 23-Apr-13 A
11 23-Apr-13 A

06-Jan-15
16-Sep-13


Offsites Area
GC000B2P25090A

C000-Overall & Unit Plot Plan-FR rev.A

Plot Plans issue for QRA
Plot Plans issue for IFR
Plot Plans issue for IFA
Plot Plans issue for IFC
Plot Plans issue for IFC - Final issue
AD00 - Plot Plan_IFR
AD00 - Plot Plan_IFA (after incorporating Employer's comments)
AD00 - Plot Plan_IFC (for piling)
AD00 - Plot Plan_IFC (for final)
AE00 - Plot Plan_IFR
AE00 - Plot Plan_IFA (after incorporating Employer's comments)
AE00 - Plot Plan_IFC (for piling)
AE00 - Plot Plan_IFC (for final)
AG00 - Plot Plan_IFR
AG00 - Plot Plan_IFA (after incorporating Employer's comments)
AG00 - Plot Plan_IFC (for piling)
AG00 - Plot Plan_IFC (for final)

B100 - Plot Plan_IFR
B100 - Plot Plan_IFA (after incorporating Employer's comments)
B100 - Plot Plan_IFC (for piling)
B100 - Plot Plan_IFC (for final)
B200 - Plot Plan_IFR
B200 - Plot Plan_IFA (after incorporating Employer's comments)
B200 - Plot Plan_IFC (for piling)

B200 - Plot Plan_IFC (for final)
B300 - Plot Plan_IFR
B300 - Plot Plan_IFA (after incorporating Employer's comments)
B300 - Plot Plan_IFC (for piling)
B300 - Plot Plan_IFC (for final)
B400 - Plot Plan_IFR
B400 - Plot Plan_IFA (after incorporating Employer's comments)
B400 - Plot Plan_IFC (for piling)
B400 - Plot Plan_IFC (for final)
B500 - Plot Plan_IFR
B500 - Plot Plan_IFA (after incorporating Employer's comments)
B500 - Plot Plan_IFC (for piling)
B500 - Plot Plan_IFC (for final)
C000-Overall & Unit Plot Plan-FR rev.A

GC000B2P25090B

C000-Overall & Unit Plot Plan-Review by Employer

10

11 17-Sep-13

04-Oct-13

GC000B2P25090C

C000-Overall & Unit Plot Plan-FA rev.B

53


11 07-Oct-13

19-Dec-13

GC000B2P25090D

C000-Overall & Unit Plot Plan-FC rev.0 (for Piling)

50

11 20-Dec-13

05-Mar-14

GC000B2P25090E

C000-Overall & Unit Plot Plan-FC rev.1 (W/o Hold) for SWCT/Flare/Marine/Tank

65

57 04-Jun-14

04-Sep-14

C000-Overall & Unit Plot Plan-FC rev.1 (W/o Hold) for SWCT/Flare/Marine/Tank

GC000B2P25090F

C000-Overall & Unit Plot Plan-FC rev.1 (W/o Hold) for WWT/Building


65

37 17-Jul-14

22-Oct-14

C000-Overall & Unit Plot Plan-FC rev.1 (W/o Hold) for WWT/Building

GC000B2P25090G

C000-Overall & Unit Plot Plan-FC rev.2 (Frozen) for SWCT/Flare/Marine/Tank

60

96 29-Sep-14

23-Dec-14

GC000B2P25090H

C000-Overall & Unit Plot Plan-FC rev.2 (Frozen) for WWT/Building

60

88 13-Oct-14

06-Jan-15

339

77

30 21-Mar-13 A
43 19-Apr-13 A

29-Dec-14
09-Aug-13

Pump Hydraulics (Hydraulics & Line Sizing)

Hydraulic Design
CAC00B2P27010

Pump Hydraulics (Hydraulics & Line Sizing)

C000-Overall & Unit Plot Plan-Review by Employer
C000-Overall & Unit Plot Plan-FA rev.B
C000-Overall & Unit Plot Plan-FC rev.0 (for Piling)

C000-Overall & Unit Plot Plan-FC rev.2 (Frozen) for SWCT/Flare/Marine/Tank
C000-Overall & Unit Plot Plan-FC rev.2 (Frozen) for WWT/Building

CAC00B2P27020

CS >= 6", LA & SS; All (Hydraulics & Line Sizing)

67

43 08-May-13 A


09-Aug-13

CS >= 6", LA & SS; All (Hydraulics & Line Sizing)

CAC00B2P27030

CS All (Hydraulic s & Line Sizing)

47

43 05-Jun-13 A

09-Aug-13

CS All (Hydraulic s & Line Sizing)

CAC00B2P27040

PSV In/Out Line, incl. Flare Sub Header (HEADER) (Hydraulics & Line Sizing)

85

43 05-Jun-13 A

04-Oct-13

PSV In/Out Line, incl. Flare Sub Header (HEADER) (Hydraulics & Line Sizing)

CAC00B2P27050


PSV In/Out Line, incl. Flare Sub Header (PSC In/Out Latereal) (Hydraulics & Line Sizing

38

43 12-Aug-13

04-Oct-13

PSV In/Out Line, incl. Flare Sub Header (PSC In/Out Latereal) (Hydraulics & Line Sizing)

CAC00B2P27060A

Lines require Vendor Information (1st) (Hydraulic s & Line Sizing)

18

74 27-Dec-13

29-Jan-14

CAC00B2P27060B

Lines require Vendor Information (Last) (Hydraulics & Line Sizing)

21

69 07-Jul-14

05-Aug-14


CAC00B2P27070

Utility Headers (Hydraulics & Line Sizing)

88

43 04-Apr-13 A

09-Aug-13

Utility Headers (Hydraulics & Line Sizing)

CAC00B2P27080

Recycle Loop (Hydraulics & Line Sizing)

98

25 21-Mar-13 A

09-Aug-13

Recycle Loop (Hydraulics & Line Sizing)

CAC00B2P27090

PSV Sizing

33


65 12-Aug-13

27-Sep-13

GA700B2P27010

A700-Hydraulic Design for Rotary Machineries

33 11-Apr-13 A

07-Oct-13

GA700B2P27020

A700-Hydraulic Design for Instrument Valves (CV & On-Off Valve)

25

33 04-Sep-13

15-Oct-13

GA700B2P27030

A700-Hydraulic Design for Pressure Relief Valve

25

33 30-Sep-13


05-Nov-13

GC000B2P27010

C000-Hydraulic Design for Rotary Machineries

33 11-Apr-13 A

07-Oct-13

GC000B2P27020

C000-Hydraulic Design for Instrument Valves (CV & On-Off Valve)

25

33 04-Sep-13

15-Oct-13

GC000B2P27030

C000-Hydraulic Design for Pressure Relief Valve

25

33 30-Sep-13

05-Nov-13


C000-Hydraulic Design for Pressure Relief Valve

J0000B2P27010

Hydraulic Design for Rotary Machineries

86

17 01-Jul-13 A

01-Nov-13

Hydraulic Design for Rotary Machineries

J0000B2P27020

Hydraulic Design for Instrument Valves (CV & On-Off Valve)

21

31 29-Aug-13

30-Sep-13

Hydraulic Design for Instrument Valves (CV & On-Off Valve)

J0000B2P27030

Hydraulic Design for Pressure Relief Valve


21

62 29-Aug-13

30-Sep-13

Hydraulic Design for Pressure Relief Valve

T0000B2P27014A

Deluge Hydraulic Calculation Note (FR)

85

109 27-Sep-13

30-Jan-14

T0000B2P27014B

Deluge Hydraulic Calculation Note (FA)

66

61 24-Sep-14

29-Dec-14

T0000B2P27023


Hydraulic Design for Instrument Valves (CV & On-Off Valve)

47

34 22-Jul-13

27-Sep-13

Hydraulic Design for Instrument Valves (CV & On-Off Valve)

T0000B2P27033

Hydraulic Design for Pressure Relief Valve

47

34 22-Jul-13

27-Sep-13

Hydraulic Design for Pressure Relief Valve

T0000B2P27041D

Hydraulic calculations

52

34 15-Jul-13 A


27-Sep-13

Hydraulic calculations

96
59
61
28

30-Jan-15
30-Jan-15
26-Nov-14
26-Sep-13

Fire Water Demand Calculation Note (FR)

120

120

02-Apr-13 A
02-Apr-13 A
01-Jul-13 A
01-Jul-13 A

Lines require Vendor Information (1st) (Hydraulic s & Line Sizing)
Lines require Vendor Information (Last) (Hydraulics & Line Sizing)

PSV Sizing
A700-Hydraulic Design for Rotary Machineries

A700-Hydraulic Design for Instrument Valves (CV & On-Off Valve)
A700-Hydraulic Design for Pressure Relief Valve
C000-Hydraulic Design for Rotary Machineries
C000-Hydraulic Design for Instrument Valves (CV & On-Off Valve)

Deluge Hydraulic Calculation Note (FR)
Deluge Hydraulic Calculation Note (FA)

Engineering HSE
Fire Protection Design
Common Area
T0000B4P41012A

Fire Water Demand Calculation Note (FR)

342
342
352
61

T0000B4P41012B

Fire Water Demand Calculation Note (FA)

43

61 12-Jun-14

13-Aug-14


T0000B4P41013A

Deluge System Arr angement Calculation Note ( FR)

102

107 01-Aug-13

31-Dec-13

T0000B4P41013B

Deluge System Arr angement Calculation Note ( FA)

65

61 22-Aug-14

26-Nov-14

T0000B4P4102B

Fire Water P&IDs Joint Review with Employer (NOT REQUIRED)

0

40 25-Oct-13

25-Oct-13


Fire Water P&IDs Joint Review with Employer (NOT REQUIRED)

T0000B4P4102C

Fire Water P&ID Issue for Approval rev.B (FA) (for HAZOP)

23

28 13-Nov-13

13-Dec-13

Fire Water P&ID Issue for Approval rev.B (FA) (for HAZOP)

T0000B4P4102D

Fire Water P&ID Issue for Construction rev.0

40

23 02-Apr-14

28-May-14

59 02-Apr-13 A
52 25-Jun-13 A

30-Jan-15
25-Sep-13


Process Area
J0000B4P4102A

Fire P&ID Issue for Review rev.A (FR)

342
64

J0000B4P4102B

Fire P&IDs Joint Review with Employer

12

52 26-Sep-13

11-Oct-13

J0000B4P4102C

Fire P&ID Issue for Approval r ev.B(for HAZOP)

44

52 11-Nov-13

20-Jan-14

J0000B4P4102D


Fire P&ID Issue for Construction rev.0

30

73 18-Feb-14

01-Apr-14

T0000B4P4102A

Fire Water P&ID Issue for Review rev.A (FR)

82

28 01-Aug-13

02-Dec-13

330
17

85 02-Sep-13
55 02-Sep-13

31-Dec-14
27-Sep-13

104

55 30-Sep-13


28-Feb-14

A100 - No.1 Sour Water Stripper (1SWS)
SA100B4P41021
A100 - P&IDs for Fire Fighting System (Yard)_IFR
SA100B4P41025

A100 - P&IDs for Fire Fighting System (Yard)_IFA

SA100B4P41028

A100 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

66

55 03-Mar-14

04-Jun-14

SA100B4P41029

A100 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

80

55 05-Jun-14

30-Sep-14


SA100B4P41051

A100 - Escape Route Drawing_IFR

41

85 01-Sep-14

31-Oct-14

SA100B4P41057

A100 - Escape Route Drawing_IFC

42

85 03-Nov-14

31-Dec-14

SA100B4P41061

A100 - Fire Fighting System Layout Drawings (Yard)_IFR

121

55 02-Sep-13

28-Feb-14


SA100B4P41067

A100 - Fire Fighting System Layout Drawings (Yard)_IFC

146

55 03-Mar-14

30-Sep-14

303
54

79 16-Oct-13
34 16-Oct-13

31-Dec-14
31-Dec-13

A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B4P41021
A500 - P&IDs for Fire Fighting System (Yard)_IFR

Fire Water Demand Calculation Note (FA)
Deluge System Arr angement Calculation Note ( FR)
Deluge System Arr angement Calculation Note ( FA)

Fire Water P&ID Issue for Construction rev.0
Fire P&ID Issue for Review rev.A (FR)

Fire P&IDs Joint Review with Employer
Fire P&ID Issue for Approval r ev.B(for HAZOP)
Fire P&ID Issue for Construction rev.0
Fire Water P&ID Issue for Review rev.A (FR)
A100 - P&IDs for Fire Fighting System (Yard)_IFR
A100 - P&IDs for Fire Fighting System (Yard)_IFA
A100 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
A100 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
A100 - Escape Route Drawing_IFR
A100 - Escape Route Drawing_IFC
A100 - Fire Fighting System Layout Drawings (Yard)_IFR
A100 - Fire Fighting System Layout Drawings (Yard)_IFC
A500 - P&IDs for Fire Fighting System (Yard)_IFR

SA500B4P41025

A500 - P&IDs for Fire Fighting System (Yard)_IFA

50

34 02-Jan-14

14-Mar-14

SA500B4P41028

A500 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

62


34 17-Mar-14

13-Jun-14

SA500B4P41029

A500 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

95

34 16-Jun-14

31-Oct-14

A500 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

SA500B4P41051

A500 - Escape Route Drawing_IFR

41

79 01-Sep-14

31-Oct-14

A500 - Escape Route Drawing_IFR

SA500B4P41057


A500 - Escape Route Drawing_IFC

42

79 03-Nov-14

31-Dec-14

SA500B4P41061

A500 - Fire Fighting System Layout Drawings (Yard)_IFR

104

80 16-Oct-13

14-Mar-14

SA500B4P41067

A500 - Fire Fighting System Layout Drawings (Yard)_IFC

157

80 17-Mar-14

31-Oct-14

324
54


72 16-Oct-13
34 16-Oct-13

30-Jan-15
31-Dec-13

A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B4P41021
A600 - P&IDs for Fire Fighting System (Yard)_IFR

A500 - P&IDs for Fire Fighting System (Yard)_IFA
A500 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

A500 - Escape Route Drawing_IFC
A500 - Fire Fighting System Layout Drawings (Yard)_IFR
A500 - Fire Fighting System Layout Drawings (Yard)_IFC
A600 - P&IDs for Fire Fighting System (Yard)_IFR

SA600B4P41025

A600 - P&IDs for Fire Fighting System (Yard)_IFA

50

34 02-Jan-14

14-Mar-14


SA600B4P41028

A600 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

62

34 17-Mar-14

13-Jun-14

SA600B4P41029

A600 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

95

34 16-Jun-14

31-Oct-14

A600 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

SA600B4P41051

A600 - Escape Route Drawing_IFR

41

79 01-Sep-14


31-Oct-14

A600 - Escape Route Drawing_IFR

SA600B4P41057

A600 - Escape Route Drawing_IFC

42

79 03-Nov-14

31-Dec-14

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA


A600 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

A600 - Escape Route Drawing_IFC

Page 16 of 179

Actual Work
Remaining Work

A600 - P&IDs for Fire Fighting System (Yard)_IFA

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara

T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

Finish


2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
A600 - Fire Fighting System Layout Drawings (Yard)_IFR

SA600B4P41061

A600 - Fire Fighting System Layout Drawings (Yard)_IFR

104

59 16-Oct-13

14-Mar-14

SA600B4P41067

A600 - Fire Fighting System Layout Drawings (Yard)_IFC

157

59 17-Mar-14

31-Oct-14

A600 - Fire Fighting System Layout Drawings (Yard)_IFC


SA600B4P41081

A600 - Fire Fighting System Layout Drawings (Building)_IFR

125

72 01-Apr-14

30-Sep-14

A600 - Fire Fighting System Layout Drawings (Building)_IFR

SA600B4P41087

A600 - Fire Fighting System Layout Drawings (Building)_IFC

A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B4P41010A
A700-F/F P&ID for Yard-FR rev.A

84

72 01-Oct-14

30-Jan-15

156

30

176 10-Sep-13
60 10-Sep-13

28-Apr-14
28-Oct-13

GA700B4P41010B

A700-F/F P&ID for Yard-Approval by Employer

10

60 29-Oct-13

11-Nov-13

GA700B4P41010C

A700-F/F P&ID for Yard-FA rev.B

35

60 12-Nov-13

31-Dec-13

GA700B4P41010D


A700-F/F P&ID for Yard -FC

35

157 11-Mar-14

28-Apr-14

GA700B4P41030A

A700-F/F Layout for Yard-FA

18

60 05-Dec-13

31-Dec-13

GA700B4P41030B

A700-F/F Layout for Yard-FC

AA00 - Polypropylene U
Unit (PPU)
SAA00B4P41021
AA00 - P&IDs for Fire Fighting System (Yard)_IFR

A600 - Fire Fighting System Layout Drawings (Building)_IFC
A700-F/F P&ID for Yard-FR rev.A
A700-F/F P&ID for Yard-Approval by Employer

A700-F/F P&ID for Yard-FA rev.B
A700-F/F P&ID for Yard -FC
A700-F/F Layout for Yard-FA

18

176 03-Apr-14

28-Apr-14

A700-F/F Layout for Yard-FC

325
102

47 23-Aug-13
51 23-Aug-13

15-Dec-14
22-Jan-14

AA00 - P&IDs for Fire Fighting System (Yard)_IFR

SAA00B4P41025

AA00 - P&IDs for Fire Fighting System (Yard)_IFA

19

51 23-Jan-14


20-Feb-14

SAA00B4P41028

AA00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

78

51 21-Feb-14

13-Jun-14

SAA00B4P41029

AA00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

69

51 16-Jun-14

23-Sep-14

SAA00B4P41041

AA00 - P&IDs for Fire Fighting System (Building)_IFR

76

46 04-Oct-13


22-Jan-14

SAA00B4P41045

AA00 - P&IDs for Fire Fighting System (Building)_IFA

55

46 23-Jan-14

11-Apr-14

SAA00B4P41048

AA00 - P&IDs for Fire Fighting System (Building)_IFC (w/ hold)

15

46 14-Apr-14

02-May-14

SAA00B4P41051

AA00 - Escape Route Drawing_IFR

40

47 01-Aug-14


30-Sep-14

SAA00B4P41057

AA00 - Escape Route Drawing_IFC

52

47 01-Oct-14

15-Dec-14

SAA00B4P41061

AA00 - Fire Fighting System Layout Drawings (Yard)_IFR

102

14 23-Aug-13

22-Jan-14

SAA00B4P41067

AA00 - Fire Fighting System Layout Drawings (Yard)_IFC

166

14 23-Jan-14


23-Sep-14

SAA00B4P41081

AA00 - Fire Fighting System Layout Drawings (Building)_IFR

104

45 04-Oct-13

05-Mar-14

SAA00B4P41087

AA00 - Fire Fighting System Layout Drawings (Building)_IFC

63

45 06-Mar-14

04-Jun-14

AA00 - Fire Fighting System Layout Drawings (Building)_IFC

SAA00B4P41149

AA00 - P&IDs for Fire Fighting System (Building)_IFC (w/o hold)

21


46 07-May-14

04-Jun-14

AA00 - P&IDs for Fire Fighting System (Building)_IFC (w/o hold)

330
17

86 02-Sep-13
60 02-Sep-13

31-Dec-14
27-Sep-13

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B4P41021
AB10 - P&IDs for Fire Fighting System (Yard)_IFR
SAB10B4P41025

AB10 - P&IDs for Fire Fighting System (Yard)_IFA

104

60 30-Sep-13

28-Feb-14


SAB10B4P41028

AB10 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

66

60 03-Mar-14

04-Jun-14

SAB10B4P41029

AB10 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

80

60 05-Jun-14

30-Sep-14

SAB10B4P41051

AB10 - Escape Route Drawing_IFR

41

86 01-Sep-14

31-Oct-14


SAB10B4P41057

AB10 - Escape Route Drawing_IFC

42

86 03-Nov-14

31-Dec-14

SAB10B4P41061

AB10 - Fire Fighting System Layout Drawings (Yard)_IFR

121

60 02-Sep-13

28-Feb-14

SAB10B4P41067

AB10 - Fire Fighting System Layout Drawings (Yard)_IFC

146

60 03-Mar-14

30-Sep-14


SAB10B4P41081

AB10 - Fire Fighting System Layout Drawings (Building)_IFR

83

40 01-Oct-13

29-Jan-14

SAB10B4P41087

AB10 - Fire Fighting System Layout Drawings (Building)_IFC

63

40 03-Feb-14

30-Apr-14

SAB20B4P41051

AB20 - Escape Route Drawing_IFR

41

86 01-Sep-14

31-Oct-14


SAB20B4P41057

AB20 - Escape Route Drawing_IFC

42

86 03-Nov-14

31-Dec-14

SAB20B4P41061

AB20 - Fire Fighting System Layout Drawings (Yard)_IFR

121

60 02-Sep-13

28-Feb-14

SAB20B4P41067

AB20 - Fire Fighting System Layout Drawings (Yard)_IFC

146

60 03-Mar-14

30-Sep-14


SAB30B4P41051

AB30 - Escape Route Drawing_IFR

41

86 01-Sep-14

31-Oct-14

SAB30B4P41057

AB30 - Escape Route Drawing_IFC

42

86 03-Nov-14

31-Dec-14

SAB30B4P41061

AB30 - Fire Fighting System Layout Drawings (Yard)_IFR

121

60 02-Sep-13

28-Feb-14


SAB30B4P41067

AB30 - Fire Fighting System Layout Drawings (Yard)_IFC

146

60 03-Mar-14

30-Sep-14

212
90

62 02-Apr-13 A
34 02-Apr-13 A

13-Feb-14
09-Aug-13

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B4P41005A
Layout for Fire & Gas Detection/ Alarm System for Internal Information
CAC00B4P41005B

Layout for Fire & Gas Detection/ Alarm System IF C

97


80 21-Aug-13

17-Jan-14

CAC00B4P41010A

P&ID for Fire Fighting System for Internal Infomation

85

34 09-Apr-13 A

09-Aug-13

CAC00B4P41010B

P&ID for Fire Fighting System IFC

62 19-Aug-13

13-Feb-14

CAC00B4P41020A

Fire Main & Deluge Line Size & Route for Internal Information

52 09-Apr-13 A

09-Aug-13


CAC00B4P41020B

Fire Main & Deluge Line Size & Route IFC

CAC00B4P41030A

Layout for Fire Fighting System for Internal Information

CAC00B4P41030B

Layout for Fire Fighting System IFC

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B4P41021
AD00 - P&IDs for Fire Fighting System (Yard)_IFR

117
85
118

59 13-Aug-13

07-Feb-14

90

87 02-Apr-13 A

09-Aug-13


97

80 21-Aug-13

17-Jan-14

330
17

86 02-Sep-13
56 02-Sep-13

31-Dec-14
27-Sep-13

SAD00B4P41025

AD00 - P&IDs for Fire Fighting System (Yard)_IFA

104

56 30-Sep-13

28-Feb-14

SAD00B4P41028

AD00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)


66

56 03-Mar-14

04-Jun-14

SAD00B4P41029

AD00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

80

56 05-Jun-14

30-Sep-14

SAD00B4P41051

AD00 - Escape Route Drawing_IFR

41

86 01-Sep-14

31-Oct-14

SAD00B4P41057

AD00 - Escape Route Drawing_IFC


42

86 03-Nov-14

31-Dec-14

SAD00B4P41061

AD00 - Fire Fighting System Layout Drawings (Yard)_IFR

121

56 02-Sep-13

28-Feb-14

SAD00B4P41067

AD00 - Fire Fighting System Layout Drawings (Yard)_IFC

146

56 03-Mar-14

30-Sep-14

SAD00B4P41081

AD00 - Fire Fighting System Layout Drawings (Building)_IFR


83

90 01-Oct-13

29-Jan-14

SAD00B4P41087

AD00 - Fire Fighting System Layout Drawings (Building)_IFC

AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B4P41021
AE00 - P&IDs for Fire Fighting System (Yard)_IFR

63

90 03-Feb-14

30-Apr-14

330
17

86 02-Sep-13
67 02-Sep-13

31-Dec-14
27-Sep-13


104

67 30-Sep-13

28-Feb-14

SAE00B4P41025

AE00 - P&IDs for Fire Fighting System (Yard)_IFA

SAE00B4P41028

AE00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

66

67 03-Mar-14

04-Jun-14

SAE00B4P41029

AE00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

80

67 05-Jun-14

30-Sep-14


SAE00B4P41051

AE00 - Escape Route Drawing_IFR

41

86 01-Sep-14

31-Oct-14

SAE00B4P41057

AE00 - Escape Route Drawing_IFC

42

86 03-Nov-14

31-Dec-14

SAE00B4P41061

AE00 - Fire Fighting System Layout Drawings (Yard)_IFR

121

80 02-Sep-13

28-Feb-14


SAE00B4P41067

AE00 - Fire Fighting System Layout Drawings (Yard)_IFC

146

80 03-Mar-14

30-Sep-14

84
42

41 16-May-14
41 16-May-14

16-Sep-14
15-Jul-14

42

41 16-Jul-14

16-Sep-14

285
285
14


41 05-Sep-13
41 05-Sep-13
77 05-Sep-13

31-Oct-14
31-Oct-14
27-Sep-13

AG00 - Common Piperack
Pipera
SAG00B4P41051
AG00 - Escape Route Drawing_IFR
SAG00B4P41057

AG00 - Escape Route Drawing_IFC

Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B4P41021
B100 - P&IDs for Fire Fighting System (Yard)_IFR
SB100B4P41025

B100 - P&IDs for Fire Fighting System (Yard)_IFA

64

77 30-Sep-13

31-Dec-13


SB100B4P41028

B100 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

55

77 02-Jan-14

21-Mar-14

SB100B4P41029

B100 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

57

77 24-Mar-14

13-Jun-14

SB100B4P41051

B100 - Escape Route Drawing_IFR

42

72 16-May-14

15-Jul-14


SB100B4P41057

B100 - Escape Route Drawing_IFC

42

72 16-Jul-14

16-Sep-14

SB100B4P41061

B100 - Fire Fighting System Layout Drawings (Yard)_IFR

78

77 05-Sep-13

31-Dec-13

SB100B4P41067

B100 - Fire Fighting System Layout Drawings (Yard)_IFC

112

77 02-Jan-14

13-Jun-14


SB100B4P41081

B100 - Fire Fighting System Layout Drawings (Building)_IFR

84

20 01-Apr-14

30-Jul-14

SB100B4P41087

B100 - Fire Fighting System Layout Drawings (Building)_IFC

62

20 31-Jul-14

31-Oct-14

254
14

72 05-Sep-13
77 05-Sep-13

16-Sep-14
27-Sep-13

B200 - Service / Potable / Fire Water

SB200B4P41021
B200 - P&IDs for Fire Fighting System (Yard)_IFR
SB200B4P41025

B200 - P&IDs for Fire Fighting System (Yard)_IFA

64

77 30-Sep-13

31-Dec-13

SB200B4P41028

B200 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

55

77 02-Jan-14

21-Mar-14

SB200B4P41029

B200 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

57

77 24-Mar-14


13-Jun-14

SB200B4P41051

B200 - Escape Route Drawing_IFR

42

72 16-May-14

15-Jul-14

SB200B4P41057

B200 - Escape Route Drawing_IFC

42

72 16-Jul-14

16-Sep-14

SB200B4P41061

B200 - Fire Fighting System Layout Drawings (Yard)_IFR

78

77 05-Sep-13


31-Dec-13

SB200B4P41067

B200 - Fire Fighting System Layout Drawings (Yard)_IFC

112

77 02-Jan-14

13-Jun-14

32 05-Sep-13
55 05-Sep-13

16-Sep-14
27-Sep-13

B300 - P&IDs for Fire Fighting System (Yard)_IFR

254
14

SB300B4P41025

B300 - P&IDs for Fire Fighting System (Yard)_IFA

64

55 30-Sep-13


31-Dec-13

SB300B4P41028

B300 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

55

55 02-Jan-14

21-Mar-14

SB300B4P41029

B300 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

57

55 24-Mar-14

13-Jun-14

SB300B4P41051

B300 - Escape Route Drawing_IFR

42

32 16-May-14


15-Jul-14

SB300B4P41057

B300 - Escape Route Drawing_IFC

42

32 16-Jul-14

16-Sep-14

SB300B4P41061

B300 - Fire Fighting System Layout Drawings (Yard)_IFR

78

55 05-Sep-13

31-Dec-13

SB300B4P41067

B300 - Fire Fighting System Layout Drawings (Yard)_IFC

112

55 02-Jan-14


13-Jun-14

B400 - P&IDs for Fire Fighting System (Yard)_IFR

285
14

41 05-Sep-13
77 05-Sep-13

31-Oct-14
27-Sep-13

SB400B4P41025

B400 - P&IDs for Fire Fighting System (Yard)_IFA

64

77 30-Sep-13

31-Dec-13

SB400B4P41028

B400 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)

55


77 02-Jan-14

21-Mar-14

SB400B4P41029

B400 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)

57

77 24-Mar-14

13-Jun-14

SB400B4P41051

B400 - Escape Route Drawing_IFR

42

72 16-May-14

15-Jul-14

SB400B4P41057

B400 - Escape Route Drawing_IFC

42


72 16-Jul-14

16-Sep-14

SB400B4P41061

B400 - Fire Fighting System Layout Drawings (Yard)_IFR

78

77 05-Sep-13

31-Dec-13

SB400B4P41067

B400 - Fire Fighting System Layout Drawings (Yard)_IFC

112

77 02-Jan-14

13-Jun-14

SB400B4P41081

B400 - Fire Fighting System Layout Drawings (Building)_IFR

85


20 01-Apr-14

31-Jul-14

SB400B4P41087

B400 - Fire Fighting System Layout Drawings (Building)_IFC

61

20 01-Aug-14

31-Oct-14

B500 - Escape Route Drawing_IFR

254
42

32 05-Sep-13
32 16-May-14

16-Sep-14
15-Jul-14

B500 - Escape Route Drawing_IFC

42

32 16-Jul-14


16-Sep-14

B300 - Demine & Fuel
SB300B4P41021

B400 - Steam & Power
SB400B4P41021

B500 - Cooling Water
SB500B4P41051
SB500B4P41057

AA00 - P&IDs for Fire Fighting System (Yard)_IFA
AA00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
AA00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
AA00 - P&IDs for Fire Fighting System (Building)_IFR
AA00 - P&IDs for Fire Fighting System (Building)_IFA
AA00 - P&IDs for Fire Fighting System (Building)_IFC (w/ hold)
AA00 - Escape Route Drawing_IFR
AA00 - Escape Route Drawing_IFC
AA00 - Fire Fighting System Layout Drawings (Yard)_IFR
AA00 - Fire Fighting System Layout Drawings (Yard)_IFC
AA00 - Fire Fighting System Layout Drawings (Building)_IFR

AB10 - P&IDs for Fire Fighting System (Yard)_IFR
AB10 - P&IDs for Fire Fighting System (Yard)_IFA
AB10 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
AB10 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
AB10 - Escape Route Drawing_IFR

AB10 - Escape Route Drawing_IFC
AB10 - Fire Fighting System Layout Drawings (Yard)_IFR
AB10 - Fire Fighting System Layout Drawings (Yard)_IFC
AB10 - Fire Fighting System Layout Drawings (Building)_IFR
AB10 - Fire Fighting System Layout Drawings (Building)_IFC
AB20 - Escape Route Drawing_IFR
AB20 - Escape Route Drawing_IFC
AB20 - Fire Fighting System Layout Drawings (Yard)_IFR
AB20 - Fire Fighting System Layout Drawings (Yard)_IFC
AB30 - Escape Route Drawing_IFR
AB30 - Escape Route Drawing_IFC
AB30 - Fire Fighting System Layout Drawings (Yard)_IFR
AB30 - Fire Fighting System Layout Drawings (Yard)_IFC
Layout for Fire & Gas Detection/ Alarm System for Internal Information
Layout for Fire & Gas Detection/ Alarm System IF C
P&ID for Fire Fighting System for Internal Infomation
P&ID for Fire Fighting System IFC
Fire Main & Deluge Line Size & Route for Internal Information
Fire Main & Deluge Line Size & Route IFC
Layout for Fire Fighting System for Internal Information
Layout for Fire Fighting System IFC
AD00 - P&IDs for Fire Fighting System (Yard)_IFR
AD00 - P&IDs for Fire Fighting System (Yard)_IFA
AD00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
AD00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
AD00 - Escape Route Drawing_IFR
AD00 - Escape Route Drawing_IFC
AD00 - Fire Fighting System Layout Drawings (Yard)_IFR
AD00 - Fire Fighting System Layout Drawings (Yard)_IFC
AD00 - Fire Fighting System Layout Drawings (Building)_IFR

AD00 - Fire Fighting System Layout Drawings (Building)_IFC
AE00 - P&IDs for Fire Fighting System (Yard)_IFR
AE00 - P&IDs for Fire Fighting System (Yard)_IFA
AE00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
AE00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
AE00 - Escape Route Drawing_IFR
AE00 - Escape Route Drawing_IFC
AE00 - Fire Fighting System Layout Drawings (Yard)_IFR
AE00 - Fire Fighting System Layout Drawings (Yard)_IFC
AG00 - Escape Route Drawing_IFR
AG00 - Escape Route Drawing_IFC

B100 - P&IDs for Fire Fighting System (Yard)_IFR
B100 - P&IDs for Fire Fighting System (Yard)_IFA
B100 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
B100 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
B100 - Escape Route Drawing_IFR
B100 - Escape Route Drawing_IFC
B100 - Fire Fighting System Layout Drawings (Yard)_IFR
B100 - Fire Fighting System Layout Drawings (Yard)_IFC
B100 - Fire Fighting System Layout Drawings (Building)_IFR
B100 - Fire Fighting System Layout Drawings (Building)_IFC
B200 - P&IDs for Fire Fighting System (Yard)_IFR
B200 - P&IDs for Fire Fighting System (Yard)_IFA
B200 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
B200 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
B200 - Escape Route Drawing_IFR
B200 - Escape Route Drawing_IFC
B200 - Fire Fighting System Layout Drawings (Yard)_IFR
B200 - Fire Fighting System Layout Drawings (Yard)_IFC

B300 - P&IDs for Fire Fighting System (Yard)_IFR
B300 - P&IDs for Fire Fighting System (Yard)_IFA
B300 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
B300 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
B300 - Escape Route Drawing_IFR
B300 - Escape Route Drawing_IFC
B300 - Fire Fighting System Layout Drawings (Yard)_IFR
B300 - Fire Fighting System Layout Drawings (Yard)_IFC
B400 - P&IDs for Fire Fighting System (Yard)_IFR

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

B400 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
B400 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
B400 - Escape Route Drawing_IFR

B400 - Escape Route Drawing_IFC
B400 - Fire Fighting System Layout Drawings (Yard)_IFR
B400 - Fire Fighting System Layout Drawings (Yard)_IFC
B400 - Fire Fighting System Layout Drawings (Building)_IFR
B400 - Fire Fighting System Layout Drawings (Building)_IFC
B500 - Escape Route Drawing_IFR
B500 - Escape Route Drawing_IFC

Page 17 of 179

Actual Work
Remaining Work

B400 - P&IDs for Fire Fighting System (Yard)_IFA

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked

T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration


Finish

SB500B4P41061

B500 - Fire Fighting System Layout Drawings (Yard)_IFR

78

55 05-Sep-13

31-Dec-13

SB500B4P41067

B500 - Fire Fighting System Layout Drawings (Yard)_IFC

112

55 02-Jan-14

13-Jun-14

C000-F/F P&ID for Yard-FR rev.A

136
30

129 10-Sep-13
60 10-Sep-13


31-Mar-14
28-Oct-13

Offsites Area
GC000B4P41020A
GC000B4P41020B

C000-F/F P&ID for Yard-Approval by Employer

10

60 29-Oct-13

11-Nov-13

GC000B4P41020C

C000-F/F P&ID for Yard-FA rev.B

35

60 12-Nov-13

31-Dec-13

GC000B4P41020D

C000-F/F P&ID for Yard -FC


35

129 11-Feb-14

31-Mar-14

GC000B4P41050A

C000-F/F Layout for Yard-FA

18

60 05-Dec-13

31-Dec-13

GC000B4P41050B

C000-F/F Layout for Yard-FC

Electrical Safety and Oper
Operability Review
Common Area
V0000B4P42001
Electrical Safety and Operability Review (Initial)
V0000B4P42002
HAZOP / SIL Study
HAZOP Study
Common Area
T0000B5P51001A

T0000B5P51002
Process Area
J0000B5P51010

Electrical Safety and Operability Review (Final)

HAZOP Review
Vendor HAZOP Review for Vendor Design (LLI Equipment & NHDS Fire Heater)
HAZOP Review

18

129 06-Mar-14

31-Mar-14

217
217
5

103 12-Mar-14
103 12-Mar-14
103 12-Mar-14

30-Jan-15
30-Jan-15
18-Mar-14

5


103 26-Jan-15

30-Jan-15

252
191
138
30

69
1
23
23

22-Oct-13
22-Oct-13
11-Nov-13
11-Nov-13

31-Mar-15
30-Sep-14
28-May-14
20-Dec-13

22

23 28-Apr-14

28-May-14


191
20

1 22-Oct-13
9 15-Nov-13

30-Sep-14
12-Dec-13

J0000B5P51020

Vendor HAZOP Review for Vendor Design

21

47 23-Apr-14

26-May-14

T0000B5P51001B

Prepare & Submit HAZOP Report

44

64 29-Nov-13

04-Feb-14

161

63

0 10-Feb-14
0 10-Feb-14

30-Sep-14
09-May-14

49

0 21-Jul-14

30-Sep-14

172
15

37 02-Dec-13
23 02-Dec-13

07-Aug-14
20-Dec-13

A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B5P51017
A500 - Detail HAZOP
SA500B5P51027

A500 - Vendor HAZOP


A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B5P51010A
A700-HAZOP Review for HMU
GA700B5P51010B

A700-HAZOP Report for HMU

15

129 08-Jan-14

28-Jan-14

GA700B5P51010C

A700-Vendor Pac kage HAZ OP Review for HMU

20

37 11-Jul-14

07-Aug-14

AA00 - Polypropylene U
Unit (PPU)
SAA00B5P51021
AA00 - Detail HAZOP

SAA00B5P51027

AA00 - Vendor HAZ OP

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B5P51021
AB10 - Detail HAZOP
SAB10B5P51027

AB10 - Vendor HAZ OP

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B5P51010
Hazop Study

159
58

0 06-Jan-14
0 06-Jan-14

22-Aug-14
28-Mar-14

54

0 09-Jun-14


22-Aug-14

169
68

0 06-Jan-14
0 06-Jan-14

05-Sep-14
11-Apr-14

54

0 23-Jun-14

05-Sep-14

107
13

27 22-Oct-13
38 22-Oct-13

02-Apr-14
08-Nov-13

2013
2014
2015

2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
B500 - Fire Fighting System Layout Drawings (Yard)_IFR
B500 - Fire Fighting System Layout Drawings (Yard)_IFC
C000-F/F P&ID for Yard-FR rev.A
C000-F/F P&ID for Yard-Approval by Employer
C000-F/F P&ID for Yard-FA rev.B
C000-F/F P&ID for Yard -FC
C000-F/F Layout for Yard-FA
C000-F/F Layout for Yard-FC

Electrical Safety and Operability Review (Initial)
Electrical Safety and Operability Review (Final)

HAZOP Review
Vendor HAZOP Review for Vendor Design (LLI Equipment & NHDS Fire Heater)
HAZOP Review
Vendor HAZOP Review for Vendor Design
Prepare & Submit HAZOP Report
A500 - Detail HAZOP
A500 - Vendor HAZOP
A700-HAZOP Review for HMU
A700-HAZOP Report for HMU
A700-Vendor Pac kage HAZ OP Review for HMU
AA00 - Detail HAZOP
AA00 - Vendor HAZ OP
AB10 - Detail HAZOP
AB10 - Vendor HAZ OP

Hazop Study

CAC00B5P51030

Vendor HAZOP Review

18

27 06-Feb-14

04-Mar-14

CAC00B5P51050

HAZOP Report

20

27 05-Mar-14

02-Apr-14

B400 - Detail HAZOP

196
196
51

0 02-Dec-13
0 02-Dec-13

0 02-Dec-13

15-Sep-14
15-Sep-14
14-Feb-14

B400 - Vendor HAZOP

115

0 31-Mar-14

15-Sep-14

B400 - Vendor HAZOP

C000-HAZOP Review for Flare/ETP/SWCT/Tankage

172
15

17 02-Dec-13
14 02-Dec-13

07-Aug-14
20-Dec-13

C000-HAZOP Review for Flare/ETP/SWCT/Tankage

5


16 06-Jan-14

10-Jan-14

Utilities Area
B400 - Steam & Power
SB400B5P51017
SB400B5P51027
Offsites Area
GC000B5P51010A1
GC000B5P51010A2

C000-HAZOP Review for Tankage

GC000B5P51010B

C000-HAZOP Report for Flare/ETP/SWCT/Tankage

15

96 27-Jan-14

18-Feb-14

GC000B5P51010C

C000-Vendor Package HAZOP Review for Flare/ETP/SWCT/Tankage

20


17 11-Jul-14

07-Aug-14

246
160
37

69 11-Nov-13
101 06-Jan-14
47 06-Jan-14

31-Mar-15
22-Aug-14
27-Feb-14

SIL Study
Common Area
T0000B5P52001A

SIL Classification Study

T0000B5P52001B

SIL Classification Study Report (FR)

25

83 28-Feb-14


03-Apr-14

T0000B5P52001C

SIL Classification Study Report (FC)

13

83 22-Apr-14

12-May-14

T0000B5P52001D

SIL Verification Report

60

101 29-May-14

22-Aug-14

SIL Classification Study

246
11

69 11-Nov-13
9 05-Dec-13


31-Mar-15
19-Dec-13

Process Area
J0000B5P52010
J0000B5P52020A

SIL Classification Study Report (FR)

23

74 27-Dec-13

05-Feb-14

J0000B5P52020B

SIL Classification Study Report (FC)

19

74 06-Feb-14

05-Mar-14

J0000B5P52030A

SIL Verification Report (FR)


27

42 27-Jun-14

05-Aug-14

J0000B5P52030A10

SIL Verification Report (FC)

21

42 06-Aug-14

03-Sep-14

T0000B5P52002A

Vendor SIL Review (LLI Equipment & NHDS Fire Heater)

10

64 10-Jul-14

23-Jul-14

T0000B5P52002B

Vendor SIL Classification Study Report (FC)


20

64 24-Jul-14

20-Aug-14

264
25

58 10-Mar-14
20 10-Mar-14

31-Mar-15
11-Apr-14

A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B5P52012
A500 - SIL Classification Study
SA500B5P5203R

A500 - SIL Classification Study Report

23

20 14-Apr-14

16-May-14

SA500B5P52091


A500 - SIL Reliability Calculations_IFR

42

58 17-Nov-14

15-Jan-15

SA500B5P52097

A500 - SIL Reliability Calculations_IFC

50

58 16-Jan-15

31-Mar-15

A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B5P52010A
A700-SIL Classification Study for HMU

224
10

101 06-Jan-14
136 06-Jan-14


27-Nov-14
17-Jan-14

GA700B5P52010B

A700-SIL Classification Report for HMU

15

136 05-Feb-14

25-Feb-14

GA700B5P52010C

A700-SIL Verification Report for HMU

15

101 07-Nov-14

27-Nov-14

266
25

83 23-Jan-14
24 23-Jan-14


16-Feb-15
28-Feb-14

AA00 - Polypropylene U
Unit (PPU)
SAA00B5P52012
AA00 - SIL Classification Study
SAA00B5P5201R

AA00 - SIL Classification Study Report

25

27 03-Mar-14

04-Apr-14

SAA00B5P52091

AA00 - SIL Reliability Calculations_IFR

44

61 15-Oct-14

15-Dec-14

SAA00B5P52097

AA00 - SIL Reliability Calculations_IFC


43

83 16-Dec-14

16-Feb-15

262
25

47 10-Feb-14
26 10-Feb-14

27-Feb-15
14-Mar-14

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B5P52012
AB10 - SIL Classification Study
SAB10B5P5201R

AB10 - SIL Classification Study Report

25

26 17-Mar-14

18-Apr-14


SAB10B5P52091

AB10 - SIL Reliability Calculations_IFR

49

47 23-Oct-14

31-Dec-14

SAB10B5P52097

AB10 - SIL Reliability Calculations_IFC

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B5P52010
SIL Classification Study

38

47 02-Jan-15

27-Feb-15

172
5

44 11-Nov-13

46 11-Nov-13

25-Jul-14
15-Nov-13

CAC00B5P52030

SIL Classification Study Report

21

46 18-Nov-13

16-Dec-13

CAC00B5P52040

SIL Verification Report

16

44 03-Jul-14

25-Jul-14

279
279
23

57 16-Dec-13

57 16-Dec-13
28 16-Dec-13

28-Jan-15
28-Jan-15
17-Jan-14

Utilities Area
B400 - Steam & Power
SB400B5P52012

B400 - SIL Classification Study

SB400B5P5201R

B400 - SIL Classification Study Report

23

28 20-Jan-14

21-Feb-14

SB400B5P52091

B400 - SIL Reliability Calculations_IFR

41

24 01-Oct-14


28-Nov-14

SB400B5P52097

B400 - SIL Reliability Calculations_IFC

41

57 01-Dec-14

28-Jan-15

224
10

33 06-Jan-14
110 06-Jan-14

27-Nov-14
17-Jan-14

Offsites Area
GC000B5P52010A

C000-SIL Classification Study for Flare/ETP/SWCT

GC000B5P52010A10

C000-SIL Classification Study for Tankage


10

102 16-Jan-14

29-Jan-14

GC000B5P52010B

C000-SIL Classification Report for Flare/ETP/SWCT/Tankage

15

102 17-Feb-14

07-Mar-14

GC000B5P52010C

C000-SIL Verification Report for Flare/ETP/SWCT/Tankage

15

33 07-Nov-14

27-Nov-14

Detail Engineering
Design Basis
Civil General

Common Area
T0000DB10010

Design Basis/Gen. Specs For Civil General (By JVD)

V0000DB100010A

Soil Survey - 1st Priority Areas (Crude Oil & IC Piperack)

V0000DB100010B
V0000DB100010C

564
180
180
129
24

12
174
101
10

31-Jan-13 A
31-Jan-13 A
31-Jan-13 A
23-Apr-13 A
23-Apr-13 A

24-Dec-15

31-Jan-14
31-Jan-14
31-Jan-14
28-May-13 A

Vendor HAZOP Review
HAZOP Report

B400 - Detail HAZOP

C000-HAZOP Review for Tankage
C000-HAZOP Report for Flare/ETP/SWCT/Tankage
C000-Vendor Package HAZOP Review for Flare/ETP/SWCT/Tankage

SIL Classification Study
SIL Classification Study Report (FR)
SIL Classification Study Report (FC)
SIL Verification Report
SIL Classification Study
SIL Classification Study Report (FR)
SIL Classification Study Report (FC)
SIL Verification Report (FR)
SIL Verification Report (FC)
Vendor SIL Review (LLI Equipment & NHDS Fire Heater)
Vendor SIL Classification Study Report (FC)
A500 - SIL Classification Study
A500 - SIL Classification Study Report
A500 - SIL Reliability Calculations_IFR
A500 - SIL Reliability Calculations_IFC
A700-SIL Classification Study for HMU

A700-SIL Classification Report for HMU
A700-SIL Verification Report for HMU
AA00 - SIL Classification Study
AA00 - SIL Classification Study Report
AA00 - SIL Reliability Calculations_IFR
AA00 - SIL Reliability Calculations_IFC
AB10 - SIL Classification Study
AB10 - SIL Classification Study Report
AB10 - SIL Reliability Calculations_IFR
AB10 - SIL Reliability Calculations_IFC
SIL Classification Study
SIL Classification Study Report
SIL Verification Report

B400 - SIL Classification Study
B400 - SIL Classification Study Report
B400 - SIL Reliability Calculations_IFR
B400 - SIL Reliability Calculations_IFC
C000-SIL Classification Study for Flare/ETP/SWCT
C000-SIL Classification Study for Tankage
C000-SIL Classification Report for Flare/ETP/SWCT/Tankage
C000-SIL Verification Report for Flare/ETP/SWCT/Tankage

Design Basis/Gen. Specs For Civil General (By JVD)

48

0 01-Jul-13 A

24-Aug-13


Soil Data Report Issued by Subcon - 1st Priority Areas (Crude Oil & IC Piperack)

11

0 26-Aug-13

07-Sep-13

Evaluation of Soil Data Report - 1st Priority Areas ( Crude Oil & IC Piperack)

36

0 09-Sep-13

31-Oct-13

V0000DB100010D

Soil Improvement Method Confirmed with NSRP - 1st Priority Areas (Crude Oil & IC Pip

39

0 01-Nov-13

27-Dec-13

V0000DB100020A

Soil Survey - 2nd Priority Areas (Other Tank Ar ea & B400)


57

0 01-Aug-13

07-Oct-13

V0000DB100020B

Soil Data Report Issued by Subcon - 2nd Priority Areas ( Other Tank Area & B400)

9

0 08-Oct-13

17-Oct-13

V0000DB100020C

Evaluation of Soil Data Report - 2nd Priority Areas (Other Tank Area & B400)

30

0 18-Oct-13

29-Nov-13

V0000DB100020D

Soil Improvement Method Confirmed with NSRP - 2nd Priority Areas (Other Tank Area &


19

0 02-Dec-13

27-Dec-13

V0000DB100030A

Soil Survey - 3rd Priority Areas (Proces s & Utilit y Areas)

48

27 03-Sep-13

28-Oct-13

Soil Survey - 3rd Priority Areas (Proces s & Utilit y Areas)

V0000DB100030B

Soil Data Report Issued by Subcon - 3rd Priority Areas (Process & Utility Areas)

20

27 10-Oct-13

01-Nov-13

Soil Data Report Issued by Subcon - 3rd Priority Areas (Process & Utility Areas)


V0000DB100030C

Evaluation of Soil Data Report - 3rd Priority Areas (Process & Utility Areas)

38

21 05-Nov-13

27-Dec-13

V0000DB100030D

Soil Improvement Method Confirmed with NSRP - 3rd Priority Areas (Process & Utility A

19

21 06-Jan-14

31-Jan-14

159
22

122 31-Jan-13 A
29-Mar-13 A

27-Nov-13
01-May-13 A


167
127

151 28-Mar-13 A
59 28-Mar-13 A

27-Nov-13
30-Sep-13

151 17-Oct-13

27-Nov-13

Process Area
J0000DB100010

Design Basis/Gen. Specs For Civil General

A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700DB400010A
A700-Design Basis / General Specs for Buildings-FR
GA700DB400010B

A700-Design Basis / General Specs for Buildings-FC

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)

CAC00DB000010
Preparation of Procedures and Standard documentation
CAC00DB100030

Design Basis & General Specifications For Civil General

CAC00DD140004

JVD Soil Data Report Issued by S/C - 3rd Priority Area

Offsites Area
GC000DB400010A

C000-Design Basis / General Specs for Buildings-FR

30
187
73

20 31-Jan-13 A
31-Jan-13 A

31-Oct-13
20-May-13 A

33

20-Feb-13 A

08-Apr-13 A


0
167
127

20

31-Oct-13

34 28-Mar-13 A
12 28-Mar-13 A

27-Nov-13
30-Sep-13

Soil Survey - 1st Priority Areas (Crude Oil & IC Piperack)
Soil Data Report Issued by Subcon - 1st Priority Areas (Crude Oil & IC Piperack)
Evaluation of Soil Data Report - 1st Priority Areas ( Crude Oil & IC Piperack)
Soil Improvement Method Confirmed with NSRP - 1st Priority Areas (Crude Oil & IC Piperack)
Soil Survey - 2nd Priority Areas (Other Tank Ar ea & B400)
Soil Data Report Issued by Subcon - 2nd Priority Areas ( Other Tank Area & B400)
Evaluation of Soil Data Report - 2nd Priority Areas (Other Tank Area & B400)
Soil Improvement Method Confirmed with NSRP - 2nd Priority Areas (Other Tank Area & B400)

Evaluation of Soil Data Report - 3rd Priority Areas (Process & Utility Areas)
Soil Improvement Method Confirmed with NSRP - 3rd Priority Areas (Process & Utility Areas)
Design Basis/Gen. Specs For Civil General
A700-Design Basis / General Specs for Buildings-FR
A700-Design Basis / General Specs for Buildings-FC
Preparation of Procedures and Standard documentation

Design Basis & General Specifications For Civil General

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

C000-Design Basis / General Specs for Buildings-FR

Page 18 of 179

Actual Work
Remaining Work

JVD Soil Data Report Issued by S/C - 3rd Priority Area

Date
31-Jul-13

22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3


S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

GC000DB400010B
Concrete Structure
Common Area
T0000DB20010
Process Area
J0000DB200010

Process Area
J0000DB300010

Building
Common Area
T0000DB40010
Process Area
J0000DB400010

Design Basis/Gen. Specs For Concrete Structure (By JVD)

68

24
24

20-Feb-13 A
23-Apr-13 A
23-Apr-13 A

04-Jun-13 A
28-May-13 A
28-May-13 A

Design Basis/Gen. Specs For Concrete Structure

68
22

20-Feb-13 A
01-May-13 A

04-Jun-13 A
04-Jun-13 A

Design Basis/Gen. Specs For Concrete Structure

33
33

20-Feb-13 A
20-Feb-13 A


08-Apr-13 A
08-Apr-13 A

Design Basis & General Specifications For Concrete Structure

Design Basis/Gen. Specs For Steel Structure (By JVD)

68
24
24

20-Feb-13 A
23-Apr-13 A
23-Apr-13 A

04-Jun-13 A
28-May-13 A
28-May-13 A

Design Basis/Gen. Specs For Steel Structure

68
22

20-Feb-13 A
01-May-13 A

04-Jun-13 A
04-Jun-13 A


Design Basis/Gen. Specs For Steel Structure

33
33

20-Feb-13 A
20-Feb-13 A

08-Apr-13 A
08-Apr-13 A

Design Basis & General Specifications For Steel Structure

Design Basis/Gen. Specs For Buildings (By JVD)

68
24
24

20-Feb-13 A
23-Apr-13 A
23-Apr-13 A

04-Jun-13 A
28-May-13 A
28-May-13 A

Design Basis/Gen. Specs For Buildings (By JVD)

68

0

20-Feb-13 A

Design Basis/Gen. Specs For Buildings

04-Jun-13 A
04-Jun-13 A

Design Basis/Gen. Specs For Buildings

33
33

20-Feb-13 A
20-Feb-13 A

08-Apr-13 A
08-Apr-13 A

Design Basis & General Specifications For Building

140
43
22

27 20-Feb-13 A
20-Feb-13 A
26-Mar-13 A


31-Oct-13
24-Apr-13 A
24-Apr-13 A

33
33

20-Feb-13 A
20-Feb-13 A

08-Apr-13 A
08-Apr-13 A

55 02-May-13 A
02-May-13 A

31-Oct-13
31-May-13 A

55 01-Oct-13

31-Oct-13

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB400060
Design Basis & General Specifications For Building
Mechanical Equipment
Process Area

J0000DB500010

Design Basis/Gen. Specs For Equipment

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB500070
Design Basis & General Specifications For Equipment

27-Nov-13

Offsites Area
GC000DB500010A

C000-General Specs for Equipment-FR

122
20

GC000DB500010B

C000-General Specs for Equipment-FC

20

Design Basis / Piping Material Specification (By JVD)

91
94

74

20-Feb-13 A
01-Mar-13 A
01-Mar-13 A

12-Jul-13 A
12-Jul-13 A
14-Jun-13 A

Piping Material Specification (By JVD) - Review / Final

20

17-Jun-13 A

12-Jul-13 A

Design Basis/Piping Material Specification

68
22

20-Feb-13 A
01-May-13 A

04-Jun-13 A
04-Jun-13 A

33

33

20-Feb-13 A
20-Feb-13 A

08-Apr-13 A
08-Apr-13 A

Design Basis/Gen. Specs for Instrument

95
24
24

20-Feb-13 A
13-May-13 A
13-May-13 A

19-Jul-13 A
14-Jun-13 A
14-Jun-13 A

Design Basis/Gen. Specs for Instrument

95
12

20-Feb-13 A
02-Jul-13 A


19-Jul-13 A
19-Jul-13 A

33
33

20-Feb-13 A
20-Feb-13 A

08-Apr-13 A
08-Apr-13 A

115
24
24

60 20-Feb-13 A
115 22-Jul-13
115 22-Jul-13

50
0

20-Feb-13 A

07-May-13 A
07-May-13 A

33
33


20-Feb-13 A
20-Feb-13 A

08-Apr-13 A
08-Apr-13 A

125
36
36

56 20-Feb-13 A
115 26-Jul-13
115 26-Jul-13

33
33
33

20-Feb-13 A
20-Feb-13 A
20-Feb-13 A

125
36
36

56 20-Feb-13 A
115 26-Jul-13
115 26-Jul-13


33
33
33

20-Feb-13 A
20-Feb-13 A
20-Feb-13 A

Piping
Common Area
T0000DB60010A
T0000DB60010B
Process Area
J0000DB600010

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB600080
Design Basis & General Specifications For Piping Materials
Instrumentation
Common Area
T0000DB70010
Process Area
J0000DB700010

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)

CAC00DB700090
Design Basis & General Specifications For Instrument
Electrical
Common Area
T0000DB80010
Process Area
J0000DB800010

Design Basis/Philosophy/Gen. Specs for Electrical (By JVD)
Design Basis/Gen. Specs for Electrical

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB800100
Design Basis & General Specifications For Electrical
Insulation
Common Area
T0000DB90010

Design Basis/Gen. Specs for Insulation (By JVD)

Process Area
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB900110
Design Basis & General Specifications For Insulation
Painting
Common Area

T0000DBA0010

Design Basis/Gen. Specs for Painting (By JVD)

Process Area
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DBA00120
Design Basis & General Specifications For Painting
Fire Proofing
Common Area
T0000DBB0010

Design Basis/Gen. Specs for Fire Proofing (By JVD)

Layout/Specifications/Data Sheet & Requisition
J0000DCZ20010A
Piping Layout (3D Modeling)

36
36
36

115 26-Jul-13
115 26-Jul-13
115 26-Jul-13

08-Apr-13 A
08-Apr-13 A

08-Apr-13 A

08-Apr-13 A
08-Apr-13 A
08-Apr-13 A

546
376

11 04-Mar-13 A
50 23-May-13 A

24-Dec-15
02-Dec-14

6 11-Dec-13

31-Jan-14

60% 3D Model Review

21

10 03-Jul-14

01-Aug-14

J0000DCZ20010D

90% 3D Model Review


10

46 07-Nov-14

20-Nov-14

30% 3D Model Review

277
281
13

46 08-Jul-13 A
67 04-Dec-13
14 04-Dec-13

19-Jan-15
19-Jan-15
20-Dec-13

TA000DCZ2001C

Piping Layout (3D Modeling) - 60%

97

15 15-Jan-14

02-Jun-14


TA000DCZ2001D

60 % 3D Model Review

15

15 03-Jun-14

23-Jun-14

TA000DCZ2001F

90% 3D Model Review

15

37 27-Nov-14

17-Dec-14

TA000DCZ2001G

Piping Layout (3D Modeling) - Balance

21

67 18-Dec-14

19-Jan-15


15 08-Jul-13 A
14 08-Jul-13 A

05-Dec-14
02-Dec-13

Process Area
TA000DCZ2001A

Piping Layout (3D Modeling) - 30%

262
101

TA000DCZ2001E

Piping Layout (3D Modeling) - 90%

105

37 24-Jun-14

25-Nov-14

280
103

43 01-Oct-13
14 01-Oct-13


14-Nov-14
28-Feb-14

SA100DCZ2001R

A100 - 3D Modeling (30%)_Issue for Model Review & Report

21

14 03-Mar-14

31-Mar-14

SA100DCZ2003M

A100 - 3D Modeling (60%)_Modeling Completion

83

14 03-Mar-14

30-Jun-14

SA100DCZ2003R

A100 - 3D Modeling (60%)_Issue for Model Review & Report

23


14 01-Jul-14

31-Jul-14

SA100DCZ2005M

A100 - 3D Modeling (90%)_Modeling Completion

72

37 01-Jul-14

15-Oct-14

SA100DCZ2005R

A100 - 3D Modeling (90%)_Issue for Model Review & Report

22

43 16-Oct-14

14-Nov-14

280
103

0 01-Oct-13
0 01-Oct-13


14-Nov-14
28-Feb-14

SA500DCZ2001R

A500 - 3D Modeling (30%)_Issue for Model Review & Report

21

0 03-Mar-14

31-Mar-14

SA500DCZ2003M

A500 - 3D Modeling (60%)_Modeling Completion

83

0 03-Mar-14

30-Jun-14

SA500DCZ2003R

A500 - 3D Modeling (60%)_Issue for Model Review & Report

23

0 01-Jul-14


31-Jul-14

SA500DCZ2005M

A500 - 3D Modeling (90%)_Modeling Completion

72

0 01-Jul-14

15-Oct-14

SA500DCZ2005R

A500 - 3D Modeling (90%)_Issue for Model Review & Report

22

0 16-Oct-14

14-Nov-14

280
103

19 01-Oct-13
14 01-Oct-13

14-Nov-14

28-Feb-14

SA600DCZ2001R

A600 - 3D Modeling (30%)_Issue for Model Review & Report

21

14 03-Mar-14

31-Mar-14

SA600DCZ2003M

A600 - 3D Modeling (60%)_Modeling Completion

83

14 03-Mar-14

30-Jun-14

SA600DCZ2003R

A600 - 3D Modeling (60%)_Issue for Model Review & Report

23

14 01-Jul-14


31-Jul-14

SA600DCZ2005M

A600 - 3D Modeling (90%)_Modeling Completion

72

19 01-Jul-14

15-Oct-14

SA600DCZ2005R

A600 - 3D Modeling (90%)_Issue for Model Review & Report

22

19 16-Oct-14

14-Nov-14

274
67

21 01-Nov-13
31 01-Nov-13

05-Dec-14
07-Feb-14


A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700DCZ20020A
A700-3D Modeling Model(30%)
GA700DCZ20020B

A700-3D Modeling Model(60%)

65

28 20-Feb-14

23-May-14

GA700DCZ20020C

A700-3D Modeling Model(90%)

93

21 02-Jul-14

14-Nov-14

GA700DCZ20030A

A700-3D Model review(30%)


10

31 10-Feb-14

21-Feb-14

GA700DCZ20030B

A700-3D Model review(60%)

19

21 04-Jun-14

01-Jul-14

GA700DCZ20030C

A700-3D Model review(90%)

15

21 17-Nov-14

05-Dec-14

278
93

0 01-Oct-13

0 01-Oct-13

12-Nov-14
14-Feb-14

AA00 - Polypropylene U
Unit (PPU)
SAA00DCZ2001M
AA00 - 3D Modeling (30%)_Modeling Completion
SAA00DCZ2001R

AA00 - 3D Modeling (30%)_Issue for Model Review & Report

20

0 17-Feb-14

14-Mar-14

SAA00DCZ2003M

AA00 - 3D Modeling (60%)_Modeling Completion

83

0 18-Feb-14

17-Jun-14

SAA00DCZ2003R


AA00 - 3D Modeling (60%)_Issue for Model Review & Report

20

0 18-Jun-14

15-Jul-14

SAA00DCZ2005M

AA00 - 3D Modeling (90%)_Modeling Completion

72

0 01-Jul-14

15-Oct-14

SAA00DCZ2005R

AA00 - 3D Modeling (90%)_Issue for Model Review & Report

20

0 16-Oct-14

12-Nov-14

280

103

42 01-Oct-13
0 01-Oct-13

14-Nov-14
28-Feb-14

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DCZ2001M
AB10 - 3D Modeling (30%)_Modeling Completion

Design Basis & General Specifications For Equipment
C000-General Specs for Equipment-FR
C000-General Specs for Equipment-FC

Design Basis / Piping Material Specification (By JVD)
Piping Material Specification (By JVD) - Review / Final
Design Basis/Piping Material Specification
Design Basis & General Specifications For Piping Materials

Design Basis/Gen. Specs for Instrument
Design Basis/Gen. Specs for Instrument
Design Basis & General Specifications For Instrument

Design Basis/Philosophy/Gen. Specs for Electrical (By JVD)
Design Basis/Gen. Specs for Electrical
Design Basis & General Specifications For Electrical


Design Basis/Gen. Specs for Insulation (By JVD)

Design Basis & General Specifications For Insulation

Design Basis/Gen. Specs for Painting (By JVD)

Design Basis & General Specifications For Painting

18-Sep-13
18-Sep-13
18-Sep-13

J0000DCZ20010C

A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DCZ2001M
A600 - 3D Modeling (30%)_Modeling Completion

Design Basis/Gen. Specs For Equipment

18-Sep-13
18-Sep-13
18-Sep-13

31

A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DCZ2001M

A500 - 3D Modeling (30%)_Modeling Completion

Design Basis/Gen. Specs For Steel Structure (By JVD)

18-Sep-13
18-Sep-13
18-Sep-13

30% 3D Model Review

A100 - No.1 Sour Water Stripper (1SWS)
SA100DCZ2001M
A100 - 3D Modeling (30%)_Modeling Completion

Design Basis/Gen. Specs For Concrete Structure (By JVD)

26-Aug-13
26-Aug-13
26-Aug-13

J0000DCZ20010B

3D Model
Common Area
TA000DCZ2001B

2013
2014
2015
2016

2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
C000-Design Basis / General Specs for Buildings-FC

30

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB300050
Design Basis & General Specifications For Steel Structure

34 17-Oct-13

Finish

C000-Design Basis / General Specs for Buildings-FC

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB200040
Design Basis & General Specifications For Concrete Structure
Steel Structure
Common Area
T0000DB30010

Original Total Float Start
Duration


SAB10DCZ2001R

AB10 - 3D Modeling (30%)_Issue for Model Review & Report

21

0 03-Mar-14

31-Mar-14

SAB10DCZ2003M

AB10 - 3D Modeling (60%)_Modeling Completion

83

0 03-Mar-14

30-Jun-14

SAB10DCZ2003R

AB10 - 3D Modeling (60%)_Issue for Model Review & Report

23

0 01-Jul-14

31-Jul-14


SAB10DCZ2005M

AB10 - 3D Modeling (90%)_Modeling Completion

72

0 01-Jul-14

15-Oct-14

SAB10DCZ2005R

AB10 - 3D Modeling (90%)_Issue for Model Review & Report

22

0 16-Oct-14

14-Nov-14

SAB20DCZ2001M

AB20 - 3D Modeling (30%)_Modeling Completion

103

14 01-Oct-13

28-Feb-14


Design Basis/Gen. Specs for Fire Proofing (By JVD)

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

60% 3D Model Review
90% 3D Model Review

30% 3D Model Review
Piping Layout (3D Modeling) - 60%
60 % 3D Model Review
90% 3D Model Review
Piping Layout (3D Modeling) - Balance
Piping Layout (3D Modeling) - 30%
Piping Layout (3D Modeling) - 90%

A100 - 3D Modeling (30%)_Modeling Completion
A100 - 3D Modeling (30%)_Issue for Model Review & Report
A100 - 3D Modeling (60%)_Modeling Completion
A100 - 3D Modeling (60%)_Issue for Model Review & Report
A100 - 3D Modeling (90%)_Modeling Completion
A100 - 3D Modeling (90%)_Issue for Model Review & Report
A500 - 3D Modeling (30%)_Modeling Completion
A500 - 3D Modeling (30%)_Issue for Model Review & Report
A500 - 3D Modeling (60%)_Modeling Completion
A500 - 3D Modeling (60%)_Issue for Model Review & Report
A500 - 3D Modeling (90%)_Modeling Completion
A500 - 3D Modeling (90%)_Issue for Model Review & Report
A600 - 3D Modeling (30%)_Modeling Completion
A600 - 3D Modeling (30%)_Issue for Model Review & Report
A600 - 3D Modeling (60%)_Modeling Completion
A600 - 3D Modeling (60%)_Issue for Model Review & Report
A600 - 3D Modeling (90%)_Modeling Completion
A600 - 3D Modeling (90%)_Issue for Model Review & Report
A700-3D Modeling Model(30%)
A700-3D Modeling Model(60%)
A700-3D Modeling Model(90%)
A700-3D Model review(30%)
A700-3D Model review(60%)
A700-3D Model review(90%)
AA00 - 3D Modeling (30%)_Modeling Completion
AA00 - 3D Modeling (30%)_Issue for Model Review & Report
AA00 - 3D Modeling (60%)_Modeling Completion
AA00 - 3D Modeling (60%)_Issue for Model Review & Report
AA00 - 3D Modeling (90%)_Modeling Completion
AA00 - 3D Modeling (90%)_Issue for Model Review & Report

AB10 - 3D Modeling (30%)_Modeling Completion
AB10 - 3D Modeling (30%)_Issue for Model Review & Report
AB10 - 3D Modeling (60%)_Modeling Completion
AB10 - 3D Modeling (60%)_Issue for Model Review & Report
AB10 - 3D Modeling (90%)_Modeling Completion
AB10 - 3D Modeling (90%)_Issue for Model Review & Report
AB20 - 3D Modeling (30%)_Modeling Completion

Page 19 of 179

Actual Work
Remaining Work

Piping Layout (3D Modeling)
30% 3D Model Review

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine


Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start

Duration

Finish

SAB20DCZ2001R

AB20 - 3D Modeling (30%)_Issue for Model Review & Report

21

14 03-Mar-14

31-Mar-14

SAB20DCZ2003M

AB20 - 3D Modeling (60%)_Modeling Completion

83

14 03-Mar-14

30-Jun-14

SAB20DCZ2003R

AB20 - 3D Modeling (60%)_Issue for Model Review & Report

23


14 01-Jul-14

31-Jul-14

SAB20DCZ2005M

AB20 - 3D Modeling (90%)_Modeling Completion

72

42 01-Jul-14

15-Oct-14

SAB20DCZ2005R

AB20 - 3D Modeling (90%)_Issue for Model Review & Report

22

42 16-Oct-14

14-Nov-14

SAB30DCZ2001M

AB30 - 3D Modeling (30%)_Modeling Completion

103


14 01-Oct-13

28-Feb-14

SAB30DCZ2001R

AB30 - 3D Modeling (30%)_Issue for Model Review & Report

21

14 03-Mar-14

31-Mar-14

SAB30DCZ2003M

AB30 - 3D Modeling (60%)_Modeling Completion

83

14 03-Mar-14

30-Jun-14

SAB30DCZ2003R

AB30 - 3D Modeling (60%)_Issue for Model Review & Report

23


14 01-Jul-14

31-Jul-14

SAB30DCZ2005M

AB30 - 3D Modeling (90%)_Modeling Completion

72

38 01-Jul-14

15-Oct-14

SAB30DCZ2005R

AB30 - 3D Modeling (90%)_Issue for Model Review & Report

22

38 16-Oct-14

14-Nov-14

280
103

0 01-Oct-13
0 01-Oct-13


14-Nov-14
28-Feb-14

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00DCZ2001M
AD00 - 3D Modeling (30%)_Modeling Completion
SAD00DCZ2001R

AD00 - 3D Modeling (30%)_Issue for Model Review & Report

21

0 03-Mar-14

31-Mar-14

SAD00DCZ2003M

AD00 - 3D Modeling (60%)_Modeling Completion

83

0 03-Mar-14

30-Jun-14

SAD00DCZ2003R

AD00 - 3D Modeling (60%)_Issue for Model Review & Report


23

0 01-Jul-14

31-Jul-14

SAD00DCZ2005M

AD00 - 3D Modeling (90%)_Modeling Completion

72

0 01-Jul-14

15-Oct-14

SAD00DCZ2005R

AD00 - 3D Modeling (90%)_Issue for Model Review & Report

AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00DCZ2001M
AE00 - 3D Modeling (30%)_Modeling Completion

22

0 16-Oct-14


14-Nov-14

280
103

0 01-Oct-13
0 01-Oct-13

14-Nov-14
28-Feb-14

SAE00DCZ2001R

AE00 - 3D Modeling (30%)_Issue for Model Review & Report

21

0 03-Mar-14

31-Mar-14

SAE00DCZ2003M

AE00 - 3D Modeling (60%)_Modeling Completion

83

0 03-Mar-14


30-Jun-14

SAE00DCZ2003R

AE00 - 3D Modeling (60%)_Issue for Model Review & Report

23

0 01-Jul-14

31-Jul-14

SAE00DCZ2005M

AE00 - 3D Modeling (90%)_Modeling Completion

72

0 01-Jul-14

15-Oct-14

SAE00DCZ2005R

AE00 - 3D Modeling (90%)_Issue for Model Review & Report

22

0 16-Oct-14


14-Nov-14

227
71

49 01-Aug-13
0 01-Aug-13

02-Jul-14
15-Nov-13

22

0 18-Nov-13

17-Dec-13

134

0 18-Nov-13

30-May-14

22

49 02-Jun-14

02-Jul-14

308

308
115

27 01-Aug-13
27 01-Aug-13
0 01-Aug-13

30-Oct-14
30-Oct-14
20-Jan-14

AG00 - Common Piperack
Pipera
SAG00DCZ2001M
AG00 - 3D Modeling (30%)_Modeling Completion
SAG00DCZ2001R

AG00 - 3D Modeling (30%)_Issue for Model Review & Report

SAG00DCZ2003M

AG00 - 3D Modeling (60%)_Modeling Completion

SAG00DCZ2003R

AG00 - 3D Modeling (60%)_Issue for Model Review & Report

Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100DCZ2001M

B100 - 3D Modeling (30%)_Modeling Completion
SB100DCZ2001R

B100 - 3D Modeling (30%)_Issue for Model Review & Report

19

0 21-Jan-14

18-Feb-14

SB100DCZ2003M

B100 - 3D Modeling (60%)_Modeling Completion

90

0 21-Jan-14

30-May-14

SB100DCZ2003R

B100 - 3D Modeling (60%)_Issue for Model Review & Report

22

0 02-Jun-14

02-Jul-14


SB100DCZ2005M

B100 - 3D Modeling (90%)_Modeling Completion

83

16 02-Jun-14

30-Sep-14

SB100DCZ2005R

B100 - 3D Modeling (90%)_Issue for Model Review & Report

20

27 01-Oct-14

30-Oct-14

308
115

27 01-Aug-13
0 01-Aug-13

30-Oct-14
20-Jan-14


B200 - Service / Potable / Fire Water
SB200DCZ2001M
B200 - 3D Modeling (30%)_Modeling Completion
SB200DCZ2001R

B200 - 3D Modeling (30%)_Issue for Model Review & Report

19

0 21-Jan-14

18-Feb-14

SB200DCZ2003M

B200 - 3D Modeling (60%)_Modeling Completion

90

0 21-Jan-14

30-May-14

SB200DCZ2003R

B200 - 3D Modeling (60%)_Issue for Model Review & Report

22

0 02-Jun-14


02-Jul-14

SB200DCZ2005M

B200 - 3D Modeling (90%)_Modeling Completion

83

16 02-Jun-14

30-Sep-14

SB200DCZ2005R

B200 - 3D Modeling (90%)_Issue for Model Review & Report

20

27 01-Oct-14

30-Oct-14

308
115

27 01-Aug-13
0 01-Aug-13

30-Oct-14

20-Jan-14

B300 - Demine & Fuel
SB300DCZ2001M

B300 - 3D Modeling (30%)_Modeling Completion

SB300DCZ2001R

B300 - 3D Modeling (30%)_Issue for Model Review & Report

19

0 21-Jan-14

18-Feb-14

SB300DCZ2003M

B300 - 3D Modeling (60%)_Modeling Completion

90

0 21-Jan-14

30-May-14

SB300DCZ2003R

B300 - 3D Modeling (60%)_Issue for Model Review & Report


22

0 02-Jun-14

02-Jul-14

SB300DCZ2005M

B300 - 3D Modeling (90%)_Modeling Completion

83

16 02-Jun-14

30-Sep-14

SB300DCZ2005R

B300 - 3D Modeling (90%)_Issue for Model Review & Report

20

27 01-Oct-14

30-Oct-14

308
115


27 01-Aug-13
0 01-Aug-13

30-Oct-14
20-Jan-14

B400 - Steam & Power
SB400DCZ2001M

B400 - 3D Modeling (30%)_Modeling Completion

SB400DCZ2001R

B400 - 3D Modeling (30%)_Issue for Model Review & Report

19

0 21-Jan-14

18-Feb-14

SB400DCZ2003M

B400 - 3D Modeling (60%)_Modeling Completion

90

0 21-Jan-14

30-May-14


SB400DCZ2003R

B400 - 3D Modeling (60%)_Issue for Model Review & Report

22

0 02-Jun-14

02-Jul-14

SB400DCZ2005M

B400 - 3D Modeling (90%)_Modeling Completion

83

16 02-Jun-14

30-Sep-14

SB400DCZ2005R

B400 - 3D Modeling (90%)_Issue for Model Review & Report

20

27 01-Oct-14

30-Oct-14


308
115

27 01-Aug-13
16 01-Aug-13

30-Oct-14
20-Jan-14

B500 - Cooling Water
SB500DCZ2001M

B500 - 3D Modeling (30%)_Modeling Completion

SB500DCZ2001R

B500 - 3D Modeling (30%)_Issue for Model Review & Report

19

16 21-Jan-14

18-Feb-14

SB500DCZ2003M

B500 - 3D Modeling (60%)_Modeling Completion

90


16 21-Jan-14

30-May-14

SB500DCZ2003R

B500 - 3D Modeling (60%)_Issue for Model Review & Report

22

16 02-Jun-14

02-Jul-14

SB500DCZ2005M

B500 - 3D Modeling (90%)_Modeling Completion

83

16 02-Jun-14

30-Sep-14

SB500DCZ2005R

B500 - 3D Modeling (90%)_Issue for Model Review & Report

20


27 01-Oct-14

30-Oct-14

30 01-Nov-13
11 01-Nov-13

05-Dec-14
07-Feb-14

Offsites Area
GC000DCZ20020A

C000-3D Modeling Model(30%)

274
67

GC000DCZ20020B

C000-3D Modeling Model(60%)

65

14 20-Feb-14

23-May-14

GC000DCZ20020C


C000-3D Modeling Model(90%)

89

30 08-Jul-14

14-Nov-14

GC000DCZ20030A

C000-3D Model review(30%)

15

11 10-Feb-14

28-Feb-14

GC000DCZ20030B

C000-3D Model review(60%)

19

3 11-Jun-14

07-Jul-14

GC000DCZ20030C


C000-3D Model review(90%)

15

30 17-Nov-14

05-Dec-14

Spec/Req. for Piling (By JVD)

338
288
99
22

49
21
48
40

31-Dec-14
20-Aug-14
10-Mar-14
10-Mar-14

Civil General
Civil General - Common
Common Area
T0000DC14020

T0000DC15010

Specification for Earth Structure (By JVD)

TA900DC16010

A900 - Advance Underground Layout

Process Area
J0000DC16010
J0000DC17010

Conceptual UG Layout
Layout for Road & Paving

AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DCZ20005
Set Up for 3D Model (Initial)

25-Mar-13 A
25-Mar-13 A
16-Oct-13
07-Feb-14

31

29 20-Dec-13


06-Feb-14

32

115 16-Oct-13

29-Nov-13

288
218

21 25-Mar-13 A
24 30-Sep-13

20-Aug-14
20-Aug-14

98 11-Dec-13

16-Apr-14

327
25

51 25-Mar-13 A
25-Mar-13 A

23-Jul-14
26-Apr-13 A


82

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
AB20 - 3D Modeling (30%)_Issue for Model Review & Report
AB20 - 3D Modeling (60%)_Modeling Completion
AB20 - 3D Modeling (60%)_Issue for Model Review & Report
AB20 - 3D Modeling (90%)_Modeling Completion
AB20 - 3D Modeling (90%)_Issue for Model Review & Report
AB30 - 3D Modeling (30%)_Modeling Completion
AB30 - 3D Modeling (30%)_Issue for Model Review & Report
AB30 - 3D Modeling (60%)_Modeling Completion
AB30 - 3D Modeling (60%)_Issue for Model Review & Report
AB30 - 3D Modeling (90%)_Modeling Completion
AB30 - 3D Modeling (90%)_Issue for Model Review & Report
AD00 - 3D Modeling (30%)_Modeling Completion
AD00 - 3D Modeling (30%)_Issue for Model Review & Report
AD00 - 3D Modeling (60%)_Modeling Completion
AD00 - 3D Modeling (60%)_Issue for Model Review & Report
AD00 - 3D Modeling (90%)_Modeling Completion
AD00 - 3D Modeling (90%)_Issue for Model Review & Report
AE00 - 3D Modeling (30%)_Modeling Completion
AE00 - 3D Modeling (30%)_Issue for Model Review & Report
AE00 - 3D Modeling (60%)_Modeling Completion
AE00 - 3D Modeling (60%)_Issue for Model Review & Report

AE00 - 3D Modeling (90%)_Modeling Completion
AE00 - 3D Modeling (90%)_Issue for Model Review & Report
AG00 - 3D Modeling (30%)_Modeling Completion
AG00 - 3D Modeling (30%)_Issue for Model Review & Report
AG00 - 3D Modeling (60%)_Modeling Completion
AG00 - 3D Modeling (60%)_Issue for Model Review & Report

B100 - 3D Modeling (30%)_Modeling Completion
B100 - 3D Modeling (30%)_Issue for Model Review & Report
B100 - 3D Modeling (60%)_Modeling Completion
B100 - 3D Modeling (60%)_Issue for Model Review & Report
B100 - 3D Modeling (90%)_Modeling Completion
B100 - 3D Modeling (90%)_Issue for Model Review & Report
B200 - 3D Modeling (30%)_Modeling Completion
B200 - 3D Modeling (30%)_Issue for Model Review & Report
B200 - 3D Modeling (60%)_Modeling Completion
B200 - 3D Modeling (60%)_Issue for Model Review & Report
B200 - 3D Modeling (90%)_Modeling Completion
B200 - 3D Modeling (90%)_Issue for Model Review & Report
B300 - 3D Modeling (30%)_Modeling Completion
B300 - 3D Modeling (30%)_Issue for Model Review & Report
B300 - 3D Modeling (60%)_Modeling Completion
B300 - 3D Modeling (60%)_Issue for Model Review & Report
B300 - 3D Modeling (90%)_Modeling Completion
B300 - 3D Modeling (90%)_Issue for Model Review & Report
B400 - 3D Modeling (30%)_Modeling Completion
B400 - 3D Modeling (30%)_Issue for Model Review & Report
B400 - 3D Modeling (60%)_Modeling Completion
B400 - 3D Modeling (60%)_Issue for Model Review & Report
B400 - 3D Modeling (90%)_Modeling Completion

B400 - 3D Modeling (90%)_Issue for Model Review & Report
B500 - 3D Modeling (30%)_Modeling Completion
B500 - 3D Modeling (30%)_Issue for Model Review & Report
B500 - 3D Modeling (60%)_Modeling Completion
B500 - 3D Modeling (60%)_Issue for Model Review & Report
B500 - 3D Modeling (90%)_Modeling Completion
B500 - 3D Modeling (90%)_Issue for Model Review & Report
C000-3D Modeling Model(30%)
C000-3D Modeling Model(60%)
C000-3D Modeling Model(90%)
C000-3D Model review(30%)
C000-3D Model review(60%)
C000-3D Model review(90%)

Spec/Req. for Piling (By JVD)
Specification for Earth Structure (By JVD)
A900 - Advance Underground Layout
Conceptual UG Layout
Layout for Road & Paving
Set Up for 3D Model (Initial)

CAC00DCZ20010

3D Model Development for Plot 3D Model

52

25 04-Jun-13 A

15-Aug-13


3D Model Development for Plot 3D Model

CAC00DCZ20015

Set-up for 3D Model (Official)

12

25 31-Jul-13

15-Aug-13

Set-up for 3D Model (Official)

CAC00DCZ20020

Plot 3D Model Review

6

25 16-Aug-13

23-Aug-13

CAC00DCZ20030

3D Model Development for 30% Model

35


25 22-Aug-13

11-Oct-13

CAC00DCZ20040

30% 3D Model Review

8

25 15-Oct-13

24-Oct-13

CAC00DCZ20050

3D Model Development for 60% Model

74

29 25-Oct-13

18-Feb-14

3D Model Development for 60% Model

CAC00DCZ20055

3D Model Internal Review for Piping / Civil


5

29 17-Feb-14

21-Feb-14

3D Model Internal Review for Piping / Civil

CAC00DCZ20060

60% 3D Model Review

12

29 03-Mar-14

18-Mar-14

CAC00DCZ20070

3D Model Development for 90% Model

74

52 19-Mar-14

04-Jul-14

CAC00DCZ20080


90% 3D Model Review

11

51 08-Jul-14

23-Jul-14

49
49
77
28

16-Oct-13
16-Oct-13
17-Mar-14
17-Mar-14

31-Dec-14
31-Dec-14
28-Nov-14
29-Aug-14

Sewer and Drainage
Process Area
A100 - No.1 Sour Water Stripper (1SWS)
SA100DC160121
A100 - Drainage Design and Calculations_IFR
SA100DC160127


224
224
177
116

A100 - Drainage Design and Calculations_IFC

61

77 01-Sep-14

28-Nov-14

A500 - Xylene Frac./Par
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DC160121
A500 - Drainage Design and Calculations_IFR

209
146

26 03-Mar-14
26 03-Mar-14

31-Dec-14
30-Sep-14

A500 - Drainage Design and Calculations_IFC


63

26 01-Oct-14

31-Dec-14

A600 - Tatoray/Sulfolan
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DC160121
A600 - Drainage Design and Calculations_IFR

209
146

48 03-Mar-14
48 03-Mar-14

31-Dec-14
30-Sep-14

63

48 01-Oct-14

31-Dec-14

32
32

74 16-Oct-13

74 16-Oct-13

29-Nov-13
29-Nov-13

100
63

40 01-May-14
40 01-May-14

25-Sep-14
31-Jul-14

AA00 - Drainage Design and Calculations_IFC

37

40 01-Aug-14

25-Sep-14

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DC160121
AB10 - Drainage Design and Calculations_IFR

177
116


98 17-Mar-14
28 17-Mar-14

28-Nov-14
29-Aug-14

AB10 - Drainage Design and Calculations_IFC

61

98 01-Sep-14

28-Nov-14

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00DC160121
AD00 - Drainage Design and Calculations_IFR

177
116

76 17-Mar-14
28 17-Mar-14

28-Nov-14
29-Aug-14

AD00 - Drainage Design and Calculations_IFC


61

76 01-Sep-14

28-Nov-14

AE00 - Gas Oil Hydrosulphuriser
Hydrosu
(GOHDS)
SAE00DC160121
AE00 - Drainage Design and Calculations_IFR

177
116

90 17-Mar-14
28 17-Mar-14

28-Nov-14
29-Aug-14

AE00 - Drainage Design and Calculations_IFC

61

90 01-Sep-14

28-Nov-14

AG00 - Common Piperack

Pipera
SAG00DC160121
AG00 - Drainage Design and Calculations_IFR

103
41

49 03-Feb-14
49 03-Feb-14

30-Jun-14
31-Mar-14

62

49 01-Apr-14

30-Jun-14

184

33 02-Dec-13

26-Aug-14

SA500DC160127

SA600DC160127

A600 - Drainage Design and Calculations_IFC


A800 - Naphtha Hydrodesulphurizer
Hydrod
/ CCR (NHDS/CCR)
TA800DC16010
A800 - Advance Underground Layout
AA00 - Polypropylene Unit
U
(PPU)
SAA00DC160121
AA00 - Drainage Design and Calculations_IFR
SAA00DC160127

SAB10DC160127

SAD00DC160127

SAE00DC160127

SAG00DC160127

AG00 - Drainage Design and Calculations_IFC

Utilities Area

Plot 3D Model Review

Detail Engineering, Procurement, and

Critical Remaining Work

Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

30% 3D Model Review

60% 3D Model Review
3D Model Development for 90% Model
90% 3D Model Review

A100 - Drainage Design and Calculations_IFR
A100 - Drainage Design and Calculations_IFC
A500 - Drainage Design and Calculations_IFR
A500 - Drainage Design and Calculations_IFC
A600 - Drainage Design and Calculations_IFR
A600 - Drainage Design and Calculations_IFC
A800 - Advance Underground Layout
AA00 - Drainage Design and Calculations_IFR
AA00 - Drainage Design and Calculations_IFC
AB10 - Drainage Design and Calculations_IFR

AB10 - Drainage Design and Calculations_IFC
AD00 - Drainage Design and Calculations_IFR
AD00 - Drainage Design and Calculations_IFC
AE00 - Drainage Design and Calculations_IFR
AE00 - Drainage Design and Calculations_IFC
AG00 - Drainage Design and Calculations_IFR
AG00 - Drainage Design and Calculations_IFC

Page 20 of 179

Actual Work
Remaining Work

3D Model Development for 30% Model

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked

T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura


NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration


Finish

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49

184
104

25 02-Dec-13
25 02-Dec-13

26-Aug-14
30-Apr-14

B100 - Drainage Design and Calculations_IFC

80

25 01-May-14

26-Aug-14

B200 - Service / Potable / Fire Water
SB200DC160121

B200 - Drainage Design and Calculations_IFR

103
41

57 03-Feb-14
57 03-Feb-14

30-Jun-14
31-Mar-14

B200 - Drainage Design and Calculations_IFC

62

57 01-Apr-14

30-Jun-14

B300 - Drainage Design and Calculations_IFR

103
63

67 03-Feb-14
67 03-Feb-14

30-Jun-14
30-Apr-14


B300 - Drainage Design and Calculations_IFC

40

67 01-May-14

30-Jun-14

B400 - Drainage Design and Calculations_IFR

123
83

73 02-Jan-14
60 02-Jan-14

30-Jun-14
30-Apr-14

B400 - Drainage Design and Calculations_IFC

40

73 01-May-14

30-Jun-14

B500 - Drainage Design and Calculations_IFR

143

81

44 02-Jan-14
44 02-Jan-14

28-Jul-14
28-Apr-14

B500 - Drainage Design and Calculations_IFC

62

44 29-Apr-14

28-Jul-14

141
61
61

84 16-Oct-13
39 16-Oct-13
39 16-Oct-13

08-May-14
13-Jan-14
13-Jan-14

24
24

24

84 04-Apr-14
49 04-Apr-14
49 04-Apr-14

08-May-14
08-May-14
08-May-14

A800 - DWG for Review (FR) Layout for Road & Paving

24
24

84 04-Apr-14
84 04-Apr-14

08-May-14
08-May-14

A900 - DWG for Review (FR) Layout for Road & Paving

B100 - Plant / Inst. Air & Nitrogen
SB100DC160121
B100 - Drainage Design and Calculations_IFR
SB100DC160127

SB200DC160127
B300 - Demine & Fuel

SB300DC160121
SB300DC160127
B400 - Steam & Power
SB400DC160121
SB400DC160127
B500 - Cooling Water
SB500DC160121
SB500DC160127
Road & Paving
Common Area
T0000DC17030

Specification for Road and Paving (By JVD)

Process Area
A800 - Naphtha Hydrodesulphurizer
Hydrod
/ CCR (NHDS/CCR)
TA800DC17010
A800 - DWG for Review (FR) Layout for Road & Paving
A900 - PENEX (PENX)
TA900DC17010

A900 - DWG for Review (FR) Layout for Road & Paving

Concrete Structure
Concrete Structure - Common
Com
Common Area
T0000DC20010

Prel. Design & Layout for Major Concrete Struct.

236
216
122
32

47
30
114
26

22-Aug-13
22-Aug-13
03-Sep-13
16-Oct-13

28-Nov-14
30-Sep-14
28-Feb-14
29-Nov-13

50

69 16-Oct-13

26-Dec-13

T0000DC20020


Spec/Req. for Anchor Bolts (For Frame Agreement)

T0000DC20070

Conceptual Design for Concrete Foundations and Structures

122

114 03-Sep-13

28-Feb-14

Prel. Design & Layout for Major Concrete Struct.

216
30

30 22-Aug-13
138 22-Aug-13

30-Sep-14
04-Oct-13

166
83

60 03-Feb-14
60 03-Feb-14

30-Sep-14

30-May-14

A100 - Concrete Structural Design Calculations_IFC

83

60 02-Jun-14

30-Sep-14

A500 - Xylene Frac./Par
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DC200201
A500 - Concrete Structural Design Calculations_IFR

176
124

21 16-Jan-14
21 16-Jan-14

30-Sep-14
15-Jul-14

A500 - Concrete Structural Design Calculations_IFC

52

21 16-Jul-14


30-Sep-14

A600 - Tatoray/Sulfolan
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DC200201
A600 - Concrete Structural Design Calculations_IFR

176
124

41 16-Jan-14
41 16-Jan-14

30-Sep-14
15-Jul-14

A600 - Concrete Structural Design Calculations_IFC

52

41 16-Jul-14

30-Sep-14

AA00 - Polypropylene Unit
U
(PPU)
SAA00DC200201
AA00 - Concrete Structural Design Calculations_IFR


144
61

60 04-Feb-14
60 04-Feb-14

28-Aug-14
29-Apr-14

AA00 - Concrete Structural Design Calculations_IFC

83

60 30-Apr-14

28-Aug-14

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DC200201
AB10 - Concrete Structural Design Calculations_IFR

166
83

54 03-Feb-14
54 03-Feb-14

30-Sep-14
30-May-14


Process Area
J0000DC200010

A100 - No.1 Sour Water Stripper (1SWS)
SA100DC200201
A100 - Concrete Structural Design Calculations_IFR
SA100DC200207

SA500DC200207

SA600DC200207

SAA00DC200207

SAB10DC200207

AB10 - Concrete Structural Design Calculations_IFC

83

54 02-Jun-14

30-Sep-14

SAB20DC200201

AB20 - Concrete Structural Design Calculations_IFR

83


36 03-Feb-14

30-May-14

SAB20DC200207

AB20 - Concrete Structural Design Calculations_IFC

83

36 02-Jun-14

30-Sep-14

SAB30DC200201

AB30 - Concrete Structural Design Calculations_IFR

83

40 03-Feb-14

30-May-14

SAB30DC200207

AB30 - Concrete Structural Design Calculations_IFC

83


40 02-Jun-14

30-Sep-14

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00DC200201
AD00 - Concrete Structural Design Calculations_IFR

166
83

54 03-Feb-14
54 03-Feb-14

30-Sep-14
30-May-14

AD00 - Concrete Structural Design Calculations_IFC

83

54 02-Jun-14

30-Sep-14

AE00 - Gas Oil Hydrosulphuriser
Hydrosu
(GOHDS)

SAE00DC200201
AE00 - Concrete Structural Design Calculations_IFR

166
83

54 03-Feb-14
54 03-Feb-14

30-Sep-14
30-May-14

83

54 02-Jun-14

30-Sep-14

Stack, Silo, Tank including
includin Foundation
Common Area
T0000DC22001A
Anchor Bolts and Nuts (2120001) - Update Specs / Data Sheet / Req (Progressively)

181
181
181

37 14-Feb-14
37 14-Feb-14

37 14-Feb-14

04-Nov-14
04-Nov-14
04-Nov-14

Foundation
Process Area
A100 - No.1 Sour Water Stripper (1SWS)
SA100DC230001
A100 - Foundations Design Calculations (for Piperack)_IFR

282
269
187
83

87
87
59
69

28-Nov-14
28-Nov-14
28-Nov-14
30-Jun-14

SAD00DC200207

SAE00DC200207


AE00 - Concrete Structural Design Calculations_IFC

15-Oct-13
01-Nov-13
03-Mar-14
03-Mar-14

SA100DC230007

A100 - Foundations Design Calculations (for Piperack)_IFC

43

78 01-Jul-14

29-Aug-14

SA100DC230011

A100 - Foundations Design Calculations (Equipment)_IFR

85

71 01-Apr-14

31-Jul-14

SA100DC230017


A100 - Foundations Design Calculations (Equipment)_IFC

49

71 01-Aug-14

15-Oct-14

SA100DC230021

A100 - Foundations Design Calculations (Other)_IFR

83

59 01-May-14

29-Aug-14

SA100DC230027

A100 - Foundations Design Calculations (Other)_IFC

A500 - Xylene Frac./Par
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DC230251
A500 - Foundations Design Calculations (for Equipments)_IFR
SA500DC230257

A500 - Foundations Design Calculations (for Equipments)_IFC


SA500DC230261

A500 - Foundations Design Calculations (for Others)_IFR

SA500DC230267

A500 - Foundations Design Calculations (for Others)_IFC

A600 - Tatoray/Sulfolan
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DC230251
A600 - Foundations Design Calculations (for Equipments)_IFR
SA600DC230257

A600 - Foundations Design Calculations (for Equipments)_IFC

SA600DC230261

A600 - Foundations Design Calculations (for Others)_IFR

SA600DC230267

A600 - Foundations Design Calculations (for Others)_IFC

AA00 - Polypropylene Unit
U
(PPU)
SAA00DC230241
AA00 - Foundations Design Calculations_IFR
SAA00DC230247


AA00 - Foundations Design Calculations_IFC

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DC230001
AB10 - Foundations Design Calculations (for Piperack)_IFR

B500 - Drainage Design and Calculations_IFC

Specification for Road and Paving (By JVD)

Prel. Design & Layout for Major Concrete Struct.
Spec/Req. for Anchor Bolts (For Frame Agreement)
Conceptual Design for Concrete Foundations and Structures
Prel. Design & Layout for Major Concrete Struct.
A100 - Concrete Structural Design Calculations_IFR
A100 - Concrete Structural Design Calculations_IFC
A500 - Concrete Structural Design Calculations_IFR
A500 - Concrete Structural Design Calculations_IFC
A600 - Concrete Structural Design Calculations_IFR
A600 - Concrete Structural Design Calculations_IFC
AA00 - Concrete Structural Design Calculations_IFR
AA00 - Concrete Structural Design Calculations_IFC
AB10 - Concrete Structural Design Calculations_IFR
AB10 - Concrete Structural Design Calculations_IFC
AB20 - Concrete Structural Design Calculations_IFR
AB20 - Concrete Structural Design Calculations_IFC
AB30 - Concrete Structural Design Calculations_IFR
AB30 - Concrete Structural Design Calculations_IFC

AD00 - Concrete Structural Design Calculations_IFR
AD00 - Concrete Structural Design Calculations_IFC
AE00 - Concrete Structural Design Calculations_IFR
AE00 - Concrete Structural Design Calculations_IFC

Anchor Bolts and Nuts (2120001) - Update Specs / Data Sheet / Req (Progressively)

A100 - Foundations Design Calculations (for Piperack)_IFR
A100 - Foundations Design Calculations (for Piperack)_IFC
A100 - Foundations Design Calculations (Equipment)_IFR
A100 - Foundations Design Calculations (Equipment)_IFC
A100 - Foundations Design Calculations (Other)_IFR

A500 - Foundations Design Calculations (for Equipments)_IFR

41

20 01-Sep-14

31-Oct-14

114

87 16-Apr-14

30-Sep-14

41

87 01-Oct-14


28-Nov-14

177
116

80 17-Mar-14
56 17-Mar-14

28-Nov-14
29-Aug-14

41

56 01-Sep-14

31-Oct-14

114

80 16-Apr-14

30-Sep-14

A500 - Foundations Design Calculations (for Equipments)_IFC
A500 - Foundations Design Calculations (for Others)_IFR
A500 - Foundations Design Calculations (for Others)_IFC
A600 - Foundations Design Calculations (for Equipments)_IFR
A600 - Foundations Design Calculations (for Equipments)_IFC
A600 - Foundations Design Calculations (for Others)_IFR


41

80 01-Oct-14

28-Nov-14

144
88

78 04-Feb-14
78 04-Feb-14

28-Aug-14
10-Jun-14

56

78 11-Jun-14

28-Aug-14

AA00 - Foundations Design Calculations_IFC

187
83

81 03-Mar-14
43 03-Mar-14


28-Nov-14
30-Jun-14

AB10 - Foundations Design Calculations (for Piperack)_IFR

AB10 - Foundations Design Calculations (Equipment)_IFR

85

70 01-Apr-14

31-Jul-14

AB10 - Foundations Design Calculations (Equipment)_IFC

49

70 01-Aug-14

15-Oct-14

SAB10DC230021

AB10 - Foundations Design Calculations (Other)_IFR

83

69 01-May-14

29-Aug-14


SAB10DC230027

AB10 - Foundations Design Calculations (Other)_IFC

61

69 01-Sep-14

28-Nov-14

SAB20DC230001

AB20 - Foundations Design Calculations (for Piperack)_IFR

83

65 03-Mar-14

30-Jun-14

SAB20DC230007

AB20 - Foundations Design Calculations (for Piperack)_IFC

43

78 01-Jul-14

29-Aug-14


SAB20DC230011

AB20 - Foundations Design Calculations (Equipment)_IFR

85

71 01-Apr-14

31-Jul-14

SAB20DC230017

AB20 - Foundations Design Calculations (Equipment)_IFC

49

71 01-Aug-14

15-Oct-14

SAB20DC230021

AB20 - Foundations Design Calculations (Other)_IFR

83

51 01-May-14

29-Aug-14


SAB20DC230027

AB20 - Foundations Design Calculations (Other)_IFC

61

51 01-Sep-14

28-Nov-14

SAB30DC230001

AB30 - Foundations Design Calculations (for Piperack)_IFR

83

51 03-Mar-14

30-Jun-14

SAB30DC230007

AB30 - Foundations Design Calculations (for Piperack)_IFC

43

51 01-Jul-14

29-Aug-14


SAB30DC230011

AB30 - Foundations Design Calculations (Equipment)_IFR

85

71 01-Apr-14

31-Jul-14

SAB30DC230017

AB30 - Foundations Design Calculations (Equipment)_IFC

49

71 01-Aug-14

15-Oct-14

SAB30DC230021

AB30 - Foundations Design Calculations (Other)_IFR

83

81 01-May-14

29-Aug-14


SAB30DC230027

AB30 - Foundations Design Calculations (Other)_IFC

61

81 01-Sep-14

28-Nov-14

187
83

70 03-Mar-14
21 03-Mar-14

28-Nov-14
30-Jun-14

SAD00DC230007

AD00 - Foundations Design Calculations (for Piperack)_IFC

43

41 01-Jul-14

29-Aug-14


SAD00DC230011

AD00 - Foundations Design Calculations (Equipment)_IFR

85

34 01-Apr-14

31-Jul-14

SAD00DC230017

AD00 - Foundations Design Calculations (Equipment)_IFC

49

34 01-Aug-14

15-Oct-14

SAD00DC230021

AD00 - Foundations Design Calculations (Other)_IFR

83

70 01-May-14

29-Aug-14


SAD00DC230027

AD00 - Foundations Design Calculations (Other)_IFC

61

70 01-Sep-14

28-Nov-14

187
83

86 03-Mar-14
21 03-Mar-14

28-Nov-14
30-Jun-14

SAE00DC230007

AE00 - Foundations Design Calculations (for Piperack)_IFC

43

87 01-Jul-14

29-Aug-14

SAE00DC230011


AE00 - Foundations Design Calculations (Equipment)_IFR

85

58 01-Apr-14

31-Jul-14

SAE00DC230017

AE00 - Foundations Design Calculations (Equipment)_IFC

49

58 01-Aug-14

15-Oct-14

SAE00DC230021

AE00 - Foundations Design Calculations (Other)_IFR

83

86 01-May-14

29-Aug-14

SAE00DC230027


AE00 - Foundations Design Calculations (Other)_IFC

61

86 01-Sep-14

28-Nov-14

103
72

51 01-Nov-13
51 01-Nov-13

31-Mar-14
14-Feb-14

AG00 - Foundations Design Calculations_IFC

31

51 17-Feb-14

31-Mar-14

Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100DC230241
B100 - Foundations Design Calculations_IFR


241
208
82

52 15-Oct-13
46 01-Nov-13
41 01-Nov-13

30-Sep-14
29-Aug-14
28-Feb-14

SB100DC230247

B100 - Foundations Design Calculations_IFC

106

66 03-Mar-14

31-Jul-14

SB100DC230251

B100 - Foundations Design Calculations (for Equipments)_IFR

125

46 01-Nov-13


30-Apr-14

SB100DC230257

B100 - Foundations Design Calculations (for Equipments)_IFC

83

46 01-May-14

29-Aug-14

220

72 16-Oct-13

29-Aug-14

A600 - Foundations Design Calculations (for Others)_IFC
AA00 - Foundations Design Calculations_IFR

AB10 - Foundations Design Calculations (for Piperack)_IFC
AB10 - Foundations Design Calculations (Equipment)_IFR
AB10 - Foundations Design Calculations (Equipment)_IFC
AB10 - Foundations Design Calculations (Other)_IFR
AB10 - Foundations Design Calculations (Other)_IFC
AB20 - Foundations Design Calculations (for Piperack)_IFR
AB20 - Foundations Design Calculations (for Piperack)_IFC
AB20 - Foundations Design Calculations (Equipment)_IFR

AB20 - Foundations Design Calculations (Equipment)_IFC
AB20 - Foundations Design Calculations (Other)_IFR
AB20 - Foundations Design Calculations (Other)_IFC
AB30 - Foundations Design Calculations (for Piperack)_IFR
AB30 - Foundations Design Calculations (for Piperack)_IFC
AB30 - Foundations Design Calculations (Equipment)_IFR
AB30 - Foundations Design Calculations (Equipment)_IFC
AB30 - Foundations Design Calculations (Other)_IFR
AB30 - Foundations Design Calculations (Other)_IFC
AD00 - Foundations Design Calculations (for Piperack)_IFR
AD00 - Foundations Design Calculations (for Piperack)_IFC
AD00 - Foundations Design Calculations (Equipment)_IFR
AD00 - Foundations Design Calculations (Equipment)_IFC
AD00 - Foundations Design Calculations (Other)_IFR
AD00 - Foundations Design Calculations (Other)_IFC
AE00 - Foundations Design Calculations (for Piperack)_IFR
AE00 - Foundations Design Calculations (for Piperack)_IFC
AE00 - Foundations Design Calculations (Equipment)_IFR
AE00 - Foundations Design Calculations (Equipment)_IFC
AE00 - Foundations Design Calculations (Other)_IFR
AE00 - Foundations Design Calculations (Other)_IFC
AG00 - Foundations Design Calculations_IFR
AG00 - Foundations Design Calculations_IFC

B100 - Foundations Design Calculations_IFR
B100 - Foundations Design Calculations_IFC
B100 - Foundations Design Calculations (for Equipments)_IFR
B100 - Foundations Design Calculations (for Equipments)_IFC

Page 21 of 179


Actual Work

Detail Engineering, Procurement, and

Critical Remaining Work

Construction CPM Network
Level - 3 Overall Schedule

A
R
D
014
2
N
R
I 12-MA

B500 - Drainage Design and Calculations_IFR

A100 - Foundations Design Calculations (Other)_IFC

SAB10DC230017

Milestone

B400 - Drainage Design and Calculations_IFC

28-Nov-14

29-Aug-14

SAB10DC230011

Remaining Work

B300 - Drainage Design and Calculations_IFC
B400 - Drainage Design and Calculations_IFR

28-Nov-14

29-Aug-14

B200 - Service / Potable / Fire Water

B300 - Drainage Design and Calculations_IFR

87 17-Mar-14
20 17-Mar-14

77 01-Jul-14

SAG00DC230247

B200 - Drainage Design and Calculations_IFC

59 01-Sep-14

43


AG00 - Common Piperack
Pipera
SAG00DC230241
AG00 - Foundations Design Calculations_IFR

B200 - Drainage Design and Calculations_IFR

61

AB10 - Foundations Design Calculations (for Piperack)_IFC

AE00 - Gas Oil Hydrosulphuriser
Hydrosu
(GOHDS)
SAE00DC230001
AE00 - Foundations Design Calculations (for Piperack)_IFR

B100 - Drainage Design and Calculations_IFC

177
116

SAB10DC230007

AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00DC230001
AD00 - Foundations Design Calculations (for Piperack)_IFR

B100 - Drainage Design and Calculations_IFR


Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14

Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura



NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3

S-000-1133-1002V
Rev.3

ATTACHMENT - 1

Nghi Son Refinery and Petrochemical Complex Project

Activity ID

Activity Name

Original Total Float Start
Duration

Finish

SB200DC230251

B200 - Foundations Design Calculations (for Equipments)_IFR

94

41 16-Oct-13

28-Feb-14

SB200DC230257


B200 - Foundations Design Calculations (for Equipments)_IFC

126

72 03-Mar-14

29-Aug-14

B300 - Foundations Design Calculations_IFR

241
95

49 15-Oct-13
41 15-Oct-13

30-Sep-14
28-Feb-14

B300 - Demine & Fuel
SB300DC230241
SB300DC230247

B300 - Foundations Design Calculations_IFC

SB300DC230251

B300 - Foundations Design Calculations (for Equipments)_IFR


SB300DC230257

B300 - Foundations Design Calculations (for Equipments)_IFC

SB300DC230261

B300 - Foundations Design Calculations (for Others)_IFR

SB300DC230267

B300 - Foundations Design Calculations (for Others)_IFC

63

69 03-Mar-14

30-May-14

127

13 15-Oct-13

15-Apr-14

62

13 16-Apr-14

15-Jul-14


178

49 15-Oct-13

30-Jun-14

63

49 01-Jul-14

30-Sep-14

39 01-Nov-13
41 01-Nov-13

29-Aug-14
28-Feb-14

B400 - Foundations Design Calculations_IFR

208
82

SB400DC230247

B400 - Foundations Design Calculations_IFC

63

60 03-Mar-14


30-May-14

SB400DC230251

B400 - Foundations Design Calculations (for Equipments)_IFR

113

27 02-Dec-13

15-May-14

SB400DC230257

B400 - Foundations Design Calculations (for Equipments)_IFC

54

27 16-May-14

31-Jul-14

SB400DC230261

B400 - Foundations Design Calculations (for Others)_IFR

103

39 02-Jan-14


30-May-14

SB400DC230267

B400 - Foundations Design Calculations (for Others)_IFC

63

39 02-Jun-14

29-Aug-14

53 01-Nov-13
41 01-Nov-13

29-Aug-14
28-Feb-14

B400 - Steam & Power
SB400DC230241

B500 - Foundations Design Calculations_IFR

208
82

SB500DC230247

B500 - Foundations Design Calculations_IFC


83

96 03-Mar-14

30-Jun-14

SB500DC230251

B500 - Foundations Design Calculations (for Equipments)_IFR

145

53 01-Nov-13

30-May-14

SB500DC230257

B500 - Foundations Design Calculations (for Equipments)_IFC

63

53 02-Jun-14

29-Aug-14

57
57
57

77

24-Feb-15
24-Feb-15
24-Feb-15
19-Dec-13

B500 - Cooling Water
SB500DC230241

Steel Structure
Steel Structure - Common
Common Area
G0000DC300010
Requisition for Steel Structure for Blanket Order(only for GS)

249
249
239
10

01-Oct-13
01-Oct-13
31-Oct-13
06-Dec-13

T0000DC30001A

Shop Fabricated Structural Steel (2130001) - Update Specs / Data Sheet / Req


20

63 17-Mar-14

11-Apr-14

T0000DC30001B

Structural Steel MTO - Update / Release Progressively for Fabrication & Supply

235

63 17-Mar-14

24-Feb-15

T0000DC30001C

Shop Fabricated Structural Steel - Preliminary Requisition

29

57 31-Oct-13

10-Dec-13

270
187
83


59 01-Oct-13
39 03-Feb-14
20 03-Feb-14

31-Oct-14
31-Oct-14
30-May-14

83

60 02-Jun-14

30-Sep-14

106

40 03-Mar-14

31-Jul-14

Process Area
A100 - No.1 Sour Water Stripper (1SWS)
SA100DC300171
A100 - Structural Steelwork Design Calculations (for Piperack)_IFR
SA100DC300177

A100 - Structural Steelwork Design Calculations (for Piperack)_IFC

SA100DC300181


A100 - Structural Steelwork Design Calculations (Equipment)_IFR

SA100DC300187

A100 - Structural Steelwork Design Calculations (Equipment)_IFC

SA100DC300191

A100 - Structural Steelwork Design Calculations (Other)_IFR

SA100DC300197

A100 - Structural Steelwork Design Calculations (Other)_IFC

A500 - Xylene Frac./Par
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DC300171
A500 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFR
SA500DC300177

A500 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFC

SA500DC300181

A500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR

SA500DC300187

A500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC


A600 - Tatoray/Sulfolan
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DC300171
A600 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFR
SA600DC300177

A600 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFC

SA600DC300181

A600 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR

SA600DC300187

A600 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC

AA00 - Polypropylene Unit
U
(PPU)
SAA00DC300171
AA00 - Structural Steelwork Design Calculations_IFR
SAA00DC300177

AA00 - Structural Steelwork Design Calculations_IFC

AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DC300171
AB10 - Structural Steelwork Design Calculations (for Piperack)_IFR


49

51 01-Aug-14

15-Oct-14

105

39 01-Apr-14

29-Aug-14

41

39 01-Sep-14

31-Oct-14

197
136

59 16-Jan-14
20 16-Jan-14

31-Oct-14
31-Jul-14

40

80 01-Aug-14


30-Sep-14

136

20 17-Feb-14

29-Aug-14

41

59 01-Sep-14

31-Oct-14

197
136

59 16-Jan-14
20 16-Jan-14

31-Oct-14
31-Jul-14

40

80 01-Aug-14

30-Sep-14


136

20 17-Feb-14

29-Aug-14

41

59 01-Sep-14

31-Oct-14

226
165

20 15-Nov-13
20 15-Nov-13

14-Oct-14
14-Jul-14

61

20 15-Jul-14

14-Oct-14

187
83


39 03-Feb-14
20 03-Feb-14

31-Oct-14
30-May-14

SAB10DC300177

AB10 - Structural Steelwork Design Calculations (for Piperack)_IFC

SAB10DC300181

AB10 - Structural Steelwork Design Calculations (Equipment)_IFR

SAB10DC300187

AB10 - Structural Steelwork Design Calculations (Equipment)_IFC

SAB10DC300191

AB10 - Structural Steelwork Design Calculations (Other)_IFR

SAB10DC300197

AB10 - Structural Steelwork Design Calculations (Other)_IFC

SAB20DC300171

AB20 - Structural Steelwork Design Calculations (for Piperack)_IFR


SAB20DC300177

AB20 - Structural Steelwork Design Calculations (for Piperack)_IFC

SAB20DC300181

AB20 - Structural Steelwork Design Calculations (Equipment)_IFR

SAB20DC300187

AB20 - Structural Steelwork Design Calculations (Equipment)_IFC

SAB20DC300191

AB20 - Structural Steelwork Design Calculations (Other)_IFR

SAB20DC300197

AB20 - Structural Steelwork Design Calculations (Other)_IFC

SAB30DC300171

AB30 - Structural Steelwork Design Calculations (for Piperack)_IFR

SAB30DC300177

AB30 - Structural Steelwork Design Calculations (for Piperack)_IFC

SAB30DC300191


AB30 - Structural Steelwork Design Calculations (Other)_IFR

SAB30DC300197

AB30 - Structural Steelwork Design Calculations (Other)_IFC

41

AD00 - Kerosene Hydrodesulphuriser
Hydro
(KHDS)
SAD00DC300171
AD00 - Structural Steelwork Design Calculations (for Piperack)_IFR
SAD00DC300177

AD00 - Structural Steelwork Design Calculations (for Piperack)_IFC

SAD00DC300181

AD00 - Structural Steelwork Design Calculations (Equipment)_IFR

SAD00DC300187

AD00 - Structural Steelwork Design Calculations (Equipment)_IFC

SAD00DC300191

AD00 - Structural Steelwork Design Calculations (Other)_IFR

SAD00DC300197


AD00 - Structural Steelwork Design Calculations (Other)_IFC

AE00 - Gas Oil Hydrosulphuriser
Hydrosu
(GOHDS)
SAE00DC300171
AE00 - Structural Steelwork Design Calculations (for Piperack)_IFR

83

60 02-Jun-14

30-Sep-14

106

40 03-Mar-14

31-Jul-14

49

51 01-Aug-14

15-Oct-14

105

39 01-Apr-14


29-Aug-14

41

39 01-Sep-14

31-Oct-14

83

20 03-Feb-14

30-May-14

83

60 02-Jun-14

30-Sep-14

106

40 03-Mar-14

31-Jul-14

49

51 01-Aug-14


15-Oct-14

105

39 01-Apr-14

29-Aug-14

41

39 01-Sep-14

31-Oct-14

83

20 03-Feb-14

30-May-14

83

40 02-Jun-14

30-Sep-14

105

39 01-Apr-14


29-Aug-14

39 01-Sep-14

31-Oct-14

187
83

39 03-Feb-14
20 03-Feb-14

31-Oct-14
30-May-14

83

60 02-Jun-14

30-Sep-14

106

40 03-Mar-14

31-Jul-14

49


51 01-Aug-14

15-Oct-14

105

39 01-Apr-14

29-Aug-14

41

39 01-Sep-14

31-Oct-14

187
83

39 03-Feb-14
20 03-Feb-14

31-Oct-14
30-May-14

SAE00DC300177

AE00 - Structural Steelwork Design Calculations (for Piperack)_IFC

83


60 02-Jun-14

30-Sep-14

SAE00DC300181

AE00 - Structural Steelwork Design Calculations (Equipment)_IFR

106

40 03-Mar-14

31-Jul-14

SAE00DC300187

AE00 - Structural Steelwork Design Calculations (Equipment)_IFC

49

51 01-Aug-14

15-Oct-14

SAE00DC300191

AE00 - Structural Steelwork Design Calculations (Other)_IFR

105


39 01-Apr-14

29-Aug-14

SAE00DC300197

AE00 - Structural Steelwork Design Calculations (Other)_IFC

AG00 - Common Piperack
Pipera
SAG00DC300071
AG00 - Requisitions for Structure_IFR

41

39 01-Sep-14

31-Oct-14

114
21

61 01-Oct-13
0 01-Nov-13

17-Mar-14
29-Nov-13

SAG00DC300077


AG00 - Requisitions for Structure_IFC

56

0 02-Dec-13

21-Feb-14

SAG00DC300095

AG00 - TBE Report for Structure

28

0 02-Jan-14

12-Feb-14

SAG00DC300171

AG00 - Structural Steelwork Design Calculations_IFR

98

61 01-Oct-13

21-Feb-14

SAG00DC300177


AG00 - Structural Steelwork Design Calculations_IFC

16

61 24-Feb-14

17-Mar-14

Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100DC300171
B100 - Structural Steelwork Design Calculations_IFR

177
177
93

83 15-Nov-13
39 15-Nov-13
81 15-Nov-13

30-Jul-14
30-Jul-14
31-Mar-14

SB100DC300177

B100 - Structural Steelwork Design Calculations_IFC


42

81 01-Apr-14

30-May-14

SB100DC300191

B100 - Structural Steelwork Design Calculations ( for Others)_IFR

94

39 16-Dec-13

30-Apr-14

SB100DC300197

B100 - Structural Steelwork Design Calculations ( for Others)_IFC

62

39 01-May-14

30-Jul-14

B200 - Service / Potable / Fire Water
SB200DC300191
B200 - Structural Steelwork Design Calculations ( for Others)_IFR


166
104

83 02-Dec-13
83 02-Dec-13

30-Jul-14
30-Apr-14

62

83 01-May-14

30-Jul-14

B300 - Structural Steelwork Design Calculations_IFR

177
93

39 15-Nov-13
81 15-Nov-13

30-Jul-14
31-Mar-14

SB300DC300177

B300 - Structural Steelwork Design Calculations_IFC


42

81 01-Apr-14

30-May-14

SB300DC300191

B300 - Structural Steelwork Design Calculations ( for Others)_IFR

73

39 16-Jan-14

30-Apr-14

SB300DC300197

B300 - Structural Steelwork Design Calculations ( for Others)_IFC

SB200DC300197
B300 - Demine & Fuel
SB300DC300171

B200 - Structural Steelwork Design Calculations ( for Others)_IFC

62

39 01-May-14


30-Jul-14

39 15-Nov-13
81 15-Nov-13

30-Jul-14
31-Mar-14

B400 - Structural Steelwork Design Calculations_IFR

177
93

SB400DC300177

B400 - Structural Steelwork Design Calculations_IFC

42

81 01-Apr-14

30-May-14

SB400DC300191

B400 - Structural Steelwork Design Calculations ( for Others)_IFR

73

39 16-Jan-14


30-Apr-14

SB400DC300197

B400 - Structural Steelwork Design Calculations ( for Others)_IFC

B400 - Steam & Power
SB400DC300171

62

39 01-May-14

30-Jul-14

B500 - Structural Steelwork Design Calculations_IFR

166
82

80 02-Dec-13
82 02-Dec-13

30-Jul-14
31-Mar-14

SB500DC300177

B500 - Structural Steelwork Design Calculations_IFC


42

82 01-Apr-14

30-May-14

SB500DC300181

B500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR

83

80 02-Jan-14

30-Apr-14

SB500DC300187

B500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC

62

80 01-May-14

30-Jul-14

SB500DC300191

B500 - Structural Steelwork Design Calculations ( for Others)_IFR


63

80 03-Feb-14

30-Apr-14

SB500DC300197

B500 - Structural Steelwork Design Calculations ( for Others)_IFC

62

80 01-May-14

30-Jul-14

48
48
48
48

14-Jan-14
14-Jan-14
14-Jan-14
14-Jan-14

30-Jun-14
30-Jun-14
30-Jun-14

26-Mar-14

48 10-Apr-14

30-Jun-14

55
44
44
45

17-Jul-15
15-Dec-14
10-Dec-14
16-Oct-13

B500 - Cooling Water
SB500DC300171

Pipe Rack
Process Area
A700 - Hydrogen Manufacturing
Manu
(HMU/HCDS)
GA700DD310010A
A700-DWG for Piperack Structure-FR
GA700DD310010B
Building
Building - Common
Common Area

G0000DC400000A

A700-DWG for Piperack Structure-FC

Requisition for TR, LV SWGR/MCC & Distribution Board in Building for Frame Agreeme

115
115
115
50
55
383
238
318
30

22-Jul-13
29-Aug-13
29-Aug-13
29-Aug-13

G0000DC400000A2

Requisition for TR, LV SWGR/MCC & Distribution Board in Building-group1

10

45 23-Jun-14

04-Jul-14


G0000DC400000B

Requisition for TR, LV SWGR/MCC & Distribution Board in Building-group2

10

43 02-Jul-14

15-Jul-14

2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
B200 - Foundations Design Calculations (for Equipments)_IFR

Detail Engineering, Procurement, and

Critical Remaining Work
Milestone

Construction CPM Network
Level - 3 Overall Schedule

A
R

D
014
2
N
R
I 12-MA

B300 - Foundations Design Calculations_IFC
B300 - Foundations Design Calculations (for Equipments)_IFR
B300 - Foundations Design Calculations (for Equipments)_IFC
B300 - Foundations Design Calculations (for Others)_IFR
B300 - Foundations Design Calculations (for Others)_IFC
B400 - Foundations Design Calculations_IFR
B400 - Foundations Design Calculations_IFC
B400 - Foundations Design Calculations (for Equipments)_IFR
B400 - Foundations Design Calculations (for Equipments)_IFC
B400 - Foundations Design Calculations (for Others)_IFR
B400 - Foundations Design Calculations (for Others)_IFC
B500 - Foundations Design Calculations_IFR
B500 - Foundations Design Calculations_IFC
B500 - Foundations Design Calculations (for Equipments)_IFR
B500 - Foundations Design Calculations (for Equipments)_IFC

Requisition for Steel Structure for Blanket Order(only for GS)
Shop Fabricated Structural Steel (2130001) - Update Specs / Data Sheet / Req
Structural Steel MTO - Update / Release Progressively for Fabrication & Supply
Shop Fabricated Structural Steel - Preliminary Requisition

A100 - Structural Steelwork Design Calculations (for Piperack)_IFR
A100 - Structural Steelwork Design Calculations (for Piperack)_IFC

A100 - Structural Steelwork Design Calculations (Equipment)_IFR
A100 - Structural Steelwork Design Calculations (Equipment)_IFC
A100 - Structural Steelwork Design Calculations (Other)_IFR
A100 - Structural Steelwork Design Calculations (Other)_IFC
A500 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFR
A500 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFC
A500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR
A500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC
A600 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFR
A600 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFC
A600 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR
A600 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC
AA00 - Structural Steelwork Design Calculations_IFR
AA00 - Structural Steelwork Design Calculations_IFC
AB10 - Structural Steelwork Design Calculations (for Piperack)_IFR
AB10 - Structural Steelwork Design Calculations (for Piperack)_IFC
AB10 - Structural Steelwork Design Calculations (Equipment)_IFR
AB10 - Structural Steelwork Design Calculations (Equipment)_IFC
AB10 - Structural Steelwork Design Calculations (Other)_IFR
AB10 - Structural Steelwork Design Calculations (Other)_IFC
AB20 - Structural Steelwork Design Calculations (for Piperack)_IFR
AB20 - Structural Steelwork Design Calculations (for Piperack)_IFC
AB20 - Structural Steelwork Design Calculations (Equipment)_IFR
AB20 - Structural Steelwork Design Calculations (Equipment)_IFC
AB20 - Structural Steelwork Design Calculations (Other)_IFR
AB20 - Structural Steelwork Design Calculations (Other)_IFC
AB30 - Structural Steelwork Design Calculations (for Piperack)_IFR
AB30 - Structural Steelwork Design Calculations (for Piperack)_IFC
AB30 - Structural Steelwork Design Calculations (Other)_IFR
AB30 - Structural Steelwork Design Calculations (Other)_IFC

AD00 - Structural Steelwork Design Calculations (for Piperack)_IFR
AD00 - Structural Steelwork Design Calculations (for Piperack)_IFC
AD00 - Structural Steelwork Design Calculations (Equipment)_IFR
AD00 - Structural Steelwork Design Calculations (Equipment)_IFC
AD00 - Structural Steelwork Design Calculations (Other)_IFR
AD00 - Structural Steelwork Design Calculations (Other)_IFC
AE00 - Structural Steelwork Design Calculations (for Piperack)_IFR
AE00 - Structural Steelwork Design Calculations (for Piperack)_IFC
AE00 - Structural Steelwork Design Calculations (Equipment)_IFR
AE00 - Structural Steelwork Design Calculations (Equipment)_IFC
AE00 - Structural Steelwork Design Calculations (Other)_IFR
AE00 - Structural Steelwork Design Calculations (Other)_IFC
AG00 - Requisitions for Structure_IFR
AG00 - Requisitions for Structure_IFC
AG00 - TBE Report for Structure
AG00 - Structural Steelwork Design Calculations_IFR
AG00 - Structural Steelwork Design Calculations_IFC

B100 - Structural Steelwork Design Calculations_IFR
B100 - Structural Steelwork Design Calculations_IFC
B100 - Structural Steelwork Design Calculations ( for Others)_IFR
B100 - Structural Steelwork Design Calculations ( for Others)_IFC
B200 - Structural Steelwork Design Calculations ( for Others)_IFR
B200 - Structural Steelwork Design Calculations ( for Others)_IFC
B300 - Structural Steelwork Design Calculations_IFR
B300 - Structural Steelwork Design Calculations_IFC
B300 - Structural Steelwork Design Calculations ( for Others)_IFR
B300 - Structural Steelwork Design Calculations ( for Others)_IFC
B400 - Structural Steelwork Design Calculations_IFR
B400 - Structural Steelwork Design Calculations_IFC

B400 - Structural Steelwork Design Calculations ( for Others)_IFR
B400 - Structural Steelwork Design Calculations ( for Others)_IFC
B500 - Structural Steelwork Design Calculations_IFR
B500 - Structural Steelwork Design Calculations_IFC
B500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR
B500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC
B500 - Structural Steelwork Design Calculations ( for Others)_IFR
B500 - Structural Steelwork Design Calculations ( for Others)_IFC

A700-DWG for Piperack Structure-FR
A700-DWG for Piperack Structure-FC

Requisition for TR, LV SWGR/MCC & Distribution Board in Building for Frame Agreement
Requisition for TR, LV SWGR/MCC & Distribution Board in Building-group1
Requisition for TR, LV SWGR/MCC & Distribution Board in Building-group2

Page 22 of 179

Actual Work
Remaining Work

B200 - Foundations Design Calculations (for Equipments)_IFC
B300 - Foundations Design Calculations_IFR

Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14


Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine

Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara

Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura