Employer Doc. No.
NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Limited Liability Company
Nghi Son, Vietnam
Contractor Doc. No.
Employer Contract No.: , Contractor JOB Code: 0-6495-20
S-000-1133-1002V
Rev. 3
Page 1 of 3
Date: 11/MAR/14
Detail Engineering, Procurement and
Construction CPM Network Level-3
Unit No.: Not Applicable
Unit Abbreviation.: Not Applicable
Document Class: Z
Issue Purpose
Rev
Date
Page
3
2
1
0
A
11/MAR/14
05/MAR/14
02/DEC/13
22/NOV/13
31/JUL/13
ALL
ALL
ALL
ALL
ALL
Description
Update Marine Schedules
Issued as Baseline Schedule
Revised Issue for Construction
Issue for Construction
Issue for Approval
Operation Centre JOB Code:
Responsible Company
JVD
R-20A
14
D
R
IN
A
M
12
For Construction
Prep'd
Chk'd
App'd
C.Q.
C.Q.
C.Q.
C.Q.
C.Q.
T.H.
T.H.
T.H.
T.H.
T.H.
F.K.
F.K.
F.K.
F.K.
F.K.
Operation Centre Doc. No.:
Prepared by
C. Quicho
Checked by
T. Hinohara
Approved by
F. Kimura
Employer Doc. No.
NSRP Complex Project
Title: Detail Engineering, Procurement and Construction
CPM Network Level-3
Contractor Doc. No.
S-000-1133-1002V
Rev. 3
Page 2 of 3
CONTENTS
1
PURPOSE .............................................................................................................................................3
2
REFERENCE DOCUMENTS ................................................................................................................3
3
CONDITIONS ........................................................................................................................................3
4
ATTACHMENTS ...................................................................................................................................3
R-20A
14
D
R
IN
A
M
12
Employer Doc. No.
NSRP Complex Project
Title: Detail Engineering, Procurement and Construction
CPM Network Level-3
1
Contractor Doc. No.
S-000-1133-1002V
Rev. 3
Page 3 of 3
PURPOSE
This document contains all the Detail Engineering, Procurement and Construction CPM Network
(Level -3) Schedule of Joint Venture Directorate (JVD) and each JGCS Consortium Operation
Centers, namely JGC, GSEC, Chiyoda, SKEC, and Technip. This is for Employer to have a detail
view of the project and understand the scope of work within the JGCS Consortium.
2
REFERENCE DOCUMENTS
3
S-000-1132-0001V “Work Breakdown Structure”
CONDITIONS
The following conditions are considered in the preparation of the schedules:
4
R-20A
14
D
R
IN
A
M
12
Schedule is prepared using Primavera 6 version 7.0 SP3
Schedule is prepared in accordance with Attachment - 2 “H-000-1133-1001V Basic Rules for
Level-3 Schedule Development”
JVD and each operation centre prepare the schedule for his own scope of work, which is in
accordance with Contractor Scope Map in S-000-1132-0001V.
Data date is set at 22-Jul-13 as Commencement Date. Early works were also shown in the
schedule to support the ongoing activities in the schedule before the Commencement Date.
Mechanical Completion date is set at 22-Nov-16, 40 months after commencement date.
Total float of less than or equal to 12 days is considered for critical activities
Marine facilities are based on D-000-1225-1011V Rev.A Key Plan for Plot Plan Marine
Facility.
Buildings schedule is based on the Employer’s Requirement of 3550-8330-SP-0001 Rev.D5
Building Performance Specification.
UOP design package, P&Id No.953060-120-07-A1 Rev.3 and vessel data sheet for
028-V-051A/B, 953060-301 Rev.0 are basis for Unit 028 Indirect Alkylation (INALK unit)
Stick built is considered for interconnecting piperack. (SK scope area)
Solid sulfur system is considerd instead of liquid sulfur system. (GS scope area)
ATTACHMENTS
Attachment -1:
JGCS Level-3 Schedule
Attachment - 2:
H-000-1133-1001V “Basic Rules for Level-3 Schedule Development”
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Overall Baseline Schedule
Sch
07-Mar-14 (Rev. Marine Resource)
On-Shore Facilities 90%
90
Milestones
General Milestones
C0000M010
Project Base Date (Contract Signing Date)
Original Total Float Start
Duration
Finish
919
0 15-Jan-13 A
22-Jul-17
919
0 15-Jan-13 A
22-Jul-17
919
0 15-Jan-13 A
22-Jul-17
919
0
0 15-Jan-13 A
22-Jul-17
15-Jan-13 A
C0000M020
Contract Effective Date (Project Base Date +120)
0
10-Jun-13 A
C0000M030
Commencement Date
0
22-Jul-13 A
C0000M0A5
Issue System definition IFC & System completion schedule
0
25
29-Mar-16
C0000M0A6
All As -Built drawings and final documentation handover to employer
0
178
31-Oct-16
C0000M0A8
Vendor Training
0
68
19-Aug-15
G0000M0001
Letter of Award (LOA)
0
15-Jan-13 A
G0000M0002
Effective Date
0
10-Jun-13 A
G0000M0003
Commencement Date
0
G0000M0A05
Issue Sys. Definition Issued for FC & Sys. Completion Schedule
0
107
22-Sep-14
G0000M0A06
All As -Built DWG & Final Doc . H/O to Employer
0
43
22-Feb-17
G0000M0A08
Vendor Training
0
68 23-Nov-16
G0000M0A09
Initial acceptance
0
J0000M0001
Letter of Award (LOA)
0
J0000M0002
Effective Date
0
J0000M0003
Commencement Date
0
J0000M0A05
Issue Systems Definition (IFC) & Completion Schedule
0
180
30-Apr-14
J0000M0A08
Vendor training
0
132
19-Jan-16
S0000M0001
Letter of Award (LOA)
0
S0000M0002
Effective Date
0
S0000M0003
Commencement Date
0
S0000M0004
All Unit MC of 40 Month
0
0
22-Nov-16
S0000M0005
Initial Acceptance 48 Month
0
0
22-Jul-17
S0000M0A05
Issue systems definition Issued for Construction (IFC) & Systems completion Schedule
0
80
22-Nov-13
S0000M0A06
All As Built drawings and final documentation handover to Employer
0
48
22-Nov-16
S0000M0A08
Vendor training
0
40
26-Sep-16
T0000M0001
Letter of Award (LOA)
0
15-Jan-13 A
T0000M0003
Effective Date
0
10-Jun-13 A
T0000M0005
Commencement Date
0
22-Jul-13 A
T0000M0007
Completion of Early Works
0
22
31-Jul-13
T0000M0008
Engineering Complete - Technip
0
80
23-Jun-15
T0000M0010
Initial Acceptance
0
0
22-Jul-17
T0000M0A05
Issue systems definition issued for Construction (IFC) & Systems Completion Schedul
0
49
12-Sep-16
T0000M0A06
All As -Built drawings and final documentation handover to Employer
0
45
V0000M0001
Letter of Award (LOA)
0
15-Jan-13 A
V0000M0002
Effective Date
0
10-Jun-13 A
V0000M0003
Site Access for Soil Study
0
V0000M0004
Commencement Date
0
0 22-Jul-13
V0000M0005
Final Mechanical Completion
0
0
22-Nov-16
V0000M0006
Initial Acceptance
0
0
22-Jul-17
V0000M0A01
Issue Overall Project Execution Plan Etc. (Final Issue)
0
116
31-Jan-14
V0000M0A02
Issue Project Control Procedure, Etc. (Final)
0
114
13-Dec-13
V0000M0A03
Issue Construction Execution Plan, Etc. (Final)
0
63
31-Jan-14
V0000M0A04
Issue Pre-commissioning and Handover Procedures, Etc. (Final)
0
102
30-Sep-15
V0000M0A06
Issue All As-Built Dwgs & Final Documentation
0
28
17-Jan-17
V0000M0A07
Training programme for Employer's personnel (IFA)
0
113
16-Dec-13
Engineering Milestones
C0000MEB01
Issue Utility demands,associated line sizes and electrical load data & equipt. ratings fin
684
0
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
Project Base Date (Contract Signing Date)
Contract Effective Date (Project Base Date +120)
Commencement Date
Issue System definition IFC & System completion schedu
All As -Built drawings and final do
Vendor Training
Letter of Award (LOA)
Effective Date
0 22-Jul-13
0
Commencement Date
Issue Sys. Definition Issued for FC & Sys. Completion Schedule
All As -Built DWG & F
Vendor Training
22-Jul-17
15-Jan-13 A
Init
Letter of Award (LOA)
10-Jun-13 A
Effective Date
3 22-Jul-13
Commencement Date
15-Jan-13 A
Issue Systems Definition (IFC) & Completion Schedule
Vendor training
Letter of Award (LOA)
10-Jun-13 A
Effective Date
80 22-Jul-13
Commencement Date
All Unit MC of 40 Month
Init
Issue systems definition Issued for Construction (IFC) & Systems completion Schedule
All As Built drawings and final d
Vendor training
Letter of Award (LOA)
Effective Date
Commencement Date
Completion of Early Works
Engineering Complete - Technip
Init
Issue systems definition issued for Co
17-Jan-17
All As -Built drawings and
Letter of Award (LOA)
Effective Date
01-Jul-13 A
94 20-May-13 A
64
Site Access for Soil Study
Commencement Date
Final Mechanical Completion
Init
Issue Overall Project Execution Plan Etc. (Final Issue)
Issue Project Control Procedure, Etc. (Final)
Issue Construction Execution Plan, Etc. (Final)
Issue Pre-commissioning and Handover Procedures, Etc. (Final)
Issue All As-Built Dwgs
Training programme for Employer's personnel (IFA)
22-Nov-16
20-Mar-14
Issue Utility demands,associated line sizes and electrical load data & equipt. ratings final
C0000MEB02
Issue for Employer approval all documents for HAZOP review
0
122
08-Oct-13
C0000MEB03
Complete HAZOP Review and submit Report
0
27
02-Apr-14
Issue for Employer approval all documents for HAZOP review
C0000MEB04
Issue for Employer approval all documents for SIL review
0
69
13-Nov-13
C0000MEB05
Complete SIL Review and submit Report
0
46
16-Dec-13
C0000MEB06
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporat
0
54
04-Apr-14
C0000MEB07
Issue IFC Plot Plans, Equipment Layouts etc. complete
0
31
04-Apr-14
C0000MEB08
Issue 1st Piling Drawings IFC
0
56
28-Feb-14
C0000MEB09
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities
0
22
27-Mar-14
C0000MEB10
Issue Material Requsitions (MRs) for all Major Equipment & Packages (Refer Items C1
0
42
26-Sep-13
C0000MEB11
Receipt of key vendor data (by major equipment)
0
25
20-Jun-14
C0000MEB12
Issue IFC all underground services drawings
0
56
31-Jul-14
C0000MEB13
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
0
178
26-Aug-14
C0000MEB14
Issue IFC 50% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers, e
0
161
02-May-14
C0000MEB15
Issue IFC 50% of Civil/ Structural drawings etc. for all Buildings
0
41
26-May-14
C0000MEB16
Complete 30% 3D-CAD model review
0
118
24-Oct-13
C0000MEB17
Complete 60% 3D-CAD model review
0
47
18-Mar-14
C0000MEB18
Complete 90% 3D-CAD model review
0
105
23-Jul-14
C0000MEB19
Start issue piping isometrics IFC
0
25 23-Jun-14
C0000MEB20
Issue 50% Piping Isometrics IFC
0
54
17-Nov-14
C0000MEB21
Complete Piping Isometrics IFC
0
66
18-Mar-15
C0000MEB22
Issue 1st MTO and MRs for piping bulk materials
0
139
03-Oct-13
C0000MEB23
Issue Intermediate MTO & MR's for piping bulk materials
0
89
18-Jun-14
C0000MEB24
Issue final MTO and MRs for piping bulk materials
0
57
03-Apr-15
C0000MEB25
Issue IFC Electrical cable schedules, cable layouts, equipment layouts, earthing layout
0
28
26-Sep-14
C0000MEB26
Issue 1st MTO and MRs for electrical bulk materials
0
112
06-Mar-14
C0000MEB27
Issue final MTO and MRs for electrical bulk materials
0
61
30-Sep-14
C0000MEB28
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tre
0
22
23-Oct-14
C0000MEB29
Issue 1st MTO and MRs for instrument bulk materials
0
75
02-May-14
C0000MEB30
Issue final MTO and MRs for instrument bulk materials
0
85
03-Oct-14
C0000MEB31
Issue IFC Electrical/Instrument layouts, interconnection diagrams etc. including all build
0
22
23-Oct-14
C0000MEB32
Finalize and issue IFC all instrumentation loop diagrams
0
169
08-Dec-14
Finalize and issue IFC all instrumentation loop diagrams
C0000MEB33
Issue all IFC drawings for roads, fencing, paving, tiling and all other finishing works com
0
169
08-Dec-14
Issue all IFC drawings for roads, fencing, paving, tiling and all other finishing works complete
C0000MEB34
Final issue of Operation and Maintenance Manual
0
25
29-Mar-16
G0000MEB01
Issue Utility demands, associated line sizes and electrical load data and equipment rati
0
80
01-Sep-14
G0000MEB02
Issue for Employer approval all documents for HAZOP review
0
74
22-Nov-13
G0000MEB03
Complete HAZOP Review and submit Report
0
116
18-Feb-14
G0000MEB04
Issue for Employer approval all documents for SIL review
0
74
22-Nov-13
G0000MEB05
Complete SIL Review and submit Report
0
114
27-Nov-14
G0000MEB06
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporat
0
63
17-Apr-14
G0000MEB07
Issue IFC Plot Plans, Equipment Layouts etc. complete
0
116
23-Oct-14
G0000MEB08
Issue 1st Piling Drawings IFC
0
40
03-Apr-14
G0000MEB09
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities
0
99
04-Sep-14
G0000MEB11
Receipt of key vendor data (by major equipment)
0
125
24-Jul-14
G0000MEB12
Issue IFC all underground services drawings
0
165
13-Nov-14
G0000MEB13
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
0
156
20-Nov-14
G0000MEB14
Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers e
0
88
07-Jan-15
G0000MEB15
Issue IFC 95% of Civil / Structural drawings etc for all Buildings.
0
133
17-Dec-14
G0000MEB16
Complete 30% 3D.CAD model review
0
72
28-Feb-14
G0000MEB17
Complete 60% 3D.CAD model review
0
119
07-Jul-14
G0000MEB18
Complete 90% 3D.CAD model review
0
50
05-Dec-14
G0000MEB19
Start issue piping isometrics IFC
0
G0000MEB20
Issue 50% Piping Isometrics IFC
0
84
02-Feb-15
G0000MEB21
Complete Piping Isometrics IFC
0
138
25-Mar-15
G0000MEB22
Issue 1st MTO and MRs for piping bulk materials
0
106
20-Jan-14
G0000MEB23
Issue Intermediate MTO and MR¡¯s for piping bulk materials
0
102
22-Jul-14
G0000MEB24
Issue final MTO and MRs for piping bulk materials
0
41
16-Feb-15
G0000MEB25
Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts
0
91
18-Mar-15
G0000MEB26
Issue 1st MTO and MRs for electrical bulk materials
0
121
29-Sep-14
G0000MEB27
Issue final MTO and MRs for electrical bulk materials
0
61
23-Jan-15
G0000MEB28
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tre
0
70
16-Apr-15
G0000MEB29
Issue 1st MTO and MRs for instrument bulk materials
0
144
02-Dec-14
G0000MEB30
Issue final MTO and MRs for instrument bulk materials
0
92
19-Mar-15
G0000MEB31
Issue IFC Electrical/Instrument Layout, Diagram, etc. for all Buildings
0
96
11-Mar-15
G0000MEB32
Finalize and issue IFC all instrumentation loop diagrams.
0
114
05-Mar-15
G0000MEB33
Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works co
0
171
03-Nov-14
G0000MEB34
Final issue of Operation and Maintenance Manuals
0
125
22-Nov-16
J0000MEB01
Issue Utility Demands, Load , Ratings, Etc.
0
120
19-Aug-14
Complete HAZOP Review and submit Report
Issue for Employer approval all documents for SIL review
Complete SIL Review and submit Report
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporating HAZOP Comments
Issue IFC Plot Plans, Equipment Layouts etc. complete
Issue 1st Piling Drawings IFC
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities (complete).
Issue Material Requsitions (MRs) for all Major Equipment & Packages (Refer Items C1-C17 below for details).
Issue IFC 50% of Civil/ Structural drawings etc. for all Buildings
Complete 30% 3D-CAD model review
Complete 60% 3D-CAD model review
Complete 90% 3D-CAD model review
Issue 50% Piping Isometrics IFC
Complete Piping Isometrics IFC
Issue 1st MTO and MRs for piping bulk materials
Issue Intermediate MTO & MR's for piping bulk materials
Issue final MTO and MRs for piping bulk materials
Issue IFC Electrical cable schedules, cable layouts, equipment layouts, earthing layouts, lighting layouts, JB details
Issue 1st MTO and MRs for electrical bulk materials
Issue final MTO and MRs for electrical bulk materials
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, trench details, etc. complete
Issue 1st MTO and MRs for instrument bulk materials
Issue final MTO and MRs for instrument bulk materials
Issue IFC Electrical/Instrument layouts, interconnection diagrams etc. including all buildings control systems, HVAC
Final issue of Operation and Maintenance Manual
Issue Utility demands, associated line sizes and electrical load data and equipment ratings final.
Issue for Employer approval all documents for HAZOP review
Complete HAZOP Review and submit Report
Issue for Employer approval all documents for SIL review
Complete SIL Review and submit Report
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporating HAZOP comments
Issue IFC Plot Plans, Equipment Layouts etc. complete
Issue 1st Piling Drawings IFC
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities (complete)
Receipt of key vendor data (by major equipment)
Issue IFC all underground services drawings
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers etc. complete.
Issue IFC 95% of Civil / Structural drawings etc for all Buildings.
Complete 30% 3D.CAD model review
Complete 60% 3D.CAD model review
Complete 90% 3D.CAD model review
Start issue piping isometrics IFC
Issue 50% Piping Isometrics IFC
Complete Piping Isometrics IFC
Issue 1st MTO and MRs for piping bulk materials
Issue Intermediate MTO and MR¡¯s for piping bulk materials
Issue final MTO and MRs for piping bulk materials
Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts, lighting layo
Issue 1st MTO and MRs for electrical bulk materials
Issue final MTO and MRs for electrical bulk materials
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, trench deta
Issue 1st MTO and MRs for instrument bulk materials
Issue final MTO and MRs for instrument bulk materials
Issue IFC Electrical/Instrument Layout, Diagram, etc. for all Buildings
Finalize and issue IFC all instrumentation loop diagrams.
Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works complete
Final issue of Operation and M
Issue Utility Demands, Load , Ratings, Etc.
Page 1 of 179
Detail Engineering, Procurement, and
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
Issue IFC 50% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers, etc. complete
139 01-Oct-14
Critical Remaining Work
Milestone
Issue IFC all underground services drawings
Start issue piping isometrics IFC
Actual Work
Remaining Work
Receipt of key vendor data (by major equipment)
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
Issue Document for HAZOP
J0000MEB02
Issue Document for HAZOP
0
21
28-Oct-13
J0000MEB03
Complete HAZOP Review and Submit Report
0
124
22-Jan-14
J0000MEB04
Issue Document for SIL Review
0
184
28-Oct-13
J0000MEB05
Complete SIL Review and Submit Report
0
63
03-Sep-14
J0000MEB06
Issue PFD, P&ID, Etc., Incl. HAZOP Comments
0
97
26-Jun-14
Issue PFD, P&ID, Etc., Incl. HAZOP Comments
J0000MEB07
Issue Plot Plans, Etc. (FC)
0
95
30-Jun-14
Issue Plot Plans, Etc. (FC)
J0000MEB08
Issue 1st Piling Drawings (FC)
0
J0000MEB09
Issue Single Line Diagram, Etc. (FC)
0
J0000MEB10
Issue Requisition for Major Equipment
0
J0000MEB11
Receive Major Equipment Vendor Data
0
108
07-Feb-14
J0000MEB12
Issue U/G Drawings (FC)
0
103
16-Jan-15
Issue U/G Drawings (FC)
J0000MEB13
Issue Foundation Drawings, Etc. (FC)
0
115
01-Oct-14
Issue Foundation Drawings, Etc. (FC)
J0000MEB14
Issue 95% of Civil/Str Dwgs for Pipe Support(FC)
0
16
12-Jun-15
J0000MEB15
Issue 95% of Civil/Str Dwgs. for Buildings (FC)
0
70
20-Oct-14
J0000MEB16
Complete 30% 3D-CAD Model Review
0
86
31-Jan-14
J0000MEB17
Complete 60% 3D-CAD Model Review
0
61
01-Aug-14
J0000MEB18
Complete 90% 3D-CAD Model Review
0
46
20-Nov-14
J0000MEB19
Start Issue Piping Isometrics IFC
0
53 11-Nov-14
J0000MEB20
Issue 50% Piping Isometrics IFC
0
46
07-Apr-15
J0000MEB21
Complete Piping Isometrics IFC
0
46
18-Aug-15
J0000MEB22
Issue 1st MTO & MR's for Piping Bulk Materials
0
27
28-Feb-14
J0000MEB23
Issue Intermediate MTO & MR's for Piping Bulk
0
183
10-Jul-14
J0000MEB24
Issue Final MTO & MR's for Piping Bulk Materials
0
77
30-Apr-15
J0000MEB25
Issue IFC Electrical Cable Schedule, Layout, Etc
0
100
20-Oct-14
J0000MEB26
Issue 1st MTO & MR's for Electrical Bulk Mat'l
0
39
27-Jun-14
J0000MEB27
Issue Final MTO & MR's for Electrical Bulk Mat'l
0
18
26-Mar-15
J0000MEB28
Issue IFC Instrument Cable Schedule, Layout, Etc
0
169
07-Oct-14
J0000MEB29
Issue 1st MTO & MR's for Instrument Bulk Mat'l
0
30
27-Aug-14
J0000MEB30
Issue Final MTO & MR's for Instrument Bulk Mat'l
0
17
28-Jan-15
J0000MEB31
Issue IFC Electrical/Instrument Layout, Diagram
0
39
27-Jun-14
J0000MEB32
Finalize & Issue IFC All Instrument Loop Diagram
0
164
20-Oct-15
J0000MEB33
Issue All IFC Dwg. for Roads, Fence, Paving, Etc
0
191
08-Dec-14
J0000MEB34
Final Issue of Operation and Maintenance Manual
0
23
19-Oct-16
S0000MEB01
Issue Utility demands, associated line sizes and electrical load data and equipment rati
0
82
28-Feb-14
S0000MEB02
Issue for Employer approval all documents for HAZOP review
0
54
30-Sep-14
Issue for Employer approval all documents for HAZOP review
S0000MEB03
Complete HAZOP Review and submit Report.
0
54
30-Sep-14
Complete HAZOP Review and submit Report.
S0000MEB04
Issue for Employer approval all documents for SIL review
0
79
31-Mar-15
S0000MEB05
Complete SIL Review and submit Report.
0
79
31-Mar-15
S0000MEB06
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporat
0
78
12-Jan-15
S0000MEB07
Issue IFC Plot Plans, Equipment Layouts etc. complete
0
87
29-Aug-14
S0000MEB08
Issue 1st Piling Drawings IFC
0
86
17-Feb-14
S0000MEB09
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities
0
80
31-Dec-14
S0000MEB10
Issue Material Requisitions (MRs) for all Major Equipment & Packages (Refer Items C
0
34
30-Aug-13
S0000MEB11
Receipt of key vendor data (by major equipment)
0
68
31-Jul-14
S0000MEB12
Issue IFC all underground services drawings
0
82
04-Mar-15
S0000MEB13
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
0
59
31-Oct-14
S0000MEB14
Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers e
0
61
28-Nov-14
S0000MEB15
Issue IFC 95% of Civil / Structural drawings etc for all Buildings.
0
98
14-Nov-14
S0000MEB16
Complete 30% 3D CAD model review
0
69
31-Mar-14
S0000MEB17
Complete 60% 3D CAD model review
0
50
31-Jul-14
S0000MEB18
Complete 90% 3D CAD model review
0
67
14-Nov-14
S0000MEB19
Start issue piping isometrics IFC
0
23 01-Jul-14
S0000MEB20
Issue 50% Piping Isometrics IFC
0
70
13-Feb-15
S0000MEB21
Complete Piping Isometrics IFC
0
45
30-Apr-15
S0000MEB22
Issue 1st MTO and MRs for piping bulk materials
0
74
28-Feb-14
S0000MEB23
Issue Intermediate MTO and MR's for piping bulk materials
0
94
29-Aug-14
S0000MEB24
Issue final MTO and MRs for piping bulk materials
0
45
30-Apr-15
S0000MEB25
Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts
0
88
31-Dec-14
S0000MEB26
Issue 1st MTO and MRs for electrical bulk materials
0
80
30-May-14
S0000MEB27
Issue final MTO and MRs for electrical bulk materials
0
80
30-Jan-15
S0000MEB28
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tre
0
93
31-Mar-15
S0000MEB29
Issue 1st MTO and MRs for instrument bulk materials
0
84
07-Jul-14
S0000MEB30
Issue final MTO and MRs for instrument bulk materials
0
79
31-Mar-15
S0000MEB31
Issue IFC Electrical/Instrument layouts, interconnection diagrams etc including all build
0
58
15-Jan-15
S0000MEB32
Finalize and issue IFC all instrumentation loop diagrams.
0
55
30-Apr-15
S0000MEB33
Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works co
0
61
31-Mar-15
S0000MEB34
Final issue of Operation and Maintenance Manuals
0
84
31-Aug-15
T0000MEB01
Issue Utility demands, associated line sizes and electrical load data and equipment rati
0
82
30-Apr-15
T0000MEB02
Issue for Employer approval all documents for HAZOP review
0
27
01-Nov-13
T0000MEB03
Complete HAZOP Review and submit Report.
0
64
04-Feb-14
T0000MEB04
Issue for Employer approval all documents for SIL review
0
65
17-Jan-14
Issue for Employer approval all documents for SIL review
T0000MEB05
Complete SIL Review and submit Report.
0
88
03-Apr-14
Complete SIL Review and submit Report.
T0000MEB06
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporat
0
82
19-May-15
T0000MEB07
Issue IFC Plot Plans, Equipment Layouts etc. complete
0
78
22-Apr-15
T0000MEB08
Issue 1st Piling Drawings IFC
0
45
31-Mar-14
T0000MEB09
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities
0
32
11-May-15
T0000MEB10
Issue Material Requisitions (MRs) for all Major Equipment & Packages (Refer Items C
0
T0000MEB11
Receipt of key vendor data (by major equipment)
0
23
04-Jun-14
T0000MEB12
Issue IFC all underground services drawings
0
54
31-Jul-14
T0000MEB13
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
0
62
21-Oct-14
T0000MEB14
Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers e
0
112
14-Jan-15
T0000MEB15
Issue IFC 95% of Civil / Structural drawings etc for all Buildings.
0
68
14-Jan-15
T0000MEB16
Complete 30% 3D-CAD model review
0
29
20-Dec-13
T0000MEB17
Complete 60% 3D-CAD model review
0
37
23-Jun-14
T0000MEB18
Complete 90% 3D-CAD model review
0
88
17-Dec-14
T0000MEB19
Start issue piping isometrics IFC
0
88
20-Oct-14
T0000MEB20
Issue 50% Piping Isometrics IFC
0
41
24-Feb-15
T0000MEB21
Complete Piping Isometrics IFC
0
44
22-Apr-15
T0000MEB22
Issue 1st MTO and RMLs for piping bulk materials
0
65
28-Feb-14
T0000MEB23
Issue Intermediate MTO and RMLs for piping bulk materials
0
51
04-Sep-14
T0000MEB24
Issue final MTO and RMLs for piping bulk materials
0
98
22-Apr-15
T0000MEB25
Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts
0
47
10-Jun-15
T0000MEB26
Issue 1st MTO and RMLs for electrical bulk materials
0
66
06-Aug-14
T0000MEB27
Issue final MTO and RMLs for electrical bulk materials
0
64
03-Dec-14
T0000MEB28
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tre
0
80
23-Jun-15
T0000MEB29
Issue 1st MTO and RMLs for instrument bulk materials
0
117
24-Mar-14
T0000MEB30
Issue final MTO and RMLs for instrument bulk materials
0
99
26-Jan-15
T0000MEB31
Issue IFC Electrical/Instrument layouts, interconnection diagrams etc including all build
0
97
29-May-15
T0000MEB32
Finalize and issue IFC all instrumentation loop diagrams.
0
97
29-May-15
T0000MEB33
Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works co
0
32
04-Feb-15
T0000MEB34
Final issue of Operation and Maintenance Manuals
0
86
15-Jun-15
T0000MEB38
Final Issue of Chemical & Catalyst recommandation to JVD
0
76
03-Jun-14
V0000MEB34
Final Issue of Operation and Maintenance Manual
0
102
31-Mar-15
Procurement Service Milestones
Milest
C0000MPC02
Issue purchase order for RHDS Fixed Bed Reactors
624
0
Complete HAZOP Review and Submit Report
Issue Document for SIL Review
Complete SIL Review and Submit Report
38 14-Apr-14
167
Issue 1st Piling Drawings (FC)
14-Mar-14
Issue Single Line Diagram, Etc. (FC)
02-Jul-13 A
Issue Requisition for Major Equipment
Receive Major Equipment Vendor Data
Issue 95% of Civil/Str Dwgs for Pipe Support(FC)
Issue 95% of Civil/Str Dwgs. for Buildings (FC)
Complete 30% 3D-CAD Model Review
Complete 60% 3D-CAD Model Review
Complete 90% 3D-CAD Model Review
Start Issue Piping Isometrics IFC
Issue 50% Piping Isometrics IFC
Complete Piping Isometrics IFC
Issue 1st MTO & MR's for Piping Bulk Materials
Issue Intermediate MTO & MR's for Piping Bulk
Issue Final MTO & MR's for Piping Bulk Materials
Issue IFC Electrical Cable Schedule, Layout, Etc
Issue 1st MTO & MR's for Electrical Bulk Mat'l
Issue Final MTO & MR's for Electrical Bulk Mat'l
Issue IFC Instrument Cable Schedule, Layout, Etc
Issue 1st MTO & MR's for Instrument Bulk Mat'l
Issue Final MTO & MR's for Instrument Bulk Mat'l
Issue IFC Electrical/Instrument Layout, Diagram
Finalize & Issue IFC All Instrument Loop Diagram
Issue All IFC Dwg. for Roads, Fence, Paving, Etc
Final Issue of Operation and Main
Issue Utility demands, associated line sizes and electrical load data and equipment ratings final.
Issue for Employer approval all documents for SIL review
Complete SIL Review and submit Report.
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporating HAZOP commen
Issue IFC Plot Plans, Equipment Layouts etc. complete
Issue 1st Piling Drawings IFC
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities (complete).
Issue Material Requisitions (MRs) for all Major Equipment & Packages (Refer Items C1 C17 below for details).
Receipt of key vendor data (by major equipment)
Issue IFC all underground services drawings
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers etc. complete.
Issue IFC 95% of Civil / Structural drawings etc for all Buildings.
Complete 30% 3D CAD model review
Complete 60% 3D CAD model review
Complete 90% 3D CAD model review
Start issue piping isometrics IFC
20-May-13 A
33 30-Aug-13
17
22-Nov-16
30-Aug-13
C0000MPC03
Issue purchase order for RHDS Recycle Gas Compressors
0
34
03-Oct-13
C0000MPC18
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment
0
90
13-Dec-13
C0000MPC19
Issue purchase order for all major Electrical Equipment
0
26
01-Jul-14
C0000MPC20
Issue purchase order for HVAC, Fire Detection and FF Systems for all buildings
0
107
28-Feb-14
C0000MPC21
Issue purchase order for all major Instrument Control Systems
0
55
10-Mar-14
C0000MPC22
Issue purchase order for all Field Instrument tagged materials
0
55
27-Jun-14
C0000MPC23
Issue 1st purchase orders for bulk piping materials
0
60
31-Jan-14
C0000MPC24
Issue 1st purchase orders for bulk electrical materials
0
52
24-Apr-14
C0000MPC25
Issue last purchase orders for bulk electrical materials
0
114
30-Mar-15
C0000MPC26
Issue 1st purchase orders for bulk instrument materials
0
96
26-May-14
C0000MPC27
Issue last purchase order for bulk instrument materials
0
93
29-Aug-14
C0000MPC28
Final listing of two year operation & maintenance spares per item of equipment, with pri
0
68
06-Jan-16
G0000MPC18
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment
0
126
24-Jun-14
G0000MPC19
Issue purchase orders for all major electrical Equipment
0
118
12-Nov-14
G0000MPC20
Issue purchase orders for HVAC, Fire Detection and Fire Fighting Systems for all build
0
90
11-Dec-14
Issue 50% Piping Isometrics IFC
Complete Piping Isometrics IFC
Issue 1st MTO and MRs for piping bulk materials
Issue Intermediate MTO and MR's for piping bulk materials
Issue final MTO and MRs for piping bulk materials
Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts, lighting layouts, JB
Issue 1st MTO and MRs for electrical bulk materials
Issue final MTO and MRs for electrical bulk materials
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, trench details
Issue 1st MTO and MRs for instrument bulk materials
Issue final MTO and MRs for instrument bulk materials
Issue IFC Electrical/Instrument layouts, interconnection diagrams etc including all building control systems
Finalize and issue IFC all instrumentation loop diagrams.
Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works complete
Final issue of Operation and Maintenance Manuals
Issue Utility demands, associated line sizes and electrical load data and equipment ratings fina
Issue for Employer approval all documents for HAZOP review
Complete HAZOP Review and submit Report.
Issue IFC PFDs, P&IDs, Data Sheets, Equipment Lists, Line Lists complete incorporating HA
Issue IFC Plot Plans, Equipment Layouts etc. complete
Issue 1st Piling Drawings IFC
Issue IFC all Single Line Diagrams, Hazardous Area classification details for all facilities (com
Issue Material Requisitions (MRs) for all Major Equipment & Packages (Refer Items C1-C17 below for details).
Receipt of key vendor data (by major equipment)
Issue IFC all underground services drawings
Issue IFC all foundation & superstructure drawings for all Equipment & Packages
Issue IFC 95% of Civil / Structural drawings for pipe supports, pipe trestles, sleepers etc. complete.
Issue IFC 95% of Civil / Structural drawings etc for all Buildings.
Complete 30% 3D-CAD model review
Complete 60% 3D-CAD model review
Complete 90% 3D-CAD model review
Start issue piping isometrics IFC
Issue 50% Piping Isometrics IFC
Complete Piping Isometrics IFC
Issue 1st MTO and RMLs for piping bulk materials
Issue Intermediate MTO and RMLs for piping bulk materials
Issue final MTO and RMLs for piping bulk materials
Issue IFC Electrical cable schedules, cable layouts, equipment layouts earthing layouts, lig
Issue 1st MTO and RMLs for electrical bulk materials
Issue final MTO and RMLs for electrical bulk materials
Issue IFC Instrument cable schedules, cable layouts, equipment layouts, JB details, tren
Issue 1st MTO and RMLs for instrument bulk materials
Issue final MTO and RMLs for instrument bulk materials
Issue IFC Electrical/Instrument layouts, interconnection diagrams etc including all building c
Finalize and issue IFC all instrumentation loop diagrams.
Issue all IFC drawings for roads, fencing, paving, tiling, and all other finishing works complete
Final issue of Operation and Maintenance Manuals
Final Issue of Chemical & Catalyst recommandation to JVD
Final Issue of Operation and Maintenance Manual
Issue purchase order for RHDS Fixed Bed Reactors
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment Packages
Issue purchase order for all major Electrical Equipment
Issue purchase order for HVAC, Fire Detection and FF Systems for all buildings
Issue purchase order for all major Instrument Control Systems
Issue purchase order for all Field Instrument tagged materials
Issue 1st purchase orders for bulk piping materials
Issue 1st purchase orders for bulk electrical materials
Issue last purchase orders for bulk electrical materials
Issue 1st purchase orders for bulk instrument materials
Issue last purchase order for bulk instrument materials
Final listing of two year operation & maintenance spares per item o
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment Packages
Issue purchase orders for all major electrical Equipment
Issue purchase orders for HVAC, Fire Detection and Fire Fighting Systems for all buildings.
Page 2 of 179
Actual Work
Remaining Work
Issue purchase order for RHDS Recycle Gas Compressors
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
Issue purchase order for all major instrument control systems
G0000MPC21
Issue purchase order for all major instrument control systems
0
114
06-Nov-13
G0000MPC22
Issue purchase orders for all field instrument tagged items
0
110
22-Aug-14
G0000MPC23
Issue 1st purchase orders for bulk piping materials
0
169
05-Mar-14
G0000MPC24
Issue 1st purchase orders for bulk electrical materials
0
50
29-Oct-14
G0000MPC25
Issue last purchase orders for bulk electrical materials
0
57
25-Feb-15
G0000MPC26
Issue 1st purchase orders for bulk instrument materials
0
134
25-Nov-14
G0000MPC27
Issue last purchase orders for bulk instrument materials
0
85
16-Apr-15
G0000MPC28
Final listing of two year operation and maintenance spares per item of equipment, with
0
48
22-Nov-16
J0000MPC04
Issue purchase order for RFCC Air Blower
0
7
28-Nov-13
Issue purchase order for RFCC Air Blower
J0000MPC05
Issue purchase order for RFCC Wet Gas Compressors
0
72
28-Nov-13
Issue purchase order for RFCC Wet Gas Compressors
J0000MPC18
Issue POs for All Remaining Mechanical Equipment
0
77
12-Feb-14
J0000MPC19
Issue POs for All Major Elec trical Equipment
0
17
25-Jun-14
J0000MPC20
Issue POs for HVAC, Fire Fighting Equipment
0
52
04-Nov-14
J0000MPC21
Issue POs for Major Instrument Controls Systems
0
47
19-Nov-13
J0000MPC22
Issue POs for All F ield Ins trument Tagged Items
0
126
13-Mar-14
J0000MPC23
Issue 1st PO for Bulk Piping Materials
0
6
01-Apr-14
J0000MPC24
Issue 1st PO for Bulk Electrical Materials
0
80
28-Apr-14
J0000MPC25
Issue Last PO for Bulk Electrical Materials
0
110
03-Sep-14
J0000MPC26
Issue 1st PO for Bulk Instrument Materials
0
91
10-Oct-14
J0000MPC27
Issue Last PO for Bulk Instrument Materials
0
134
12-Mar-15
J0000MPC28
Final List of Two Years Operation & Maint. Spare
0
98
01-Jul-16
S0000MPC01
Issue purchase order for CDU Crude Distillation Column
0
0
17-Jan-14
S0000MPC06
Issue purchase order for KHDS Recycle Compressor
0
74
31-Dec-13
S0000MPC07
Issue purchase order for GO HDS Reactors
0
79
05-Dec-13
S0000MPC08
Issue purchase order for Ar omatics UOP Rotary valve
0
41
06-Dec-13
S0000MPC11
Issue purchase order for Polypropylene Loop Reactors
0
78
24-Oct-13
S0000MPC12
Issue purchase order for Polypropylene Pelletizer Unit
0
97
05-Dec-13
Issue purchase order for Polypropylene Pelletizer Unit
S0000MPC13
Issue purchase order for Utilities GTG Packages
0
72
29-Nov-13
Issue purchase order for Utilities GTG Packages
S0000MPC14
Issue purchase order for Utilities HHP MP Steam Turbine Generator
0
91
29-Nov-13
Issue purchase order for Utilities HHP MP Steam Turbine Generator
S0000MPC15
Issue purchase order for Utilities HRSG packages
0
75
17-Feb-14
Issue purchase order for Utilities HRSG packages
S0000MPC18
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment
0
74
29-Aug-14
S0000MPC19
Issue purchase orders for all major electrical Equipment
0
96
31-Jul-14
S0000MPC21
Issue purchase order for all major instrument control systems
0
80
17-Jul-14
Issue purchase order for all major instrument control systems
S0000MPC22
Issue purchase orders for all field instrument tagged items
0
82
15-Jul-14
Issue purchase orders for all field instrument tagged items
S0000MPC23
Issue 1st purchase orders for bulk piping materials
0
60
29-Jan-14
S0000MPC24
Issue 1st purchase orders for bulk electrical materials
0
65
01-Jul-14
S0000MPC25
Issue last purchase orders for bulk electrical materials
0
62
28-Nov-14
S0000MPC26
Issue 1st purchase orders for bulk instrument materials
0
49
31-Oct-14
S0000MPC27
Issue last purchase orders for bulk instrument materials
0
87
31-Dec-14
S0000MPC28
Final listing of two year operation and maintenance spares per item of equipment, with
0
25
31-Aug-15
T0000MPC09
Issue purchase order Recovery plus system
0
16
29-Nov-13
T0000MPC10
Issue purchase order for CCR Regenerator
0
3
30-Dec-13
T0000MPC18
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment
0
85
25-Apr-14
T0000MPC19
Issue purchase orders for all major electrical Equipment
0
13
22-Aug-14
T0000MPC21
Issue purchase order for all major instrument control systems
0
59
11-Mar-14
T0000MPC22
Issue purchase orders for all field instrument tagged items
0
46
17-Oct-14
T0000MPC23
Issue 1st purchase orders for bulk piping materials
0
71
27-Feb-14
T0000MPC24
Issue 1st purchase orders for bulk electrical materials
0
50
09-Sep-14
T0000MPC25
Issue last purchase orders for bulk electrical materials
0
63
01-Oct-14
T0000MPC26
Issue 1st purchase orders for bulk instrument materials
0
65
13-Aug-14
T0000MPC27
Issue last purchase orders for bulk instrument materials
0
84
19-Sep-14
T0000MPC28
Final listing of two year operation and maintenance spares per item of equipment, with
0
57
15-Jun-15
53 31-Jul-14
15
22-Nov-16
16-Apr-15
RHDS Fixed Bed Reactors delivered to site
RHDS Recycle Gas Compressors delivered to site
Manufacturing & Delivery Milestones
M
C0000MMD02
RHDS Fixed Bed Reactors delivered to site
450
0
Issue purchase orders for all field instrument tagged items
Issue 1st purchase orders for bulk piping materials
Issue 1st purchase orders for bulk electrical materials
Issue last purchase orders for bulk electrical materials
Issue 1st purchase orders for bulk instrument materials
Issue last purchase orders for bulk instrument materials
Final listing of two year operat
Issue POs for All Remaining Mechanical Equipment
Issue POs for All Major Elec trical Equipment
Issue POs for HVAC, Fire Fighting Equipment
Issue POs for Major Instrument Controls Systems
Issue POs for All F ield Ins trument Tagged Items
Issue 1st PO for Bulk Piping Materials
Issue 1st PO for Bulk Electrical Materials
Issue Last PO for Bulk Electrical Materials
Issue 1st PO for Bulk Instrument Materials
Issue Last PO for Bulk Instrument Materials
Final List of Two Years Operation & Maint. Spa
Issue purchase order for CDU Crude Distillation Column
Issue purchase order for KHDS Recycle Compressor
Issue purchase order for GO HDS Reactors
Issue purchase order for Ar omatics UOP Rotary valve
Issue purchase order for Polypropylene Loop Reactors
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment Packages
Issue purchase orders for all major electrical Equipment
Issue 1st purchase orders for bulk piping materials
Issue 1st purchase orders for bulk electrical materials
Issue last purchase orders for bulk electrical materials
Issue 1st purchase orders for bulk instrument materials
Issue last purchase orders for bulk instrument materials
Final listing of two year operation and maintenance spares per item of equipment
Issue purchase order Recovery plus system
Issue purchase order for CCR Regenerator
Issue purchase orders for all remaining Mechanical / Rotating Equipment & Equipment Packages
Issue purchase orders for all major electrical Equipment
Issue purchase order for all major instrument control systems
Issue purchase orders for all field instrument tagged items
Issue 1st purchase orders for bulk piping materials
Issue 1st purchase orders for bulk electrical materials
Issue last purchase orders for bulk electrical materials
Issue 1st purchase orders for bulk instrument materials
Issue last purchase orders for bulk instrument materials
Final listing of two year operation and maintenance spares per item of equipment, with pri
C0000MMD03
RHDS Recycle Gas Compressors delivered to site
0
34
15-Apr-15
C0000MMD15
Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to site
0
69
17-Aug-15
C0000MMD16
All major Electrical Equipment delivered to site
0
154
02-Mar-15
C0000MMD17
HVAC, Fire Detection and Fire Fighting Systems for all buildings delivered to site
0
128
16-Mar-15
C0000MMD18
Major instrument control systems delivered to site
0
65
29-Sep-15
C0000MMD19
Instrument Control Systems for CCB delivered to site
0
65
29-Sep-15
C0000MMD20
Field instrument tagged items delivered to site
0
61
19-Jun-15
C0000MMD21
Bulk piping materials initial MTO delivered to site
0
86
29-Sep-14
C0000MMD22
Bulk piping materials final MTO delivered to site
0
59
28-Jan-16
C0000MMD23
Bulk electrical materials initial MTO delivered to site
0
67
01-Dec-14
C0000MMD24
Bulk instrument materials initial MTO delivered to site
0
98
29-Jul-15
C0000MMD25
Bulk instrument materials final MTO delivered to site
0
116
02-Jul-15
C0000MMD26
Insurance spares for all equipment & packages arrival at site and handover to Employe
0
69
16-Nov-15
C0000MMD27
Commissioning and Initial Operation Spares & Consumables arrival at site and handove
0
69
11-Aug-16
Commissioning and Initial Operation Spare
G0000MMD15
Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to site
0
75
14-Jan-16
Remaining Mechanical / Rotating Equipment & Equipment Packag
G0000MMD16
All major electrical Equipment delivered to site
0
144
07-Dec-15
G0000MMD17
HVAC, Fire Detection and Fire Fighting Systems for all buildings delivered to site
0
84
07-Sep-15
G0000MMD18
Major Instrument Control Systems Delivered to Site
0
128
18-Sep-15
G0000MMD19
Instrument Control Systems for CCB delivered to site
0
128
18-Sep-15
G0000MMD20
Field instrument tagged items delivered to site
0
165
18-Jun-15
G0000MMD21
Bulk piping materials initial MTO delivered to site
0
67
31-Oct-14
G0000MMD22
Bulk piping materials final MTO delivered to site
0
125
26-Nov-15
G0000MMD23
Bulk electrical materials initial MTO delivered to site
0
154
02-May-15
G0000MMD24
Bulk instrument materials initial MTO delivered to site
0
125
23-Jun-15
G0000MMD25
Bulk instrument materials final MTO delivered to site
0
118
12-Nov-15
G0000MMD26
Insurance spares for all equipment & packages arrival at site and handover to Employe
0
97
22-Nov-16
G0000MMD27
Commissioning and Initial Operation Spares and Consumables arrival at site and hando
0
97
22-Nov-16
J0000MMD04
RFCC Air Blower Delivered to Site
0
17
31-Oct-15
J0000MMD05
RFCC Wet Gas Compressor Delivered to Site
0
26
30-Jul-15
J0000MMD15
Remaining Mechanical Equipment Delivered to Site
0
114
29-Nov-15
J0000MMD16
All Major Electrical Equipment Delivered to Site
0
83
25-Jun-15
J0000MMD17
HVAC, Fire Fighting Systems Delivered to Site
0
185
29-Aug-15
J0000MMD18
Major Instrument Control Systems Delvd to Site
0
144
26-Nov-15
J0000MMD20
Field Instrument Tagged Items Delivered to Site
0
108
17-Aug-15
J0000MMD21
Bulk Piping Materials 1st MTO Delivered to Site
0
143
27-Nov-14
J0000MMD22
Bulk Piping Material Final MTO Delivered to Site
0
175
11-Oct-15
J0000MMD23
Bulk Electrical Matls 1st MTO Delivered to Site
0
158
22-Feb-15
J0000MMD24
Bulk Instrument Matls 1st MTO Delivered to Site
0
143
07-Jul-15
J0000MMD25
Bulk Instrument Matl Final MTO Delivered to Site
0
143
15-Oct-15
J0000MMD26
Insurance Spares for All Equipment Arrival @Site
0
145
01-Jul-16
J0000MMD27
Comm'ng & Initial Operation Spares Arr ival @Site
0
46
07-Oct-16
S0000MMD01
CDU Crude Distillation Column delivered to site
0
29
15-May-15
S0000MMD06
KHDS Recycle Compressor delivered to site
0
83
28-Feb-15
S0000MMD07
GO HDS Reactors delivered to site
0
64
30-Apr-15
S0000MMD08
AROMATICS UOP Rotary valve delivered to site
0
50
23-Sep-15
S0000MMD10
Polypropylene Loop Reactors delivered to site
0
0
30-Jun-15
S0000MMD11
Polypropylene Pelletizer Unit delivered to site
0
74
15-Jun-15
S0000MMD12
Utilities GTG Packages delivered to site
0
0
30-Jun-15
S0000MMD13
Utilities HHP MP Steam Turbine Generator delivered to site
0
74
31-May-15
S0000MMD14
Utilities HRSG packages delivered to site
0
84
17-Mar-15
S0000MMD15
Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to site
0
76
23-Sep-15
S0000MMD16
All major electrical Equipment delivered to site
0
44
30-Sep-15
S0000MMD18
Major instrument control systems delivered to site
0
83
31-Oct-15
S0000MMD20
Field instrument tagged items delivered to site
0
83
15-Mar-15
S0000MMD21
Bulk piping materials initial MTO delivered to site
0
67
31-Jul-14
S0000MMD22
Bulk piping materials final MTO delivered to site
0
89
13-Aug-15
S0000MMD23
Bulk electrical materials initial MTO delivered to site
0
85
28-Feb-15
S0000MMD24
Bulk instrument materials initial MTO delivered to site
0
49
31-May-15
S0000MMD25
Bulk instrument materials final MTO delivered to site
0
89
30-Nov-15
S0000MMD26
Insurance spares for all equipment & packages arrival at site and handover to Employe
0
42
22-Nov-16
S0000MMD27
Commissioning and Initial Operation Spares and Consumables arrival at site and hando
0
42
22-Nov-16
T0000MMD09
AROMATICS Recovery plus system delivered to site
0
64
17-Sep-15
T0000MMD15
Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to site
0
26
26-Nov-15
T0000MMD16
All major electrical Equipment delivered to site
0
30
26-Sep-15
All major electrical Equipment delivered to site
T0000MMD18
Major instrument control systems delivered to site
0
92
23-Sep-15
Major instrument control systems delivered to site
T0000MMD19
Instrument Control Systems for ISB delivered to site
0
92
23-Sep-15
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
HVAC, Fire Detection and Fire Fighting Systems for all buildings delivered to site
Major instrument control systems delivered to site
Instrument Control Systems for CCB delivered to site
Field instrument tagged items delivered to site
Bulk piping materials initial MTO delivered to site
Bulk piping materials final MTO delivered to site
Bulk electrical materials initial MTO delivered to site
Bulk instrument materials initial MTO delivered to site
Bulk instrument materials final MTO delivered to site
Insurance spares for all equipment & packages arrival at site and hando
All major electrical Equipment delivered to site
HVAC, Fire Detection and Fire Fighting Systems for all buildings delivered to site
Major Instrument Control Systems Delivered to Site
Instrument Control Systems for CCB delivered to site
Field instrument tagged items delivered to site
Bulk piping materials initial MTO delivered to site
Bulk piping materials final MTO delivered to site
Bulk electrical materials initial MTO delivered to site
Bulk instrument materials initial MTO delivered to site
Bulk instrument materials final MTO delivered to site
Insurance spares for all equip
Commissioning and Initial Ope
RFCC Air Blower Delivered to Site
RFCC Wet Gas Compressor Delivered to Site
Remaining Mechanical Equipment Delivered to Site
All Major Electrical Equipment Delivered to Site
HVAC, Fire Fighting Systems Delivered to Site
Major Instrument Control Systems Delvd to Site
Field Instrument Tagged Items Delivered to Site
Bulk Piping Materials 1st MTO Delivered to Site
Bulk Piping Material Final MTO Delivered to Site
Bulk Electrical Matls 1st MTO Delivered to Site
Bulk Instrument Matls 1st MTO Delivered to Site
Bulk Instrument Matl Final MTO Delivered to Site
Insurance Spares for All Equipment Arrival @S
Comm'ng & Initial Operation Spares
CDU Crude Distillation Column delivered to site
KHDS Recycle Compressor delivered to site
GO HDS Reactors delivered to site
AROMATICS UOP Rotary valve delivered to site
Polypropylene Loop Reactors delivered to site
Polypropylene Pelletizer Unit delivered to site
Utilities GTG Packages delivered to site
Utilities HHP MP Steam Turbine Generator delivered to site
Utilities HRSG packages delivered to site
Remaining Mechanical / Rotating Equipment & Equipment Packages delivered
All major electrical Equipment delivered to site
Major instrument control systems delivered to site
Field instrument tagged items delivered to site
Bulk piping materials initial MTO delivered to site
Bulk piping materials final MTO delivered to site
Bulk electrical materials initial MTO delivered to site
Bulk instrument materials initial MTO delivered to site
Bulk instrument materials final MTO delivered to site
Insurance spares for all equip
Commissioning and Initial Ope
AROMATICS Recovery plus system delivered to site
Remaining Mechanical / Rotating Equipment & Equipment Packages de
Instrument Control Systems for ISB delivered to site
Page 3 of 179
Actual Work
Remaining Work
Remaining Mechanical / Rotating Equipment & Equipment Packages delivered to s
All major Electrical Equipment delivered to site
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
Field instrument tagged items delivered to site
T0000MMD20
Field instrument tagged items delivered to site
0
79
03-Oct-15
T0000MMD21
Bulk piping materials initial MTO delivered to site
0
88
01-Dec-14
T0000MMD22
Bulk piping materials final MTO delivered to site
0
97
17-Sep-15
T0000MMD23
Bulk electrical materials initial MTO delivered to site
0
71
23-Apr-15
T0000MMD24
Bulk instrument materials initial MTO delivered to site
0
97
20-May-15
T0000MMD25
Bulk instrument materials final MTO delivered to site
0
93
25-Sep-15
T0000MMD26
Insurance spares for all equipment & packages arrival at site and handover to Employe
0
64
17-Sep-15
Insurance spares for all equipment & packages arrival at site and handover to
T0000MMD27
Commissioning & Initial Operation Spares & Consumables arrival at site and handover
0
64
14-Feb-16
Commissioning & Initial Operation Spares & Consumables arr
38 23-Oct-13
98 23-Jan-14
17-Dec-16
Construction & Commissioning
Commissio
Milestones
C0000MCE01
Commence on site
614
0
Bulk piping materials initial MTO delivered to site
Bulk piping materials final MTO delivered to site
Bulk electrical materials initial MTO delivered to site
Bulk instrument materials initial MTO delivered to site
Bulk instrument materials final MTO delivered to site
Commence on site
C0000MCE03
Complete site preparation and ground improvement works
0
22
27-Jun-14
C0000MCE04
Complete construction of foundations for RHDS Reactor
0
44
14-Feb-15
C0000MCE05
Complete construction of foundations for RHDS Recycle Gas Compressor
0
105
06-Feb-15
C0000MCE10
Complete construction of foundations for all remaining mechanical, rotating & package
0
149
18-Sep-15
C0000MCE13
Complete construction of foundation and superstructure works for unit substation build
0
149
18-Sep-15
C0000MCE14
Complete all underground piping including Sea Cooling Water
0
92
16-May-15
C0000MCE15
Complete installation of all underground electrical cabling
0
135
03-Sep-15
C0000MCE16
Complete Installation of all underground instrument cabling
0
130
30-Nov-15
C0000MCE17
Complete construction of instrument satellite buildings to ready for installation of contro
0
154
31-Jul-15
C0000MCE18
Complete installation of steel structure works for compressor shelter and package unit
0
148
30-Nov-15
C0000MCE20
Complete installation of RHDS Reactors
0
111
16-Jun-15
C0000MCE26
Complete installation of all remaining mechanical, rotating & package equipment
0
152
15-Feb-16
C0000MCE27
Complete of Heavy Lifts
0
75
30-Oct-15
C0000MCE28
Start Piping Fabrication
0
C0000MCE29
Complete 50% piping prefabrication
0
118
16-Jun-15
C0000MCE30
Complete 100% piping prefabrication
0
66
02-Jan-16
C0000MCE31
Complete installation of pipe support, sleeper, tretle, etc.
0
113
27-May-16
C0000MCE32
Start piping erection
0
162 31-Mar-15
C0000MCE33
Piping erection 50% complete
0
118
16-Nov-15
C0000MCE34
Piping erection 100% complete
0
86
04-Jun-16
C0000MCE35
Piping hydrotesting commence
0
75 09-Nov-15
C0000MCE36
Piping hydrotesting 50% complete
0
32
29-Mar-16
C0000MCE37
Piping hydrotesting 100% complete
0
81
04-Jul-16
C0000MCE38
Complete all Piping tie-ins
0
118
16-Nov-15
C0000MCE39
Complete heat tracing, insulation, fireproofing and painting works
0
23
26-Oct-16
Complete heat tracing, insulation,
C0000MCE40
Complete installation of platform, walkways, cross-overs, etc.
0
118
26-Feb-16
Complete installation of platform, walkways, cross-overs, etc
C0000MCE41
Complete installation of substation electrical eqpt.
0
126
29-Feb-16
Complete installation of substation electrical eqpt.
C0000MCE42
Trenches for Main Electrical Feeder cables Main to Unit Substations available
0
105
22-Apr-15
C0000MCE43
Complete electrical cabling and termination work (field works) for all plant facilities inclu
0
114
13-May-16
Complete electrical cabling and termination work (fie
C0000MCE44
Complete lighting work
0
118
09-May-16
Complete lighting work
C0000MCE50
Complete installation termination & testing of 33KV Feeders to Process Substation rea
0
118
26-Feb-16
C0000MCE51
Complete motor runs
0
30
19-Oct-16
C0000MCE52
Complete installation of all instrumentation equipment in new Instrument Satellite buildin
0
130
04-Jan-16
Complete installation of all instrumentation equipment in new Instru
C0000MCE53
Complete installation package unit control system ready for precom. checks
0
117
04-Jan-16
Complete installation package unit control system ready for precom
C0000MCE54
Complete instrument cabling & termination work ready for precom. checks
0
128
25-Mar-16
C0000MCE55
Complete SAT on DCS/ESD
0
119
01-Feb-16
C0000MCE56
Complete Pre-commissioning checks
0
21
28-Oct-16
C0000MCE62
Sea Water / Closed circuit Cooling water Mechanical completion
0
198
17-Jun-15
G0000MCE01
Commence on site
0
G0000MCE03
Complete site preparation and ground improvement works
0
101
18-Apr-14
G0000MCE06
Complete construction of foundations for Flare package
0
106
01-Aug-15
G0000MCE08
Complete Foundations for Waste water treatment package
0
59
17-Jun-15
G0000MCE10
Complete construction of foundations for all remaining mechanical, rotating & packaged
0
151
17-Feb-16
Complete construction of foundations for all remaining mecha
G0000MCE13
Complete construction of foundation and superstructure works for unit substation build
0
148
18-Sep-15
Complete construction of foundation and superstructure works for unit substat
G0000MCE15
Complete installation of all underground electrical cabling
0
37
05-Sep-16
Complete installation of all underground
G0000MCE16
Complete installation of all underground instrument cabling
0
94
03-Aug-16
Complete installation of all underground ins
G0000MCE17
Complete construction of instrument satellite buildings to ready for installation of contro
0
55
18-Feb-16
Complete construction of instrument satellite buildings to read
G0000MCE18
Complete installation of steel structural works for Compressor shelters, and Package U
0
138
13-Jun-16
G0000MCE19
CCB completed for commencement of installation of Control Equipment
0
59
28-Aug-15
G0000MCE22
Complete installation of Flare package
0
82
24-Dec-15
G0000MCE23
Complete installation of Sea Water cooling water pumps
0
61
08-Mar-16
G0000MCE25
Complete installation of site erected tankage
0
139
11-Jun-16
G0000MCE26
Complete installation of all remaining mechanical, rotating & packaged equipment
0
15
10-Aug-16
G0000MCE27
Completion of Heavy Lifts
0
7
18-Feb-16
G0000MCE28
Start Piping Prefabrication
0
54 28-Nov-14
G0000MCE29
Complete Prefabrication 50% Piping.
0
76
19-Nov-15
G0000MCE30
Complete Prefabrication 100% Piping
0
78
03-Feb-16
G0000MCE31
Complete installation of pipe supports, sleepers, trestles etc
0
47
05-Sep-16
G0000MCE32
Start Piping erection
0
41 02-Apr-15
G0000MCE33
Piping Erection 50% Complete
0
117
07-Jul-16
G0000MCE34
Piping Erection 100% Complete
0
19
05-Sep-16
G0000MCE35
Piping Hydrotesting commence
0
G0000MCE36
Piping Hydrotesting 50% complete
0
37
14-Jun-16
G0000MCE37
Piping Hydrotesting 100% complete
0
47
28-Sep-16
G0000MCE38
Complete all piping tie.ins
0
19
05-Sep-16
G0000MCE39
Complete Heat Tr acing, Insulation, Fire Proofing and Painting works
0
68
01-Nov-16
Complete Heat Tr acing, Insulatio
G0000MCE40
Complete installation of platforms, walk.ways, cross.overs etc.
0
125
01-Mar-16
Complete installation of platforms, walk.ways, cross.overs e
G0000MCE41
Complete installation of all Substation electrical equipment.
0
52
02-Apr-16
Complete installation of all Substation electrical equipmen
G0000MCE42
Trenches for Main Electrical Feeder cables Main to Unit Substations available
0
44
02-Feb-16
Trenches for Main Electrical Feeder cables Main to Unit Substa
G0000MCE43
Complete electrical cabling and termination works (field works) for all plant facilities inc
0
52
22-Sep-16
Complete electrical cabling and termi
G0000MCE44
Complete Lighting
0
42
04-Oct-16
G0000MCE45
All service connections to new laboratory live
0
35
12-Oct-16
G0000MCE46
Complete CCB refurbishment ready for Control panel installation
0
19
28-Aug-15
G0000MCE48
11KV boards available for energisation in Utilities area substations SS U01 . U04
0
87
03-Nov-15
11KV boards available for energisation in Utilities area substations SS U0
G0000MCE49
11KV board available for energisation in Offsites area substations SS O01.O05
0
62
03-Nov-15
11KV board available for energisation in Offsites area substations SS O01
G0000MCE50
Complete Installation termination & testing of 33KV Feeders to Process Substations re
0
152
19-Dec-15
Complete Installation termination & testing of 33KV Feeders to Proce
G0000MCE51
Complete motor runs
0
122
31-May-16
G0000MCE52
Complete Installation of All ISB Instrument Eqpt
0
155
18-Apr-16
G0000MCE53
Complete installation of package unit control systems ready for Pre.commissioning che
0
161
14-Jul-16
G0000MCE54
Complete instrument cabling and termination works ready for Pre.commissioning chec
0
64
03-Aug-16
G0000MCE55
Complete SAT on DCS/ESD
0
155
18-Apr-16
G0000MCE56
Complete Pre.commissioning checks
0
70
22-Nov-16
G0000MCE60
Drainage & Effluent Treatment systems Mechanical Completion
0
107
07-Jul-16
G0000MCE62
Sea Water / Closed circuit Cooling water Mechanical Completion
0
13
20-May-16
Sea Water / Closed circuit Cooling water Mechanic
G0000MCE64
Fuel Gas available at battery limits all Flare systems R.F.S.U.
0
106
24-May-16
Fuel Gas available at battery limits all Flare system
G0000MCE65
Crude Oil SPM / Pipeline Crude oil Storage & Pumping Unit Mechanical Completion
0
54
20-Sep-16
G0000MCE66
Final Mechanical Completion Certificate issued
0
0
22-Nov-16
J0000MCE01
Construction Commence On Site
0
3 23-Oct-13
J0000MCE10
Complete Construction of All Foundations
0
50
14-Dec-15
J0000MCE13
Complete Const. of Unit S/S Superstructure Works
0
107
28-Feb-15
J0000MCE15
Complete Installation All U/G Electrical Cabling
0
70
20-Jan-16
J0000MCE16
Complete Installation All U/G Instrument Cabling
0
63
29-Apr-16
J0000MCE17
Complete Const. of ISB Ready for Control Install
0
113
04-Nov-15
J0000MCE18
Complete Inst'n of Steel Str'l Works Comp Shelters & Package Units etc.
0
118
31-Aug-15
J0000MCE26
Complete Instal of All Remaining Mec h, Rotary, Pkgs
0
41
09-Jun-16
J0000MCE27
Completion of Heavy Lifts
0
8
25-Mar-16
J0000MCE28
Start Piping Prefabrication
0
50 02-Jan-15
J0000MCE29
Complete Prefabrication 50% Piping.
0
50
04-May-15
J0000MCE30
Complete Prefabrication 100% Piping
0
2
20-Jan-16
J0000MCE31
Complete Installation of Pipe Supports, Sleeper
0
66
26-Aug-16
J0000MCE32
Start Piping Erection
0
26 23-Apr-15
J0000MCE33
Piping Erection 50% Complete
0
8
26-Apr-16
J0000MCE34
Piping Erection 100% Complete
0
55
20-Jun-16
J0000MCE35
Piping Hydrotesting Commence
0
163 29-Sep-15
J0000MCE36
Piping Hydrotesting 50% Complete
0
163
11-Feb-16
J0000MCE37
Piping Hydrotesting 100% Complete
0
66
26-Aug-16
J0000MCE39
Complete Heat Tr acing, Insulation, Fire Proofing
0
35
12-Oct-16
J0000MCE40
Complete Installation Platforms, Walk-ways, Etc.
0
40
07-Apr-16
J0000MCE41
Complete Installation of All S/S Electrical Eqpt
0
19
24-Oct-15
J0000MCE42
Trenches for Main Elec. Feeder Cables Available
0
95
15-Aug-15
Complete construction of foundation and superstructure works for unit substat
Complete all underground piping including Sea Cooling Water
Complete installation of all underground electrical cabling
Complete Installation of all underground instrument cabling
Complete construction of instrument satellite buildings to ready for installation of con
Complete installation of steel structure works for compressor shelter a
Complete installation of RHDS Reactors
Complete installation of all remaining mechanical, rotating & pa
Complete of Heavy Lifts
Complete 50% piping prefabrication
Complete 100% piping prefabrication
Complete installation of pipe support, sleeper, tretle
Start piping erection
Piping erection 50% complete
Piping erection 100% complete
Piping hydrotesting commence
49 19-Apr-14
Piping hydrotesting 50% complete
Piping hydrotesting 100% complete
Complete all Piping tie-ins
Trenches for Main Electrical Feeder cables Main to Unit Substations available
Complete installation termination & testing of 33KV Feeders t
Complete motor runs
Complete instrument cabling & termination work ready for
Complete SAT on DCS/ESD
Complete Pre-commissioning ch
Sea Water / Closed circuit Cooling water Mechanical completion
Commence on site
Complete site preparation and ground improvement works
Complete construction of foundations for Flare package
Complete Foundations for Waste water treatment package
Complete installation of steel structural works fo
CCB completed for commencement of installation of Control Equipment
Complete installation of Flare package
Complete installation of Sea Water cooling water pumps
Complete installation of site erected tankage
Complete installation of all remaining mech
Completion of Heavy Lifts
Start Piping Prefabrication
Complete Prefabrication 50% Piping.
Complete Prefabrication 100% Piping
Complete installation of pipe supports,
Start Piping erection
Piping Erection 50% Complete
Piping Erection 100% Complete
101 25-Nov-15
Piping Hydrotesting commence
Piping Hydrotesting 50% complete
Piping Hydrotesting 100% complete
Complete all piping tie.ins
Complete Lighting
All service connections to new labo
Complete CCB refurbishment ready for Control panel installation
Complete motor runs
Complete Installation of All ISB Instrument Eqpt
Complete installation of package unit control
Complete instrument cabling and terminatio
Complete SAT on DCS/ESD
Complete Pre.commissioning
Drainage & Effluent Treatment systems Mech
Crude Oil SPM / Pipeline Crude oil Sto
Final Mechanical Completion C
Construction Commence On Site
Complete Construction of All Foundations
Complete Const. of Unit S/S Superstructure Works
Complete Installation All U/G Electrical Cabling
Complete Installation All U/G Instrument Cabling
Complete Const. of ISB Ready for Control Install
Complete Inst'n of Steel Str'l Works Comp Shelters & Package Units etc.
Complete Instal of All Remaining Mec h, Rotary, P
Completion of Heavy Lifts
Start Piping Prefabrication
Complete Prefabrication 50% Piping.
Complete Prefabrication 100% Piping
Complete Installation of Pipe Supports, S
Start Piping Erection
Piping Erection 50% Complete
Piping Erection 100% Complete
Piping Hydrotesting Commence
Piping Hydrotesting 50% Complete
Piping Hydrotesting 100% Complete
Complete Heat Tr acing, Insulation,
Complete Installation Platforms, Walk-ways, Etc.
Complete Installation of All S/S Electrical Eqpt
Trenches for Main Elec. Feeder Cables Available
Page 4 of 179
Detail Engineering, Procurement, and
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
Complete construction of foundations for all remaining mechanical, rotating & p
Start Piping Fabrication
Critical Remaining Work
Milestone
Complete construction of foundations for RHDS Reactor
Complete construction of foundations for RHDS Recycle Gas Compressor
33 01-Nov-14
Actual Work
Remaining Work
Complete site preparation and ground improvement works
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
Complete Electrical Cabling & Termination Works
J0000MCE43
Complete Electrical Cabling & Termination Works
0
18
16-Mar-16
J0000MCE44
Complete Lighting
0
80
19-Aug-16
Complete Lighting
J0000MCE50
Comp. Termination & Testing of 33KV Feeders
0
28
05-Dec-15
Comp. Termination & Testing of 33KV Feeders
J0000MCE51
Complete Motor Runs
0
0
22-Nov-16
J0000MCE52
Complete Installation of All ISB Instrument Eqpt
0
48
21-Apr-16
J0000MCE54
Complete Instrument Cabling & Termination Wor ks
0
68
04-May-16
Complete Instrument Cabling & Termination Wor ks
J0000MCE55
Complete SAT on DCS/ESD
0
66
06-May-16
Complete SAT on DCS/ESD
J0000MCE56
Complete Pre-commissioning Works
0
0
22-Nov-16
S0000MCE01
Commence on site
0
43 10-Mar-14
S0000MCE03
Complete site preparation and ground improvement works
0
79
16-Sep-14
S0000MCE07
Complete Foundations for GTG's Utility unit
0
14
28-Aug-15
S0000MCE10
Complete construction of foundations for all remaining mechanical, rotating & packaged
0
57
15-Dec-15
S0000MCE11
Complete all interconnecting Piperack foundations
0
87
28-Feb-15
S0000MCE12
Complete construction of foundation and superstructure works for main Substation bui
0
15
30-Jun-15
S0000MCE13
Complete construction of foundation and superstructure works for unit substation build
0
55
30-Nov-15
Complete construction of foundation and superstructure works for uni
S0000MCE14
Complete all underground piping including Sea Cooling Water and closed circuit cooling
0
43
30-Jun-15
Complete all underground piping including Sea Cooling Water and closed circuit cooling
S0000MCE15
Complete installation of all underground electrical cabling
0
79
20-Feb-16
S0000MCE16
Complete installation of all underground instrument cabling
0
73
29-Feb-16
S0000MCE17
Complete construction of instrument satellite buildings to ready for installation of contro
0
27
01-Oct-15
S0000MCE18
Complete installation of steel structural works for Steel shelters, and Package Units etc
0
49
15-Mar-16
S0000MCE21
Complete installation of main air compressor package
0
38
01-Oct-15
S0000MCE24
Complete installation of GTG's
0
50
15-Oct-15
S0000MCE26
Complete installation of all remaining mechanical, rotating & packaged equipment
0
26
29-Feb-16
S0000MCE27
Completion of Heavy Lifts
0
49
30-Jan-16
S0000MCE28
Start Piping Prefabrication
0
46 01-Aug-14
S0000MCE29
Complete prefabrication 50% piping.
0
44
30-Sep-15
S0000MCE30
Complete prefabrication 100% piping
0
38
15-Mar-16
S0000MCE31
Complete installation of pipe supports, sleepers, trestles etc
0
58
14-May-16
S0000MCE32
Start Piping erection
0
71 01-Dec-14
S0000MCE33
Piping erection 50% Complete
0
73
28-Dec-15
S0000MCE34
Piping Erection 100% complete
0
60
15-Jul-16
S0000MCE35
Piping Hydrotesting commence
0
57 01-Sep-15
S0000MCE36
Piping Hydrotesting 50% complete
0
76
31-Mar-16
S0000MCE37
Piping Hydrotesting 100% complete
0
75
25-Aug-16
S0000MCE38
Complete all piping tie ins
0
73
30-Jun-16
S0000MCE39
Complete Heat Tr acing, Insulation, Fire Proofing and Painting works
0
45
30-Sep-16
S0000MCE40
Complete installation of platforms, walk ways, cross overs etc.
0
42
13-Jul-16
S0000MCE41
Complete installation of all Substation electrical equipment.
0
33
31-Mar-16
Complete installation of all Substation electrical equipmen
S0000MCE42
Trenches for Main Electrical Feeder cables Main to Unit Substations available
0
52
30-Sep-15
Trenches for Main Electrical Feeder cables Main to Unit Substations available
S0000MCE43
Complete electrical cabling and termination works (field works) for all plant facilities inc
0
50
24-Sep-16
S0000MCE44
Complete lighting
0
84
15-Aug-16
S0000MCE47
33KV board available for energisation in Main intake Substation
0
13
27-Nov-15
33KV board available for energisation in Main intake Substation
S0000MCE48
11KV boards available for energisation in Utilities area substations SS U01 - U04
0
13
27-Nov-15
11KV boards available for energisation in Utilities area substations SS U
S0000MCE50
Complete Installation termination & testing of 33KV Feeders to Process Substations re
0
35
29-Mar-16
Complete Installation termination & testing of 33KV Feede
S0000MCE51
Complete motor runs
0
48
27-Sep-16
S0000MCE52
Complete installation of all instrumentation equipment in the new instrument Satellite bu
0
71
29-Apr-16
S0000MCE53
Complete installation of package unit control systems ready for Pre commissioning che
0
45
30-Sep-16
Complete installation of package uni
S0000MCE54
Complete instrument cabling and termination works ready for Pre commissioning chec
0
58
15-Sep-16
Complete instrument cabling and term
S0000MCE55
Complete SAT on DCS/ESD
0
71
29-Apr-16
S0000MCE56
Complete Pre commissioning checks
0
70
22-Nov-16
S0000MCE57
Power Generation Unit and Main Substation Mechanical Completion
0
0
27-Sep-16
S0000MCE58
Plant Air, Instrument Air systems, Mechanical Completion
0
0
04-Jul-16
Plant Air, Instrument Air systems, Mechanical
S0000MCE59
Process water, Potable water, Demineralised water, Firewater systems Mechanical Co
0
0
09-Jul-16
Process water, Potable water, Demineralised
S0000MCE61
Nitrogen System Mechanical completion
0
20
03-Sep-16
Nitrogen System Mechanical completio
S0000MCE62
Sea Water / Closed circuit Cooling water Mechanical Completion
0
30
09-Aug-16
Sea Water / Closed circuit Cooling water M
S0000MCE63
Steam and Condensate Generation and Distribution Systems Mechanical Completion
0
0
27-Sep-16
T0000MCE01
Commence on site
0
51
28-Nov-13
T0000MCE03
Complete site preparation and ground improvement works
0
72
15-Nov-14
T0000MCE10
Complete construction of foundations for all remaining mechanical, rotating & packaged
0
66
22-Apr-15
T0000MCE11
Complete all interconnecting Piperack foundations
0
37
14-Feb-15
T0000MCE13
Complete construction of foundation and superstructure works for unit substation build
0
99
15-Jul-15
T0000MCE14
Complete all underground piping including Sea Cooling Water and closed circuit cooling
0
29
27-May-15
T0000MCE15
Complete installation of all underground electrical cabling
0
56
11-Feb-16
T0000MCE16
Complete installation of all underground instrument cabling
0
76
21-Nov-15
T0000MCE17
Complete construction of instrument satellite buildings to ready for installation of contro
0
73
21-Dec-15
T0000MCE18
Complete installation of steel structural works for Compressor shelters, and Package U
0
37
24-Dec-15
T0000MCE26
Complete installation of all remaining mechanical, rotating & packaged equipment
0
82
05-Oct-15
T0000MCE27
Completion of Heavy Lifts
0
79
12-Jan-16
T0000MCE28
Start Piping Prefabrication
0
66
16-Jan-15
T0000MCE29
Complete prefabrication 50% piping.
0
55
25-May-15
T0000MCE30
Complete prefabrication 100% piping
0
92
24-Aug-15
T0000MCE31
Complete installation of pipe supports, sleepers, trestles etc
0
78
19-Nov-15
T0000MCE32
Start Piping erection
0
69
11-May-15
T0000MCE33
Piping erection 50% Complete
0
70
01-Dec-15
T0000MCE34
Piping Erection 100% complete
0
58
23-Jun-16
T0000MCE35
Piping Hydrotesting commence
0
63
10-Dec-15
T0000MCE36
Piping Hydrotesting 50% complete
0
89
19-Mar-16
T0000MCE37
Piping Hydrotesting 100% complete
0
50
01-Aug-16
T0000MCE38
Complete all piping tie-ins
0
81
19-Dec-15
T0000MCE39
Complete Heat Tr acing, Insulation, Fire Proofing and Painting works
0
54
28-Jul-16
T0000MCE40
Complete installation of platforms, walk-ways, cross-overs etc.
0
61
09-Nov-15
T0000MCE41
Complete installation of all Substation electrical equipment.
0
75
30-Nov-15
T0000MCE42
Trenches for Main Electrical Feeder cables Main to Unit Substations available
0
85
15-Jan-15
T0000MCE43
Complete electrical cabling and termination works (field works) for all plant facilities inc
0
56
11-Feb-16
Complete electrical cabling and termination works (field works
T0000MCE44
Complete lighting
0
98
11-Feb-16
Complete lighting
T0000MCE48
11KV boards available for energisation in Utilities area substations SS U01 - U04
0
73
01-Mar-16
11KV boards available for energisation in Utilities area subst
T0000MCE50
Complete Installation termination & testing of 33KV Feeders to Process Substations re
0
56
11-Feb-16
Complete Installation termination & testing of 33KV Feeders to
T0000MCE51
Complete motor runs
0
20
01-Nov-16
T0000MCE52
Complete installation of all instrumentation equipment in the new instrument Satellite bu
0
77
23-Dec-15
Complete installation of all instrumentation equipment in the new inst
T0000MCE53
Complete installation of package unit control systems ready for Pre-commissioning che
0
60
21-Mar-16
Complete installation of package unit control systems read
T0000MCE54
Complete instrument cabling and termination works ready for Pre-commissioning chec
0
40
07-Apr-16
T0000MCE55
Complete SAT on Main Automation Sys tem/ESD
0
56
21-Mar-16
T0000MCE56
Complete Pre-commissioning checks
0
6
17-Nov-16
T0000MCE58
Plant Air, Instrument Air systems, Mechanical Completion
0
6
17-Nov-16
T0000MCE66
Final Mechanical Completion Certificate issued
0
6
17-Nov-16
V0000MCE02
Complete Const. of Temp. Facilities & Const. Jetty
0
61
29-Nov-14
V0000MCE66
Final Mechanical Completion Certificate Issued
4
17-Dec-16
Interface Milestones
Engineering Interface
Civil General
C0000MIDB10003
JVD Soil Improvement Method to OC - 3rd Priority Areas (Process & Utility Areas)
0
534
60
11
0
79 30-Sep-13
81 29-Nov-13
120 27-Dec-13
41
Complete Motor Runs
Complete Installation of All ISB Instrument Eqpt
Complete Pre-commissioning
Commence on site
Complete site preparation and ground improvement works
Complete Foundations for GTG's Utility unit
Complete construction of foundations for all remaining mechanical, ro
Complete all interconnecting Piperack foundations
Complete construction of foundation and superstructure works for main Substation build
Complete installation of all underground electrical cabling
Complete installation of all underground instrument cabling
Complete construction of instrument satellite buildings to ready for installation
Complete installation of steel structural works for Steel she
Complete installation of main air compressor package
Complete installation of GTG's
Complete installation of all remaining mechanical, rotating &
Completion of Heavy Lifts
Start Piping Prefabrication
Complete prefabrication 50% piping.
Complete prefabrication 100% piping
Complete installation of pipe supports, sleepers, tre
Start Piping erection
Piping erection 50% Complete
Piping Erection 100% complete
Piping Hydrotesting commence
01-Jul-16
22-Apr-14
31-Jan-14
31-Jan-14
Piping Hydrotesting 50% complete
Piping Hydrotesting 100% complete
Complete all piping tie ins
Complete Heat Tr acing, Insulation, F
Complete installation of platforms, walk ways
Complete electrical cabling and term
Complete lighting
Complete motor runs
Complete installation of all instrumentation equipment
Complete SAT on DCS/ESD
Complete Pre commissioning
Power Generation Unit and Main Sub
Steam and Condensate Generation a
Commence on site
Complete site preparation and ground improvement works
Complete construction of foundations for all remaining mechanical, rotating & packaged equipm
Complete all interconnecting Piperack foundations
Complete construction of foundation and superstructure works for unit substation buil
Complete all underground piping including Sea Cooling Water and closed circuit cooling wat
Complete installation of all underground electrical cabling
Complete installation of all underground instrument cabling
Complete construction of instrument satellite buildings to ready for in
Complete installation of steel structural works for Compressor shelt
Complete installation of all remaining mechanical, rotating & packaged equipm
Completion of Heavy Lifts
Start Piping Prefabrication
Complete prefabrication 50% piping.
Complete prefabrication 100% piping
Complete installation of pipe supports, sleepers, trestles etc
Start Piping erection
Piping erection 50% Complete
Piping Erection 100% complete
Piping Hydrotesting commence
Piping Hydrotesting 50% complete
Piping Hydrotesting 100% complete
Complete all piping tie-ins
Complete Heat Tr acing, Insulation, Fire Pro
Complete installation of platforms, walk-ways, cross-overs etc.
Complete installation of all Substation electrical equipment.
Trenches for Main Electrical Feeder cables Main to Unit Substations available
Complete motor runs
Complete instrument cabling and termination works read
Complete SAT on Main Automation Sys tem/ESD
Complete Pre-commissioning c
Plant Air, Instrument Air system
Final Mechanical Completion C
Complete Const. of Temp. Facilities & Const. Jetty
Final Mechanical Completio
JVD Soil Improvement Method to OC - 3rd Priority Areas (Process & Utility Areas)
G0000MIDB10001
Soil Improvement Method to OC - 1st Priority Ar eas (Crude Oil & Interconnecting Pipera
0
6
27-Dec-13
Soil Improvement Method to OC - 1st Priority Ar eas (Crude Oil & Interconnecting Piperack) by JVD
G0000MIDB10002
Soil Improvement Method to OC - 2nd Priority Areas (Other Tank Area & B400) by JVD
0
157
27-Dec-13
Soil Improvement Method to OC - 2nd Priority Areas (Other Tank Area & B400) by JVD
G0000MIDB10003
Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas) by JVD
0
179
31-Jan-14
J0000MIDB10003
Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas)
0
51
31-Jan-14
S0000MIDB10001
Soil Improvement Method to OC - 1st Priority Ar eas by JVD
0
19
27-Dec-13
Soil Improvement Method to OC - 1st Priority Ar eas by JVD
S0000MIDB10002
Soil Improvement Method to OC - 2nd Priority Areas by J VD (B400)
0
0
27-Dec-13
Soil Improvement Method to OC - 2nd Priority Areas by J VD (B400)
S0000MIDB10003
Soil Improvement Method to OC - 3rd Priority Areas by JVD ( Process & Utility Areas)
0
32
31-Jan-14
T0000MIDB10003
Soil Improvement Method confirmed with NSRP (By JVD) - 3rd Priority Areas (Process
0
41
31-Jan-14
V0000MIDB10001
Soil Improvement Method to OC - 1st Priority Ar eas (Crude Oil & IC Piperack)
0
6
27-Dec-13
Soil Improvement Method to OC - 1st Priority Ar eas (Crude Oil & IC Piperack)
V0000MIDB10002
Soil Improvement Method to OC - 2nd Priority Areas (Other Tank Area & B400)
0
0
27-Dec-13
Soil Improvement Method to OC - 2nd Priority Areas (Other Tank Area & B400)
V0000MIDB10003
Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas)
0
32
31-Jan-14
25 29-Nov-13
55
22-Apr-14
29-Nov-13
Conceptual Design for SS-P07 H/O - CYD to GS for Detail Engineering
Conceptual Design for ISB-02 H/O - CYD to GS for Detail Engineering
Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas) by JVD
Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas)
Soil Improvement Method to OC - 3rd Priority Areas by JVD ( Process & Utility Areas)
Soil Improvement Method confirmed with NSRP (By JVD) - 3rd Priority Areas (Process & Utility Areas)
Soil Improvement Method to OC - 3rd Priority Areas (Proc ess & Utility Areas)
Building
CAC00MIDC4A010
Conceptual Design for SS-P07 H/O - CYD to GS for Detail Engineering
60
0
CAC00MIDC4B020
Conceptual Design for ISB-02 H/O - CYD to GS for Detail Engineering
0
55
29-Nov-13
GA200MIDC4B020
A200-Conceptual DWG for Control Building(ISB-05) from JGC
0
41
21-Feb-14
GA300MIDC4A010
A300-Conceptual DWG for Substation(SS-P03) from JGC
0
34
20-Dec-13
GA400MIDC4B010
A400-Conceptual DWG for Control Building(ISB-06) from JGC
0
40
20-Mar-14
A400-Conceptual DWG for Control Building(ISB-06) from JGC
GA900MIDC4A010
A900-Conceptual DWG for Substation(SS-P06) from TP
0
44
09-Apr-14
A900-Conceptual DWG for Substation(SS-P06) from TP
GA900MIDC4B010
A900-Conceptual DWG for Control Building(ISB-09) from TP
0
44
09-Apr-14
A900-Conceptual DWG for Control Building(ISB-09) from TP
Page 5 of 179
Actual Work
Remaining Work
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
A200-Conceptual DWG for Control Building(ISB-05) from JGC
A300-Conceptual DWG for Substation(SS-P03) from JGC
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
AC00-Conceptual DWG for Substation(SS-P07) from CYD
GAC00MIDC4A010
AC00-Conceptual DWG for Substation(SS-P07) from CYD
0
55
29-Nov-13
GAC00MIDC4B020
AC00-Conceptual DWG for Control Building(ISB-02) from CYD
0
55
29-Nov-13
AC00-Conceptual DWG for Control Building(ISB-02) from CYD
GAF00MIDC4A010
AF00-Conceptual DWG for Substation(SS-P02) from JGC
0
34
20-Dec-13
AF00-Conceptual DWG for Substation(SS-P02) from JGC
GAF00MIDC4B020
AF00-Conceptual DWG for Control Building(ISB-04) from JGC
0
31
22-Apr-14
JA200MIDC4B020
A200-Conceptual DWG for Control Building(ISB-05) to GSEC
0
41
21-Feb-14
JA300MIDC4A010
A300-Conceptual DWG for Substation(SS-P03) to GSEC
0
34
20-Dec-13
JA400MIDC4B010
A400-Conceptual DWG for Control Building(ISB-06) to GSEC
0
40
20-Mar-14
JAF00MIDC4A010
AF00-Conceptual DWG for Substation(SS-P02) to GSEC
0
34
20-Dec-13
JAF00MIDC4B020
AF00-Conceptual DWG for Control Building(ISB-04) to GSEC
0
31
22-Apr-14
TA900MIDC4A010
Conceptual Design for Substation (P 06) to GSEC
0
44
09-Apr-14
Conceptual Design for Substation (P 06) to GSEC
TA900MIDC4B010
Conceptual Design for Control Room Building (ISB 09) to GSEC
44
09-Apr-14
Conceptual Design for Control Room Building (ISB 09) to GSEC
Procurement Interface
Civil General
C0000MIEC2110002
JVD Blanket Order PO Issue for Non-pressured GRE Piping Material
0
197
0
0
AF00-Conceptual DWG for Control Building(ISB-04) from JGC
A200-Conceptual DWG for Control Building(ISB-05) to GSEC
A300-Conceptual DWG for Substation(SS-P03) to GSEC
A400-Conceptual DWG for Control Building(ISB-06) to GSEC
AF00-Conceptual DWG for Substation(SS-P02) to GSEC
AF00-Conceptual DWG for Control Building(ISB-04) to GSEC
158 06-Nov-13
62 20-Nov-13
119
31-Oct-14
20-Nov-13
20-Nov-13
JVD Blanket Order PO Issue for Non-pressured GRE Piping Material
G0000MIEC2110002
Blanket Order PO Issue for Non-pressured GRE Piping Material by JVD
0
153
20-Nov-13
Blanket Order PO Issue for Non-pressured GRE Piping Material by JVD
J0000MIEC2110002
Blanket Order PO Issue for Non-pressured GRE Piping Material from JVD
0
37
20-Nov-13
Blanket Order PO Issue for Non-pressured GRE Piping Material from JVD
S0000MIEC2110002
Blanket Order for Non-pressured GRP Piping Material by JVD
0
60
20-Nov-13
Blanket Order for Non-pressured GRP Piping Material by JVD
T0000MIEC2110002
U/G Non-pressured GRE Piping Material - PO by JVD (Frame Agreement)
0
131
20-Nov-13
U/G Non-pressured GRE Piping Material - PO by JVD (Frame Agreement)
V0000MIEC2110002
Blanket Order PO Issue for Non-pressured GRE Piping Material
0
37
20-Nov-13
Blanket Order PO Issue for Non-pressured GRE Piping Material
46 27-Dec-13
108
27-Dec-13
27-Dec-13
JVD Blanket Order PO Issue for Anchor Bolts
JVD Blanket Order PO Issue for Anchor Bolts
0
0
G0000MIEC2120001
Blanket Order PO Issue for Anchor Bolts by JVD
0
111
27-Dec-13
Blanket Order PO Issue for Anchor Bolts by JVD
J0000MIEC2120001
Blanket Order PO Issue for Anchor Bolts from JVD
0
43
27-Dec-13
Blanket Order PO Issue for Anchor Bolts from JVD
S0000MIEC2120001
Blanket Order for Anchor Bolts by JVD
0
37
27-Dec-13
Blanket Order for Anchor Bolts by JVD
T0000MIEC2120001
Anchor Bolts and Nuts - PO by JVD (Frame Agreement)
0
111
27-Dec-13
Anchor Bolts and Nuts - PO by JVD (Frame Agreement)
V0000MIEC2120001
Blanket Order PO Issue for Anchor Bolts
0
37
27-Dec-13
Concrete Structure
C0000MIEC2120001
Piping
C0000MIEC216A109
JVD Blanket Order PO Issue for GRP Pipes and Piping Components
36
0
226 18-Nov-13
61
12-Mar-14
18-Nov-13
Blanket Order PO Issue for Anchor Bolts
JVD Blanket Order PO Issue for GRP Pipes and Piping Components
C0000MIEC216A117
JVD Blanket Order PO Issue for CS Welded Pipes for U/G Piping
0
72
25-Dec-13
JVD Blanket Order PO Issue for CS Welded Pipes for U/G Piping
C0000MIEC216AXXX
JVD Blanket Order PO Issue for Pipes and Piping Components
0
74
25-Dec-13
JVD Blanket Order PO Issue for Pipes and Piping Components
C0000MIEC216BXXXA
JVD Blanket Order PO Issue for Valves (1st Blanket Order)
0
72
27-Dec-13
JVD Blanket Order PO Issue for Valves (1st Blanket Order)
C0000MIEC216BXXXB
JVD Blanket Order PO Issue for Valves (Last Blanket Order)
0
101
25-Feb-14
C0000MIEC216CXXX
JVD Blanket Order PO Issue for Fittings
0
74
25-Dec-13
JVD Blanket Order PO Issue for Fittings
C0000MIEC216D171
JVD Blanket Order PO Issue for Flanges
0
87
12-Dec-13
JVD Blanket Order PO Issue for Flanges
C0000MIEC216E181
JVD Blanket Order PO Issue for Bolts and Nuts
0
148
12-Mar-14
C0000MIEC216F191
JVD Blanket Order PO Issue for Gaskets
0
148
12-Mar-14
G0000MIEC216A109
Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil) by JVD
0
155
18-Nov-13
G0000MIEC216A117
Blanket Order for CS Welded Pipes for U/G by JVD
0
118
25-Dec-13
Blanket Order for CS Welded Pipes for U/G by JVD
G0000MIEC216AXXX
Blanket Order PO Issue for Pipes and Piping Components by JVD
0
105
25-Dec-13
Blanket Order PO Issue for Pipes and Piping Components by JVD
G0000MIEC216BXXXA
Blanket Order PO Issue for Valves(1st Blanket Order) by JVD
0
123
27-Dec-13
Blanket Order PO Issue for Valves(1st Blanket Order) by JVD
G0000MIEC216BXXXB
Blanket Order PO Issue for Valves(Last Blanket Order) by JVD
0
304
25-Feb-14
G0000MIEC216CXXX
Blanket Order Issue PO for Fittings by JVD
0
105
25-Dec-13
Blanket Order Issue PO for Fittings by JVD
G0000MIEC216D171
Blanket Order PO Issue for Flanges by JVD
0
118
12-Dec-13
Blanket Order PO Issue for Flanges by JVD
G0000MIEC216E181
Blanket Order PO Issue for Bolts and Nuts by JVD
0
263
12-Mar-14
G0000MIEC216F191
Blanket Order PO Issue for Gaskets by JVD
0
263
12-Mar-14
J0000MIEC216A109
Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil) from JVD
0
63
18-Nov-13
J0000MIEC216A117
Blanket Order for CS Welded Pipes for U/G from JVD
0
147
25-Dec-13
Blanket Order for CS Welded Pipes for U/G from JVD
J0000MIEC216AXXX
Blanket Order PO Issue for Pipes and Piping Components from JVD
0
75
25-Dec-13
Blanket Order PO Issue for Pipes and Piping Components from JVD
J0000MIEC216BXXX
Blanket Order PO Issue for Valves from JVD (1st Blanket Order)
0
73
27-Dec-13
Blanket Order PO Issue for Valves from JVD (1st Blanket Order)
J0000MIEC216BXXXB
Blanket Order PO Issue for Valves (Last Blanket Order) from JVD
0
421
25-Feb-14
J0000MIEC216CXXX
Blanket Order Issue PO for Fittings from JVD
0
75
25-Dec-13
Blanket Order Issue PO for Fittings from JVD
J0000MIEC216D171
Blanket Order PO Issue for Flanges from JVD
0
88
12-Dec-13
Blanket Order PO Issue for Flanges from JVD
J0000MIEC216E181
Blanket Order PO Issue for Bolts and Nuts from JVD
0
99
12-Mar-14
J0000MIEC216F191
Blanket Order PO Issue for Gaskets from JVD
0
99
12-Mar-14
S0000MIEC216A109
Blanket Order for GRP PIPES AND PIPING COMPONENTS by JVD
0
0
18-Nov-13
S0000MIEC216A117
Blanket Order for CS Welded Pipes for U/G by JVD
0
4
25-Dec-13
Blanket Order for CS Welded Pipes for U/G by JVD
S0000MIEC216AXXX
Blanket Order PO Issue for Pipes and Piping Components by JVD
0
2
25-Dec-13
Blanket Order PO Issue for Pipes and Piping Components by JVD
S0000MIEC216BXXXA
Blanket Order PO Issue for Valves (1st Blanket Order) by JVD
0
33
27-Dec-13
Blanket Order PO Issue for Valves (1st Blanket Order) by JVD
S0000MIEC216BXXXB
Blanket Order PO Issue for Valves (Last Blanket Order) by JVD
0
33
25-Feb-14
S0000MIEC216CXXX
Blanket Order Issue PO for Fittings by JVD
0
0
25-Dec-13
S0000MIEC216D171
Blanket Order for FLANGES by JVD
0
17
12-Dec-13
S0000MIEC216E181
Blanket Order PO Issue for Bolts and Nuts by JVD
0
41
12-Mar-14
S0000MIEC216F191
Blanket Order PO Issue for Gaskets by JVD
0
26
12-Mar-14
T0000MIEC216A109
U/G GRP Piping Material - PO by JVD (Frame Agreement)
0
131
18-Nov-13
T0000MIEC216A117
U/G CS Welded Piping Material - PO by JVD (Frame Agreement)
0
122
25-Dec-13
U/G CS Welded Piping Material - PO by JVD (Frame Agreement)
T0000MIEC216AXXX
Pipes - PO by JVD (Frame Agreement)
0
115
25-Dec-13
Pipes - PO by JVD (Frame Agreement)
T0000MIEC216BXXXA
Gate, Globe and Check Valves (1st Blanket Order) - PO by JVD (Blanket Order)
0
88
27-Dec-13
Gate, Globe and Check Valves (1st Blanket Order) - PO by JVD (Blanket Order)
T0000MIEC216BXXXB
Gate, Globe and Check Valves (Last Blanket Order) - PO by JVD (Blanket Order)
0
93
25-Feb-14
T0000MIEC216CXXX
Fittings - PO by JVD (Frame Agreement)
0
115
25-Dec-13
Fittings - PO by JVD (Frame Agreement)
T0000MIEC216D171
Flanges - PO by JVD (Frame Agreement)
0
98
12-Dec-13
Flanges - PO by JVD (Frame Agreement)
T0000MIEC216E181
Bolt & Nut - PO by JVD (Frame Agreement)
0
82
12-Mar-14
T0000MIEC216F191
Gaskets - PO by JVD (Frame Agreement)
0
82
12-Mar-14
V0000MIEC216A109
Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil)
0
0
18-Nov-13
V0000MIEC216A117
Blanket Order for CS Welded Pipes for U/G
0
4
25-Dec-13
Blanket Order for CS Welded Pipes for U/G
V0000MIEC216AXXX
Blanket Order PO Issue for Pipes and Piping Components
0
2
25-Dec-13
Blanket Order PO Issue for Pipes and Piping Components
V0000MIEC216BXXXA
Blanket Order PO Issue for Valves (1st Blanket Order)
0
33
27-Dec-13
Blanket Order PO Issue for Valves (1st Blanket Order)
V0000MIEC216BXXXB
Blanket Order PO Issue for Valves (Last Blanket Order)
0
33
25-Feb-14
V0000MIEC216CXXX
Blanket Order Issue PO for Fittings
0
0
25-Dec-13
Blanket Order Issue PO for Fittings
V0000MIEC216D171
Blanket Order PO Issue for Flanges
0
17
12-Dec-13
Blanket Order PO Issue for Flanges
V0000MIEC216E181
Blanket Order PO Issue for Bolts and Nuts
0
41
12-Mar-14
Blanket Order PO Issue for Bolts and Nuts
V0000MIEC216F191
Blanket Order PO Issue for Gaskets
0
26
12-Mar-14
Blanket Order PO Issue for Gaskets
Instrumentation
C0000MIEC2171101
JVD Frame Agr eement Placement -Main Automation System (DCS/SIS/FGS/Other Sys
197
0
158 06-Nov-13
74
31-Oct-14
06-Nov-13
JVD Blanket Order PO Issue for Valves (Last Blanket Order)
JVD Blanket Order PO Issue for Bolts and Nuts
JVD Blanket Order PO Issue for Gaskets
Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil) by JVD
Blanket Order PO Issue for Valves(Last Blanket Order) by JVD
Blanket Order PO Issue for Bolts and Nuts by JVD
Blanket Order PO Issue for Gaskets by JVD
Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil) from JVD
Blanket Order PO Issue for Valves (Last Blanket Order) from JVD
Blanket Order PO Issue for Bolts and Nuts from JVD
Blanket Order PO Issue for Gaskets from JVD
Blanket Order for GRP PIPES AND PIPING COMPONENTS by JVD
Blanket Order PO Issue for Valves (Last Blanket Order) by JVD
Blanket Order Issue PO for Fittings by JVD
Blanket Order for FLANGES by JVD
Blanket Order PO Issue for Bolts and Nuts by JVD
Blanket Order PO Issue for Gaskets by JVD
U/G GRP Piping Material - PO by JVD (Frame Agreement)
Gate, Globe and Check Valves (Last Blanket Order) - PO by JVD (Blanket Order)
Bolt & Nut - PO by JVD (Frame Agreement)
Gaskets - PO by JVD (Frame Agreement)
Blanket Order PO Issue for GRP Pipes and Piping Components(Incl. Civil)
Blanket Order PO Issue for Valves (Last Blanket Order)
JVD Frame Agr eement Placement -Main Automation System (DCS/SIS/FGS/Other System)
C0000MIEC2173XXXA
JVD Frame Agr eement - Local Instruments (1st Frame Agreement)
0
71
28-Feb-14
C0000MIEC2173XXXB
JVD Frame Agr eement - Local Instruments (Last Frame Agreement)
0
195
31-Oct-14
C0000MIEC2174101
JVD Frame Agr eement PO Issue for Control Valve (General)
0
81
20-Nov-13
JVD Frame Agr eement PO Issue for Control Valve (General)
C0000MIEC2174201
JVD Frame Agr eement PO Issue for On-Off Valve
0
96
20-Nov-13
JVD Frame Agr eement PO Issue for On-Off Valve
C0000MIEC2178101
JVD Blanket Order PO Issue for Instrument Cable
0
78
30-Jun-14
G0000MIEC2171101
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System
0
39
06-Nov-13
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System) by JVD
G0000MIEC2173XXXA
Frame Agreement PO Issue for Local Instruments (1st Frame Agreement) by JVD
0
263
28-Feb-14
Frame Agreement PO Issue for Local Instruments (1st Frame Agreement) by JVD
G0000MIEC2173XXXB
Frame Agreement PO Issue for Local Instruments (Last Frame Agreement) by JVD
0
281
31-Oct-14
G0000MIEC2174101
Frame Agreement PO Issue for Control Valve (General) by JVD
0
109
20-Nov-13
G0000MIEC2174201
Frame Agreement PO Issue for On-Off Valves by JVD
0
109
20-Nov-13
G0000MIEC2178101
Blanket Order PO Issue for Instrument Cables by JVD
0
199
30-Jun-14
J0000MIEC2171101
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System
0
70
06-Nov-13
J0000MIEC2173XXXA
Blanket Order PO Issue for Local Instruments (1st Frame Agreement)
0
116
28-Feb-14
J0000MIEC2173XXXB
Blanket Order PO Issue for Local Instruments (Last Frame Agreement)
0
119
31-Oct-14
J0000MIEC2174101
Frame Agreement PO Issue for Control Valve (General) from JVD
0
16
20-Nov-13
Frame Agreement PO Issue for Control Valve (General) from JVD
J0000MIEC2174201
Frame Agreement PO Issue for On-Off Valves from JVD
0
68
20-Nov-13
Frame Agreement PO Issue for On-Off Valves from JVD
J0000MIEC2178101
Blanket Order PO Issue for Instrument Cables from JVD
0
72
30-Jun-14
S0000MIEC2171101
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System
0
22
06-Nov-13
S0000MIEC2173XXXA
Frame Agreement PO Issue for Local Instruments (1st Frame Agreement) by JVD
0
38
28-Feb-14
S0000MIEC2174101
Frame Agreement PO Issue for Control Valve (General) by JVD
0
84
20-Nov-13
Frame Agreement PO Issue for Control Valve (General) by JVD
S0000MIEC2174201
Frame Agreement for On- Off Valves by JVD
0
63
20-Nov-13
Frame Agreement for On- Off Valves by JVD
S0000MIEC2178101
Blanket Order PO Issue for Instrument Cables by JVD
0
23
30-Jun-14
T0000MIEC2171101
Main Automation System (DCS/SIS/F GS/Other System) - Blanket Order PO Iss ued by J
0
107
06-Nov-13
T0000MIEC2173XXXA
Local Instrument - PO by JVD (1st Frame Agreement)
0
49
28-Feb-14
T0000MIEC2174101
Control valves - PO by JVD (Frame Agreement)
0
69
20-Nov-13
Control valves - PO by JVD (Frame Agreement)
T0000MIEC2174201
On-Off Valves - PO by JVD (Frame Agreement)
0
72
20-Nov-13
On-Off Valves - PO by JVD (Frame Agreement)
T0000MIEC2178101
Instrument Cables - PO by JVD (Frame Agreement)
0
98
30-Jun-14
V0000MIEC2171101
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System
0
22
06-Nov-13
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System)
V0000MIEC2173XXXA
Frame Agreement PO Issue for Local Instruments (1st Frame Agreement)
0
38
28-Feb-14
Frame Agreement PO Issue for Local Instruments (1st Frame Agreement)
V0000MIEC2173XXXB
Frame Agreement PO Issue for Local Instruments (Last Frame Agreement)
0
119
31-Oct-14
V0000MIEC2174101
Frame Agreement PO Issue for Control Valve (General)
0
16
20-Nov-13
Frame Agreement PO Issue for Control Valve (General)
V0000MIEC2174201
Frame Agreement PO Issue for On-Off Valves
0
63
20-Nov-13
Frame Agreement PO Issue for On-Off Valves
V0000MIEC2178101
Blanket Order PO Issue for Instrument Cables
0
23
30-Jun-14
Electrical
C0000MIEC2180001
JVD Blanket Order PO issue for Electrical Bulk Materials, Cable glands & Cable Trays
47
0
162 07-Nov-13
43
Frame Agreement PO Issue for Local Instruments (Last Frame Agreement) by JVD
Frame Agreement PO Issue for Control Valve (General) by JVD
Frame Agreement PO Issue for On-Off Valves by JVD
Blanket Order PO Issue for Instrument Cables by JVD
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System) from JVD
Blanket Order PO Issue for Local Instruments (1st Frame Agreement)
Blanket Order PO Issue for Local Instruments (Last Frame Agreement)
Blanket Order PO Issue for Instrument Cables from JVD
Frame Agreement PO Issue for Main Automation System (DCS/SIS/FGS/Other System) by JVD
Frame Agreement PO Issue for Local Instruments (1st Frame Agreement) by JVD
Blanket Order PO Issue for Instrument Cables by JVD
Main Automation System (DCS/SIS/F GS/Other System) - Blanket Order PO Iss ued by JVD
Local Instrument - PO by JVD (1st Frame Agreement)
Instrument Cables - PO by JVD (Frame Agreement)
Frame Agreement PO Issue for Local Instruments (Last Frame Agreement)
Blanket Order PO Issue for Instrument Cables
JVD Blanket Order PO issue for Electrical Bulk Materials, Cable glands & Cable Trays
0
92
24-Mar-14
C0000MIEC2181XXX
JVD Frame Agr eement PO Issue for Substation Equipment
0
23
06-Jan-14
JVD Frame Agr eement PO Issue for Substation Equipment
Page 6 of 179
Actual Work
Detail Engineering, Procurement, and
Critical Remaining Work
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
JVD Blanket Order PO Issue for Instrument Cable
JVD Frame Agr eement PO Issue for AC UPS & DC Power Supply Unit
JVD Frame Agr eement PO Issue for AC UPS & DC Power Supply Unit
Milestone
JVD Frame Agr eement - Local Instruments (Last Frame Agreement)
28-Mar-14
28-Mar-14
C0000MIEC2181016
Remaining Work
JVD Frame Agr eement - Local Instruments (1st Frame Agreement)
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
JVD Blanket Order PO Issue for Power, Control and Communication Cables
C0000MIEC2182001
JVD Blanket Order PO Issue for Power, Control and Communication Cables
0
151
26-Feb-14
C0000MIEC2182XXX
JVD Frame Agr eement PO Issue for Motors
0
50
07-Nov-13
C0000MIEC2187001
JVD Blanket Order PO Issue for Cathodic Protection Materials
0
163
15-Jan-14
G0000MIEC2180001
Blanket Order PO Issue for Electrical Bulk Materials by JVD
0
257
28-Mar-14
G0000MIEC2181016
Frame Agreement PO Issue for AC UPS & DC Power Supply Unit by JVD
0
232
24-Mar-14
G0000MIEC2181XXX
Frame Agreement PO Issue for Substation Equipment by JVD
0
28
06-Jan-14
G0000MIEC2182001
Blanket Order PO Issue for Power, Control and Communic ation Cables by JVD
0
287
26-Feb-14
G0000MIEC2182XXX
Frame Agreement PO Issue for Motor by JVD
0
398
07-Nov-13
G0000MIEC2187001
Blanket Order PO Issue for Cathodic Protection Materials by JVD
0
118
15-Jan-14
J0000MIEC2180001
Blanket Order PO Issue for Electrical Bulk Materials
0
27
28-Mar-14
Blanket Order PO Issue for Electrical Bulk Materials
J0000MIEC2181016
Frame Agreement PO Issue for AC UPS & DC Power Supply Unit from JVD
0
97
24-Mar-14
Frame Agreement PO Issue for AC UPS & DC Power Supply Unit from JVD
J0000MIEC2181XXX
Frame Agreement PO Issue for Substation Equipment from JVD
0
84
06-Jan-14
J0000MIEC2182001
Blanket Order PO Issue for Power, Control and Communic ation Cables from JVD
0
126
26-Feb-14
J0000MIEC2182XXX
Frame Agreement PO Issue for Motor from JVD
0
81
07-Nov-13
J0000MIEC2187001
Blanket Order PO Issue for Cathodic Protection Materials from JVD
0
72
15-Jan-14
S0000MIEC2180001
Blanket Order PO Issue for Electrical Bulk Materials by JVD
0
36
28-Mar-14
Blanket Order PO Issue for Electrical Bulk Materials by JVD
S0000MIEC2181016
Frame Agreement PO Issue for AC UPS & DC Power Supply Unit by JVD
0
0
24-Mar-14
Frame Agreement PO Issue for AC UPS & DC Power Supply Unit by JVD
S0000MIEC2181XXX
Frame Agreement PO Issue for Substation Equipment by JVD
0
41
06-Jan-14
S0000MIEC2182001
Blanket Order PO Issue for Power, Control and Communic ation Cables by JVD
0
97
26-Feb-14
S0000MIEC2182XXX
Frame Agreement PO Issue for Motor by JVD
0
111
07-Nov-13
S0000MIEC2187001
Blanket Order PO Issue for Cathodic Protection Materials by JVD
0
39
15-Jan-14
T0000MIEC2180001
Electrical Bulk Materials - PO by JVD (Frame Agreement)
0
119
28-Mar-14
T0000MIEC2181016
AC UPS & DC POWER Supply Unit - PO by JVD (Frame Agr eement)
0
23
24-Mar-14
T0000MIEC2181XXX
Frame Agreement PO issue for Subs tation Equipment (J VD)
0
18
06-Jan-14
T0000MIEC2182001
Power, Control and Communic ation Cables - PO by JVD (Blanket Order)
0
90
26-Feb-14
T0000MIEC2182XXX
Motor - PO by JVD (Frame Agreement)
0
87
07-Nov-13
T0000MIEC2187001
Cathodic Protection System - PO by JVD (Frame Agreement)
0
125
15-Jan-14
V0000MIEC2180001
Blanket Order PO Issue for Electrical Bulk Materials
0
27
28-Mar-14
Blanket Order PO Issue for Electrical Bulk Materials
V0000MIEC2181016
Frame Agreement PO Issue for AC UPS & DC Power Supply Unit
0
0
24-Mar-14
Frame Agreement PO Issue for AC UPS & DC Power Supply Unit
V0000MIEC2181XXX
Frame Agreement PO Issue for Substation Equipment
0
18
06-Jan-14
V0000MIEC2182001
Blanket Order PO Issue for Power, Control and Communic ation Cables
0
90
26-Feb-14
V0000MIEC2182XXX
Frame Agreement PO Issue for Motor
0
50
07-Nov-13
V0000MIEC2187001
Blanket Order PO Issue for Cathodic Protection Materials
39
15-Jan-14
Subcontracting Interface
Civil General
C0000MIFC1400
Piling Subcontract
0
59
0
0
167 30-Sep-13
99 29-Nov-13
25
JVD Frame Agr eement PO Issue for Motors
JVD Blanket Order PO Issue for Cathodic Protection Materials
Blanket Order PO Issue for Electrical Bulk Materials by JVD
Frame Agreement PO Issue for AC UPS & DC Power Supply Unit by JVD
Frame Agreement PO Issue for Substation Equipment by JVD
Blanket Order PO Issue for Power, Control and Communic ation Cables by JVD
Frame Agreement PO Issue for Motor by JVD
Blanket Order PO Issue for Cathodic Protection Materials by JVD
Frame Agreement PO Issue for Substation Equipment from JVD
Blanket Order PO Issue for Power, Control and Communic ation Cables from JVD
Frame Agreement PO Issue for Motor from JVD
Blanket Order PO Issue for Cathodic Protection Materials from JVD
Frame Agreement PO Issue for Substation Equipment by JVD
Blanket Order PO Issue for Power, Control and Communic ation Cables by JVD
Frame Agreement PO Issue for Motor by JVD
Blanket Order PO Issue for Cathodic Protection Materials by JVD
Electrical Bulk Materials - PO by JVD (Frame Agreement)
AC UPS & DC POWER Supply Unit - PO by JVD (Frame Agr eement)
Frame Agreement PO issue for Subs tation Equipment (J VD)
Power, Control and Communic ation Cables - PO by JVD (Blanket Order)
Motor - PO by JVD (Frame Agreement)
Cathodic Protection System - PO by JVD (Frame Agreement)
Frame Agreement PO Issue for Substation Equipment
Blanket Order PO Issue for Power, Control and Communic ation Cables
Frame Agreement PO Issue for Motor
Blanket Order PO Issue for Cathodic Protection Materials
24-Mar-14
29-Nov-13
29-Nov-13
Piling Subcontract
G0000MIFC1400
Subcontract Award - Piling by JVD
0
32
29-Nov-13
Subcontract Award - Piling by JVD
J0000MIFC1400
Subcontract Award - Piling (by JVD)
0
192
29-Nov-13
Subcontract Award - Piling (by JVD)
S0000MIFC1400
Subcontract Award - Piling by JVD
0
1
29-Nov-13
Subcontract Award - Piling by JVD
T0000MIFC1400
Subcontract Award - Piling (By JVD)
0
108
29-Nov-13
Subcontract Award - Piling (By JVD)
V0000MIFC1400
Subcontract Award - Piling
0
1
29-Nov-13
Subcontract Award - Piling
Building
C0000MIFC40002
Building - Substations & ISBs (PC) Subcontract
50
0
167 30-Sep-13
160
26-Feb-14
26-Feb-14
Building - Substations & ISBs (PC) Subcontract
G0000MIFC40001
Subcontract Award - Building - Admin (EPC) by JVD
0
85
30-Sep-13
G0000MIFC40002
Subcontract Award - Building - Substations & ISBs (PC) by JVD
0
267
26-Feb-14
Subcontract Award - Building - Substations & ISBs (PC) by JVD
G0000MIFC40003
Subcontract Award - Building - Pre-Engineered Building (PEB) by JVD
0
137
06-Jan-14
Subcontract Award - Building - Pre-Engineered Building (PEB) by JVD
J0000MIFC40002
Subcontract Award - Building - Substations & ISBs (PC) (by JVD)
0
181
26-Feb-14
Subcontract Award - Building - Substations & ISBs (PC) (by JVD)
J0000MIFC40003
Subcontract Award - Building - Pre-Engineered Building (PEB) (by JVD)
0
301
06-Jan-14
Subcontract Award - Building - Pre-Engineered Building (PEB) (by JVD)
S0000MIFC4002
Subcontract Award - Building - Substations & ISBs (PC)
0
65
26-Feb-14
Subcontract Award - Building - Substations & ISBs (PC)
S0000MIFC4003
Subcontract Award - Building - Pre-Engineered Building (PEB)
0
99
06-Jan-14
Subcontract Award - Building - Pre-Engineered Building (PEB)
T0000MIFC40002
Subcontract Award - Building - Substations & ISBs (PC) (By JVD)
0
140
26-Feb-14
V0000MIFC40001
Subcontract Award - Building - Admin (EPC)
0
85
30-Sep-13
V0000MIFC40002
Subcontract Award - Building - Substations & ISBs (PC)
0
65
26-Feb-14
Subcontract Award - Building - Substations & ISBs (PC)
V0000MIFC40003
Subcontract Award - Building - Pre-Engineered Building (PEB)
0
99
06-Jan-14
Subcontract Award - Building - Pre-Engineered Building (PEB)
Tank Subcontract
0
0
G0000MIFC5400
Subcontract Award - Tank (EPC) by JVD
0
J0000MIFC5400
Subcontract Award - Tank (EPC) (by JVD)
S0000MIFC5400
Subcontract Award - Building - Substations & ISBs (PC) (By JVD)
Subcontract Award - Building - Admin (EPC)
05-Dec-13
05-Dec-13
Tank Subcontract
0
05-Dec-13
Subcontract Award - Tank (EPC) by JVD
0
152
05-Dec-13
Subcontract Award - Tank (EPC) (by JVD)
Subcontract Award - Tank (EPC) by JVD
0
90
05-Dec-13
Subcontract Award - Tank (EPC) by JVD
T0000MIFC5400
Subcontract Award - Tank (by JVD)
0
170
05-Dec-13
Subcontract Award - Tank (by JVD)
V0000MIFC5400
Subcontract Award - Tank (EPC)
0
0
05-Dec-13
Subcontract Award - Tank (EPC)
U/G SW Pipe Subcontract
0
0
167 24-Mar-14
110
24-Mar-14
24-Mar-14
U/G SW Pipe Subcontract
G0000MIFC6300
Subcontract Award for U/G Seawater Pipe Installation by JVD
0
269
24-Mar-14
Subcontract Award for U/G Seawater Pipe Installation by JVD
J0000MIFC6300
Subcontract Award for U/G Seawater Pipe Installation (by JVD)
0
183
24-Mar-14
Subcontract Award for U/G Seawater Pipe Installation (by JVD)
S0000MIFC6300
Subcontract Award for U/G Seawater Pipe Installation by JVD
0
84
24-Mar-14
Subcontract Award for U/G Seawater Pipe Installation by JVD
T0000MIFC6300
Subcontract Award - U/G Seawater Pipe Installation (by JVD)
0
127
24-Mar-14
Subcontract Award - U/G Seawater Pipe Installation (by JVD)
V0000MIFC6300
Subcontract Award for U/G Seawater Pipe Installation
0
84
24-Mar-14
Subcontract Award for U/G Seawater Pipe Installation
89 27-Feb-15
89 27-Feb-15
37
14-Jul-15
14-Jul-15
14-Mar-15
HVAC Equipt. for SS-P07 (RV2140-401) Handover to CYD
HVAC Equipt. for ISB-02 (RV2140-401) Handover to CYD
Mechanical Equipment
C0000MIFC5400
Piping
C0000MIFC6300
Manufacturing & Delivery Interface
I
Building
C0000MIEF2140401050
HVAC Equipt. for SS-P07 (RV2140-401) Handover to CYD
98
98
0
84 05-Dec-13
154
Subcontract Award - Building - Admin (EPC) by JVD
C0000MIEF2140401060
HVAC Equipt. for ISB-02 (RV2140-401) Handover to CYD
0
95
14-Mar-15
G0000MIEF2140401010
HVAC Equipment for ISB-05(RV2140-401) Handover to JGC
0
95
10-May-15
G0000MIEF2140401015
HVAC Equipment for SS-P03(RV2140-401) Handover to JGC
0
30
14-Mar-15
G0000MIEF2140401020
HVAC Equipment for ISB-06(RV2140-401) Handover to JGC
0
89
09-Jun-15
G0000MIEF2140401030
HVAC Equipment for SS-P02(RV2140-401) Handover to JGC
0
36
14-Mar-15
G0000MIEF2140401040
HVAC Equipment for ISB-04(RV2140-401) Handover to JGC
0
111
14-Jul-15
G0000MIEF2140401050
HVAC Equipment for SS-P07(RV2140-401) Handover to CYD
0
37
14-Mar-15
G0000MIEF2140401060
HVAC Equipment for ISB-02(RV2140-401) Handover to CYD
0
95
14-Mar-15
G0000MIEF2140401070
HVAC Equipment for SS-M01(RV2140-401) Handover to SK
0
0
27-Feb-15
HVAC Equipment for SS-M01(RV2140-401) Handover to SK
G0000MIEF2140401080
HVAC Equipment for SS-M02(RV2140-401) Handover to SK
0
0
27-Feb-15
HVAC Equipment for SS-M02(RV2140-401) Handover to SK
G0000MIEF2140401090
HVAC Equipment for SS-U01(RV2140-401) Handover to SK
0
0
27-Feb-15
HVAC Equipment for SS-U01(RV2140-401) Handover to SK
G0000MIEF2140401100
HVAC Equipment for ISB-12(RV2140-401) Handover to SK
0
0
27-Feb-15
HVAC Equipment for ISB-12(RV2140-401) Handover to SK
G0000MIEF2140401110
HVAC Equipment for SS-U04(RV2140-401) Handover to SK
0
0
27-Feb-15
HVAC Equipment for SS-U04(RV2140-401) Handover to SK
G0000MIEF2140401120
HVAC Equipment for ISB-11(RV2140-401) Handover to SK
0
0
27-Feb-15
HVAC Equipment for ISB-11(RV2140-401) Handover to SK
G0000MIEF2140401130
HVAC Equipment for SS-P01(RV2140-401) Handover to SK
0
45
10-May-15
HVAC Equipment for SS-P01(RV2140-401) Handover to SK
G0000MIEF2140401140
HVAC Equipment for ISB-01(RV2140-401) Handover to SK
0
45
10-May-15
HVAC Equipment for ISB-01(RV2140-401) Handover to SK
G0000MIEF2140401150
HVAC Equipment for SS-P04(RV2140-401) Handover to SK
0
45
10-May-15
HVAC Equipment for SS-P04(RV2140-401) Handover to SK
G0000MIEF2140401160
HVAC Equipment for ISB-03(RV2140-401) Handover to SK
0
45
10-May-15
HVAC Equipment for ISB-03(RV2140-401) Handover to SK
G0000MIEF2140401170
HVAC Equipment for SS-P08(RV2140-401) Handover to SK
0
58
09-Jun-15
HVAC Equipment for SS-P08(RV2140-401) Handover to SK
G0000MIEF2140401180
HVAC Equipment for ISB-10(RV2140-401) Handover to SK
0
42
09-Jun-15
HVAC Equipment for ISB-10(RV2140-401) Handover to SK
G0000MIEF2140401190
HVAC Equipment for SS-P05(RV2140-401) Handover to SK
0
38
14-Jul-15
HVAC Equipment for SS-P05(RV2140-401) Handover to SK
G0000MIEF2140401200
HVAC Equipment for ISB-07(RV2140-401) Handover to SK
0
31
14-Jul-15
HVAC Equipment for ISB-07(RV2140-401) Handover to SK
G0000MIEF2140401210
HVAC Equipment for SS-P06(RV2140-401) Handover to TP
0
45
14-Jul-15
HVAC Equipment for SS-P06(RV2140-401) Handover to TP
G0000MIEF2140401220
HVAC Equipment for ISB-09(RV2140-401) Handover to TP
0
93
14-Jul-15
J0000MIEF2140401010
HVAC Equipment for ISB-05(RV2140-401) Handover from GSEC
0
250
10-May-15
J0000MIEF2140401015
HVAC Equipment for SS-P03(RV2140-401) Handover from GSEC
0
30
14-Mar-15
J0000MIEF2140401020
HVAC Equipment for ISB-06(RV2140-401) Handover from GSEC
0
179
09-Jun-15
J0000MIEF2140401030
HVAC Equipment for SS-P02(RV2140-401) Handover from GSEC
0
36
14-Mar-15
J0000MIEF2140401040
HVAC Equipment for ISB-04(RV2140-401) Handover from GSEC
0
192
14-Jul-15
S0000MIEF2140401070
HVAC Equipment for SS-M01(RV2140-401) Handover by GS
0
0
27-Feb-15
HVAC Equipment for SS-M01(RV2140-401) Handover by GS
S0000MIEF2140401080
HVAC Equipment for SS-M02(RV2140-401) Handover by GS
0
0
27-Feb-15
HVAC Equipment for SS-M02(RV2140-401) Handover by GS
S0000MIEF2140401090
HVAC Equipment for SS-U01(RV2140-401) Handover by GS
0
0
27-Feb-15
HVAC Equipment for SS-U01(RV2140-401) Handover by GS
S0000MIEF2140401100
HVAC Equipment for ISB-12(RV2140-401) Handover by GS
0
0
27-Feb-15
HVAC Equipment for ISB-12(RV2140-401) Handover by GS
S0000MIEF2140401110
HVAC Equipment for SS-U04(RV2140-401) Handover by GS
0
0
27-Feb-15
HVAC Equipment for SS-U04(RV2140-401) Handover by GS
S0000MIEF2140401120
HVAC Equipment for ISB-11(RV2140-401) Handover by GS
0
0
27-Feb-15
HVAC Equipment for ISB-11(RV2140-401) Handover by GS
S0000MIEF2140401130
HVAC Equipment for SS-P01(RV2140-401) Handover by GS
0
45
10-May-15
HVAC Equipment for SS-P01(RV2140-401) Handover by GS
S0000MIEF2140401140
HVAC Equipment for ISB-01(RV2140-401) Handover by GS
0
45
10-May-15
HVAC Equipment for ISB-01(RV2140-401) Handover by GS
S0000MIEF2140401150
HVAC Equipment for SS-P04(RV2140-401) Handover by GS
0
45
10-May-15
HVAC Equipment for SS-P04(RV2140-401) Handover by GS
S0000MIEF2140401160
HVAC Equipment for ISB-03(RV2140-401) Handover by GS
0
45
10-May-15
HVAC Equipment for ISB-03(RV2140-401) Handover by GS
S0000MIEF2140401170
HVAC Equipment for SS-P08(RV2140-401) Handover by GS
0
58
09-Jun-15
HVAC Equipment for SS-P08(RV2140-401) Handover by GS
S0000MIEF2140401180
HVAC Equipment for ISB-10(RV2140-401) Handover by GS
0
42
09-Jun-15
HVAC Equipment for ISB-10(RV2140-401) Handover by GS
S0000MIEF2140401190
HVAC Equipment for SS-P05(RV2140-401) Handover by GS
0
38
14-Jul-15
HVAC Equipment for SS-P05(RV2140-401) Handover by GS
S0000MIEF2140401200
HVAC Equipment for ISB-07(RV2140-401) Handover by GS
0
31
14-Jul-15
HVAC Equipment for ISB-07(RV2140-401) Handover by GS
T0000MIEF2140401210
Handover of HVAC Materials for SS-P06 from GSEC
0
45
14-Jul-15
Handover of HVAC Materials for SS-P06 from GSEC
T0000MIEF2140401220
Handover of HVAC Materials for ISB-09 from GSEC
0
94
14-Jul-15
Handover of HVAC Materials for ISB-09 from GSEC
Construction Interface
Piping
CAB00MIH1630101
Hydrotest for SW U/G Pipe Completed from CDU
JAD00MIH1630101
Hydrotest for SW U/G Pipe Completed from KHDS
SAB00MIH1630101
AB10 - Hydrotest for SW U/G Pipe Completed from CDU
251
5
0
142 29-Nov-14
388 29-Nov-14
177
15-Apr-16
15-Dec-14
29-Nov-14
0
708
15-Dec-14
0
91
29-Nov-14
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
HVAC Equipment for ISB-06(RV2140-401) Handover to JGC
HVAC Equipment for SS-P02(RV2140-401) Handover to JGC
HVAC Equipment for ISB-04(RV2140-401) Handover to JGC
HVAC Equipment for SS-P07(RV2140-401) Handover to CYD
HVAC Equipment for ISB-02(RV2140-401) Handover to CYD
HVAC Equipment for ISB-09(RV2140-401) Handover to TP
HVAC Equipment for ISB-05(RV2140-401) Handover from GSEC
HVAC Equipment for SS-P03(RV2140-401) Handover from GSEC
HVAC Equipment for ISB-06(RV2140-401) Handover from GSEC
HVAC Equipment for SS-P02(RV2140-401) Handover from GSEC
HVAC Equipment for ISB-04(RV2140-401) Handover from GSEC
Hydrotest for SW U/G Pipe Completed from CDU
Hydrotest for SW U/G Pipe Completed from KHDS
AB10 - Hydrotest for SW U/G Pipe Completed from CDU
Page 7 of 179
Actual Work
Remaining Work
HVAC Equipment for ISB-05(RV2140-401) Handover to JGC
HVAC Equipment for SS-P03(RV2140-401) Handover to JGC
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
SAD00MIH1630101
Instrumentation
CAC00MIH17810
AD00 - Hydrotest for SW U/G Pipe Completed from KHDS
Main Instrument Cable Installation to ISB-02 completed
Original Total Float Start
Duration
0
79
0
CC600MIH171010
MAV Installation & SAT for Central Control Building
0
GA700MIH17810
Main Instrument Cable Installation to ISB-08 completed by JVD(JGC)
GC100MIH17810
Main Instrument Cable Installation to ISB-14 completed by JVD(JGC)
GC300MIH17810
GC300MIH17811
Finish
90
15-Dec-14
33 16-Sep-15
84
15-Apr-16
30-Nov-15
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
AD00 - Hydrotest for SW U/G Pipe Completed from KHDS
Main Instrument Cable Installation to ISB-02 completed
124
21-Oct-15
0
11
15-Apr-16
Main Instrument Cable Installation to ISB-08 completed
0
89
15-Jan-16
Main Instrument Cable Installation to ISB-14 completed by JVD(J
Main Instrument Cable Installation to ISB-13 (via ISB-15/16)completed by JVD(JGC)
0
82
24-Dec-15
Main Instrument Cable Installation to ISB-13 (via ISB-15/16)complet
Main Instrument Cable Installation to ISB-15 (via ISB-16)completed by JVD(JGC)
0
82
24-Dec-15
Main Instrument Cable Installation to ISB-15 (via ISB-16)completed
GC400MIH17810
Main Instrument Cable Installation to ISB-16 completed by JVD(JGC)
0
69
24-Dec-15
GC600MIH171010
MAV Installation & SAT for Central Control Building
0
16
21-Oct-15
GC600MIH17810
Main Instrument Cable Installation to Fire Station completed by JVD(JGC)
0
52
16-Sep-15
Main Instrument Cable Installation to Fire Station completed by JVD(JGC)
GC600MIH17811
Main Instrument Cable Installation to Main Gate completed by JVD(JGC)
0
52
16-Sep-15
Main Instrument Cable Installation to Main Gate completed by JVD(JGC)
GC700MIH17810
Main Instrument Cable Installation to ISB-17 (via ISB-14)completed by JVD(JGC)
0
23
15-Jan-16
GC700MIH17811
Main Instrument Cable Installation to JCB (via ISB-14/17)completed by JVD(JGC)
0
23
15-Jan-16
Main Instrument Cable Installation to JCB (via ISB-14/17)complet
GC700MIH17812
Main Instrument Cable Installation to TLB (via ISB-15/16)completed by JVD(JGC)
0
45
24-Dec-15
Main Instrument Cable Installation to TLB (via ISB-15/16)completed
GC700MIH17813
Main Instrument Cable Installation to SPM (via ISB-14/17/JCB)completed by JVD(JGC)
0
23
15-Jan-16
Main Instrument Cable Installation to SPM (via ISB-14/17/JCB)co
JA600MIH17810
Main Instrument Cable Installation to ISB-07 completed
0
69
30-Jan-16
JA700MIH17810
Main Instrument Cable Installation to ISB-08 completed
0
11
15-Apr-16
JA900MIH17810
Main Instrument Cable Installation from ISB-09 completed
0
111
30-Jan-16
JAA00MIH17810
Main Instrument Cable Installation to ISB-10 (via ISB-01) completed
0
98
28-Dec-15
JAB10MIH17810
Main Instrument Cable Installation to ISB-01 completed
0
48
28-Dec-15
JAC00MIH17810
Main Instrument Cable Installation to ISB-02 completed
0
84
30-Nov-15
JAD10MIH17810
Main Instrument Cable Installation to ISB-03 completed
0
48
28-Dec-15
JB100MIH17810
Main Instrument Cable Installation to ISB-11 completed
0
37
30-Sep-15
Main Instrument Cable Installation to ISB-11 completed
JB400MIH17810
Main Instrument Cable Installation to ISB-12 (via ISB-11) completed
0
53
30-Sep-15
Main Instrument Cable Installation to ISB-12 (via ISB-11) completed
JC100MIH17810
Main Instrument Cable Installation to ISB-14 completed
0
89
15-Jan-16
JC300MIH17810
Main Instrument Cable Installation to ISB-13 (via ISB-15/16) completed
0
82
24-Dec-15
Main Instrument Cable Installation to ISB-13 (via ISB-15/16) comple
JC300MIH17811
Main Instrument Cable Installation to ISB-15 (via ISB-16) completed
0
82
24-Dec-15
Main Instrument Cable Installation to ISB-15 (via ISB-16) completed
JC400MIH17810
Main Instrument Cable Installation to ISB-16 completed
0
69
24-Dec-15
JC600MIH171010
MAV Installation & SAT for Central Control Building (by GSEC)
0
218
21-Oct-15
JC600MIH17810
Main Instrument Cable Installation to Fire Station completed
0
52
16-Sep-15
Main Instrument Cable Installation to Fire Station completed
JC600MIH17811
Main Instrument Cable Installation to Main Gate completed
0
52
16-Sep-15
Main Instrument Cable Installation to Main Gate completed
JC700MIH17810
Main Instrument Cable Installation to ISB-17 (via ISB_14) completed
0
23
15-Jan-16
JC700MIH17811
Main Instrument Cable Installation to JCB (via ISB-14/17) completed
0
23
15-Jan-16
Main Instrument Cable Installation to JCB (via ISB-14/17) comple
JC700MIH17812
Main Instrument Cable Installation to TLB (via ISB-15/16) completed
0
45
24-Dec-15
Main Instrument Cable Installation to TLB (via ISB-15/16) completed
JC700MIH17813
Main Instrument Cable Installation to SPM (via ISB-14/17/JCB) completed
0
23
15-Jan-16
S0000MIH171010
MAV Installation & SAT for Central Control Building
0
16
21-Oct-15
SA600MIH17810
Main Instrument Cable Installation to ISB-07 completed
0
69
30-Jan-16
SAA00MIH17810
Main Instrument Cable Installation to ISB-10 completed
0
98
28-Dec-15
Main Instrument Cable Installation to ISB-10 completed
SAB10MIH17810
Main Instrument Cable Installation to ISB-01 completed
0
48
28-Dec-15
Main Instrument Cable Installation to ISB-01 completed
SAD10MIH17810
Main Instrument Cable Installation to ISB-03 completed
0
48
28-Dec-15
SB100MIH17810
Main Instrument Cable Installation to ISB-11 completed
0
37
30-Sep-15
Main Instrument Cable Installation to ISB-11 completed
SB400MIH17810
Main Instrument Cable Installation to ISB-12 (via ISB-11) completed
0
53
30-Sep-15
Main Instrument Cable Installation to ISB-12 (via ISB-11) completed
TA900MIH17810
Main Instrument Cable Installation from ISB-09 completed (by JVD/JGC)
0
111
30-Jan-16
TC600MIH171010
MAV Installation & SAT for Central Control Building (by GSEC)
0
126
21-Oct-15
37 31-Jul-15
114
30-Sep-15
31-Jul-15
Main Cable Installation Completed for Group-2 (SS-P04(SK), SS-P07(CYD), SS-P05
Electrical
C0000MIH1820074
Main Cable Installation Completed for Group-2 (SS-P04(SK), SS-P07(CYD), SS-P05(S
36
0
MAV Installation & SAT for Central Control Building
Main Instrument Cable Installation to ISB-16 completed by JVD(JGC
MAV Installation & SAT for Central Control Building
Main Instrument Cable Installation to ISB-17 (via ISB-14)complete
Main Instrument Cable Installation to ISB-07 completed
Main Instrument Cable Installation to ISB-08 completed
Main Instrument Cable Installation from ISB-09 completed
Main Instrument Cable Installation to ISB-10 (via ISB-01) completed
Main Instrument Cable Installation to ISB-01 completed
Main Instrument Cable Installation to ISB-02 completed
Main Instrument Cable Installation to ISB-03 completed
Main Instrument Cable Installation to ISB-14 completed
Main Instrument Cable Installation to ISB-16 completed
MAV Installation & SAT for Central Control Building (by GSEC)
Main Instrument Cable Installation to ISB-17 (via ISB_14) comple
Main Instrument Cable Installation to SPM (via ISB-14/17/JCB) co
MAV Installation & SAT for Central Control Building
Main Instrument Cable Installation to ISB-07 completed
Main Instrument Cable Installation to ISB-03 completed
Main Instrument Cable Installation from ISB-09 completed (by J
MAV Installation & SAT for Central Control Building (by GSEC)
G0000MIH1820072
Main Cable Instrallation Completed for SS-O02, SS-U03 by JVD(SK)
0
171
31-Jul-15
Main Cable Instrallation Completed for SS-O02, SS-U03 by JVD(SK)
G0000MIH1820074
Main Cable Instrallation Completed for SS-P09, SS-O03 by JVD(SK)
0
111
31-Jul-15
Main Cable Instrallation Completed for SS-P09, SS-O03 by JVD(SK)
G0000MIH1820078
Main Cable Instrallation Completed for SS-U02, SS-O01 by JVD(SK)
0
106
30-Sep-15
J0000MIH1820072
Main Cable Installation Completed for Group-1 (SS-O02(GS), SS-U03(GS), SS-P02(JG
0
70
31-Jul-15
J0000MIH1820076
Main Cable Installation Completed for Group-3 (SS-P03 (JGC))
0
40
30-Sep-15
S0000MIH1820072
Main Cable Instrallation Completed for Group-1 (SS-O02(GS), SS-U03(GS), SS-P02(JG
0
63
31-Jul-15
Main Cable Instrallation Completed for Group-1 (SS-O02(GS), SS-U03(GS), SS-P02
S0000MIH1820074
Main Cable Instrallation Completed for Group-2 (SS-P04(SK), SS-P07(CYD), SS-P05(S
0
98
31-Jul-15
Main Cable Instrallation Completed for Group-2 (SS-P04(SK), SS-P07(CYD), SS-P0
S0000MIH1820076
Main Cable Instrallation Completed for Group-3 (SS-P01 (SK), SS-P03 (JGC&CYD), S
0
40
30-Sep-15
S0000MIH1820078
Main Cable Instrallation Completed for Group-4 (SS-U02 (GS), SS-O01 (GS))
0
94
30-Sep-15
T0000MIH1820072
Main Cable Installation Completed for Group 1 (SS-002(GS), SS-U03(GS), SS-P02(JG
0
87
31-Jul-15
54 20-May-16
24
01-Jul-16
01-Jul-16
Pre-Commissioning Interface
Interfa
CAG00MIH2H20120
Steam available for Process Area steam blow
35
0
Main Cable Instrallation Completed for SS-U02, SS-O01 by JVD(SK)
Main Cable Installation Completed for Group-1 (SS-O02(GS), SS-U03(GS), SS-P02(
Main Cable Installation Completed for Group-3 (SS-P03 (JGC))
Main Cable Instrallation Completed for Group-3 (SS-P01 (SK), SS-P03 (JGC
Main Cable Instrallation Completed for Group-4 (SS-U02 (GS), SS-O01 (GS))
Main Cable Installation Completed for Group 1 (SS-002(GS), SS-U03(GS), SS-P02(J
Steam available for Process Area steam blow
GAG00MIH2H20120
Steam available for Process Area steam blow by SK
0
69
01-Jul-16
GB600MIH2H2040
Seawater Cooling Tower Ready for Service to SKEC
0
0
20-May-16
JAG00MIH2H20120
Steam available for Process Area steam blow (by SKEC)
0
0
01-Jul-16
S0000MIH2H2040
Seawater Cooling Tower Ready for Service by GSEC
0
0
20-May-16
SAG00MIJ1J10120
Steam available for Process Area Steam Blow
0
0
01-Jul-16
Steam available for Process Area Steam Blow
TAG00MIJ1J10120
Steam Available for Process Area Steam Blow (by SKEC)
0
48
01-Jul-16
Steam Available for Process Area Steam Blow
80 29-Nov-14
72
29-Feb-16
29-Nov-14
Marine Interface
C0000MIH1000010
Temporary Construction Jetty - Ready for Use
228
0
Steam available for Process Area steam blow
Seawater Cooling Tower Ready for Service to SKEC
Steam available for Process Area steam blow
Seawater Cooling Tower Ready for Service by GSE
Temporary Construction Jetty - Ready for Use
GC700MIH1100010
Handover of Seawater intake Basin for Equipment installation by Marine Subcontractor
0
69
30-May-15
GC700MIH1100020
Handover of Solid Berth (Berth 1B) by Marine Subcontractor
0
121
21-Dec-15
GC700MIH1100025
Handover of Solid Berth (Berth 1A) by Marine Subcontractor
0
116
29-Feb-16
GC700MIH1100030
Handover of Berth 2 incl. Piperack Tr estle by Mar ine Subcontractor
0
68
31-May-15
GC700MIH1100040
Handover of Berth 4 incl. Piperack Tr estle by Mar ine Subcontractor
0
7
31-Jul-15
GC700MIH1100050
Handover of Onshore Seawater Outfall Pipeline Rout by Marine Subcontractor
0
72
31-Aug-15
GC700MIH1100070
Handover of Temporary Construction Jetty by Marine Subcontractor
0
222
29-Nov-14
GC700MIH1100090
Handover Partially of Piperack Area by Marine Subcontractor
0
110
20-Jan-15
Handover Partially of Piperack Area by Marine Subcontractor
GC700MIH1100100
Handover of J-Area for Jetty Admin Building by Marine Subcontractor
0
0
20-Jan-15
Handover of J-Area for Jetty Admin Building by Marine Subcontractor
GC700MIH1100110
Handover of Jetty W/S, Etc. Area by Marine Subc ontractor
0
43
18-Jul-15
GC700MIH1100120
Handover of Onshore SW Intake Pipeline Rout by Marine Subcontractor
0
45
20-Jan-15
J0000MIFC40013
Handover of Temporary Construction Jetty
0
42
29-Nov-14
Handover of Temporary Construction Jetty
S0000MIMC008
Handover of Temporary Construction Jetty by JVD
0
46
29-Nov-14
Handover of Temporary Construction Jetty by JVD
TD200MIMC008
Handover of Temporary Construction Jetty (by Marine)
0
72
29-Nov-14
Handover of Temporary Construction Jetty (by Marine)
574
12 15-Jan-13 A
24-Dec-15
536
536
160
129
74
16
16
26
57
31-Aug-15
31-Aug-15
31-Oct-13
16-Aug-13
01-May-13 A
Engineering 8%
Basic Engineering
Basic Design
Process Design Basis
Common Area
J0000B2P22001
T0000B2P22001
Process Area
J0000B2P23060B
Design Basis & General Spec
Process Design Basis Update (Mark-Up to UOP)
Flare Load Summary
A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P22011
A100 - Design Basis_IFR
SA100B2P22017
18
31-Oct-13
04-Jun-13 A
146
97
44 01-Apr-13 A
13 01-Apr-13 A
31-Oct-13
16-Aug-13
44 19-Aug-13
31-Oct-13
26 15-Apr-13 A
0 15-Apr-13 A
31-Oct-13
24-Jul-13
26 25-Jul-13
31-Oct-13
24 15-Apr-13 A
0 15-Apr-13 A
31-Oct-13
09-Aug-13
24 12-Aug-13
31-Oct-13
44 01-Apr-13 A
0 01-Apr-13 A
31-Oct-13
16-Aug-13
A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B2P22011
A500 - Design Basis_IFR
136
71
A500 - Design Basis_IFC
65
AA00 - Polypropylene U
Unit (PPU)
SAA00B2P22011
AA00 - Design Basis_IFR
136
83
AA00 - Design Basis_IFC
53
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B2P22011
AB10 - Design Basis_IFR
146
97
SAB10B2P22017
AB10 - Design Basis_IFC
49
31 19-Aug-13
31-Oct-13
SAB20B2P22011
AB20 - Design Basis_IFR
97
13 01-Apr-13 A
16-Aug-13
SAB20B2P22017
AB20 - Design Basis_IFC
49
44 19-Aug-13
31-Oct-13
SAB30B2P22011
AB30 - Design Basis_IFR
97
13 01-Apr-13 A
16-Aug-13
SAB30B2P22017
AB30 - Design Basis_IFC
49
44 19-Aug-13
31-Oct-13
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B2P22010
Receipt of LICENSOR PACKAGE
Handover of Solid Berth (Berth 1B) by Marine Subcontractor
Handover of Solid Berth (Berth 1A) by Marine Subcontractor
Handover of Berth 2 incl. Piperack Tr estle by Mar ine Subcontractor
Handover of Berth 4 incl. Piperack Tr estle by Mar ine Subcontractor
Handover of Onshore Seawater Outfall Pipeline Rout by Marine Subcontractor
Handover of Temporary Construction Jetty by Marine Subcontractor
Handover of Jetty W/S, Etc. Area by Marine Subc ontractor
Handover of Onshore SW Intake Pipeline Rout by Marine Subcontractor
Design Basis & General Spec
16-Aug-13
21 31-Jan-13 A
01-May-13 A
49
SAA00B2P22017
104 22-Jul-13
150
22
A100 - Design Basis_IFC
SA500B2P22017
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
15-Jan-13 A
Handover of Seawater intake Basin for Equipment installation by Marine Subcontractor
105
0
31-Jan-13 A
31-Jan-13 A
03-Jul-13 A
Process Design Basis Update (Mark-Up to UOP)
Flare Load Summary
A100 - Design Basis_IFR
A100 - Design Basis_IFC
A500 - Design Basis_IFR
A500 - Design Basis_IFC
AA00 - Design Basis_IFR
AA00 - Design Basis_IFC
AB10 - Design Basis_IFR
AB10 - Design Basis_IFC
AB20 - Design Basis_IFR
AB20 - Design Basis_IFC
AB30 - Design Basis_IFR
AB30 - Design Basis_IFC
Receipt of LICENSOR PACKAGE
CAC00B2P22020
Process Description Review
23
31-Jan-13 A
05-Mar-13 A
CAC00B2P22025
Design Basis Preparation & Establish Philosophy
33
20-Feb-13 A
08-Apr-13 A
Design Basis Preparation & Establish Philosophy
CAC00B2P22040
Clarification with LICENSOR PACKAGE
82
06-Mar-13 A
03-Jul-13 A
Clarification with LICENSOR PACKAGE
146
97
31 01-Apr-13 A
0 01-Apr-13 A
31-Oct-13
16-Aug-13
31 19-Aug-13
31-Oct-13
31 01-Apr-13 A
0 01-Apr-13 A
31-Oct-13
16-Aug-13
31 19-Aug-13
31-Oct-13
43 01-Apr-13 A
27 01-Apr-13 A
0 01-Apr-13 A
30-Oct-13
30-Oct-13
24-Jul-13
27 25-Jul-13
30-Oct-13
27 01-Apr-13 A
30-Oct-13
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P22011
AD00 - Design Basis_IFR
SAD00B2P22017
AD00 - Design Basis_IFC
49
AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P22011
AE00 - Design Basis_IFR
146
97
SAE00B2P22017
AE00 - Design Basis_IFC
49
Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P22011
B100 - Design Basis_IFR
145
145
81
SB100B2P22017
B100 - Design Basis_IFC
B200 - Service / Potable / Fire Water
64
145
Process Description Review
AD00 - Design Basis_IFR
AD00 - Design Basis_IFC
AE00 - Design Basis_IFR
AE00 - Design Basis_IFC
B100 - Design Basis_IFR
Page 8 of 179
Actual Work
Remaining Work
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
B100 - Design Basis_IFC
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
SB200B2P22011
B200 - Design Basis_IFR
81
SB200B2P22017
B200 - Design Basis_IFC
64
B300 - Design Basis_IFR
145
81
B300 - Demine & Fuel
SB300B2P22011
SB300B2P22017
B400 - Steam & Power
SB400B2P22011
SB400B2P22017
B500 - Cooling Water
SB500B2P22011
SB500B2P22017
B300 - Design Basis_IFC
64
B400 - Design Basis_IFR
145
81
B400 - Design Basis_IFC
64
B500 - Design Basis_IFR
145
81
B500 - Design Basis_IFC
64
0 01-Apr-13 A
Finish
24-Jul-13
27 25-Jul-13
30-Oct-13
27 01-Apr-13 A
0 01-Apr-13 A
30-Oct-13
24-Jul-13
27 25-Jul-13
30-Oct-13
27 01-Apr-13 A
0 01-Apr-13 A
30-Oct-13
24-Jul-13
27 25-Jul-13
30-Oct-13
43 01-Apr-13 A
13 01-Apr-13 A
30-Oct-13
24-Jul-13
43 25-Jul-13
30-Oct-13
16 15-Jan-13 A
57 11-Mar-13 A
80 22-Jul-13
31-Aug-15
15-Jun-15
20-Sep-13
Process Design
Common Area
T0000B2P23001B
PFDs & UFDs - IFR
536
566
42
T0000B2P23001C
PFDs & UFDs - IFC
40
57 19-Jan-15
18-Mar-15
T0000B2P23010B
Heat And Mater ial Balance - F ir st Issue
10
80 23-Sep-13
04-Oct-13
T0000B2P23010C
Heat And Mater ial Balance - F inal Iss ue
25
57 10-Feb-15
18-Mar-15
T0000B2P23020A
Update Utility Summary
29
T0000B2P23020B
Utility Summary - FR
17
45 01-Jul-13 A
23-Jul-13
T0000B2P23020C
Utility Summary - FC
22
57 27-Feb-15
30-Mar-15
T0000B2P23030A
Update Effluent Summary
17
T0000B2P23030B
Effluent Summary - FR
22
45 25-Oct-13
26-Nov-13
T0000B2P23030C
Effluent Summary - FC
23
57 31-Mar-15
30-Apr-15
T0000B2P23040A
Flare Load Summary - First Issue
30
T0000B2P23040B
Flare Load Summary - Final Issue
22
T0000B2P23050A
Equipment List - First Issue
17
T0000B2P23050B
Equipment List - Intermediate Issue 1
38
71 16-Jul-13 A
09-Sep-13
T0000B2P23050C
Equipment List - Intermediate Issue 2
15
27 07-Mar-14
27-Mar-14
T0000B2P23050D
Equipment List - Final Issue (FC)
15
32 19-Mar-15
08-Apr-15
T0000B2P23060A
Line List - First Issue
20
72 16-Jul-13 A
14-Aug-13
T0000B2P23060B
Line List - Intermediate Issue 1
18
17 04-Nov-13
28-Nov-13
T0000B2P23060C
Line List - Intermediate Issue 2
19
31 03-Mar-14
27-Mar-14
T0000B2P23060D
Line List - Final Issue (FC)
19
80 07-Oct-14
03-Nov-14
T0000B2P23070A
Cause & Effect Charts - First Issue
59
39 22-Jul-13 A
16-Oct-13
T0000B2P23070B
Cause & Effect Charts - Final
19
103 08-Sep-14
03-Oct-14
T0000B2P23080A
Process Control Narrative - Prepare / Update
44
116 22-Jul-13 A
24-Sep-13
T0000B2P23090
Final Issue of Operation and Maintenance Manuals (process)
102
57 16-Jan-15
15-Jun-15
Heat and Material Balance
536
52
16 15-Jan-13 A
15-Jan-13 A
31-Aug-15
29-Mar-13 A
Process Area
J0000B2P23010
11-Mar-13 A
19-Apr-13 A
11-Mar-13 A
105 27-Feb-15
27-Mar-13 A
18-Apr-13 A
14-May-13 A
19-Apr-13 A
19-Apr-13 A
Utility Summary (Preliminary)
19
01-Apr-13 A
25-Apr-13 A
J0000B2P23020B
Utility Summary
54
01-May-13 A
19-Jul-13 A
J0000B2P23030
Material Selection Basis
53
15-Jan-13 A
01-Apr-13 A
J0000B2P23040
Cause and Effect
55
22-Feb-13 A
15-May-13 A
J0000B2P23050A
Effluent Summary (Preliminary)
19
01-Apr-13 A
25-Apr-13 A
J0000B2P23050B
Effluent Summary
25
J0000B2P23060A
Flare Load Summary (Preliminary)
20
01-Mar-13 A
604
40
25 01-Apr-13 A
25 01-Aug-14
31-Aug-15
30-Sep-14
A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P23051
A100 - Control Narrative_IFR
B200 - Design Basis_IFC
B300 - Design Basis_IFR
B300 - Design Basis_IFC
B400 - Design Basis_IFR
B400 - Design Basis_IFC
B500 - Design Basis_IFR
B500 - Design Basis_IFC
PFDs & UFDs - IFR
PFDs & UFDs - IFC
Heat And Mater ial Balance - F irst Issue
Heat And Mater ial Balance - F inal Iss ue
Update Utility Summary
Utility Summary - FR
Utility Summary - FC
Update Effluent Summary
Effluent Summary - FR
Effluent Summary - FC
Flare Load Summary - First Issue
30-Mar-15
J0000B2P23020A
52 21-Aug-13
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
B200 - Design Basis_IFR
Flare Load Summary - Final Issue
Equipment List - First Issue
Equipment List - Intermediate Issue 1
Equipment List - Intermediate Issue 2
Equipment List - Final Issue (FC)
Line List - First Issue
Line List - Intermediate Issue 1
Line List - Intermediate Issue 2
Line List - Final Issue (FC)
Cause & Effect Charts - First Issue
Cause & Effect Charts - Final
Process Control Narrative - Prepare / Update
Final Issue of Operation and Maintenance Manuals (process)
Heat and Material Balance
Utility Summary (Preliminary)
Utility Summary
Material Selection Basis
Cause and Effect
Effluent Summary (Preliminary)
26-Sep-13
29-Mar-13 A
Effluent Summary
Flare Load Summary (Preliminary)
A100 - Control Narrative_IFR
SA100B2P23057
A100 - Control Narrative_IFC
94
25 01-Oct-14
13-Feb-15
SA100B2P23071
A100 - Process Flow Diagrams (PFD)_IFR
59
37 01-May-13 A
24-Jul-13
SA100B2P23077
A100 - Process Flow Diagrams (PFD)_IFC
199
37 25-Jul-13
15-May-14
SA100B2P23111
A100 - Interlock Narrative_IFR
40
54 01-Aug-14
30-Sep-14
SA100B2P23117
A100 - Interlock Narrative_IFC
94
54 01-Oct-14
13-Feb-15
SA100B2P23131
A100 - Utility Summary_IFR
80
67 01-Apr-13 A
23-Jul-13
SA100B2P23137
A100 - Utility Summary_IFC
148
67 24-Jul-13
28-Feb-14
SA100B2P23171
A100 - Material Selection Diagram_IFR
73
37 16-Apr-13 A
29-Jul-13
SA100B2P23177
A100 - Material Selection Diagram_IFC
196
37 30-Jul-13
15-May-14
SA100B2P23191
A100 - Effluent Summary_IFR
26
88 25-Jul-13
30-Aug-13
SA100B2P23197
A100 - Effluent Summary_IFC
223
88 02-Sep-13
25-Jul-14
SA100B2P23311
A100 - Operating Manual_IFR
41
25 01-Apr-15
29-May-15
SA100B2P23317
A100 - Operating Manual_IFC
66
25 01-Jun-15
31-Aug-15
SA100B2P23931
A100 - Relief and Blowdown Summary_IFR
44
63 25-Jul-13
30-Sep-13
SA100B2P23937
A100 - Relief and Blowdown Summary_IFC
175
63 01-Oct-13
13-Jun-14
A100 - Relief and Blowdown Summary_IFC
594
29
25 15-Apr-13 A
25 01-Sep-14
31-Aug-15
15-Oct-14
A500 - Control Narrative_IFR
A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B2P23051
A500 - Control Narrative_IFR
A100 - Control Narrative_IFC
A100 - Process Flow Diagrams (PFD)_IFR
A100 - Process Flow Diagrams (PFD)_IFC
A100 - Interlock Narrative_IFR
A100 - Interlock Narrative_IFC
A100 - Utility Summary_IFR
A100 - Utility Summary_IFC
A100 - Material Selection Diagram_IFR
A100 - Material Selection Diagram_IFC
A100 - Effluent Summary_IFR
A100 - Effluent Summary_IFC
A100 - Operating Manual_IFR
A100 - Operating Manual_IFC
A100 - Relief and Blowdown Summary_IFR
SA500B2P23057
A500 - Control Narrative_IFC
84
25 16-Oct-14
12-Feb-15
SA500B2P23061
A500 - Interlock Narrative_IFR
29
25 01-Sep-14
15-Oct-14
SA500B2P23067
A500 - Interlock Narrative_IFC
84
25 16-Oct-14
12-Feb-15
SA500B2P23071
A500 - Process Flow Diagrams (PFD)_IFR
69
22 15-Apr-13 A
22-Jul-13
SA500B2P23077
A500 - Process Flow Diagrams (PFD)_IFC
221
22 23-Jul-13
13-Jun-14
SA500B2P23091
A500 - Catalyst & Chemical Summary_IFR
28
60 23-Jul-13
30-Aug-13
SA500B2P23097
A500 - Catalyst & Chemical Summary_IFC
223
60 02-Sep-13
25-Jul-14
SA500B2P23131
A500 - Utility Summary_IFR
70
44 15-Apr-13 A
23-Jul-13
SA500B2P23137
A500 - Utility Summary_IFC
138
44 24-Jul-13
14-Feb-14
SA500B2P23151
A500 - Cause & Effect Diagram_IFR
125
53 01-Jul-13 A
31-Jul-14
SA500B2P23157
A500 - Cause & Effect Diagram_IFC
110
53 01-Aug-14
12-Jan-15
SA500B2P23171
A500 - Material Selection Diagram_IFR
57
22 01-May-13 A
22-Jul-13
SA500B2P23177
A500 - Material Selection Diagram_IFC
221
22 23-Jul-13
13-Jun-14
SA500B2P23191
A500 - Effluent Summary_IFR
97
60 15-Apr-13 A
30-Aug-13
SA500B2P23197
A500 - Effluent Summary_IFC
223
60 02-Sep-13
25-Jul-14
SA500B2P23311
A500 - Operating Manual_IFR
41
25 01-Apr-15
29-May-15
SA500B2P23317
A500 - Operating Manual_IFC
66
25 01-Jun-15
31-Aug-15
SA500B2P23931
A500 - Relief and Blowdown Summary_IFR
46
30 23-Jul-13
30-Sep-13
SA500B2P23937
A500 - Relief and Blowdown Summary_IFC
175
30 01-Oct-13
13-Jun-14
A500 - Relief and Blowdown Summary_IFC
594
29
25 15-Apr-13 A
25 01-Sep-14
31-Aug-15
15-Oct-14
A600 - Control Narrative_IFR
A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B2P23051
A600 - Control Narrative_IFR
SA600B2P23057
A600 - Control Narrative_IFC
84
25 16-Oct-14
12-Feb-15
SA600B2P23061
A600 - Interlock Narrative_IFR
29
25 01-Sep-14
15-Oct-14
SA600B2P23067
A600 - Interlock Narrative_IFC
84
25 16-Oct-14
12-Feb-15
SA600B2P23071
A600 - Process Flow Diagrams (PFD)_IFR
69
36 15-Apr-13 A
22-Jul-13
SA600B2P23077
A600 - Process Flow Diagrams (PFD)_IFC
221
36 23-Jul-13
13-Jun-14
SA600B2P23091
A600 - Catalyst & Chemical Summary_IFR
28
60 23-Jul-13
30-Aug-13
SA600B2P23097
A600 - Catalyst & Chemical Summary_IFC
223
60 02-Sep-13
25-Jul-14
SA600B2P23131
A600 - Utility Summary_IFR
70
58 15-Apr-13 A
23-Jul-13
SA600B2P23137
A600 - Utility Summary_IFC
138
58 24-Jul-13
14-Feb-14
SA600B2P23151
A600 - Cause & Effect Diagram_IFR
125
78 01-Jul-13 A
31-Jul-14
SA600B2P23157
A600 - Cause & Effect Diagram_IFC
110
78 01-Aug-14
12-Jan-15
SA600B2P23171
A600 - Material Selection Diagram_IFR
57
36 01-May-13 A
22-Jul-13
SA600B2P23177
A600 - Material Selection Diagram_IFC
221
36 23-Jul-13
13-Jun-14
SA600B2P23191
A600 - Effluent Summary_IFR
97
60 15-Apr-13 A
30-Aug-13
SA600B2P23197
A600 - Effluent Summary_IFC
223
60 02-Sep-13
25-Jul-14
SA600B2P23311
A600 - Operating Manual_IFR
41
25 01-Apr-15
29-May-15
SA600B2P23317
A600 - Operating Manual_IFC
66
25 01-Jun-15
31-Aug-15
SA600B2P23931
A600 - Relief and Blowdown Summary_IFR
46
30 23-Jul-13
30-Sep-13
SA600B2P23937
A600 - Relief and Blowdown Summary_IFC
175
30 01-Oct-13
13-Jun-14
324
40
93 24-Jun-13 A
87 24-Jun-13 A
14-Oct-14
19-Aug-13
A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B2P23010A
A700-Material Selection Diagram-FR
GA700B2P23010B
A700-Material Selection Diagram-FC
15
69 25-Jun-14
15-Jul-14
GA700B2P23030A
A700-Process Flow Diagram-FR
40
34 24-Jun-13 A
19-Aug-13
GA700B2P23030B
A700-Process Flow Diagram-FC
15
69 25-Jun-14
15-Jul-14
GA700B2P23050A
A700-Cause & Effect Diagram-FR rev.A
19
46 02-Aug-13
29-Aug-13
GA700B2P23050B
A700-Cause & Effect Diagram-FA rev.B
18
73 13-Nov-13
06-Dec-13
GA700B2P23050C
A700-Cause & Effect Diagram-FC rev.0 (W/ Hold)
18
40 08-Apr-14
01-May-14
GA700B2P23050D
A700-Cause & Effect Diagram-FC rev.1 (W/o Hold)
27
93 02-Sep-14
14-Oct-14
GA700B2P23090A
A700-Effluent Summary-FR
15
92 24-Sep-13
16-Oct-13
GA700B2P23090B
A700-Effluent Summary-FC
20
40 02-Jun-14
30-Jun-14
GA700B2P23110A
A700-Heat & Material Balance-FR
10
92 29-Jul-13
09-Aug-13
GA700B2P23110B
A700-Heat & Material Balance-FC
20
79 01-Nov-13
28-Nov-13
GA700B2P23130A
A700-Utility Summary-FR
20
124 02-Oct-13
31-Oct-13
GA700B2P23130B
A700-Utility Summary-FC
20
25 04-Aug-14
01-Sep-14
GA700B2P23150A
A700-Flare Load Summary-FR
33
79 10-Sep-13
31-Oct-13
A500 - Control Narrative_IFC
A500 - Interlock Narrative_IFR
A500 - Interlock Narrative_IFC
A500 - Process Flow Diagrams (PFD)_IFR
A500 - Process Flow Diagrams (PFD)_IFC
A500 - Catalyst & Chemical Summary_IFR
A500 - Catalyst & Chemical Summary_IFC
A500 - Utility Summary_IFR
A500 - Utility Summary_IFC
A500 - Cause & Effect Diagram_IFR
A500 - Cause & Effect Diagram_IFC
A500 - Material Selection Diagram_IFR
A500 - Material Selection Diagram_IFC
A500 - Effluent Summary_IFR
A500 - Effluent Summary_IFC
A500 - Operating Manual_IFR
A500 - Operating Manual_IFC
A500 - Relief and Blowdown Summary_IFR
A600 - Control Narrative_IFC
A600 - Interlock Narrative_IFR
A600 - Interlock Narrative_IFC
A600 - Process Flow Diagrams (PFD)_IFR
A600 - Process Flow Diagrams (PFD)_IFC
A600 - Catalyst & Chemical Summary_IFR
A600 - Catalyst & Chemical Summary_IFC
A600 - Utility Summary_IFR
A600 - Utility Summary_IFC
A600 - Cause & Effect Diagram_IFR
A600 - Cause & Effect Diagram_IFC
A600 - Material Selection Diagram_IFR
A600 - Material Selection Diagram_IFC
A600 - Effluent Summary_IFR
A600 - Effluent Summary_IFC
A600 - Operating Manual_IFR
A600 - Operating Manual_IFC
A600 - Relief and Blowdown Summary_IFR
A600 - Relief and Blowdown Summary_IFC
A700-Material Selection Diagram-FR
A700-Material Selection Diagram-FC
A700-Process Flow Diagram-FR
A700-Process Flow Diagram-FC
A700-Cause & Effect Diagram-FR rev.A
A700-Cause & Effect Diagram-FA rev.B
A700-Cause & Effect Diagram-FC rev.0 (W/ Hold)
A700-Cause & Effect Diagram-FC rev.1 (W/o Hold)
A700-Effluent Summary-FR
A700-Effluent Summary-FC
A700-Heat & Material Balance-FR
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
A700-Utility Summary-FC
A700-Flare Load Summary-FR
Page 9 of 179
Actual Work
Remaining Work
A700-Heat & Material Balance-FC
A700-Utility Summary-FR
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
GA700B2P23150B
A700-Flare Load Summary-FC
20
50 17-Jun-14
14-Jul-14
GA700B2P23170A
A700-Equipment List-FR
15
52 02-Oct-13
24-Oct-13
GA700B2P23170B
A700-Equipment List-FC
35
48 14-Aug-14
07-Oct-14
594
92
33 15-Apr-13 A
24 01-Apr-14
31-Aug-15
11-Aug-14
AA00 - Polypropylene U
Unit (PPU)
SAA00B2P23051
AA00 - Control Narrative_IFR
SAA00B2P23057
AA00 - Control Narrative_IFC
108
24 12-Aug-14
19-Jan-15
SAA00B2P23061
AA00 - Interlock Narrative_IFR
92
24 01-Apr-14
11-Aug-14
SAA00B2P23067
AA00 - Interlock Narrative_IFC
108
24 12-Aug-14
19-Jan-15
SAA00B2P23071
AA00 - Process Flow Diagrams (PFD)_IFR
66
15-Apr-13 A
SAA00B2P23077
AA00 - Process Flow Diagrams (PFD)_IFC
183
61 18-Jul-13 A
14-Apr-14
SAA00B2P23091
AA00 - Catalyst & Chemical Summary_IFR
26
15 25-Jul-13
30-Aug-13
SAA00B2P23097
AA00 - Catalyst & Chemical Summary_IFC
223
15 02-Sep-13
25-Jul-14
SAA00B2P23131
AA00 - Utility Summary_IFR
71
41 15-Apr-13 A
24-Jul-13
SAA00B2P23137
AA00 - Utility Summary_IFC
137
52 25-Jul-13
14-Feb-14
SAA00B2P23151
AA00 - Cause & Effect Diagram_IFR
230
45 25-Jul-13
30-Jun-14
SAA00B2P23157
AA00 - Cause & Effect Diagram_IFC
115
45 01-Jul-14
15-Dec-14
SAA00B2P23171
AA00 - Material Selection Diagram_IFR
55
30-Apr-13 A
SAA00B2P23177
AA00 - Material Selection Diagram_IFC
183
61 18-Jul-13 A
14-Apr-14
SAA00B2P23191
AA00 - Effluent Summary_IFR
40
65 05-Jul-13 A
30-Aug-13
SAA00B2P23197
AA00 - Effluent Summary_IFC
223
65 02-Sep-13
25-Jul-14
SAA00B2P23311
AA00 - Operating Manual_IFR
81
33 30-Jan-15
29-May-15
SAA00B2P23317
AA00 - Operating Manual_IFC
66
33 01-Jun-15
31-Aug-15
SAA00B2P23931
AA00 - Relief and Blowdown Summary_IFR
115
21 15-Apr-13 A
30-Sep-13
SAA00B2P23937
AA00 - Relief and Blowdown Summary_IFC
134
21 01-Oct-13
14-Apr-14
603
40
26 01-Apr-13 A
26 01-Aug-14
28-Aug-15
30-Sep-14
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B2P23051
AB10 - Control Narrative_IFR
A700-Equipment List-FC
AA00 - Control Narrative_IFR
AA00 - Control Narrative_IFC
AA00 - Interlock Narrative_IFR
AA00 - Interlock Narrative_IFC
AA00 - Process Flow Diagrams (PFD)_IFR
AA00 - Process Flow Diagrams (PFD)_IFC
AA00 - Catalyst & Chemical Summary_IFR
AA00 - Catalyst & Chemical Summary_IFC
AA00 - Utility Summary_IFR
AA00 - Utility Summary_IFC
AA00 - Cause & Effect Diagram_IFR
AA00 - Cause & Effect Diagram_IFC
17-Jul-13 A
AB10 - Control Narrative_IFC
94
26 01-Oct-14
13-Feb-15
SAB10B2P23071
AB10 - Process Flow Diagrams (PFD)_IFR
59
20 01-May-13 A
24-Jul-13
SAB10B2P23077
AB10 - Process Flow Diagrams (PFD)_IFC
199
20 25-Jul-13
15-May-14
SAB10B2P23091
AB10 - Catalyst & Chemical Summary_IFR
26
67 25-Jul-13
30-Aug-13
SAB10B2P23097
AB10 - Catalyst & Chemical Summary_IFC
223
67 02-Sep-13
25-Jul-14
SAB10B2P23111
AB10 - Interlock Narrative_IFR
40
55 01-Aug-14
30-Sep-14
SAB10B2P23117
AB10 - Interlock Narrative_IFC
94
55 01-Oct-14
13-Feb-15
SAB10B2P23131
AB10 - Utility Summary_IFR
80
50 01-Apr-13 A
23-Jul-13
SAB10B2P23137
AB10 - Utility Summary_IFC
148
50 24-Jul-13
28-Feb-14
SAB10B2P23151
AB10 - Cause & Effect Diagram_IFR
230
60 25-Jul-13
30-Jun-14
SAB10B2P23157
AB10 - Cause & Effect Diagram_IFC
126
60 01-Jul-14
31-Dec-14
SAB10B2P23171
AB10 - Material Selection Diagram_IFR
73
20 16-Apr-13 A
29-Jul-13
SAB10B2P23177
AB10 - Material Selection Diagram_IFC
196
20 30-Jul-13
15-May-14
SAB10B2P23191
AB10 - Effluent Summary_IFR
26
89 25-Jul-13
30-Aug-13
SAB10B2P23197
AB10 - Effluent Summary_IFC
223
89 02-Sep-13
25-Jul-14
SAB10B2P23311
AB10 - Operating Manual_IFR
41
26 01-Apr-15
29-May-15
SAB10B2P23317
AB10 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
SAB10B2P23931
AB10 - Relief and Blowdown Summary_IFR
44
64 25-Jul-13
30-Sep-13
SAB10B2P23937
AB10 - Relief and Blowdown Summary_IFC
175
64 01-Oct-13
13-Jun-14
SAB20B2P23051
AB20 - Control Narrative_IFR
40
26 01-Aug-14
30-Sep-14
SAB20B2P23057
AB20 - Control Narrative_IFC
94
26 01-Oct-14
13-Feb-15
SAB20B2P23071
AB20 - Process Flow Diagrams (PFD)_IFR
59
37 01-May-13 A
24-Jul-13
SAB20B2P23077
AB20 - Process Flow Diagrams (PFD)_IFC
199
37 25-Jul-13
15-May-14
SAB20B2P23091
AB20 - Catalyst & Chemical Summary_IFR
26
67 25-Jul-13
30-Aug-13
SAB20B2P23097
AB20 - Catalyst & Chemical Summary_IFC
223
67 02-Sep-13
25-Jul-14
SAB20B2P23111
AB20 - Interlock Narrative_IFR
40
55 01-Aug-14
30-Sep-14
SAB20B2P23117
AB20 - Interlock Narrative_IFC
94
55 01-Oct-14
13-Feb-15
SAB20B2P23131
AB20 - Utility Summary_IFR
80
67 01-Apr-13 A
23-Jul-13
SAB20B2P23137
AB20 - Utility Summary_IFC
148
67 24-Jul-13
28-Feb-14
SAB20B2P23151
AB20 - Cause & Effect Diagram_IFR
230
60 25-Jul-13
30-Jun-14
SAB20B2P23157
AB20 - Cause & Effect Diagram_IFC
126
60 01-Jul-14
31-Dec-14
SAB20B2P23171
AB20 - Material Selection Diagram_IFR
73
37 16-Apr-13 A
29-Jul-13
SAB20B2P23177
AB20 - Material Selection Diagram_IFC
196
37 30-Jul-13
15-May-14
SAB20B2P23191
AB20 - Effluent Summary_IFR
26
89 25-Jul-13
30-Aug-13
SAB20B2P23197
AB20 - Effluent Summary_IFC
223
89 02-Sep-13
25-Jul-14
SAB20B2P23311
AB20 - Operating Manual_IFR
41
26 01-Apr-15
29-May-15
SAB20B2P23317
AB20 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
SAB20B2P23931
AB20 - Relief and Blowdown Summary_IFR
44
64 25-Jul-13
30-Sep-13
SAB20B2P23937
AB20 - Relief and Blowdown Summary_IFC
175
64 01-Oct-13
13-Jun-14
SAB30B2P23051
AB30 - Control Narrative_IFR
40
26 01-Aug-14
30-Sep-14
SAB30B2P23057
AB30 - Control Narrative_IFC
94
26 01-Oct-14
13-Feb-15
SAB30B2P23071
AB30 - Process Flow Diagrams (PFD)_IFR
59
37 01-May-13 A
24-Jul-13
SAB30B2P23077
AB30 - Process Flow Diagrams (PFD)_IFC
199
37 25-Jul-13
15-May-14
SAB30B2P23091
AB30 - Catalyst & Chemical Summary_IFR
26
67 25-Jul-13
30-Aug-13
SAB30B2P23097
AB30 - Catalyst & Chemical Summary_IFC
223
67 02-Sep-13
25-Jul-14
SAB30B2P23111
AB30 - Interlock Narrative_IFR
40
55 01-Aug-14
30-Sep-14
SAB30B2P23117
AB30 - Interlock Narrative_IFC
94
55 01-Oct-14
13-Feb-15
SAB30B2P23131
AB30 - Utility Summary_IFR
80
67 01-Apr-13 A
23-Jul-13
SAB30B2P23137
AB30 - Utility Summary_IFC
148
67 24-Jul-13
28-Feb-14
SAB30B2P23151
AB30 - Cause & Effect Diagram_IFR
230
60 25-Jul-13
30-Jun-14
SAB30B2P23157
AB30 - Cause & Effect Diagram_IFC
126
60 01-Jul-14
31-Dec-14
SAB30B2P23171
AB30 - Material Selection Diagram_IFR
73
37 16-Apr-13 A
29-Jul-13
SAB30B2P23177
AB30 - Material Selection Diagram_IFC
196
37 30-Jul-13
15-May-14
SAB30B2P23191
AB30 - Effluent Summary_IFR
26
89 25-Jul-13
30-Aug-13
SAB30B2P23197
AB30 - Effluent Summary_IFC
223
89 02-Sep-13
25-Jul-14
SAB30B2P23311
AB30 - Operating Manual_IFR
41
26 01-Apr-15
29-May-15
SAB30B2P23317
AB30 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
SAB30B2P23931
AB30 - Relief and Blowdown Summary_IFR
44
64 25-Jul-13
30-Sep-13
SAB30B2P23937
AB30 - Relief and Blowdown Summary_IFC
175
64 01-Oct-13
13-Jun-14
386
20
62 06-Mar-13 A
06-Mar-13 A
30-Sep-14
03-Apr-13 A
CAC00B2P23010B
PFD IFA
114
19 04-Apr-13 A
17-Sep-13
CAC00B2P23010D
PFD IFC
23
19 28-Oct-13
28-Nov-13
CAC00B2P23015A
Line List (Conformity Check with P&ID) IFR
57
56 08-Jul-13 A
27-Sep-13
CAC00B2P23015B
Line List (Conformity Check with P&ID) IFA
9
49 09-Oct-13
22-Oct-13
CAC00B2P23015C
Line List (Conformity Check with P&ID) IFC
20
69 19-Mar-14
16-Apr-14
CAC00B2P23015D
Line List (Conformity Check with P&ID) Final
20
62 17-Jul-14
14-Aug-14
CAC00B2P23017A
Line List (Process Condition Input) IFR
20
45 18-Jul-13 A
14-Aug-13
CAC00B2P23017B
Line List (Process Condition Input) IFA
18
49 23-Oct-13
18-Nov-13
CAC00B2P23017C
Line List (Process Condition Input) IFC
15
47 14-Apr-14
07-May-14
CAC00B2P23017D
Line List (Process Condition Input) Final
20
62 15-Aug-14
11-Sep-14
CAC00B2P23018A
Line List (Piping Data Input) IFR
10
45 29-Aug-13
11-Sep-13
CAC00B2P23018B
Line List (Piping Data Input) IFA
28
49 19-Nov-13
27-Dec-13
CAC00B2P23018C
Line List (Piping Data Input) IFC
10
47 08-May-14
21-May-14
CAC00B2P23018D
Line List (Piping Data Input) Final
10
62 16-Sep-14
30-Sep-14
CAC00B2P23020A
H&MB (Heat & Material Balance) IFIR
20
06-Mar-13 A
CAC00B2P23020B
H&MB IFA
140
25 04-Apr-13 A
25-Oct-13
CAC00B2P23020D
H&MB IFC
24
31 28-Oct-13
29-Nov-13
CAC00B2P23030A
MSD (Material Selection Diagram) IFIR
20
06-Mar-13 A
CAC00B2P23030B
MSD IFA
114
40 04-Apr-13 A
17-Sep-13
CAC00B2P23030D
MSD IFC
50
50 18-Sep-13
29-Nov-13
CAC00B2P23040A
Utility Summary IFIR
20
CAC00B2P23040B
Utility Summary IFA
21
43 11-Jul-13 A
09-Aug-13
CAC00B2P23040C
Utility Summary IFC
21
52 20-Feb-14
20-Mar-14
CAC00B2P23050
Relief Load Summary
68
22 08-May-13 A
12-Aug-13
CAC00B2P23060
Operation Philosophy (Clarification to Employer)
122
40 28-Mar-13 A
20-Sep-13
CAC00B2P23070A
Cause & Effect IFR
123
40 04-Apr-13 A
01-Oct-13
CAC00B2P23070B
Cause & Effect IFA
25
51 02-Oct-13
07-Nov-13
CAC00B2P23070C
Cause & Effect IFC
40
46 09-Jan-14
07-Mar-14
CAC00B2P23080
Effluent Summary
108
40 06-Mar-13 A
09-Aug-13
CAC00B2P23090
Control Narrative
81
101 04-Jun-13 A
27-Sep-13
CAC00B2P23095
Safeguarding Narrative
58
52 08-Jul-13 A
30-Sep-13
CAC00B2P23100A
UHD (Utility Header Diagram) IFIR
20
08-May-13 A
04-Jun-13 A
CAC00B2P23100B
UHD IFIR Internal Review and Meeting
10
05-Jun-13 A
18-Jun-13 A
06-Mar-13 A
A700-Equipment List-FR
17-Jul-13 A
SAB10B2P23057
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B2P23010A
PFD (Process Flow Diagram) IFIR
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
A700-Flare Load Summary-FC
03-Apr-13 A
03-Apr-13 A
03-Apr-13 A
AA00 - Material Selection Diagram_IFR
AA00 - Material Selection Diagram_IFC
AA00 - Effluent Summary_IFR
AA00 - Effluent Summary_IFC
AA00 - Operating Manual_IFR
AA00 - Operating Manual_IFC
AA00 - Relief and Blowdown Summary_IFR
AA00 - Relief and Blowdown Summary_IFC
AB10 - Control Narrative_IFR
AB10 - Control Narrative_IFC
AB10 - Process Flow Diagrams (PFD)_IFR
AB10 - Process Flow Diagrams (PFD)_IFC
AB10 - Catalyst & Chemical Summary_IFR
AB10 - Catalyst & Chemical Summary_IFC
AB10 - Interlock Narrative_IFR
AB10 - Interlock Narrative_IFC
AB10 - Utility Summary_IFR
AB10 - Utility Summary_IFC
AB10 - Cause & Effect Diagram_IFR
AB10 - Cause & Effect Diagram_IFC
AB10 - Material Selection Diagram_IFR
AB10 - Material Selection Diagram_IFC
AB10 - Effluent Summary_IFR
AB10 - Effluent Summary_IFC
AB10 - Operating Manual_IFR
AB10 - Operating Manual_IFC
AB10 - Relief and Blowdown Summary_IFR
AB10 - Relief and Blowdown Summary_IFC
AB20 - Control Narrative_IFR
AB20 - Control Narrative_IFC
AB20 - Process Flow Diagrams (PFD)_IFR
AB20 - Process Flow Diagrams (PFD)_IFC
AB20 - Catalyst & Chemical Summary_IFR
AB20 - Catalyst & Chemical Summary_IFC
AB20 - Interlock Narrative_IFR
AB20 - Interlock Narrative_IFC
AB20 - Utility Summary_IFR
AB20 - Utility Summary_IFC
AB20 - Cause & Effect Diagram_IFR
AB20 - Cause & Effect Diagram_IFC
AB20 - Material Selection Diagram_IFR
AB20 - Material Selection Diagram_IFC
AB20 - Effluent Summary_IFR
AB20 - Effluent Summary_IFC
AB20 - Operating Manual_IFR
AB20 - Operating Manual_IFC
AB20 - Relief and Blowdown Summary_IFR
AB20 - Relief and Blowdown Summary_IFC
AB30 - Control Narrative_IFR
AB30 - Control Narrative_IFC
AB30 - Process Flow Diagrams (PFD)_IFR
AB30 - Process Flow Diagrams (PFD)_IFC
AB30 - Catalyst & Chemical Summary_IFR
AB30 - Catalyst & Chemical Summary_IFC
AB30 - Interlock Narrative_IFR
AB30 - Interlock Narrative_IFC
AB30 - Utility Summary_IFR
AB30 - Utility Summary_IFC
AB30 - Cause & Effect Diagram_IFR
AB30 - Cause & Effect Diagram_IFC
AB30 - Material Selection Diagram_IFR
AB30 - Material Selection Diagram_IFC
AB30 - Effluent Summary_IFR
AB30 - Effluent Summary_IFC
AB30 - Operating Manual_IFR
AB30 - Operating Manual_IFC
AB30 - Relief and Blowdown Summary_IFR
AB30 - Relief and Blowdown Summary_IFC
PFD (Process Flow Diagram) IFIR
PFD IFA
PFD IFC
Line List (Conformity Check with P&ID) IFR
Line List (Conformity Check with P&ID) IFA
Line List (Conformity Check with P&ID) IFC
Line List (Conformity Check with P&ID) Final
Line List (Process Condition Input) IFR
Line List (Process Condition Input) IFA
Line List (Process Condition Input) IFC
Line List (Process Condition Input) Final
Line List (Piping Data Input) IFR
Line List (Piping Data Input) IFA
Line List (Piping Data Input) IFC
Line List (Piping Data Input) Final
H&MB (Heat & Material Balance) IFIR
H&MB IFA
H&MB IFC
MSD (Material Selection Diagram) IFIR
MSD IFA
MSD IFC
Utility Summary IFIR
Utility Summary IFA
Utility Summary IFC
Relief Load Summary
Operation Philosophy (Clarification to Employer)
Cause & Effect IFR
Cause & Effect IFA
Cause & Effect IFC
Effluent Summary
Control Narrative
Safeguarding Narrative
UHD (Utility Header Diagram) IFIR
UHD IFIR Internal Review and Meeting
Page 10 of 179
Actual Work
Remaining Work
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
UHD IFR
20
CAC00B2P23100D
UHD IFR Client Review
10
80 18-Jul-13 A
31-Jul-13
CAC00B2P23100F
UHD IFR Joint Review Meeting with Client
13
80 01-Aug-13
19-Aug-13
CAC00B2P23100G
UHD IFA
57
46 18-Jul-13 A
08-Oct-13
CAC00B2P23100G10
UHD IFC (w/ Hold)
62
47 09-Oct-13
15-Jan-14
UHD IFC (w/ Hold)
CAC00B2P23100H
UHD IFC
60
47 16-Jan-14
11-Apr-14
UHD IFC
CAC00B2P23100J
UHD IFC Rev.1
80
67 14-Apr-14
07-Aug-14
26 01-Apr-13 A
26 01-Aug-14
28-Aug-15
30-Sep-14
603
40
17-Jul-13 A
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
UHD IFR
CAC00B2P23100C
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P23051
AD00 - Control Narrative_IFR
19-Jun-13 A
Finish
SAD00B2P23057
AD00 - Control Narrative_IFC
94
26 01-Oct-14
13-Feb-15
SAD00B2P23071
AD00 - Process Flow Diagrams (PFD)_IFR
59
20 01-May-13 A
24-Jul-13
SAD00B2P23077
AD00 - Process Flow Diagrams (PFD)_IFC
199
20 25-Jul-13
15-May-14
SAD00B2P23091
AD00 - Catalyst & Chemical Summary_IFR
26
67 25-Jul-13
30-Aug-13
SAD00B2P23097
AD00 - Catalyst & Chemical Summary_IFC
223
67 02-Sep-13
25-Jul-14
SAD00B2P23111
AD00 - Interlock Narrative_IFR
40
55 01-Aug-14
30-Sep-14
SAD00B2P23117
AD00 - Interlock Narrative_IFC
94
55 01-Oct-14
13-Feb-15
SAD00B2P23131
AD00 - Utility Summary_IFR
80
50 01-Apr-13 A
23-Jul-13
SAD00B2P23137
AD00 - Utility Summary_IFC
148
50 24-Jul-13
28-Feb-14
SAD00B2P23151
AD00 - Cause & Effect Diagram_IFR
230
60 25-Jul-13
30-Jun-14
SAD00B2P23157
AD00 - Cause & Effect Diagram_IFC
126
60 01-Jul-14
31-Dec-14
SAD00B2P23171
AD00 - Material Selection Diagram_IFR
73
20 16-Apr-13 A
29-Jul-13
SAD00B2P23177
AD00 - Material Selection Diagram_IFC
196
20 30-Jul-13
15-May-14
SAD00B2P23191
AD00 - Effluent Summary_IFR
26
89 25-Jul-13
30-Aug-13
SAD00B2P23197
AD00 - Effluent Summary_IFC
223
89 02-Sep-13
25-Jul-14
SAD00B2P23311
AD00 - Operating Manual_IFR
41
26 01-Apr-15
29-May-15
SAD00B2P23317
AD00 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
SAD00B2P23931
AD00 - Relief and Blowdown Summary_IFR
44
64 25-Jul-13
30-Sep-13
SAD00B2P23937
AD00 - Relief and Blowdown Summary_IFC
175
64 01-Oct-13
13-Jun-14
603
40
26 01-Apr-13 A
26 01-Aug-14
28-Aug-15
30-Sep-14
94
26 01-Oct-14
13-Feb-15
AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P23051
AE00 - Control Narrative_IFR
SAE00B2P23057
AE00 - Control Narrative_IFC
SAE00B2P23071
AE00 - Process Flow Diagrams (PFD)_IFR
59
20 01-May-13 A
24-Jul-13
SAE00B2P23077
AE00 - Process Flow Diagrams (PFD)_IFC
199
20 25-Jul-13
15-May-14
SAE00B2P23091
AE00 - Catalyst & Chemical Summary_IFR
26
67 25-Jul-13
30-Aug-13
SAE00B2P23097
AE00 - Catalyst & Chemical Summary_IFC
223
67 02-Sep-13
25-Jul-14
SAE00B2P23111
AE00 - Interlock Narrative_IFR
40
55 01-Aug-14
30-Sep-14
SAE00B2P23117
AE00 - Interlock Narrative_IFC
94
55 01-Oct-14
13-Feb-15
SAE00B2P23131
AE00 - Utility Summary_IFR
80
50 01-Apr-13 A
23-Jul-13
SAE00B2P23137
AE00 - Utility Summary_IFC
148
50 24-Jul-13
28-Feb-14
SAE00B2P23151
AE00 - Cause & Effect Diagram_IFR
230
60 25-Jul-13
30-Jun-14
SAE00B2P23157
AE00 - Cause & Effect Diagram_IFC
126
60 01-Jul-14
31-Dec-14
SAE00B2P23171
AE00 - Material Selection Diagram_IFR
73
20 16-Apr-13 A
29-Jul-13
SAE00B2P23177
AE00 - Material Selection Diagram_IFC
196
20 30-Jul-13
15-May-14
SAE00B2P23191
AE00 - Effluent Summary_IFR
26
89 25-Jul-13
30-Aug-13
SAE00B2P23197
AE00 - Effluent Summary_IFC
223
89 02-Sep-13
25-Jul-14
SAE00B2P23311
AE00 - Operating Manual_IFR
41
26 01-Apr-15
29-May-15
SAE00B2P23317
AE00 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
SAE00B2P23931
AE00 - Relief and Blowdown Summary_IFR
44
64 25-Jul-13
30-Sep-13
SAE00B2P23937
AE00 - Relief and Blowdown Summary_IFC
175
64 01-Oct-13
13-Jun-14
603
603
85
26 01-Apr-13 A
26 01-Apr-13 A
44 28-Mar-14
28-Aug-15
28-Aug-15
29-Jul-14
118
46 30-Jul-14
20-Jan-15
22 01-May-13 A
24-Jul-13
Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P23051
B100 - Control Narrative_IFR
UHD IFR Client Review
UHD IFR Joint Review Meeting with Client
UHD IFA
UHD IFC Rev.1
AD00 - Control Narrative_IFR
AD00 - Control Narrative_IFC
AD00 - Process Flow Diagrams (PFD)_IFR
AD00 - Process Flow Diagrams (PFD)_IFC
AD00 - Catalyst & Chemical Summary_IFR
AD00 - Catalyst & Chemical Summary_IFC
AD00 - Interlock Narrative_IFR
AD00 - Interlock Narrative_IFC
AD00 - Utility Summary_IFR
AD00 - Utility Summary_IFC
AD00 - Cause & Effect Diagram_IFR
AD00 - Cause & Effect Diagram_IFC
AD00 - Material Selection Diagram_IFR
AD00 - Material Selection Diagram_IFC
AD00 - Effluent Summary_IFR
AD00 - Effluent Summary_IFC
AD00 - Operating Manual_IFR
AD00 - Operating Manual_IFC
AD00 - Relief and Blowdown Summary_IFR
AD00 - Relief and Blowdown Summary_IFC
AE00 - Control Narrative_IFR
AE00 - Control Narrative_IFC
AE00 - Process Flow Diagrams (PFD)_IFR
AE00 - Process Flow Diagrams (PFD)_IFC
AE00 - Catalyst & Chemical Summary_IFR
AE00 - Catalyst & Chemical Summary_IFC
AE00 - Interlock Narrative_IFR
AE00 - Interlock Narrative_IFC
AE00 - Utility Summary_IFR
AE00 - Utility Summary_IFC
AE00 - Cause & Effect Diagram_IFR
AE00 - Cause & Effect Diagram_IFC
AE00 - Material Selection Diagram_IFR
AE00 - Material Selection Diagram_IFC
AE00 - Effluent Summary_IFR
AE00 - Effluent Summary_IFC
AE00 - Operating Manual_IFR
AE00 - Operating Manual_IFC
AE00 - Relief and Blowdown Summary_IFR
AE00 - Relief and Blowdown Summary_IFC
B100 - Control Narrative_IFR
SB100B2P23057
B100 - Control Narrative_IFC
SB100B2P23071
B100 - Process Flow Diagrams (PFD)_IFR
59
B100 - Control Narrative_IFC
SB100B2P23077
B100 - Process Flow Diagrams (PFD)_IFC
168
22 25-Jul-13
31-Mar-14
SB100B2P23091
B100 - Catalyst & Chemical Summary_IFR
26
26 25-Jul-13
30-Aug-13
SB100B2P23097
B100 - Catalyst & Chemical Summary_IFC
223
26 02-Sep-13
25-Jul-14
SB100B2P23131
B100 - Utility Summary_IFR
81
43 01-Apr-13 A
24-Jul-13
SB100B2P23137
B100 - Utility Summary_IFC
147
43 25-Jul-13
28-Feb-14
SB100B2P23151
B100 - Cause & Effect Diagram_IFR
205
66 01-Aug-13
30-May-14
SB100B2P23157
B100 - Cause & Effect Diagram_IFC
139
66 02-Jun-14
19-Dec-14
SB100B2P23171
B100 - Material Selection Diagram_IFR
70
22 16-Apr-13 A
24-Jul-13
SB100B2P23177
B100 - Material Selection Diagram_IFC
168
22 25-Jul-13
31-Mar-14
SB100B2P23191
B100 - Effluent Summary_IFR
26
26 25-Jul-13
30-Aug-13
SB100B2P23197
B100 - Effluent Summary_IFC
223
26 02-Sep-13
25-Jul-14
B100 - Effluent Summary_IFC
SB100B2P23211
B100 - Interlock Narrative_IFR
83
44 01-Apr-14
29-Jul-14
B100 - Interlock Narrative_IFR
SB100B2P23217
B100 - Interlock Narrative_IFC
118
46 30-Jul-14
20-Jan-15
SB100B2P23311
B100 - Operating Manual_IFR
143
26 03-Nov-14
29-May-15
SB100B2P23317
B100 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
B200 - Service / Potable / Fire Water
SB200B2P23051
B200 - Control Narrative_IFR
603
85
26 01-Apr-13 A
38 28-Mar-14
28-Aug-15
29-Jul-14
118
38 30-Jul-14
20-Jan-15
22 01-May-13 A
24-Jul-13
B100 - Process Flow Diagrams (PFD)_IFR
B100 - Process Flow Diagrams (PFD)_IFC
B100 - Catalyst & Chemical Summary_IFR
B100 - Catalyst & Chemical Summary_IFC
B100 - Utility Summary_IFR
B100 - Utility Summary_IFC
B100 - Cause & Effect Diagram_IFR
B100 - Cause & Effect Diagram_IFC
B100 - Material Selection Diagram_IFR
B100 - Material Selection Diagram_IFC
B100 - Effluent Summary_IFR
B100 - Interlock Narrative_IFC
B100 - Operating Manual_IFR
B100 - Operating Manual_IFC
B200 - Control Narrative_IFR
SB200B2P23057
B200 - Control Narrative_IFC
SB200B2P23071
B200 - Process Flow Diagrams (PFD)_IFR
59
SB200B2P23077
B200 - Process Flow Diagrams (PFD)_IFC
168
22 25-Jul-13
31-Mar-14
SB200B2P23091
B200 - Catalyst & Chemical Summary_IFR
26
46 25-Jul-13
30-Aug-13
SB200B2P23097
B200 - Catalyst & Chemical Summary_IFC
223
46 02-Sep-13
25-Jul-14
SB200B2P23131
B200 - Utility Summary_IFR
81
63 01-Apr-13 A
24-Jul-13
SB200B2P23137
B200 - Utility Summary_IFC
147
63 25-Jul-13
28-Feb-14
SB200B2P23151
B200 - Cause & Effect Diagram_IFR
205
58 01-Aug-13
30-May-14
SB200B2P23157
B200 - Cause & Effect Diagram_IFC
139
58 02-Jun-14
19-Dec-14
SB200B2P23171
B200 - Material Selection Diagram_IFR
70
22 16-Apr-13 A
24-Jul-13
SB200B2P23177
B200 - Material Selection Diagram_IFC
168
22 25-Jul-13
31-Mar-14
SB200B2P23191
B200 - Effluent Summary_IFR
26
46 25-Jul-13
30-Aug-13
SB200B2P23197
B200 - Effluent Summary_IFC
223
46 02-Sep-13
25-Jul-14
B200 - Effluent Summary_IFC
SB200B2P23211
B200 - Interlock Narrative_IFR
83
38 01-Apr-14
29-Jul-14
B200 - Interlock Narrative_IFR
SB200B2P23217
B200 - Interlock Narrative_IFC
118
38 30-Jul-14
20-Jan-15
SB200B2P23311
B200 - Operating Manual_IFR
143
26 03-Nov-14
29-May-15
SB200B2P23317
B200 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
B300 - Control Narrative_IFR
603
85
26 01-Apr-13 A
51 28-Mar-14
28-Aug-15
29-Jul-14
SB300B2P23057
B300 - Control Narrative_IFC
118
51 30-Jul-14
20-Jan-15
SB300B2P23071
B300 - Process Flow Diagrams (PFD)_IFR
59
22 01-May-13 A
24-Jul-13
SB300B2P23077
B300 - Process Flow Diagrams (PFD)_IFC
168
22 25-Jul-13
31-Mar-14
SB300B2P23091
B300 - Catalyst & Chemical Summary_IFR
26
46 25-Jul-13
30-Aug-13
SB300B2P23097
B300 - Catalyst & Chemical Summary_IFC
223
46 02-Sep-13
25-Jul-14
SB300B2P23131
B300 - Utility Summary_IFR
81
43 01-Apr-13 A
24-Jul-13
SB300B2P23137
B300 - Utility Summary_IFC
147
43 25-Jul-13
28-Feb-14
SB300B2P23151
B300 - Cause & Effect Diagram_IFR
205
71 01-Aug-13
30-May-14
SB300B2P23157
B300 - Cause & Effect Diagram_IFC
139
71 02-Jun-14
19-Dec-14
SB300B2P23171
B300 - Material Selection Diagram_IFR
70
22 16-Apr-13 A
24-Jul-13
SB300B2P23177
B300 - Material Selection Diagram_IFC
168
22 25-Jul-13
31-Mar-14
SB300B2P23191
B300 - Effluent Summary_IFR
26
46 25-Jul-13
30-Aug-13
SB300B2P23197
B300 - Effluent Summary_IFC
223
46 02-Sep-13
25-Jul-14
B300 - Effluent Summary_IFC
SB300B2P23211
B300 - Interlock Narrative_IFR
83
51 01-Apr-14
29-Jul-14
B300 - Interlock Narrative_IFR
SB300B2P23217
B300 - Interlock Narrative_IFC
118
51 30-Jul-14
20-Jan-15
SB300B2P23311
B300 - Operating Manual_IFR
143
26 03-Nov-14
29-May-15
SB300B2P23317
B300 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
SB300B2P23931
B300 - Relief and Blowdown Summary_IFR
44
48 25-Jul-13
30-Sep-13
SB300B2P23937
B300 - Relief and Blowdown Summary_IFC
124
48 01-Oct-13
31-Mar-14
B300 - Relief and Blowdown Summary_IFC
B400 - Control Narrative_IFR
603
85
26 01-Apr-13 A
44 28-Mar-14
28-Aug-15
29-Jul-14
B400 - Control Narrative_IFR
SB400B2P23057
B400 - Control Narrative_IFC
118
62 30-Jul-14
20-Jan-15
SB400B2P23071
B400 - Process Flow Diagrams (PFD)_IFR
59
22 01-May-13 A
24-Jul-13
SB400B2P23077
B400 - Process Flow Diagrams (PFD)_IFC
168
22 25-Jul-13
31-Mar-14
SB400B2P23091
B400 - Catalyst & Chemical Summary_IFR
26
46 25-Jul-13
30-Aug-13
SB400B2P23097
B400 - Catalyst & Chemical Summary_IFC
223
46 02-Sep-13
25-Jul-14
SB400B2P23131
B400 - Utility Summary_IFR
81
43 01-Apr-13 A
24-Jul-13
SB400B2P23137
B400 - Utility Summary_IFC
147
43 25-Jul-13
28-Feb-14
SB400B2P23151
B400 - Cause & Effect Diagram_IFR
205
82 01-Aug-13
30-May-14
SB400B2P23157
B400 - Cause & Effect Diagram_IFC
139
82 02-Jun-14
19-Dec-14
SB400B2P23171
B400 - Material Selection Diagram_IFR
22 16-Apr-13 A
24-Jul-13
B300 - Demine & Fuel
SB300B2P23051
B400 - Steam & Power
SB400B2P23051
70
B200 - Control Narrative_IFC
B200 - Process Flow Diagrams (PFD)_IFR
B200 - Process Flow Diagrams (PFD)_IFC
B200 - Catalyst & Chemical Summary_IFR
B200 - Catalyst & Chemical Summary_IFC
B200 - Utility Summary_IFR
B200 - Utility Summary_IFC
B200 - Cause & Effect Diagram_IFR
B200 - Cause & Effect Diagram_IFC
B200 - Material Selection Diagram_IFR
B200 - Material Selection Diagram_IFC
B200 - Effluent Summary_IFR
B200 - Interlock Narrative_IFC
B200 - Operating Manual_IFR
B200 - Operating Manual_IFC
B300 - Control Narrative_IFR
B300 - Control Narrative_IFC
B300 - Process Flow Diagrams (PFD)_IFR
B300 - Process Flow Diagrams (PFD)_IFC
B300 - Catalyst & Chemical Summary_IFR
B300 - Catalyst & Chemical Summary_IFC
B300 - Utility Summary_IFR
B300 - Utility Summary_IFC
B300 - Cause & Effect Diagram_IFR
B300 - Cause & Effect Diagram_IFC
B300 - Material Selection Diagram_IFR
B300 - Material Selection Diagram_IFC
B300 - Effluent Summary_IFR
B300 - Interlock Narrative_IFC
B300 - Operating Manual_IFR
B300 - Operating Manual_IFC
B300 - Relief and Blowdown Summary_IFR
B400 - Control Narrative_IFC
B400 - Process Flow Diagrams (PFD)_IFR
B400 - Process Flow Diagrams (PFD)_IFC
B400 - Catalyst & Chemical Summary_IFR
B400 - Catalyst & Chemical Summary_IFC
B400 - Utility Summary_IFR
B400 - Utility Summary_IFC
B400 - Cause & Effect Diagram_IFR
B400 - Cause & Effect Diagram_IFC
B400 - Material Selection Diagram_IFR
Page 11 of 179
Actual Work
Remaining Work
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
B400 - Material Selection Diagram_IFC
SB400B2P23177
B400 - Material Selection Diagram_IFC
168
22 25-Jul-13
31-Mar-14
SB400B2P23191
B400 - Effluent Summary_IFR
26
46 25-Jul-13
30-Aug-13
SB400B2P23197
B400 - Effluent Summary_IFC
223
46 02-Sep-13
25-Jul-14
B400 - Effluent Summary_IFC
SB400B2P23211
B400 - Interlock Narrative_IFR
83
44 01-Apr-14
29-Jul-14
B400 - Interlock Narrative_IFR
SB400B2P23217
B400 - Interlock Narrative_IFC
118
62 30-Jul-14
20-Jan-15
SB400B2P23311
B400 - Operating Manual_IFR
143
26 03-Nov-14
29-May-15
SB400B2P23317
B400 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
SB400B2P23931
B400 - Relief and Blowdown Summary_IFR
44
48 25-Jul-13
30-Sep-13
SB400B2P23937
B400 - Relief and Blowdown Summary_IFC
124
48 01-Oct-13
31-Mar-14
B400 - Relief and Blowdown Summary_IFC
26 01-Apr-13 A
47 28-Mar-14
28-Aug-15
29-Jul-14
B500 - Control Narrative_IFR
47 30-Jul-14
20-Jan-15
38 01-May-13 A
24-Jul-13
B400 - Effluent Summary_IFR
B400 - Interlock Narrative_IFC
B400 - Operating Manual_IFR
B400 - Operating Manual_IFC
B400 - Relief and Blowdown Summary_IFR
B500 - Control Narrative_IFR
603
85
SB500B2P23057
B500 - Control Narrative_IFC
118
SB500B2P23071
B500 - Process Flow Diagrams (PFD)_IFR
59
SB500B2P23077
B500 - Process Flow Diagrams (PFD)_IFC
168
38 25-Jul-13
31-Mar-14
SB500B2P23091
B500 - Catalyst & Chemical Summary_IFA
26
36 25-Jul-13
30-Aug-13
SB500B2P23097
B500 - Catalyst & Chemical Summary_IFC
223
36 02-Sep-13
25-Jul-14
SB500B2P23131
B500 - Utility Summary_IFR
81
36 01-Apr-13 A
24-Jul-13
SB500B2P23137
B500 - Utility Summary_IFC
147
36 25-Jul-13
28-Feb-14
SB500B2P23151
B500 - Cause & Effect Diagram_IFR
205
67 01-Aug-13
30-May-14
SB500B2P23157
B500 - Cause & Effect Diagram_IFC
139
67 02-Jun-14
19-Dec-14
SB500B2P23171
B500 - Material Selection Diagram_IFR
70
38 16-Apr-13 A
24-Jul-13
SB500B2P23177
B500 - Material Selection Diagram_IFC
168
38 25-Jul-13
31-Mar-14
SB500B2P23191
B500 - Effluent Summary_IFR
26
46 25-Jul-13
30-Aug-13
SB500B2P23197
B500 - Effluent Summary_IFC
223
46 02-Sep-13
25-Jul-14
B500 - Effluent Summary_IFC
SB500B2P23211
B500 - Interlock Narrative_IFR
83
47 01-Apr-14
29-Jul-14
B500 - Interlock Narrative_IFR
SB500B2P23217
B500 - Interlock Narrative_IFC
118
47 30-Jul-14
20-Jan-15
SB500B2P23311
B500 - Operating Manual_IFR
143
26 03-Nov-14
29-May-15
SB500B2P23317
B500 - Operating Manual_IFC
65
26 01-Jun-15
28-Aug-15
96 24-Jun-13 A
138 24-Jun-13 A
14-Oct-14
19-Aug-13
155 26-Jun-14
16-Jul-14
B500 - Cooling Water
SB500B2P23051
Offsites Area
GC000B2P23010A
C000-Material Selection Diagram-FR
324
40
GC000B2P23010B
C000-Material Selection Diagram-FC
15
GC000B2P23030A
C000-Process Flow Diagram-FR
40
GC000B2P23030B
C000-Process Flow Diagram-FC
15
112 26-Jun-14
16-Jul-14
GC000B2P23050A
C000-Cause & Effect Diagram-FR rev.A
19
112 02-Aug-13
29-Aug-13
GC000B2P23050B
C000-Cause & Effect Diagram-FA rev.B
18
64 13-Nov-13
06-Dec-13
GC000B2P23050C
C000-Cause & Effect Diagram-FC rev.0 (W/ Hold)
18
40 08-Apr-14
01-May-14
GC000B2P23050D
C000-Cause & Effect Diagram-FC rev.1 (W/o Hold)
27
25 02-Sep-14
14-Oct-14
GC000B2P23090A
C000-Effluent Summary-FR
15
71 24-Sep-13
16-Oct-13
GC000B2P23090B
C000-Effluent Summary-FC
20
40 02-Jun-14
30-Jun-14
GC000B2P23110A
C000-Heat & Material Balance(only for WWT Unit)-FR
10
71 10-Oct-13
23-Oct-13
GC000B2P23110B
C000-Heat & Material Balance(only for WWT Unit)-FC
15
71 07-Nov-13
27-Nov-13
GC000B2P23130A
C000-Utility Summary-FR
20
122 07-Oct-13
04-Nov-13
GC000B2P23130B
C000-Utility Summary-FC
20
25 04-Aug-14
01-Sep-14
GC000B2P23150A
C000-Flare Load Summary-FR
33
66 10-Sep-13
31-Oct-13
GC000B2P23150B
C000-Flare Load Summary-FC
20
59 17-Jun-14
14-Jul-14
GC000B2P23170A
C000-Equipment List-FR
15
39 02-Oct-13
24-Oct-13
GC000B2P23170B
C000-Equipment List-FC
35
Equipment Basic Design (Process Data Sheet)
Common Area
G0000B2P24010
Process Data Sheet for Reactor
34 24-Jun-13 A
B500 - Control Narrative_IFC
B500 - Process Flow Diagrams (PFD)_IFR
B500 - Process Flow Diagrams (PFD)_IFC
B500 - Catalyst & Chemical Summary_IFA
B500 - Catalyst & Chemical Summary_IFC
B500 - Utility Summary_IFR
B500 - Utility Summary_IFC
B500 - Cause & Effect Diagram_IFR
B500 - Cause & Effect Diagram_IFC
B500 - Material Selection Diagram_IFR
B500 - Material Selection Diagram_IFC
B500 - Effluent Summary_IFR
B500 - Interlock Narrative_IFC
B500 - Operating Manual_IFR
B500 - Operating Manual_IFC
C000-Material Selection Diagram-FR
C000-Material Selection Diagram-FC
19-Aug-13
57 14-Aug-14
07-Oct-14
424
424
20
92 27-Feb-13 A
92 27-Feb-13 A
02-Apr-13 A
19-May-15
19-May-15
30-Apr-13 A
C000-Process Flow Diagram-FR
C000-Process Flow Diagram-FC
C000-Cause & Effect Diagram-FR rev.A
C000-Cause & Effect Diagram-FA rev.B
C000-Cause & Effect Diagram-FC rev.0 (W/ Hold)
C000-Cause & Effect Diagram-FC rev.1 (W/o Hold)
C000-Effluent Summary-FR
C000-Effluent Summary-FC
C000-Heat & Material Balance(only for WWT Unit)-FR
C000-Heat & Material Balance(only for WWT Unit)-FC
C000-Utility Summary-FR
C000-Utility Summary-FC
C000-Flare Load Summary-FR
C000-Flare Load Summary-FC
C000-Equipment List-FR
C000-Equipment List-FC
Process Data Sheet for Reactor
G0000B2P24015
Process Data Sheet for Jetty Fire Water Pumps
20
14-Jun-13 A
11-Jul-13 A
G0000B2P24020
Process Data Sheet for Storage Tanks
20
29-Apr-13 A
27-May-13 A
Process Data Sheet for Storage Tanks
Process Data Sheet for Jetty Fire Water Pumps
G0000B2P24030
Process Data Sheet for Sphere Tanks
20
29-Apr-13 A
27-May-13 A
Process Data Sheet for Sphere Tanks
G0000B2P24040
Process Data Sheet for Air F in Cooler
20
28 08-Jul-13 A
02-Aug-13
G0000B2P24050
Process Data Sheet for Shell & Tube Heat Exchanger
28
33 22-Jul-13
29-Aug-13
G0000B2P24060
Process Data Sheet for Deareator
14
49 26-Aug-13
12-Sep-13
G0000B2P24070
Process Data Sheet for Pressure Ves sels
20
17 23-Sep-13
22-Oct-13
G0000B2P24080
Process Data Sheet for Electric Heater
15
57 23-Sep-13
15-Oct-13
G0000B2P24090
Process Data Sheet for Static Mixer
15
35 01-Oct-13
23-Oct-13
G0000B2P24100
Process Data Sheet for Filter & Canister
15
29 24-Oct-13
13-Nov-13
G0000B2P24110
Process Data Sheet for Marine Loading Arms
20
05-Mar-13 A
02-Apr-13 A
G0000B2P24120
Process Data Sheet for Hydrogen Compressor PKG
20
28-Mar-13 A
25-Apr-13 A
G0000B2P24130
Process Data Sheet for Feed Gas Compressor PKG
20
13-May-13 A
12-Jun-13 A
G0000B2P24140
Process Data Sheet for Sea Water Intake Pumps
24
31 29-Jul-13
30-Aug-13
G0000B2P24150
Process Data Sheet for Centrifugal Pumps(VS Type)
33
12 25-Jul-13
10-Sep-13
G0000B2P24160
Process Data Sheet for Sea Water Cooling Pumps
19
G0000B2P24170
Process Data Sheet for Centrifugal Pumps(OH Type)
G0000B2P24180
Process Data Sheet for Truc k Loading Arms
G0000B2P24190
G0000B2P24210
Process Data Sheet for Air F in Cooler
Process Data Sheet for Shell & Tube Heat Exchanger
Process Data Sheet for Deareator
Process Data Sheet for Pressure Ves sels
Process Data Sheet for Electric Heater
Process Data Sheet for Static Mixer
Process Data Sheet for Filter & Canister
Process Data Sheet for Marine Loading Arms
Process Data Sheet for Hydrogen Compressor PKG
Process Data Sheet for Feed Gas Compressor PKG
Process Data Sheet for Sea Water Intake Pumps
Process Data Sheet for Centrifugal Pumps(VS Type)
2 05-Aug-13
30-Aug-13
40
7 01-Aug-13
01-Oct-13
13
29 02-Sep-13
23-Sep-13
Process Data Sheet for Centrifugal Pumps(BB Type)
40
17 08-Aug-13
10-Oct-13
Process Data Sheet for Sanitary Pumps
20
29 01-Oct-13
30-Oct-13
Process Data Sheet for Sanitary Pumps
G0000B2P24220
Process Data Sheet for Progressive Cavity Pumps
20
34 07-Oct-13
04-Nov-13
Process Data Sheet for Progressive Cavity Pumps
G0000B2P24230
Process Data Sheet for Metering Pumps
20
46 07-Oct-13
04-Nov-13
G0000B2P24250
Process Data Sheet for Reformer PKG
20
27-Feb-13 A
28-Mar-13 A
G0000B2P24260
Process Data Sheet for PSA Unit
20
23-May-13 A
21-Jun-13 A
G0000B2P24270
Process Data Sheet for Waste Water Treatment Unit
20
30-May-13 A
27-Jun-13 A
Process Data Sheet for Waste Water Treatment Unit
G0000B2P24280
Process Data Sheet for Sludge Incineration PKG
20
04-Jun-13 A
02-Jul-13 A
Process Data Sheet for Sludge Incineration PKG
G0000B2P24290
Process Data Sheet for Flare PKG
21
G0000B2P24300
Process Data Sheet for Sea Water Screen & Trash Rack
24
G0000B2P24310
Process Data Sheet for Sea Water Cooling Tower
G0000B2P24320
Process Data Sheet for Condensate Treatment PKG
G0000B2P24330
Process Data Sheet for Filtration Package
G0000B2P24340
3 05-Aug-13
Process Data Sheet for Sea Water Cooling Pumps
Process Data Sheet for Centrifugal Pumps(OH Type)
Process Data Sheet for Truc k Loading Arms
Process Data Sheet for Centrifugal Pumps(BB Type)
Process Data Sheet for Metering Pumps
Process Data Sheet for Reformer PKG
Process Data Sheet for PSA Unit
03-Sep-13
Process Data Sheet for Flare PKG
70 29-Jul-13
30-Aug-13
Process Data Sheet for Sea Water Screen & Trash Rack
24
0 29-Jul-13
30-Aug-13
Process Data Sheet for Sea Water Cooling Tower
21
25 20-Aug-13
17-Sep-13
Process Data Sheet for Condensate Treatment PKG
15
27 28-Aug-13
17-Sep-13
Process Data Sheet for Filtration Package
Process Data Sheet for Electro-Chlorination PKG
15
17 28-Aug-13
17-Sep-13
Process Data Sheet for Electro-Chlorination PKG
G0000B2P24350
Process Data Sheet for Chemical Injection Package
15
25 06-Jan-14
24-Jan-14
G0000B2P24360
Process Data Sheet for Vapour Recovery PKG
15
17 17-Sep-13
14-Oct-13
Process Data Sheet for Vapour Recovery PKG
G0000B2P24370
Process Instrument Data Sheet for C/V
20
33 16-Oct-13
12-Nov-13
Process Instrument Data Sheet for C/V
G0000B2P24380
Process Instrument Data Sheet for On-Off Valve
20
33 16-Oct-13
12-Nov-13
Process Instrument Data Sheet for On-Off Valve
G0000B2P24390
Process Instrument Data Sheet for Pressure Relief Valve
20
33 06-Nov-13
03-Dec-13
G0000B2P24400
Process Instrument Data Sheet for Inline Instrument
40
33 27-Nov-13
23-Jan-14
G0000B2P24420
Process Data Sheet for Pig Launcher & Receiver
15
24 21-Oct-13
08-Nov-13
T0000B2P24001A
PDS - Charge Heater (42-H101/102/103/104) - First Issue
14
T0000B2P24001B
PDS - Charge Heater (42-H101/102/103/104) (FINAL)
43
T0000B2P24002A
PDS - Centrifugal Compressors - First Issue
14
T0000B2P24002B
PDS - Centrifugal Compressors (FINAL)
40
T0000B2P24003A
Design Dossier - CCR Catalyst regeneration modularized package - First Issue
14
T0000B2P24003B
Design Dossier - CCR Catalyst regeneration modularized package (FINAL)
40
T0000B2P24004A
PDS - Recovery Plus Package (UOP mandatory) - First Issue
14
T0000B2P24004B
PDS - Recovery Plus Package (UOP mandatory) (FINAL)
40
T0000B2P24005A
PDS - PSA package (UOP mandatory) / Tail Gas Compressor Package (future) - First
14
T0000B2P24005B
PDS - PSA package (UOP mandatory) / Tail Gas Compressor Package (future) (FINAL
40
85 19-Mar-15
14-May-15
T0000B2P24006A
PDS - Packinox exchangers - First Issue
9
15 15-Jul-13 A
25-Jul-13
T0000B2P24006B
PDS - Packinox exchangers - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24007A
PDS - Reactors (C.S.) - First Issue
13
33 08-Jul-13 A
24-Jul-13
T0000B2P24007B
PDS - Reactors (C.S.) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24007C
PDS - Reactors (Low Alloy and Cladded) - First Issue
13
33 08-Jul-13 A
24-Jul-13
T0000B2P24007D
PDS - Reactors (Low Alloy and Cladded) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24008A
PDS - Columns (C.S.) - First Issue
30
T0000B2P24008B
PDS - Columns (C.S.) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24010A
PDS - Large CS Vessels - First Issue
16
21 12-Aug-13
02-Sep-13
T0000B2P24010B
PDS - Large CS Vessels - Final Issue
16
87 19-Mar-15
09-Apr-15
T0000B2P24010C1
PDS - Trays & Packings ( UOP mandatory) - First Issue
9
21 22-Jul-13
01-Aug-13
T0000B2P24010C2
PDS - Trays & Packings ( UOP mandatory)- Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24011A
PDS - Trays & Packing (not UOP mandatory) - First Issue
9
51 27-Aug-13
06-Sep-13
T0000B2P24011B
PDS - Trays & Packing (not UOP mandatory) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24012A
PDS - Aircoolers - First Issue
16
T0000B2P24012B
PDS - Aircoolers - Final Iss ue
30
95 19-Mar-15
29-Apr-15
T0000B2P24013A
PDS - Shell and tube exchangers (C.S.) - First Issue
45
15 22-Jul-13
25-Sep-13
T0000B2P24013B
PDS - Shell and tube exchangers (C.S.) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24015A
PDS - Shell & Tube Heat Ex changers (H2S & H2 Service) - First Issue
30
29 14-Aug-13
25-Sep-13
T0000B2P24015B
PDS - Shell & Tube Heat Ex changers (H2S & H2 Service) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24017A
PDS - Multi-tube Heat- exchangers - First Issue
6
15 29-Jul-13
05-Aug-13
22-Apr-13 A
82 19-Mar-15
22-Apr-13 A
67 19-Mar-15
22-Apr-13 A
85 19-Mar-15
22-Apr-13 A
85 19-Mar-15
22-Apr-13 A
4 08-Jul-13 A
4 15-Jul-13 A
10-May-13 A
Process Data Sheet for Chemical Injection Package
Process Instrument Data Sheet for Pressure Relief Valve
Process Instrument Data Sheet for Inline Instrument
Process Data Sheet for Pig Launcher & Receiver
PDS - Charge Heater (42-H101/102/103/104) - First Issue
19-May-15
10-May-13 A
PDS - Charge Heater (42-H101/102/103/104) (FINAL)
PDS - Centrifugal Compressors - First Issue
14-May-15
10-May-13 A
PDS - Centrifugal Compressors (FINAL)
Design Dossier - CCR Catalyst regeneration modularized package - First Issue
14-May-15
10-May-13 A
Design Dossier - CCR Catalyst regeneration modularized package (FINAL)
PDS - Recovery Plus Package (UOP mandatory) - First Issue
14-May-15
10-May-13 A
PDS - Recovery Plus Package (UOP mandatory) (FINAL)
PDS - PSA package (UOP mandatory) / Tail Gas Compressor Package (future) - First Issue
20-Aug-13
05-Aug-13
PDS - PSA package (UOP mandatory) / Tail Gas Compressor Package (future) (FINAL)
PDS - Packinox exchangers - First Issue
PDS - Packinox exchangers - Final Issue
PDS - Reactors (C.S.) - First Issue
PDS - Reactors (C.S.) - Final Issue
PDS - Reactors (Low Alloy and Cladded) - First Issue
PDS - Reactors (Low Alloy and Cladded) - Final Issue
PDS - Columns (C.S.) - First Issue
PDS - Columns (C.S.) - Final Issue
PDS - Large CS Vessels - First Issue
PDS - Large CS Vessels - Final Issue
PDS - Trays & Packings ( UOP mandatory) - First Issue
PDS - Trays & Packings ( UOP mandatory)- Final Issue
PDS - Trays & Packing (not UOP mandatory) - First Issue
PDS - Trays & Packing (not UOP mandatory) - Final Issue
PDS - Aircoolers - First Issue
PDS - Aircoolers - Final Iss ue
PDS - Shell and tube exchangers (C.S.) - First Issue
PDS - Shell and tube exchangers (C.S.) - Final Issue
PDS - Shell & Tube Heat Ex changers (H2S & H2 Service) - First Issue
PDS - Shell & Tube Heat Ex changers (H2S & H2 Service) - Final Issue
PDS - Multi-tube Heat- exchangers - First Issue
Page 12 of 179
Actual Work
Remaining Work
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
PDS - Multi-tube Heat- exchangers - Final Issue
T0000B2P24017B
PDS - Multi-tube Heat- exchangers - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24018A
PDS - CCR Regeneration Section Elevator - First Issue (Not required)
10
17 11-Sep-13
25-Sep-13
T0000B2P24018B
PDS - CCR Regeneration Section Elevator - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24019A
PDS - Bridge (Gantry) Cranes - First Issue (PDS will not be issued)
17
17 17-Sep-13
09-Oct-13
T0000B2P24019B
PDS - Bridge (Gantry) Cranes - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24020A
PDS - Electric heaters - First Issue
8
15 25-Jul-13
05-Aug-13
T0000B2P24020B
PDS - Electric heaters - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24023A
PDS - Pumps Centrifugal heavy duty (API 610 >100 kW) - First Issue
19
15 05-Aug-13
02-Sep-13
T0000B2P24023B
PDS - Pumps Centrifugal heavy duty (API 610 >100 kW) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24024A
PDS - Centrifugal vertical pumps - First Issue
10
15 25-Oct-13
08-Nov-13
T0000B2P24024B
PDS - Centrifugal vertical pumps - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24025A
PDS - Centrifugal pumps (API 610 <100 kW) - First Issue
15
15 27-Aug-13
17-Sep-13
T0000B2P24025B
PDS - Centrifugal pumps (API 610 <100 kW) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24026A
PDS - Proportioning pumps - First Issue
15
20 27-Aug-13
17-Sep-13
T0000B2P24026B
PDS - Proportioning pumps - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24027A
PDS - High-Speed Centrifugal pumps (Sundyne) - First Issue
16
17 12-Aug-13
02-Sep-13
T0000B2P24027B
PDS - High-Speed Centrifugal pumps (Sundyne) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24028A
PDS - Centrifugal pumps (Non- API 610) - Firs t Is sue
15
17 27-Aug-13
17-Sep-13
T0000B2P24028B
PDS - Centrifugal pumps (Non- API 610) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24029A
PDS - Reciprocating compressor - First Issue
12
11 27-Aug-13
11-Sep-13
T0000B2P24029B
PDS - Reciprocating compressor - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24034A
PDS - Chemical Injection Package - First Issue
20
28 27-Aug-13
24-Sep-13
T0000B2P24034B
PDS - Chemical Injection Package - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24035A
PDS - Regeneration Gas Dryer Package - First Issue
32
30 03-Sep-13
18-Oct-13
T0000B2P24035B
PDS - Regeneration Gas Dryer Package - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24036A
PDS - Ejector - First Issue
14
18 05-Aug-13
26-Aug-13
T0000B2P24036B
PDS - Ejector - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24038A
PDS - Desuperheaters - First Issue
11
70 14-Aug-13
28-Aug-13
T0000B2P24038B
PDS - Desuperheaters - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24041A
PDS - Control Valves
24
34 26-Aug-13
27-Sep-13
PDS - Control Valves
T0000B2P24041B
PDS - Pressure Relief Valves
9
34 17-Sep-13
27-Sep-13
PDS - Pressure Relief Valves
T0000B2P24041C
PDS - All other Instr uments (Local etc)
63
34 16-Oct-13
16-Jan-14
T0000B2P24055A
PDS - Carbon steel drums ( include Dryers) - First Issue
11
15 27-Aug-13
10-Sep-13
T0000B2P24055B
PDS - Carbon steel drums ( include Dryers) - Final Issue
30
95 19-Mar-15
29-Apr-15
T0000B2P24060A
PDS - NHDS Charge Heater (040-H-101) - First Issue
7
23 15-Jul-13 A
23-Jul-13
T0000B2P24060B
PDS - NHDS Charge Heater (040-H-101) (FINAL)
43
82 19-Mar-15
19-May-15
T0000B2P24095A
PDS - Filters / Coalescer - First Issue
25
32 20-Aug-13
24-Sep-13
T0000B2P24095B
PDS - Filters / Coalescer - Final Issue
30
PDS - CCR Regeneration Section Elevator - First Issue (Not required)
PDS - CCR Regeneration Section Elevator - Final Issue
PDS - Bridge (Gantry) Cranes - First Issue (PDS will not be issued)
PDS - Bridge (Gantry) Cranes - Final Issue
PDS - Electric heaters - First Issue
PDS - Electric heaters - Final Issue
PDS - Pumps Centrifugal heavy duty (API 610 >100 kW) - First Issue
PDS - Pumps Centrifugal heavy duty (API 610 >100 kW) - Final Issue
PDS - Centrifugal vertical pumps - First Issue
PDS - Centrifugal vertical pumps - Final Issue
PDS - Centrifugal pumps (API 610 <100 kW) - First Issue
PDS - Centrifugal pumps (API 610 <100 kW) - Final Issue
PDS - Proportioning pumps - First Issue
PDS - Proportioning pumps - Final Issue
PDS - High-Speed Centrifugal pumps (Sundyne) - First Issue
PDS - High-Speed Centrifugal pumps (Sundyne) - Final Issue
PDS - Centrifugal pumps (Non- API 610) - Firs t Is sue
PDS - Centrifugal pumps (Non- API 610) - Final Issue
PDS - Reciprocating compressor - First Issue
PDS - Reciprocating compressor - Final Issue
PDS - Chemical Injection Package - First Issue
PDS - Chemical Injection Package - Final Issue
PDS - Regeneration Gas Dryer Package - First Issue
PDS - Regeneration Gas Dryer Package - Final Issue
PDS - Ejector - First Issue
PDS - Ejector - Final Issue
PDS - Desuperheaters - First Issue
PDS - Desuperheaters - Final Issue
PDS - All other Instr uments (Local etc)
PDS - Carbon steel drums ( include Dryers) - First Issue
PDS - Carbon steel drums ( include Dryers) - Final Issue
PDS - NHDS Charge Heater (040-H-101) - First Issue
PDS - NHDS Charge Heater (040-H-101) (FINAL)
PDS - Filters / Coalescer - First Issue
95 19-Mar-15
29-Apr-15
352
15
54 11-Mar-13 A
15-Apr-13 A
12-Jan-15
08-May-13 A
Process Data Sheet for Rx-Rg
11
15-Apr-13 A
30-Apr-13 A
Process Data Sheet for Colums & Tray
15
09-May-13 A
29-May-13 A
Process Data Sheet for Colums & Tray
8
24-Apr-13 A
08-May-13 A
Process Data Sheet for Main Fractionator
32
15-Apr-13 A
31-May-13 A
89
37 07-Jun-13 A
20
01-May-13 A
134
18 04-Apr-13 A
17-Oct-13
80
12 24-Jun-13 A
17-Oct-13
Process Data Sheet for Tanks
22
01-Apr-13 A
01-May-13 A
J0000B2P24138
Process Data Sheet for Combustion Eqpt
40
01-May-13 A
28-Jun-13 A
Process Data Sheet for Combustion Eqpt
J0000B2P24140
Process Data Sheet for Compressor
37
08-May-13 A
28-Jun-13 A
Process Data Sheet for Compressor
J0000B2P24150
Process Data Sheet for API 610 Pumps
111
10 02-May-13 A
10-Oct-13
J0000B2P24155
Process Data Sheet for Other Pumps
108
10 03-Jun-13 A
06-Nov-13
J0000B2P24170
Process Data Sheet for Package Equipment
54
12 14-Aug-13
31-Oct-13
J0000B2P24172
Process Data Sheet for Catalyst Feeder
42
55 02-Jul-13 A
30-Aug-13
J0000B2P24180
Process Data Sheet for Control Valve
19
15 26-Sep-13
23-Oct-13
Process Data Sheet for Control Valve
J0000B2P24185
Process Data Sheet for On-Off Valve
19
15 26-Sep-13
23-Oct-13
Process Data Sheet for On-Off Valve
J0000B2P24190
Process Data Sheet for Pressure Relief Valve (PRV)
64
46 24-Oct-13
31-Jan-14
Process Data Sheet for Pressure Relief Valve (PRV)
J0000B2P2425F
Process Data Sheet for Fire fighting Equipment
22
52 21-Jan-14
20-Feb-14
Process Data Sheet for Fire fighting Equipment
426
111
85 16-Apr-13 A
13 16-Apr-13 A
31-Dec-14
25-Sep-13
212
62 26-Sep-13
31-Jul-14
68 01-May-13 A
09-Aug-13
Process Area
J0000B2P24100
Process Data Sheet for Reactor
J0000B2P24105
J0000B2P24107
J0000B2P24110
Process Data Sheet for Main Fractionator
J0000B2P24118
Process Data Sheet for PP Splitter
J0000B2P24119
Process Data Sheet for Drums
J0000B2P24120
Process Data Sheet for AFC
J0000B2P24130
Process Data Sheet for Heat Exchanger
J0000B2P24132
Process Data Sheet for Furnace
J0000B2P24136
A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P24011
A100 - Process Equipment Data Sheet_IFR
30-May-13 A
A100 - Process Equipment Data Sheet_IFC
SA100B2P24031
A100 - Equipment List_IFR
71
SA100B2P24037
A100 - Equipment List_IFC
261
68 12-Aug-13
29-Aug-14
SA100B2P24051
A100 - Line List_IFR
26
60 25-Jul-13
30-Aug-13
SA100B2P24057
A100 - Line List_IFC
330
85 02-Sep-13
31-Dec-14
434
115
53 15-Apr-13 A
0 15-Apr-13 A
12-Jan-15
30-Sep-13
238
45 01-Oct-13
15-Sep-14
41 15-Apr-13 A
23-Jul-13
SA500B2P24017
A500 - Process Equipment Data Sheet_IFC
SA500B2P24031
A500 - Equipment List_IFR
70
SA500B2P24037
A500 - Equipment List_IFC
282
43 24-Jul-13
12-Sep-14
SA500B2P24051
A500 - Line List_IFR
46
53 23-Jul-13
30-Sep-13
SA500B2P24057
A500 - Line List_IFC
319
53 01-Oct-13
12-Jan-15
434
115
78 15-Apr-13 A
40 15-Apr-13 A
12-Jan-15
30-Sep-13
238
45 01-Oct-13
15-Sep-14
27 15-Apr-13 A
23-Jul-13
A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B2P24011
A600 - Process Equipment Data Sheet_IFR
SA600B2P24017
A600 - Process Equipment Data Sheet_IFC
SA600B2P24031
A600 - Equipment List_IFR
70
SA600B2P24037
A600 - Equipment List_IFC
282
27 24-Jul-13
12-Sep-14
SA600B2P24051
A600 - Line List_IFR
46
78 23-Jul-13
30-Sep-13
SA600B2P24057
A600 - Line List_IFC
319
78 01-Oct-13
12-Jan-15
411
99
32 22-Apr-13 A
0 30-Apr-13 A
15-Dec-14
23-Sep-13
214
76 24-Sep-13
31-Jul-14
25 22-Apr-13 A
26-Aug-13
61 27-Aug-13
11-Aug-14
32 25-Apr-13 A
26-Aug-13
AA00 - Polypropylene U
Unit (PPU)
SAA00B2P24011
AA00 - Process Equipment Data Sheet_IFR
SAA00B2P24017
AA00 - Process Equipment Data Sheet_IFC
SAA00B2P24031
AA00 - Equipment List_IFR
88
SAA00B2P24037
AA00 - Equipment List_IFC
238
SAA00B2P24051
AA00 - Line List_IFR
85
SAA00B2P24057
AA00 - Line List_IFC
323
32 27-Aug-13
15-Dec-14
426
111
85 16-Apr-13 A
0 16-Apr-13 A
31-Dec-14
25-Sep-13
212
77 26-Sep-13
31-Jul-14
32 01-May-13 A
09-Aug-13
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B2P24011
AB10 - Process Equipment Data Sheet_IFR
Process Data Sheet for Rx-Rg
Process Data Sheet for PP Splitter
15-Oct-13
SA100B2P24017
A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B2P24011
A500 - Process Equipment Data Sheet_IFR
PDS - Filters / Coalescer - Final Issue
Process Data Sheet for Reactor
SAB10B2P24017
AB10 - Process Equipment Data Sheet_IFC
SAB10B2P24031
AB10 - Equipment List_IFR
71
SAB10B2P24037
AB10 - Equipment List_IFC
261
32 12-Aug-13
29-Aug-14
SAB10B2P24051
AB10 - Line List_IFR
26
35 25-Jul-13
30-Aug-13
SAB10B2P24057
AB10 - Line List_IFC
330
85 02-Sep-13
31-Dec-14
SAB20B2P24011
AB20 - Process Equipment Data Sheet_IFR
111
13 16-Apr-13 A
25-Sep-13
SAB20B2P24017
AB20 - Process Equipment Data Sheet_IFC
212
49 26-Sep-13
31-Jul-14
SAB20B2P24031
AB20 - Equipment List_IFR
71
32 01-May-13 A
09-Aug-13
SAB20B2P24037
AB20 - Equipment List_IFC
261
32 12-Aug-13
29-Aug-14
SAB20B2P24051
AB20 - Line List_IFR
26
52 25-Jul-13
30-Aug-13
SAB20B2P24057
AB20 - Line List_IFC
330
85 02-Sep-13
31-Dec-14
SAB30B2P24011
AB30 - Process Equipment Data Sheet_IFR
111
13 16-Apr-13 A
25-Sep-13
SAB30B2P24017
AB30 - Process Equipment Data Sheet_IFC
212
30 26-Sep-13
31-Jul-14
SAB30B2P24031
AB30 - Equipment List_IFR
71
32 01-May-13 A
09-Aug-13
SAB30B2P24037
AB30 - Equipment List_IFC
261
32 12-Aug-13
29-Aug-14
SAB30B2P24051
AB30 - Line List_IFR
26
35 25-Jul-13
30-Aug-13
SAB30B2P24057
AB30 - Line List_IFC
330
85 02-Sep-13
31-Dec-14
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B2P24010A
Equipment List IFIR
215
21
62 11-Mar-13 A
11-Mar-13 A
27-Jan-14
09-Apr-13 A
08-Jul-13 A
Process Data Sheet for Drums
Process Data Sheet for AFC
Process Data Sheet for Heat Exchanger
Process Data Sheet for Furnace
Process Data Sheet for Tanks
Process Data Sheet for API 610 Pumps
Process Data Sheet for Other Pumps
Process Data Sheet for Package Equipment
Process Data Sheet for Catalyst Feeder
A100 - Process Equipment Data Sheet_IFR
A100 - Process Equipment Data Sheet_IFC
A100 - Equipment List_IFR
A100 - Equipment List_IFC
A100 - Line List_IFR
A100 - Line List_IFC
A500 - Process Equipment Data Sheet_IFR
A500 - Process Equipment Data Sheet_IFC
A500 - Equipment List_IFR
A500 - Equipment List_IFC
A500 - Line List_IFR
A500 - Line List_IFC
A600 - Process Equipment Data Sheet_IFR
A600 - Process Equipment Data Sheet_IFC
A600 - Equipment List_IFR
A600 - Equipment List_IFC
A600 - Line List_IFR
A600 - Line List_IFC
AA00 - Process Equipment Data Sheet_IFR
AA00 - Process Equipment Data Sheet_IFC
AA00 - Equipment List_IFR
AA00 - Equipment List_IFC
AA00 - Line List_IFR
AA00 - Line List_IFC
AB10 - Process Equipment Data Sheet_IFR
AB10 - Process Equipment Data Sheet_IFC
AB10 - Equipment List_IFR
AB10 - Equipment List_IFC
AB10 - Line List_IFR
AB10 - Line List_IFC
AB20 - Process Equipment Data Sheet_IFR
AB20 - Process Equipment Data Sheet_IFC
AB20 - Equipment List_IFR
AB20 - Equipment List_IFC
AB20 - Line List_IFR
AB20 - Line List_IFC
AB30 - Process Equipment Data Sheet_IFR
AB30 - Process Equipment Data Sheet_IFC
AB30 - Equipment List_IFR
AB30 - Equipment List_IFC
AB30 - Line List_IFR
AB30 - Line List_IFC
Equipment List IFIR
CAC00B2P24010B
Equipment List IFR
61
10-Apr-13 A
CAC00B2P24010C
Equipment List IFA
49
46 09-Jul-13 A
17-Sep-13
CAC00B2P24010D
Equipment List IFC
84
46 18-Sep-13
27-Jan-14
CAC00B2P24020
Process D/S for RHDS Recycle Compressor
15
21-Mar-13 A
10-Apr-13 A
Process D/S for RHDS Recycle Compressor
CAC00B2P24030
Process D/S for Make-up Compressor
15
21-Mar-13 A
10-Apr-13 A
Process D/S for Make-up Compressor
CAC00B2P24040
Process D/S (Data Sheet) for RHDS Fixed Bed Reactor
19
04-Apr-13 A
01-May-13 A
CAC00B2P24050
Process D/S for COLUMN (Large column)
24
20-May-13 A
20-Jun-13 A
CAC00B2P24060
Process D/S for Hot HP & LP Separator
12
08-May-13 A
23-May-13 A
CAC00B2P24070
Process D/S for Other Tower & Drum
30
15-May-13 A
25-Jun-13 A
Process D/S for Other Tower & Drum
CAC00B2P24080
Process D/S for HP S&T Heat Exchanger
21
02-May-13 A
03-Jun-13 A
Process D/S for HP S&T Heat Exchanger
CAC00B2P24090
Process D/S for Shell & Tube H/E
21
CAC00B2P24100
Process D/S for Air Fin Cooler
40
02-May-13 A
28-Jun-13 A
CAC00B2P24120
Process D/S for Fired Heater
20
17-May-13 A
13-Jun-13 A
43 02-Jul-13 A
Equipment List IFR
Equipment List IFA
Equipment List IFC
Process D/S (Data Sheet) for RHDS Fixed Bed Reactor
Process D/S for COLUMN (Large column)
Process D/S for Hot HP & LP Separator
31-Jul-13
Process D/S for Shell & Tube H/E
Process D/S for Air Fin Cooler
Process D/S for Fired Heater
Page 13 of 179
Actual Work
Remaining Work
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
CAC00B2P24130
Process D/S for Major Pump
22
02-May-13 A
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
04-Jun-13 A
Process D/S for Major Pump
CAC00B2P24140
Process D/S for Other Pump
22
02-May-13 A
04-Jun-13 A
CAC00B2P24210
Process D/S for Feed Filter
22
15-Apr-13 A
17-May-13 A
Process D/S for Feed Filter
CAC00B2P24220
Process D/S for Membrane Package
22
15-Apr-13 A
17-May-13 A
Process D/S for Membrane Package
CAC00B2P24250
Process D/S for Control Valve & On-Off Valve
39
25 08-Jul-13 A
30-Aug-13
Process D/S for Control Valve & On-Off Valve
CAC00B2P24270
Process D/S for Instrument Analyzer
13
58 25-Oct-13
13-Nov-13
Process D/S for Instrument Analyzer
CAC00B2P24280
Process D/S for Flow & Other Instrument
30
83 07-Nov-13
18-Dec-13
CAC00B2P24290
Process D/S for PSV / TSV
55
22 10-Sep-13
29-Nov-13
426
111
85 16-Apr-13 A
0 16-Apr-13 A
31-Dec-14
25-Sep-13
212
44 26-Sep-13
31-Jul-14
46 01-May-13 A
09-Aug-13
Activity ID
Activity Name
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P24011
AD00 - Process Equipment Data Sheet_IFR
Original Total Float Start
Duration
Finish
SAD00B2P24017
AD00 - Process Equipment Data Sheet_IFC
SAD00B2P24031
AD00 - Equipment List_IFR
71
SAD00B2P24037
AD00 - Equipment List_IFC
261
46 12-Aug-13
29-Aug-14
SAD00B2P24051
AD00 - Line List_IFR
26
60 25-Jul-13
30-Aug-13
SAD00B2P24057
AD00 - Line List_IFC
330
85 02-Sep-13
31-Dec-14
426
111
85 16-Apr-13 A
0 16-Apr-13 A
31-Dec-14
25-Sep-13
212
33 26-Sep-13
31-Jul-14
46 01-May-13 A
09-Aug-13
AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P24011
AE00 - Process Equipment Data Sheet_IFR
SAE00B2P24017
AE00 - Process Equipment Data Sheet_IFC
SAE00B2P24031
AE00 - Equipment List_IFR
71
SAE00B2P24037
AE00 - Equipment List_IFC
261
46 12-Aug-13
29-Aug-14
SAE00B2P24051
AE00 - Line List_IFR
26
35 25-Jul-13
30-Aug-13
SAE00B2P24057
AE00 - Line List_IFC
330
85 02-Sep-13
31-Dec-14
AG00 - Common Piperack
Pipera
SAG00B2P24051
AG00 - Line List_IFR
350
21
34 25-Jul-13
34 25-Jul-13
22-Dec-14
23-Aug-13
329
34 26-Aug-13
22-Dec-14
420
420
113
71 16-Apr-13 A
55 16-Apr-13 A
0 16-Apr-13 A
22-Dec-14
22-Dec-14
27-Sep-13
187
67 30-Sep-13
30-Jun-14
56 01-May-13 A
24-Jul-13
SAG00B2P24057
AG00 - Line List_IFC
Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P24011
B100 - Process Equipment Data Sheet_IFR
SB100B2P24017
B100 - Process Equipment Data Sheet_IFC
SB100B2P24031
B100 - Equipment List_IFR
59
SB100B2P24037
B100 - Equipment List_IFC
269
56 25-Jul-13
25-Aug-14
SB100B2P24051
B100 - Line List_IFR
21
55 25-Jul-13
23-Aug-13
SB100B2P24057
B100 - Line List_IFC
329
55 26-Aug-13
22-Dec-14
420
113
47 16-Apr-13 A
0 16-Apr-13 A
22-Dec-14
27-Sep-13
187
77 30-Sep-13
30-Jun-14
48 01-May-13 A
24-Jul-13
B200 - Service / Potable / Fire Water
SB200B2P24011
B200 - Process Equipment Data Sheet_IFR
SB200B2P24017
B200 - Process Equipment Data Sheet_IFC
SB200B2P24031
B200 - Equipment List_IFR
59
SB200B2P24037
B200 - Equipment List_IFC
269
48 25-Jul-13
25-Aug-14
SB200B2P24051
B200 - Line List_IFR
21
47 25-Jul-13
23-Aug-13
SB200B2P24057
B200 - Line List_IFC
329
47 26-Aug-13
22-Dec-14
60 16-Apr-13 A
0 16-Apr-13 A
22-Dec-14
27-Sep-13
72 30-Sep-13
30-Jun-14
61 01-May-13 A
24-Jul-13
B300 - Process Equipment Data Sheet_IFR
420
113
SB300B2P24017
B300 - Process Equipment Data Sheet_IFC
187
SB300B2P24031
B300 - Equipment List_IFR
59
SB300B2P24037
B300 - Equipment List_IFC
269
61 25-Jul-13
25-Aug-14
SB300B2P24051
B300 - Line List_IFR
21
60 25-Jul-13
23-Aug-13
SB300B2P24057
B300 - Line List_IFC
329
60 26-Aug-13
22-Dec-14
B400 - Process Equipment Data Sheet_IFR
420
113
71 16-Apr-13 A
0 16-Apr-13 A
22-Dec-14
27-Sep-13
SB400B2P24017
B400 - Process Equipment Data Sheet_IFC
187
71 30-Sep-13
30-Jun-14
SB400B2P24031
B400 - Equipment List_IFR
59
72 01-May-13 A
24-Jul-13
SB400B2P24037
B400 - Equipment List_IFC
269
72 25-Jul-13
25-Aug-14
SB400B2P24051
B400 - Line List_IFR
21
71 25-Jul-13
23-Aug-13
SB400B2P24057
B400 - Line List_IFC
329
71 26-Aug-13
22-Dec-14
56 16-Apr-13 A
13 16-Apr-13 A
22-Dec-14
27-Sep-13
66 30-Sep-13
30-Jun-14
57 01-May-13 A
24-Jul-13
B300 - Demine & Fuel
SB300B2P24011
B400 - Steam & Power
SB400B2P24011
B500 - Process Equipment Data Sheet_IFR
420
113
SB500B2P24017
B500 - Process Equipment Data Sheet_IFC
187
SB500B2P24031
B500 - Equipment List_IFR
59
SB500B2P24037
B500 - Equipment List_IFC
269
57 25-Jul-13
25-Aug-14
SB500B2P24051
B500 - Line List_IFR
21
56 25-Jul-13
23-Aug-13
SB500B2P24057
B500 - Line List_IFC
329
56 26-Aug-13
22-Dec-14
P&IDs
Common Area
T0000B2P2501A
P&IDs Issue for Review Rev A (FR)
379
501
92
32 28-Feb-13 A
32 15-Mar-13 A
17 15-Mar-13 A
18-Mar-15
18-Mar-15
24-Jul-13
T0000B2P2501B
P&IDs rev.A - Employer Joint Review
10
17 12-Aug-13
23-Aug-13
T0000B2P2501C
P&IDs Issue for Approval Rev.B (FA) (for HAZOP)
48
17 26-Aug-13
01-Nov-13
T0000B2P2501E
P&IDs Issue for Construction Rev.1 (Final) - (W/o Hold)
70
32 24-Jun-14
03-Oct-14
T0000B2P2501F
P&IDs Issue for Construction Rev.2 (Frozen)
104
32 16-Oct-14
18-Mar-15
Process Area
J0000B2P2501A
P&IDs Issue for Review rev.A (FR)
350
78
55 28-Feb-13 A
0 01-Apr-13 A
19-Dec-14
23-Jul-13
J0000B2P2501B
P&IDs Joint Review with Employer
28
0 24-Jul-13
30-Aug-13
J0000B2P2501C
P&IDs Issue for Approval rev.B(for HAZOP)
38
0 02-Sep-13
28-Oct-13
J0000B2P2501D
P&IDs Issue for Construction rev.0 (W/ Hold)
59
9 27-Dec-13
31-Mar-14
J0000B2P2501E
P&IDs Issue for Construction rev.1 (W/o Hold)
60
24 01-Apr-14
26-Jun-14
J0000B2P2501F
P&IDs Issue for Construction rev.2 (Frozen)
87
24 27-Jun-14
31-Oct-14
T0000B2P2501D
P&IDs Issue for Construction Rev.0 - (W/ Hold)
65
27 23-Dec-13
27-Mar-14
25 01-May-13 A
13 01-May-13 A
28-Nov-14
22-Jul-13
24
13 12-Aug-13
13-Sep-13
B500 - Cooling Water
SB500B2P24011
A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P25011
A100 - P&ID_IFR (before P&ID review meeting with Employer)
393
57
SA100B2P25014
A100 - P&ID_Joint Review with Employer
SA100B2P25015
A100 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
60
13 16-Sep-13
13-Dec-13
SA100B2P25018
A100 - P&ID_IFC (w/ hold)
123
17 16-Dec-13
13-Jun-14
SA100B2P25019
A100 - P&ID_IFC (w/o hold)
115
25 16-Jun-14
28-Nov-14
415
69
25 15-Apr-13 A
0 15-Apr-13 A
12-Dec-14
22-Jul-13
A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B2P25011
A500 - P&ID_IFR (before P&ID review meeting with Employer)
SA500B2P25014
A500 - P&ID_Joint Review with Employer
14
0 12-Aug-13
30-Aug-13
SA500B2P25015
A500 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
91
0 02-Sep-13
15-Jan-14
SA500B2P25018
A500 - P&ID_IFC (w/ hold)
124
0 16-Jan-14
15-Jul-14
SA500B2P25019
A500 - P&ID_IFC (w/o hold)
103
25 16-Jul-14
12-Dec-14
415
69
25 15-Apr-13 A
14 15-Apr-13 A
12-Dec-14
22-Jul-13
A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B2P25011
A600 - P&ID_IFR (before P&ID review meeting with Employer)
SA600B2P25014
A600 - P&ID_Joint Review with Employer
14
14 12-Aug-13
30-Aug-13
SA600B2P25015
A600 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
91
14 02-Sep-13
15-Jan-14
SA600B2P25018
A600 - P&ID_IFC (w/ hold)
124
14 16-Jan-14
15-Jul-14
SA600B2P25019
A600 - P&ID_IFC (w/o hold)
103
25 16-Jul-14
12-Dec-14
427
77
85 04-Apr-13 A
7 04-Apr-13 A
19-Dec-14
23-Jul-13
7
23 02-Sep-13
10-Sep-13
A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B2P25010A
A700-P&ID-FR rev.A
GA700B2P25010B
A700-P&ID-Joint Review with Employer
GA700B2P25010C
A700-P&ID-FA rev.B (for HAZOP)
33
23 08-Oct-13
22-Nov-13
GA700B2P25010D
A700-P&ID-FC rev.0 (W/ Hold)
40
23 21-Feb-14
17-Apr-14
GA700B2P25010E
A700-P&ID-FC rev.1 (W/o Hold)
40
23 24-Jul-14
22-Sep-14
GA700B2P25010F
A700-P&ID-FC rev.2 (Frozen)
40
85 27-Oct-14
19-Dec-14
391
67
35 19-Apr-13 A
0 19-Apr-13 A
14-Nov-14
24-Jul-13
AA00 - Polypropylene U
Unit (PPU)
SAA00B2P25011
AA00 - P&ID_IFR (before P&ID review meeting with Employer)
SAA00B2P25014
AA00 - P&ID_Joint Review with Employer
10
0 26-Aug-13
06-Sep-13
SAA00B2P25015
AA00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
56
0 09-Sep-13
02-Dec-13
SAA00B2P25018
AA00 - P&ID_IFC (w/ hold)
112
0 03-Dec-13
15-May-14
SAA00B2P25019
AA00 - P&ID_IFC (w/o hold)
125
35 16-May-14
14-Nov-14
393
57
26 01-May-13 A
0 01-May-13 A
28-Nov-14
22-Jul-13
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B2P25011
AB10 - P&ID_IFR (before P&ID review meeting with Employer)
SAB10B2P25014
AB10 - P&ID_Joint Review with Employer
24
0 12-Aug-13
13-Sep-13
SAB10B2P25015
AB10 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
60
0 16-Sep-13
13-Dec-13
SAB10B2P25018
AB10 - P&ID_IFC (w/ hold)
123
0 16-Dec-13
13-Jun-14
SAB10B2P25019
AB10 - P&ID_IFC (w/o hold)
115
26 16-Jun-14
28-Nov-14
SAB20B2P25011
AB20 - P&ID_IFR (before P&ID review meeting with Employer)
57
13 01-May-13 A
22-Jul-13
SAB20B2P25014
AB20 - P&ID_Joint Review with Employer
24
13 12-Aug-13
13-Sep-13
SAB20B2P25015
AB20 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
60
13 16-Sep-13
13-Dec-13
SAB20B2P25018
AB20 - P&ID_IFC (w/ hold)
123
17 16-Dec-13
13-Jun-14
SAB20B2P25019
AB20 - P&ID_IFC (w/o hold)
115
26 16-Jun-14
28-Nov-14
SAB30B2P25011
AB30 - P&ID_IFR (before P&ID review meeting with Employer)
57
13 01-May-13 A
22-Jul-13
SAB30B2P25014
AB30 - P&ID_Joint Review with Employer
24
13 12-Aug-13
13-Sep-13
SAB30B2P25015
AB30 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
60
13 16-Sep-13
13-Dec-13
SAB30B2P25018
AB30 - P&ID_IFC (w/ hold)
123
17 16-Dec-13
13-Jun-14
Process D/S for Other Pump
Process D/S for Flow & Other Instrument
Process D/S for PSV / TSV
AD00 - Process Equipment Data Sheet_IFR
AD00 - Process Equipment Data Sheet_IFC
AD00 - Equipment List_IFR
AD00 - Equipment List_IFC
AD00 - Line List_IFR
AD00 - Line List_IFC
AE00 - Process Equipment Data Sheet_IFR
AE00 - Process Equipment Data Sheet_IFC
AE00 - Equipment List_IFR
AE00 - Equipment List_IFC
AE00 - Line List_IFR
AE00 - Line List_IFC
AG00 - Line List_IFR
AG00 - Line List_IFC
B100 - Process Equipment Data Sheet_IFR
B100 - Process Equipment Data Sheet_IFC
B100 - Equipment List_IFR
B100 - Equipment List_IFC
B100 - Line List_IFR
B100 - Line List_IFC
B200 - Process Equipment Data Sheet_IFR
B200 - Process Equipment Data Sheet_IFC
B200 - Equipment List_IFR
B200 - Equipment List_IFC
B200 - Line List_IFR
B200 - Line List_IFC
B300 - Process Equipment Data Sheet_IFR
B300 - Process Equipment Data Sheet_IFC
B300 - Equipment List_IFR
B300 - Equipment List_IFC
B300 - Line List_IFR
B300 - Line List_IFC
B400 - Process Equipment Data Sheet_IFR
B400 - Process Equipment Data Sheet_IFC
B400 - Equipment List_IFR
B400 - Equipment List_IFC
B400 - Line List_IFR
B400 - Line List_IFC
B500 - Process Equipment Data Sheet_IFR
B500 - Process Equipment Data Sheet_IFC
B500 - Equipment List_IFR
B500 - Equipment List_IFC
B500 - Line List_IFR
B500 - Line List_IFC
P&IDs Issue for Review Rev A (FR)
P&IDs rev.A - Employer Joint Review
P&IDs Issue for Approval Rev.B (FA) (for HAZOP)
P&IDs Issue for Construction Rev.1 (Final) - (W/o Hold)
P&IDs Issue for Construction Rev.2 (Frozen)
P&IDs Issue for Review rev.A (FR)
P&IDs Joint Review with Employer
P&IDs Issue for Approval rev.B(for HAZOP)
P&IDs Issue for Construction rev.0 (W/ Hold)
P&IDs Issue for Construction rev.1 (W/o Hold)
P&IDs Issue for Construction rev.2 (Frozen)
P&IDs Issue for Construction Rev.0 - (W/ Hold)
A100 - P&ID_IFR (before P&ID review meeting with Employer)
A100 - P&ID_Joint Review with Employer
A100 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
A100 - P&ID_IFC (w/ hold)
A100 - P&ID_IFC (w/o hold)
A500 - P&ID_IFR (before P&ID review meeting with Employer)
A500 - P&ID_Joint Review with Employer
A500 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
A500 - P&ID_IFC (w/ hold)
A500 - P&ID_IFC (w/o hold)
A600 - P&ID_IFR (before P&ID review meeting with Employer)
A600 - P&ID_Joint Review with Employer
A600 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
A600 - P&ID_IFC (w/ hold)
A600 - P&ID_IFC (w/o hold)
A700-P&ID-FR rev.A
A700-P&ID-Joint Review with Employer
A700-P&ID-FA rev.B (for HAZOP)
A700-P&ID-FC rev.0 (W/ Hold)
A700-P&ID-FC rev.1 (W/o Hold)
A700-P&ID-FC rev.2 (Frozen)
AA00 - P&ID_IFR (before P&ID review meeting with Employer)
AA00 - P&ID_Joint Review with Employer
AA00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AA00 - P&ID_IFC (w/ hold)
AA00 - P&ID_IFC (w/o hold)
AB10 - P&ID_IFR (before P&ID review meeting with Employer)
AB10 - P&ID_Joint Review with Employer
AB10 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AB10 - P&ID_IFC (w/ hold)
AB10 - P&ID_IFC (w/o hold)
AB20 - P&ID_IFR (before P&ID review meeting with Employer)
AB20 - P&ID_Joint Review with Employer
AB20 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AB20 - P&ID_IFC (w/ hold)
AB20 - P&ID_IFC (w/o hold)
AB30 - P&ID_IFR (before P&ID review meeting with Employer)
AB30 - P&ID_Joint Review with Employer
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
AB30 - P&ID_IFC (w/ hold)
Page 14 of 179
Actual Work
Remaining Work
AB30 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
SAB30B2P25019
AB30 - P&ID_IFC (w/o hold)
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B2P25025
SP P&ID Set-up & Alignment with JV Partners
Original Total Float Start
Duration
Finish
115
26 16-Jun-14
28-Nov-14
349
26
27 28-Feb-13 A
28-Feb-13 A
31-Jul-14
05-Apr-13 A
CAC00B2P25030
First Input To SP P&ID
66
08-Apr-13 A
11-Jul-13 A
CAC00B2P25040A
P&ID Issue (IFIR)
52
28-Feb-13 A
16-May-13 A
CAC00B2P25040B
P&ID IFIR Internal Review Meeting
12
17-May-13 A
03-Jun-13 A
CAC00B2P25040C
P&IDs Issue (IFR)
24
04-Jun-13 A
05-Jul-13 A
CAC00B2P25040D
P&ID Joint Review with Employer
10
29 29-Jul-13
09-Aug-13
CAC00B2P25040E
P&ID Issue (IFA)
39
36 13-Aug-13
08-Oct-13
CAC00B2P25040F
P&ID Issue (IFC w/ Hold)
26
30 21-Nov-13
27-Dec-13
CAC00B2P25040G
P&IDs Issue (IFC)
58
27 10-Jan-14
04-Apr-14
CAC00B2P25040H
P&IDs Final Issue (IFC, Rev.1)
80
27 07-Apr-14
31-Jul-14
393
57
26 01-May-13 A
0 01-May-13 A
28-Nov-14
22-Jul-13
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P25011
AD00 - P&ID_IFR (before P&ID review meeting with Employer)
SAD00B2P25014
AD00 - P&ID_Joint Review with Employer
24
0 12-Aug-13
13-Sep-13
SAD00B2P25015
AD00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
60
0 16-Sep-13
13-Dec-13
SAD00B2P25018
AD00 - P&ID_IFC (w/ hold)
123
0 16-Dec-13
13-Jun-14
SAD00B2P25019
AD00 - P&ID_IFC (w/o hold)
115
26 16-Jun-14
28-Nov-14
393
57
26 01-May-13 A
0 01-May-13 A
28-Nov-14
22-Jul-13
AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P25011
AE00 - P&ID_IFR (before P&ID review meeting with Employer)
SAE00B2P25014
AE00 - P&ID_Joint Review with Employer
24
0 12-Aug-13
13-Sep-13
SAE00B2P25015
AE00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
60
0 16-Sep-13
13-Dec-13
SAE00B2P25018
AE00 - P&ID_IFC (w/ hold)
123
0 16-Dec-13
13-Jun-14
SAE00B2P25019
AE00 - P&ID_IFC (w/o hold)
115
26 16-Jun-14
28-Nov-14
388
59
35 01-May-13 A
0 01-May-13 A
21-Nov-14
24-Jul-13
AG00 - Common Piperack
Pipera
SAG00B2P25011
AG00 - P&ID_IFR (before P&ID review meeting with Employer)
SAG00B2P25014
AG00 - P&ID_Joint Review with Employer
9
0 12-Aug-13
23-Aug-13
SAG00B2P25015
AG00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
70
0 26-Aug-13
06-Dec-13
SAG00B2P25018
AG00 - P&ID_IFC (w/ hold)
99
0 09-Dec-13
30-Apr-14
SAG00B2P25019
AG00 - P&ID_IFC (w/o hold)
139
35 01-May-14
21-Nov-14
388
388
59
26 01-May-13 A
26 01-May-13 A
0 01-May-13 A
21-Nov-14
21-Nov-14
24-Jul-13
9
0 12-Aug-13
23-Aug-13
Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P25011
B100 - P&ID_IFR (before P&ID review meeting with Employer)
SB100B2P25014
B100 - P&ID_Joint Review with Employer
SB100B2P25015
B100 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
70
0 26-Aug-13
06-Dec-13
SB100B2P25018
B100 - P&ID_IFC (w/ hold)
99
0 09-Dec-13
30-Apr-14
SB100B2P25019
B100 - P&ID_IFC (w/o hold)
139
26 01-May-14
21-Nov-14
388
59
26 01-May-13 A
0 01-May-13 A
21-Nov-14
24-Jul-13
9
0 12-Aug-13
23-Aug-13
B200 - Service / Potable / Fire Water
SB200B2P25011
B200 - P&ID_IFR (before P&ID review meeting with Employer)
SB200B2P25014
B200 - P&ID_Joint Review with Employer
SB200B2P25015
B200 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
70
0 26-Aug-13
06-Dec-13
SB200B2P25018
B200 - P&ID_IFC (w/ hold)
99
0 09-Dec-13
30-Apr-14
SB200B2P25019
B200 - P&ID_IFC (w/o hold)
139
26 01-May-14
21-Nov-14
B300 - P&ID_IFR (before P&ID review meeting with Employer)
388
59
26 01-May-13 A
0 01-May-13 A
21-Nov-14
24-Jul-13
B300 - Demine & Fuel
SB300B2P25011
SB300B2P25014
B300 - P&ID_Joint Review with Employer
9
0 12-Aug-13
23-Aug-13
SB300B2P25015
B300 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
70
0 26-Aug-13
06-Dec-13
SB300B2P25018
B300 - P&ID_IFC (w/ hold)
99
0 09-Dec-13
30-Apr-14
SB300B2P25019
B300 - P&ID_IFC (w/o hold)
139
26 01-May-14
21-Nov-14
B400 - P&ID_IFR (before P&ID review meeting with Employer)
388
59
26 01-May-13 A
0 01-May-13 A
21-Nov-14
24-Jul-13
9
0 12-Aug-13
23-Aug-13
B400 - Steam & Power
SB400B2P25011
SB400B2P25014
B400 - P&ID_Joint Review with Employer
SB400B2P25015
B400 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
70
0 26-Aug-13
06-Dec-13
SB400B2P25018
B400 - P&ID_IFC (w/ hold)
99
0 09-Dec-13
30-Apr-14
SB400B2P25019
B400 - P&ID_IFC (w/o hold)
139
26 01-May-14
21-Nov-14
B500 - P&ID_IFR (before P&ID review meeting with Employer)
388
59
26 01-May-13 A
15 01-May-13 A
21-Nov-14
24-Jul-13
B500 - Cooling Water
SB500B2P25011
SB500B2P25014
B500 - P&ID_Joint Review with Employer
9
16 12-Aug-13
23-Aug-13
SB500B2P25015
B500 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
70
16 26-Aug-13
06-Dec-13
SB500B2P25018
B500 - P&ID_IFC (w/ hold)
99
16 09-Dec-13
30-Apr-14
SB500B2P25019
B500 - P&ID_IFC (w/o hold)
139
26 01-May-14
21-Nov-14
C000-P&ID-FR rev.A
442
92
88 14-Mar-13 A
0 14-Mar-13 A
19-Dec-14
23-Jul-13
Offsites Area
GC000B2P25010A
GC000B2P25010B
C000-P&ID-Joint Review with Employer
15
13 21-Aug-13
10-Sep-13
GC000B2P25010C
C000-P&ID-FA rev.B (for HAZOP)
33
13 08-Oct-13
22-Nov-13
GC000B2P25010D
C000-P&ID-FC rev.0 (W/ Hold)
40
14 21-Feb-14
17-Apr-14
GC000B2P25010E
C000-P&ID-FC rev.1 (W/o Hold) for SWCT/Flare/Marine/Tank
40
17 26-Jun-14
21-Aug-14
GC000B2P25010F
C000-P&ID-FC rev.1 (W/o Hold) for WWT
40
17 24-Jul-14
22-Sep-14
GC000B2P25010G
C000-P&ID-FC rev.2 (Frozen) for SWCT/Flare/Marine/Tank
40
96 15-Oct-14
09-Dec-14
GC000B2P25010H
C000-P&ID-FC rev.2 (Frozen) for WWT
40
17 27-Oct-14
19-Dec-14
Plot Plans Issue for Approval rev.A (FR)
401
401
99
80 29-Jan-13 A
80 29-Jan-13 A
1 01-Apr-13 A
01-Apr-15
01-Apr-15
21-Aug-13
Plot Plan
Process Area
J0000B2P2502A
J0000B2P2502B
Plot Plans Issue for Approval rev.B (30% Model/ Piling)
75
1 22-Aug-13
10-Dec-13
J0000B2P2502C
Plot Plans Issue for Contruction rev.0 (FC for Piling 1st)
51
1 11-Dec-13
03-Mar-14
J0000B2P2502D
Plot Plans Issue for Construction rev.1 (FC for Piling 2nd)
81
16 04-Mar-14
30-Jun-14
J0000B2P2502E
Plot Plans Issue for Construction rev.2 (Frozen)
105
50 01-Jul-14
02-Dec-14
354
86
55 01-Apr-13 A
14 01-Apr-13 A
29-Aug-14
31-Jul-13
A100 - No.1 Sour Water Stripper (1SWS)
SA100B2P25511
A100 - Plot Plan_IFR
SA100B2P25515
A100 - Plot Plan_IFA (after incorporating Employer's comments)
122
14 01-Aug-13
29-Jan-14
SA100B2P25518
A100 - Plot Plan_IFC (for piling)
52
28 03-Feb-14
15-Apr-14
SA100B2P25519
A100 - Plot Plan_IFC (for final)
94
55 16-Apr-14
29-Aug-14
344
97
18 15-Apr-13 A
0 15-Apr-13 A
29-Aug-14
30-Aug-13
111
0 02-Sep-13
14-Feb-14
A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B2P25511
A500 - Plot Plan_IFR
SA500B2P25515
A500 - Plot Plan_IFA (after incorporating Employer's comments)
SA500B2P25518
A500 - Plot Plan_IFC (for piling)
53
0 17-Feb-14
30-Apr-14
SA500B2P25519
A500 - Plot Plan_IFC (for final)
83
18 01-May-14
29-Aug-14
344
97
37 15-Apr-13 A
14 15-Apr-13 A
29-Aug-14
30-Aug-13
A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B2P25511
A600 - Plot Plan_IFR
SA600B2P25515
A600 - Plot Plan_IFA (after incorporating Employer's comments)
111
14 02-Sep-13
14-Feb-14
SA600B2P25518
A600 - Plot Plan_IFC (for piling)
53
19 17-Feb-14
30-Apr-14
SA600B2P25519
A600 - Plot Plan_IFC (for final)
83
37 01-May-14
29-Aug-14
434
102
115 23-Apr-13 A
30 23-Apr-13 A
20-Jan-15
16-Sep-13
A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B2P25070A
A700-Overall & Unit Plot Plan-FR rev.A
GA700B2P25070B
A700-Overall & Unit Plot Plan-Review by Employer
10
30 17-Sep-13
04-Oct-13
GA700B2P25070C
A700-Overall & Unit Plot Plan-FA rev.B
53
30 07-Oct-13
19-Dec-13
GA700B2P25070D
A700-Overall & Unit Plot Plan-FC rev.0 (for Piling)
60
30 20-Dec-13
19-Mar-14
GA700B2P25070E
A700-Overall & Unit Plot Plan-FC rev.1 (W/o Hold)
65
47 18-Jul-14
23-Oct-14
GA700B2P25070F
A700-Overall & Unit Plot Plan-FC rev.2 (Frozen)
60
115 27-Oct-14
20-Jan-15
A800 - Naphtha Hydrodesulphurizer
Hydrod
/ CCR (NHDS/CCR)
TA800B2P2502A
A800 - Plot Plans Issue for Review (FR)
490
53
40 15-Apr-13 A
15-Apr-13 A
01-Apr-15
28-Jun-13 A
TA800B2P2502B
A800 - Plot Plans Issue for Approval (FA) (30% Model/ Piling)
66
14 02-Oct-13
07-Jan-14
TA800B2P2502C
A800 - Plot Plans Issue for Contruction (FC for Piling - Rack)
26
14 08-Jan-14
14-Feb-14
TA800B2P2502D
A800 - Plot Plans Issue for Construction (FC for Piling - Remaining)
84
15 14-Mar-14
10-Jul-14
TA800B2P2502E
A800 - Plot Plans Issue for Construction (Frozen)
95
40 13-Nov-14
01-Apr-15
40 15-Apr-13 A
15-Apr-13 A
01-Apr-15
28-Jun-13 A
A900 - PENEX (PENX)
TA900B2P2502A
A900 - Plot Plans Issue for Review (FR)
490
53
TA900B2P2502B
A900 - Plot Plans Issue for Approval (FA) (30% Model/ Piling)
66
21 02-Oct-13
07-Jan-14
TA900B2P2502C
A900 - Plot Plans Issue for Contruction (FC for Piling - Rack)
26
34 08-Jan-14
14-Feb-14
TA900B2P2502D
A900 - Plot Plans Issue for Construction (FC for Piling - Remaining)
84
28 25-Feb-14
23-Jun-14
TA900B2P2502E
A900 - Plot Plans Issue for Construction (Frozen)
94
40 14-Nov-14
01-Apr-15
279
31
47 19-Jun-13 A
0 19-Jun-13 A
31-Jul-14
31-Jul-13
102
0 01-Aug-13
31-Dec-13
AA00 - Polypropylene U
Unit (PPU)
SAA00B2P25511
AA00 - Plot Plan_IFR
SAA00B2P25515
AA00 - Plot Plan_IFA (after incorporating Employer's comments)
SAA00B2P25518
AA00 - Plot Plan_IFC (for piling)
30
0 02-Jan-14
14-Feb-14
SAA00B2P25519
AA00 - Plot Plan_IFC (for final)
116
47 17-Feb-14
31-Jul-14
354
86
18 01-Apr-13 A
0 01-Apr-13 A
29-Aug-14
31-Jul-13
122
0 01-Aug-13
29-Jan-14
52
0 03-Feb-14
15-Apr-14
94
18 16-Apr-14
29-Aug-14
29 29-Jan-13 A
04-Apr-14
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B2P25511
AB10 - Plot Plan_IFR
SAB10B2P25515
AB10 - Plot Plan_IFA (after incorporating Employer's comments)
SAB10B2P25518
AB10 - Plot Plan_IFC (for piling)
SAB10B2P25519
AB10 - Plot Plan_IFC (for final)
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
290
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
AB30 - P&ID_IFC (w/o hold)
SP P&ID Set-up & Alignment with JV Partners
First Input To SP P&ID
P&ID Issue (IFIR)
P&ID IFIR Internal Review Meeting
P&IDs Issue (IFR)
P&ID Joint Review with Employer
P&ID Issue (IFA)
P&ID Issue (IFC w/ Hold)
P&IDs Issue (IFC)
P&IDs Final Issue (IFC, Rev.1)
AD00 - P&ID_IFR (before P&ID review meeting with Employer)
AD00 - P&ID_Joint Review with Employer
AD00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AD00 - P&ID_IFC (w/ hold)
AD00 - P&ID_IFC (w/o hold)
AE00 - P&ID_IFR (before P&ID review meeting with Employer)
AE00 - P&ID_Joint Review with Employer
AE00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AE00 - P&ID_IFC (w/ hold)
AE00 - P&ID_IFC (w/o hold)
AG00 - P&ID_IFR (before P&ID review meeting with Employer)
AG00 - P&ID_Joint Review with Employer
AG00 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
AG00 - P&ID_IFC (w/ hold)
AG00 - P&ID_IFC (w/o hold)
B100 - P&ID_IFR (before P&ID review meeting with Employer)
B100 - P&ID_Joint Review with Employer
B100 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B100 - P&ID_IFC (w/ hold)
B100 - P&ID_IFC (w/o hold)
B200 - P&ID_IFR (before P&ID review meeting with Employer)
B200 - P&ID_Joint Review with Employer
B200 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B200 - P&ID_IFC (w/ hold)
B200 - P&ID_IFC (w/o hold)
B300 - P&ID_IFR (before P&ID review meeting with Employer)
B300 - P&ID_Joint Review with Employer
B300 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B300 - P&ID_IFC (w/ hold)
B300 - P&ID_IFC (w/o hold)
B400 - P&ID_IFR (before P&ID review meeting with Employer)
B400 - P&ID_Joint Review with Employer
B400 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B400 - P&ID_IFC (w/ hold)
B400 - P&ID_IFC (w/o hold)
B500 - P&ID_IFR (before P&ID review meeting with Employer)
B500 - P&ID_Joint Review with Employer
B500 - P&ID_IFA (for Hazop after incorporating Employer's P&ID review comments)
B500 - P&ID_IFC (w/ hold)
B500 - P&ID_IFC (w/o hold)
C000-P&ID-FR rev.A
C000-P&ID-Joint Review with Employer
C000-P&ID-FA rev.B (for HAZOP)
C000-P&ID-FC rev.0 (W/ Hold)
C000-P&ID-FC rev.1 (W/o Hold) for SWCT/Flare/Marine/Tank
C000-P&ID-FC rev.1 (W/o Hold) for WWT
C000-P&ID-FC rev.2 (Frozen) for SWCT/Flare/Marine/Tank
C000-P&ID-FC rev.2 (Frozen) for WWT
Plot Plans Issue for Approval rev.A (FR)
Plot Plans Issue for Approval rev.B (30% Model/ Piling)
Plot Plans Issue for Contruction rev.0 (FC for Piling 1st)
Plot Plans Issue for Construction rev.1 (FC for Piling 2nd)
Plot Plans Issue for Construction rev.2 (Frozen)
A100 - Plot Plan_IFR
A100 - Plot Plan_IFA (after incorporating Employer's comments)
A100 - Plot Plan_IFC (for piling)
A100 - Plot Plan_IFC (for final)
A500 - Plot Plan_IFR
A500 - Plot Plan_IFA (after incorporating Employer's comments)
A500 - Plot Plan_IFC (for piling)
A500 - Plot Plan_IFC (for final)
A600 - Plot Plan_IFR
A600 - Plot Plan_IFA (after incorporating Employer's comments)
A600 - Plot Plan_IFC (for piling)
A600 - Plot Plan_IFC (for final)
A700-Overall & Unit Plot Plan-FR rev.A
A700-Overall & Unit Plot Plan-Review by Employer
A700-Overall & Unit Plot Plan-FA rev.B
A700-Overall & Unit Plot Plan-FC rev.0 (for Piling)
A700-Overall & Unit Plot Plan-FC rev.1 (W/o Hold)
A700-Overall & Unit Plot Plan-FC rev.2 (Frozen)
A800 - Plot Plans Issue for Review (FR)
A800 - Plot Plans Issue for Approval (FA) (30% Model/ Piling)
A800 - Plot Plans Issue for Contruction (FC for Piling - Rack)
A800 - Plot Plans Issue for Construction (FC for Piling - Remaining)
A800 - Plot Plans Issue for Construction (Frozen)
A900 - Plot Plans Issue for Review (FR)
A900 - Plot Plans Issue for Approval (FA) (30% Model/ Piling)
A900 - Plot Plans Issue for Contruction (FC for Piling - Rack)
A900 - Plot Plans Issue for Construction (FC for Piling - Remaining)
A900 - Plot Plans Issue for Construction (Frozen)
AA00 - Plot Plan_IFR
AA00 - Plot Plan_IFA (after incorporating Employer's comments)
AA00 - Plot Plan_IFC (for piling)
AA00 - Plot Plan_IFC (for final)
AB10 - Plot Plan_IFR
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
AB10 - Plot Plan_IFC (for piling)
AB10 - Plot Plan_IFC (for final)
Page 15 of 179
Actual Work
Remaining Work
AB10 - Plot Plan_IFA (after incorporating Employer's comments)
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
CAC00B2P25020A
Plot Plans issue for IFIR
23
29-Jan-13 A
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
01-Mar-13 A
Plot Plans issue for IFIR
CAC00B2P25020B
Plot Plans issue for QRA
20
04-Mar-13 A
01-Apr-13 A
CAC00B2P25020C
Plot Plans issue for IFR
97
26 02-Apr-13 A
20-Aug-13
CAC00B2P25020C1
Plot Plans issue for IFA
46
29 29-Jul-13
02-Oct-13
CAC00B2P25020D
Plot Plans issue for IFC
46
29 03-Oct-13
09-Dec-13
CAC00B2P25020E
Plot Plans issue for IFC - Final issue
70
29 17-Dec-13
04-Apr-14
354
86
18 01-Apr-13 A
0 01-Apr-13 A
29-Aug-14
31-Jul-13
122
0 01-Aug-13
29-Jan-14
Activity ID
Activity Name
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B2P25511
AD00 - Plot Plan_IFR
Original Total Float Start
Duration
Finish
SAD00B2P25515
AD00 - Plot Plan_IFA (after incorporating Employer's comments)
SAD00B2P25518
AD00 - Plot Plan_IFC (for piling)
52
0 03-Feb-14
15-Apr-14
SAD00B2P25519
AD00 - Plot Plan_IFC (for final)
94
18 16-Apr-14
29-Aug-14
354
86
18 01-Apr-13 A
0 01-Apr-13 A
29-Aug-14
31-Jul-13
AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B2P25511
AE00 - Plot Plan_IFR
SAE00B2P25515
AE00 - Plot Plan_IFA (after incorporating Employer's comments)
122
0 01-Aug-13
29-Jan-14
SAE00B2P25518
AE00 - Plot Plan_IFC (for piling)
52
0 03-Feb-14
15-Apr-14
SAE00B2P25519
AE00 - Plot Plan_IFC (for final)
94
18 16-Apr-14
29-Aug-14
236
42
41 03-Jun-13 A
0 03-Jun-13 A
15-May-14
31-Jul-13
AG00 - Common Piperack
Pipera
SAG00B2P25511
AG00 - Plot Plan_IFR
SAG00B2P25515
AG00 - Plot Plan_IFA (after incorporating Employer's comments)
81
0 01-Aug-13
29-Nov-13
SAG00B2P25518
AG00 - Plot Plan_IFC (for piling)
41
0 02-Dec-13
29-Jan-14
SAG00B2P25519
AG00 - Plot Plan_IFC (for final)
72
41 03-Feb-14
15-May-14
236
236
42
72 03-Jun-13 A
72 03-Jun-13 A
0 03-Jun-13 A
15-May-14
15-May-14
31-Jul-13
Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B2P25511
B100 - Plot Plan_IFR
SB100B2P25515
B100 - Plot Plan_IFA (after incorporating Employer's comments)
81
0 01-Aug-13
29-Nov-13
SB100B2P25518
B100 - Plot Plan_IFC (for piling)
41
0 02-Dec-13
29-Jan-14
SB100B2P25519
B100 - Plot Plan_IFC (for final)
72
72 03-Feb-14
15-May-14
236
42
72 03-Jun-13 A
0 03-Jun-13 A
15-May-14
31-Jul-13
B200 - Service / Potable / Fire Water
SB200B2P25511
B200 - Plot Plan_IFR
SB200B2P25515
B200 - Plot Plan_IFA (after incorporating Employer's comments)
81
0 01-Aug-13
29-Nov-13
SB200B2P25518
B200 - Plot Plan_IFC (for piling)
41
0 02-Dec-13
29-Jan-14
SB200B2P25519
B200 - Plot Plan_IFC (for final)
72
72 03-Feb-14
15-May-14
236
42
32 03-Jun-13 A
0 03-Jun-13 A
15-May-14
31-Jul-13
B300 - Demine & Fuel
SB300B2P25511
B300 - Plot Plan_IFR
SB300B2P25515
B300 - Plot Plan_IFA (after incorporating Employer's comments)
81
0 01-Aug-13
29-Nov-13
SB300B2P25518
B300 - Plot Plan_IFC (for piling)
41
0 02-Dec-13
29-Jan-14
SB300B2P25519
B300 - Plot Plan_IFC (for final)
72
32 03-Feb-14
15-May-14
236
42
72 03-Jun-13 A
0 03-Jun-13 A
15-May-14
31-Jul-13
B400 - Steam & Power
SB400B2P25511
B400 - Plot Plan_IFR
SB400B2P25515
B400 - Plot Plan_IFA (after incorporating Employer's comments)
81
0 01-Aug-13
29-Nov-13
SB400B2P25518
B400 - Plot Plan_IFC (for piling)
41
0 02-Dec-13
29-Jan-14
SB400B2P25519
B400 - Plot Plan_IFC (for final)
72
72 03-Feb-14
15-May-14
32 03-Jun-13 A
16 03-Jun-13 A
15-May-14
31-Jul-13
B500 - Cooling Water
SB500B2P25511
B500 - Plot Plan_IFR
236
42
SB500B2P25515
B500 - Plot Plan_IFA (after incorporating Employer's comments)
81
17 01-Aug-13
29-Nov-13
SB500B2P25518
B500 - Plot Plan_IFC (for piling)
41
32 02-Dec-13
29-Jan-14
SB500B2P25519
B500 - Plot Plan_IFC (for final)
72
32 03-Feb-14
15-May-14
424
102
88 23-Apr-13 A
11 23-Apr-13 A
06-Jan-15
16-Sep-13
Offsites Area
GC000B2P25090A
C000-Overall & Unit Plot Plan-FR rev.A
Plot Plans issue for QRA
Plot Plans issue for IFR
Plot Plans issue for IFA
Plot Plans issue for IFC
Plot Plans issue for IFC - Final issue
AD00 - Plot Plan_IFR
AD00 - Plot Plan_IFA (after incorporating Employer's comments)
AD00 - Plot Plan_IFC (for piling)
AD00 - Plot Plan_IFC (for final)
AE00 - Plot Plan_IFR
AE00 - Plot Plan_IFA (after incorporating Employer's comments)
AE00 - Plot Plan_IFC (for piling)
AE00 - Plot Plan_IFC (for final)
AG00 - Plot Plan_IFR
AG00 - Plot Plan_IFA (after incorporating Employer's comments)
AG00 - Plot Plan_IFC (for piling)
AG00 - Plot Plan_IFC (for final)
B100 - Plot Plan_IFR
B100 - Plot Plan_IFA (after incorporating Employer's comments)
B100 - Plot Plan_IFC (for piling)
B100 - Plot Plan_IFC (for final)
B200 - Plot Plan_IFR
B200 - Plot Plan_IFA (after incorporating Employer's comments)
B200 - Plot Plan_IFC (for piling)
B200 - Plot Plan_IFC (for final)
B300 - Plot Plan_IFR
B300 - Plot Plan_IFA (after incorporating Employer's comments)
B300 - Plot Plan_IFC (for piling)
B300 - Plot Plan_IFC (for final)
B400 - Plot Plan_IFR
B400 - Plot Plan_IFA (after incorporating Employer's comments)
B400 - Plot Plan_IFC (for piling)
B400 - Plot Plan_IFC (for final)
B500 - Plot Plan_IFR
B500 - Plot Plan_IFA (after incorporating Employer's comments)
B500 - Plot Plan_IFC (for piling)
B500 - Plot Plan_IFC (for final)
C000-Overall & Unit Plot Plan-FR rev.A
GC000B2P25090B
C000-Overall & Unit Plot Plan-Review by Employer
10
11 17-Sep-13
04-Oct-13
GC000B2P25090C
C000-Overall & Unit Plot Plan-FA rev.B
53
11 07-Oct-13
19-Dec-13
GC000B2P25090D
C000-Overall & Unit Plot Plan-FC rev.0 (for Piling)
50
11 20-Dec-13
05-Mar-14
GC000B2P25090E
C000-Overall & Unit Plot Plan-FC rev.1 (W/o Hold) for SWCT/Flare/Marine/Tank
65
57 04-Jun-14
04-Sep-14
C000-Overall & Unit Plot Plan-FC rev.1 (W/o Hold) for SWCT/Flare/Marine/Tank
GC000B2P25090F
C000-Overall & Unit Plot Plan-FC rev.1 (W/o Hold) for WWT/Building
65
37 17-Jul-14
22-Oct-14
C000-Overall & Unit Plot Plan-FC rev.1 (W/o Hold) for WWT/Building
GC000B2P25090G
C000-Overall & Unit Plot Plan-FC rev.2 (Frozen) for SWCT/Flare/Marine/Tank
60
96 29-Sep-14
23-Dec-14
GC000B2P25090H
C000-Overall & Unit Plot Plan-FC rev.2 (Frozen) for WWT/Building
60
88 13-Oct-14
06-Jan-15
339
77
30 21-Mar-13 A
43 19-Apr-13 A
29-Dec-14
09-Aug-13
Pump Hydraulics (Hydraulics & Line Sizing)
Hydraulic Design
CAC00B2P27010
Pump Hydraulics (Hydraulics & Line Sizing)
C000-Overall & Unit Plot Plan-Review by Employer
C000-Overall & Unit Plot Plan-FA rev.B
C000-Overall & Unit Plot Plan-FC rev.0 (for Piling)
C000-Overall & Unit Plot Plan-FC rev.2 (Frozen) for SWCT/Flare/Marine/Tank
C000-Overall & Unit Plot Plan-FC rev.2 (Frozen) for WWT/Building
CAC00B2P27020
CS >= 6", LA & SS; All (Hydraulics & Line Sizing)
67
43 08-May-13 A
09-Aug-13
CS >= 6", LA & SS; All (Hydraulics & Line Sizing)
CAC00B2P27030
CS All (Hydraulic s & Line Sizing)
47
43 05-Jun-13 A
09-Aug-13
CS All (Hydraulic s & Line Sizing)
CAC00B2P27040
PSV In/Out Line, incl. Flare Sub Header (HEADER) (Hydraulics & Line Sizing)
85
43 05-Jun-13 A
04-Oct-13
PSV In/Out Line, incl. Flare Sub Header (HEADER) (Hydraulics & Line Sizing)
CAC00B2P27050
PSV In/Out Line, incl. Flare Sub Header (PSC In/Out Latereal) (Hydraulics & Line Sizing
38
43 12-Aug-13
04-Oct-13
PSV In/Out Line, incl. Flare Sub Header (PSC In/Out Latereal) (Hydraulics & Line Sizing)
CAC00B2P27060A
Lines require Vendor Information (1st) (Hydraulic s & Line Sizing)
18
74 27-Dec-13
29-Jan-14
CAC00B2P27060B
Lines require Vendor Information (Last) (Hydraulics & Line Sizing)
21
69 07-Jul-14
05-Aug-14
CAC00B2P27070
Utility Headers (Hydraulics & Line Sizing)
88
43 04-Apr-13 A
09-Aug-13
Utility Headers (Hydraulics & Line Sizing)
CAC00B2P27080
Recycle Loop (Hydraulics & Line Sizing)
98
25 21-Mar-13 A
09-Aug-13
Recycle Loop (Hydraulics & Line Sizing)
CAC00B2P27090
PSV Sizing
33
65 12-Aug-13
27-Sep-13
GA700B2P27010
A700-Hydraulic Design for Rotary Machineries
33 11-Apr-13 A
07-Oct-13
GA700B2P27020
A700-Hydraulic Design for Instrument Valves (CV & On-Off Valve)
25
33 04-Sep-13
15-Oct-13
GA700B2P27030
A700-Hydraulic Design for Pressure Relief Valve
25
33 30-Sep-13
05-Nov-13
GC000B2P27010
C000-Hydraulic Design for Rotary Machineries
33 11-Apr-13 A
07-Oct-13
GC000B2P27020
C000-Hydraulic Design for Instrument Valves (CV & On-Off Valve)
25
33 04-Sep-13
15-Oct-13
GC000B2P27030
C000-Hydraulic Design for Pressure Relief Valve
25
33 30-Sep-13
05-Nov-13
C000-Hydraulic Design for Pressure Relief Valve
J0000B2P27010
Hydraulic Design for Rotary Machineries
86
17 01-Jul-13 A
01-Nov-13
Hydraulic Design for Rotary Machineries
J0000B2P27020
Hydraulic Design for Instrument Valves (CV & On-Off Valve)
21
31 29-Aug-13
30-Sep-13
Hydraulic Design for Instrument Valves (CV & On-Off Valve)
J0000B2P27030
Hydraulic Design for Pressure Relief Valve
21
62 29-Aug-13
30-Sep-13
Hydraulic Design for Pressure Relief Valve
T0000B2P27014A
Deluge Hydraulic Calculation Note (FR)
85
109 27-Sep-13
30-Jan-14
T0000B2P27014B
Deluge Hydraulic Calculation Note (FA)
66
61 24-Sep-14
29-Dec-14
T0000B2P27023
Hydraulic Design for Instrument Valves (CV & On-Off Valve)
47
34 22-Jul-13
27-Sep-13
Hydraulic Design for Instrument Valves (CV & On-Off Valve)
T0000B2P27033
Hydraulic Design for Pressure Relief Valve
47
34 22-Jul-13
27-Sep-13
Hydraulic Design for Pressure Relief Valve
T0000B2P27041D
Hydraulic calculations
52
34 15-Jul-13 A
27-Sep-13
Hydraulic calculations
96
59
61
28
30-Jan-15
30-Jan-15
26-Nov-14
26-Sep-13
Fire Water Demand Calculation Note (FR)
120
120
02-Apr-13 A
02-Apr-13 A
01-Jul-13 A
01-Jul-13 A
Lines require Vendor Information (1st) (Hydraulic s & Line Sizing)
Lines require Vendor Information (Last) (Hydraulics & Line Sizing)
PSV Sizing
A700-Hydraulic Design for Rotary Machineries
A700-Hydraulic Design for Instrument Valves (CV & On-Off Valve)
A700-Hydraulic Design for Pressure Relief Valve
C000-Hydraulic Design for Rotary Machineries
C000-Hydraulic Design for Instrument Valves (CV & On-Off Valve)
Deluge Hydraulic Calculation Note (FR)
Deluge Hydraulic Calculation Note (FA)
Engineering HSE
Fire Protection Design
Common Area
T0000B4P41012A
Fire Water Demand Calculation Note (FR)
342
342
352
61
T0000B4P41012B
Fire Water Demand Calculation Note (FA)
43
61 12-Jun-14
13-Aug-14
T0000B4P41013A
Deluge System Arr angement Calculation Note ( FR)
102
107 01-Aug-13
31-Dec-13
T0000B4P41013B
Deluge System Arr angement Calculation Note ( FA)
65
61 22-Aug-14
26-Nov-14
T0000B4P4102B
Fire Water P&IDs Joint Review with Employer (NOT REQUIRED)
0
40 25-Oct-13
25-Oct-13
Fire Water P&IDs Joint Review with Employer (NOT REQUIRED)
T0000B4P4102C
Fire Water P&ID Issue for Approval rev.B (FA) (for HAZOP)
23
28 13-Nov-13
13-Dec-13
Fire Water P&ID Issue for Approval rev.B (FA) (for HAZOP)
T0000B4P4102D
Fire Water P&ID Issue for Construction rev.0
40
23 02-Apr-14
28-May-14
59 02-Apr-13 A
52 25-Jun-13 A
30-Jan-15
25-Sep-13
Process Area
J0000B4P4102A
Fire P&ID Issue for Review rev.A (FR)
342
64
J0000B4P4102B
Fire P&IDs Joint Review with Employer
12
52 26-Sep-13
11-Oct-13
J0000B4P4102C
Fire P&ID Issue for Approval r ev.B(for HAZOP)
44
52 11-Nov-13
20-Jan-14
J0000B4P4102D
Fire P&ID Issue for Construction rev.0
30
73 18-Feb-14
01-Apr-14
T0000B4P4102A
Fire Water P&ID Issue for Review rev.A (FR)
82
28 01-Aug-13
02-Dec-13
330
17
85 02-Sep-13
55 02-Sep-13
31-Dec-14
27-Sep-13
104
55 30-Sep-13
28-Feb-14
A100 - No.1 Sour Water Stripper (1SWS)
SA100B4P41021
A100 - P&IDs for Fire Fighting System (Yard)_IFR
SA100B4P41025
A100 - P&IDs for Fire Fighting System (Yard)_IFA
SA100B4P41028
A100 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
66
55 03-Mar-14
04-Jun-14
SA100B4P41029
A100 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
80
55 05-Jun-14
30-Sep-14
SA100B4P41051
A100 - Escape Route Drawing_IFR
41
85 01-Sep-14
31-Oct-14
SA100B4P41057
A100 - Escape Route Drawing_IFC
42
85 03-Nov-14
31-Dec-14
SA100B4P41061
A100 - Fire Fighting System Layout Drawings (Yard)_IFR
121
55 02-Sep-13
28-Feb-14
SA100B4P41067
A100 - Fire Fighting System Layout Drawings (Yard)_IFC
146
55 03-Mar-14
30-Sep-14
303
54
79 16-Oct-13
34 16-Oct-13
31-Dec-14
31-Dec-13
A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B4P41021
A500 - P&IDs for Fire Fighting System (Yard)_IFR
Fire Water Demand Calculation Note (FA)
Deluge System Arr angement Calculation Note ( FR)
Deluge System Arr angement Calculation Note ( FA)
Fire Water P&ID Issue for Construction rev.0
Fire P&ID Issue for Review rev.A (FR)
Fire P&IDs Joint Review with Employer
Fire P&ID Issue for Approval r ev.B(for HAZOP)
Fire P&ID Issue for Construction rev.0
Fire Water P&ID Issue for Review rev.A (FR)
A100 - P&IDs for Fire Fighting System (Yard)_IFR
A100 - P&IDs for Fire Fighting System (Yard)_IFA
A100 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
A100 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
A100 - Escape Route Drawing_IFR
A100 - Escape Route Drawing_IFC
A100 - Fire Fighting System Layout Drawings (Yard)_IFR
A100 - Fire Fighting System Layout Drawings (Yard)_IFC
A500 - P&IDs for Fire Fighting System (Yard)_IFR
SA500B4P41025
A500 - P&IDs for Fire Fighting System (Yard)_IFA
50
34 02-Jan-14
14-Mar-14
SA500B4P41028
A500 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
62
34 17-Mar-14
13-Jun-14
SA500B4P41029
A500 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
95
34 16-Jun-14
31-Oct-14
A500 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
SA500B4P41051
A500 - Escape Route Drawing_IFR
41
79 01-Sep-14
31-Oct-14
A500 - Escape Route Drawing_IFR
SA500B4P41057
A500 - Escape Route Drawing_IFC
42
79 03-Nov-14
31-Dec-14
SA500B4P41061
A500 - Fire Fighting System Layout Drawings (Yard)_IFR
104
80 16-Oct-13
14-Mar-14
SA500B4P41067
A500 - Fire Fighting System Layout Drawings (Yard)_IFC
157
80 17-Mar-14
31-Oct-14
324
54
72 16-Oct-13
34 16-Oct-13
30-Jan-15
31-Dec-13
A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600B4P41021
A600 - P&IDs for Fire Fighting System (Yard)_IFR
A500 - P&IDs for Fire Fighting System (Yard)_IFA
A500 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
A500 - Escape Route Drawing_IFC
A500 - Fire Fighting System Layout Drawings (Yard)_IFR
A500 - Fire Fighting System Layout Drawings (Yard)_IFC
A600 - P&IDs for Fire Fighting System (Yard)_IFR
SA600B4P41025
A600 - P&IDs for Fire Fighting System (Yard)_IFA
50
34 02-Jan-14
14-Mar-14
SA600B4P41028
A600 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
62
34 17-Mar-14
13-Jun-14
SA600B4P41029
A600 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
95
34 16-Jun-14
31-Oct-14
A600 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
SA600B4P41051
A600 - Escape Route Drawing_IFR
41
79 01-Sep-14
31-Oct-14
A600 - Escape Route Drawing_IFR
SA600B4P41057
A600 - Escape Route Drawing_IFC
42
79 03-Nov-14
31-Dec-14
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
A600 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
A600 - Escape Route Drawing_IFC
Page 16 of 179
Actual Work
Remaining Work
A600 - P&IDs for Fire Fighting System (Yard)_IFA
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
A600 - Fire Fighting System Layout Drawings (Yard)_IFR
SA600B4P41061
A600 - Fire Fighting System Layout Drawings (Yard)_IFR
104
59 16-Oct-13
14-Mar-14
SA600B4P41067
A600 - Fire Fighting System Layout Drawings (Yard)_IFC
157
59 17-Mar-14
31-Oct-14
A600 - Fire Fighting System Layout Drawings (Yard)_IFC
SA600B4P41081
A600 - Fire Fighting System Layout Drawings (Building)_IFR
125
72 01-Apr-14
30-Sep-14
A600 - Fire Fighting System Layout Drawings (Building)_IFR
SA600B4P41087
A600 - Fire Fighting System Layout Drawings (Building)_IFC
A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B4P41010A
A700-F/F P&ID for Yard-FR rev.A
84
72 01-Oct-14
30-Jan-15
156
30
176 10-Sep-13
60 10-Sep-13
28-Apr-14
28-Oct-13
GA700B4P41010B
A700-F/F P&ID for Yard-Approval by Employer
10
60 29-Oct-13
11-Nov-13
GA700B4P41010C
A700-F/F P&ID for Yard-FA rev.B
35
60 12-Nov-13
31-Dec-13
GA700B4P41010D
A700-F/F P&ID for Yard -FC
35
157 11-Mar-14
28-Apr-14
GA700B4P41030A
A700-F/F Layout for Yard-FA
18
60 05-Dec-13
31-Dec-13
GA700B4P41030B
A700-F/F Layout for Yard-FC
AA00 - Polypropylene U
Unit (PPU)
SAA00B4P41021
AA00 - P&IDs for Fire Fighting System (Yard)_IFR
A600 - Fire Fighting System Layout Drawings (Building)_IFC
A700-F/F P&ID for Yard-FR rev.A
A700-F/F P&ID for Yard-Approval by Employer
A700-F/F P&ID for Yard-FA rev.B
A700-F/F P&ID for Yard -FC
A700-F/F Layout for Yard-FA
18
176 03-Apr-14
28-Apr-14
A700-F/F Layout for Yard-FC
325
102
47 23-Aug-13
51 23-Aug-13
15-Dec-14
22-Jan-14
AA00 - P&IDs for Fire Fighting System (Yard)_IFR
SAA00B4P41025
AA00 - P&IDs for Fire Fighting System (Yard)_IFA
19
51 23-Jan-14
20-Feb-14
SAA00B4P41028
AA00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
78
51 21-Feb-14
13-Jun-14
SAA00B4P41029
AA00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
69
51 16-Jun-14
23-Sep-14
SAA00B4P41041
AA00 - P&IDs for Fire Fighting System (Building)_IFR
76
46 04-Oct-13
22-Jan-14
SAA00B4P41045
AA00 - P&IDs for Fire Fighting System (Building)_IFA
55
46 23-Jan-14
11-Apr-14
SAA00B4P41048
AA00 - P&IDs for Fire Fighting System (Building)_IFC (w/ hold)
15
46 14-Apr-14
02-May-14
SAA00B4P41051
AA00 - Escape Route Drawing_IFR
40
47 01-Aug-14
30-Sep-14
SAA00B4P41057
AA00 - Escape Route Drawing_IFC
52
47 01-Oct-14
15-Dec-14
SAA00B4P41061
AA00 - Fire Fighting System Layout Drawings (Yard)_IFR
102
14 23-Aug-13
22-Jan-14
SAA00B4P41067
AA00 - Fire Fighting System Layout Drawings (Yard)_IFC
166
14 23-Jan-14
23-Sep-14
SAA00B4P41081
AA00 - Fire Fighting System Layout Drawings (Building)_IFR
104
45 04-Oct-13
05-Mar-14
SAA00B4P41087
AA00 - Fire Fighting System Layout Drawings (Building)_IFC
63
45 06-Mar-14
04-Jun-14
AA00 - Fire Fighting System Layout Drawings (Building)_IFC
SAA00B4P41149
AA00 - P&IDs for Fire Fighting System (Building)_IFC (w/o hold)
21
46 07-May-14
04-Jun-14
AA00 - P&IDs for Fire Fighting System (Building)_IFC (w/o hold)
330
17
86 02-Sep-13
60 02-Sep-13
31-Dec-14
27-Sep-13
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B4P41021
AB10 - P&IDs for Fire Fighting System (Yard)_IFR
SAB10B4P41025
AB10 - P&IDs for Fire Fighting System (Yard)_IFA
104
60 30-Sep-13
28-Feb-14
SAB10B4P41028
AB10 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
66
60 03-Mar-14
04-Jun-14
SAB10B4P41029
AB10 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
80
60 05-Jun-14
30-Sep-14
SAB10B4P41051
AB10 - Escape Route Drawing_IFR
41
86 01-Sep-14
31-Oct-14
SAB10B4P41057
AB10 - Escape Route Drawing_IFC
42
86 03-Nov-14
31-Dec-14
SAB10B4P41061
AB10 - Fire Fighting System Layout Drawings (Yard)_IFR
121
60 02-Sep-13
28-Feb-14
SAB10B4P41067
AB10 - Fire Fighting System Layout Drawings (Yard)_IFC
146
60 03-Mar-14
30-Sep-14
SAB10B4P41081
AB10 - Fire Fighting System Layout Drawings (Building)_IFR
83
40 01-Oct-13
29-Jan-14
SAB10B4P41087
AB10 - Fire Fighting System Layout Drawings (Building)_IFC
63
40 03-Feb-14
30-Apr-14
SAB20B4P41051
AB20 - Escape Route Drawing_IFR
41
86 01-Sep-14
31-Oct-14
SAB20B4P41057
AB20 - Escape Route Drawing_IFC
42
86 03-Nov-14
31-Dec-14
SAB20B4P41061
AB20 - Fire Fighting System Layout Drawings (Yard)_IFR
121
60 02-Sep-13
28-Feb-14
SAB20B4P41067
AB20 - Fire Fighting System Layout Drawings (Yard)_IFC
146
60 03-Mar-14
30-Sep-14
SAB30B4P41051
AB30 - Escape Route Drawing_IFR
41
86 01-Sep-14
31-Oct-14
SAB30B4P41057
AB30 - Escape Route Drawing_IFC
42
86 03-Nov-14
31-Dec-14
SAB30B4P41061
AB30 - Fire Fighting System Layout Drawings (Yard)_IFR
121
60 02-Sep-13
28-Feb-14
SAB30B4P41067
AB30 - Fire Fighting System Layout Drawings (Yard)_IFC
146
60 03-Mar-14
30-Sep-14
212
90
62 02-Apr-13 A
34 02-Apr-13 A
13-Feb-14
09-Aug-13
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B4P41005A
Layout for Fire & Gas Detection/ Alarm System for Internal Information
CAC00B4P41005B
Layout for Fire & Gas Detection/ Alarm System IF C
97
80 21-Aug-13
17-Jan-14
CAC00B4P41010A
P&ID for Fire Fighting System for Internal Infomation
85
34 09-Apr-13 A
09-Aug-13
CAC00B4P41010B
P&ID for Fire Fighting System IFC
62 19-Aug-13
13-Feb-14
CAC00B4P41020A
Fire Main & Deluge Line Size & Route for Internal Information
52 09-Apr-13 A
09-Aug-13
CAC00B4P41020B
Fire Main & Deluge Line Size & Route IFC
CAC00B4P41030A
Layout for Fire Fighting System for Internal Information
CAC00B4P41030B
Layout for Fire Fighting System IFC
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00B4P41021
AD00 - P&IDs for Fire Fighting System (Yard)_IFR
117
85
118
59 13-Aug-13
07-Feb-14
90
87 02-Apr-13 A
09-Aug-13
97
80 21-Aug-13
17-Jan-14
330
17
86 02-Sep-13
56 02-Sep-13
31-Dec-14
27-Sep-13
SAD00B4P41025
AD00 - P&IDs for Fire Fighting System (Yard)_IFA
104
56 30-Sep-13
28-Feb-14
SAD00B4P41028
AD00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
66
56 03-Mar-14
04-Jun-14
SAD00B4P41029
AD00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
80
56 05-Jun-14
30-Sep-14
SAD00B4P41051
AD00 - Escape Route Drawing_IFR
41
86 01-Sep-14
31-Oct-14
SAD00B4P41057
AD00 - Escape Route Drawing_IFC
42
86 03-Nov-14
31-Dec-14
SAD00B4P41061
AD00 - Fire Fighting System Layout Drawings (Yard)_IFR
121
56 02-Sep-13
28-Feb-14
SAD00B4P41067
AD00 - Fire Fighting System Layout Drawings (Yard)_IFC
146
56 03-Mar-14
30-Sep-14
SAD00B4P41081
AD00 - Fire Fighting System Layout Drawings (Building)_IFR
83
90 01-Oct-13
29-Jan-14
SAD00B4P41087
AD00 - Fire Fighting System Layout Drawings (Building)_IFC
AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00B4P41021
AE00 - P&IDs for Fire Fighting System (Yard)_IFR
63
90 03-Feb-14
30-Apr-14
330
17
86 02-Sep-13
67 02-Sep-13
31-Dec-14
27-Sep-13
104
67 30-Sep-13
28-Feb-14
SAE00B4P41025
AE00 - P&IDs for Fire Fighting System (Yard)_IFA
SAE00B4P41028
AE00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
66
67 03-Mar-14
04-Jun-14
SAE00B4P41029
AE00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
80
67 05-Jun-14
30-Sep-14
SAE00B4P41051
AE00 - Escape Route Drawing_IFR
41
86 01-Sep-14
31-Oct-14
SAE00B4P41057
AE00 - Escape Route Drawing_IFC
42
86 03-Nov-14
31-Dec-14
SAE00B4P41061
AE00 - Fire Fighting System Layout Drawings (Yard)_IFR
121
80 02-Sep-13
28-Feb-14
SAE00B4P41067
AE00 - Fire Fighting System Layout Drawings (Yard)_IFC
146
80 03-Mar-14
30-Sep-14
84
42
41 16-May-14
41 16-May-14
16-Sep-14
15-Jul-14
42
41 16-Jul-14
16-Sep-14
285
285
14
41 05-Sep-13
41 05-Sep-13
77 05-Sep-13
31-Oct-14
31-Oct-14
27-Sep-13
AG00 - Common Piperack
Pipera
SAG00B4P41051
AG00 - Escape Route Drawing_IFR
SAG00B4P41057
AG00 - Escape Route Drawing_IFC
Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100B4P41021
B100 - P&IDs for Fire Fighting System (Yard)_IFR
SB100B4P41025
B100 - P&IDs for Fire Fighting System (Yard)_IFA
64
77 30-Sep-13
31-Dec-13
SB100B4P41028
B100 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
55
77 02-Jan-14
21-Mar-14
SB100B4P41029
B100 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
57
77 24-Mar-14
13-Jun-14
SB100B4P41051
B100 - Escape Route Drawing_IFR
42
72 16-May-14
15-Jul-14
SB100B4P41057
B100 - Escape Route Drawing_IFC
42
72 16-Jul-14
16-Sep-14
SB100B4P41061
B100 - Fire Fighting System Layout Drawings (Yard)_IFR
78
77 05-Sep-13
31-Dec-13
SB100B4P41067
B100 - Fire Fighting System Layout Drawings (Yard)_IFC
112
77 02-Jan-14
13-Jun-14
SB100B4P41081
B100 - Fire Fighting System Layout Drawings (Building)_IFR
84
20 01-Apr-14
30-Jul-14
SB100B4P41087
B100 - Fire Fighting System Layout Drawings (Building)_IFC
62
20 31-Jul-14
31-Oct-14
254
14
72 05-Sep-13
77 05-Sep-13
16-Sep-14
27-Sep-13
B200 - Service / Potable / Fire Water
SB200B4P41021
B200 - P&IDs for Fire Fighting System (Yard)_IFR
SB200B4P41025
B200 - P&IDs for Fire Fighting System (Yard)_IFA
64
77 30-Sep-13
31-Dec-13
SB200B4P41028
B200 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
55
77 02-Jan-14
21-Mar-14
SB200B4P41029
B200 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
57
77 24-Mar-14
13-Jun-14
SB200B4P41051
B200 - Escape Route Drawing_IFR
42
72 16-May-14
15-Jul-14
SB200B4P41057
B200 - Escape Route Drawing_IFC
42
72 16-Jul-14
16-Sep-14
SB200B4P41061
B200 - Fire Fighting System Layout Drawings (Yard)_IFR
78
77 05-Sep-13
31-Dec-13
SB200B4P41067
B200 - Fire Fighting System Layout Drawings (Yard)_IFC
112
77 02-Jan-14
13-Jun-14
32 05-Sep-13
55 05-Sep-13
16-Sep-14
27-Sep-13
B300 - P&IDs for Fire Fighting System (Yard)_IFR
254
14
SB300B4P41025
B300 - P&IDs for Fire Fighting System (Yard)_IFA
64
55 30-Sep-13
31-Dec-13
SB300B4P41028
B300 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
55
55 02-Jan-14
21-Mar-14
SB300B4P41029
B300 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
57
55 24-Mar-14
13-Jun-14
SB300B4P41051
B300 - Escape Route Drawing_IFR
42
32 16-May-14
15-Jul-14
SB300B4P41057
B300 - Escape Route Drawing_IFC
42
32 16-Jul-14
16-Sep-14
SB300B4P41061
B300 - Fire Fighting System Layout Drawings (Yard)_IFR
78
55 05-Sep-13
31-Dec-13
SB300B4P41067
B300 - Fire Fighting System Layout Drawings (Yard)_IFC
112
55 02-Jan-14
13-Jun-14
B400 - P&IDs for Fire Fighting System (Yard)_IFR
285
14
41 05-Sep-13
77 05-Sep-13
31-Oct-14
27-Sep-13
SB400B4P41025
B400 - P&IDs for Fire Fighting System (Yard)_IFA
64
77 30-Sep-13
31-Dec-13
SB400B4P41028
B400 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
55
77 02-Jan-14
21-Mar-14
SB400B4P41029
B400 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
57
77 24-Mar-14
13-Jun-14
SB400B4P41051
B400 - Escape Route Drawing_IFR
42
72 16-May-14
15-Jul-14
SB400B4P41057
B400 - Escape Route Drawing_IFC
42
72 16-Jul-14
16-Sep-14
SB400B4P41061
B400 - Fire Fighting System Layout Drawings (Yard)_IFR
78
77 05-Sep-13
31-Dec-13
SB400B4P41067
B400 - Fire Fighting System Layout Drawings (Yard)_IFC
112
77 02-Jan-14
13-Jun-14
SB400B4P41081
B400 - Fire Fighting System Layout Drawings (Building)_IFR
85
20 01-Apr-14
31-Jul-14
SB400B4P41087
B400 - Fire Fighting System Layout Drawings (Building)_IFC
61
20 01-Aug-14
31-Oct-14
B500 - Escape Route Drawing_IFR
254
42
32 05-Sep-13
32 16-May-14
16-Sep-14
15-Jul-14
B500 - Escape Route Drawing_IFC
42
32 16-Jul-14
16-Sep-14
B300 - Demine & Fuel
SB300B4P41021
B400 - Steam & Power
SB400B4P41021
B500 - Cooling Water
SB500B4P41051
SB500B4P41057
AA00 - P&IDs for Fire Fighting System (Yard)_IFA
AA00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
AA00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
AA00 - P&IDs for Fire Fighting System (Building)_IFR
AA00 - P&IDs for Fire Fighting System (Building)_IFA
AA00 - P&IDs for Fire Fighting System (Building)_IFC (w/ hold)
AA00 - Escape Route Drawing_IFR
AA00 - Escape Route Drawing_IFC
AA00 - Fire Fighting System Layout Drawings (Yard)_IFR
AA00 - Fire Fighting System Layout Drawings (Yard)_IFC
AA00 - Fire Fighting System Layout Drawings (Building)_IFR
AB10 - P&IDs for Fire Fighting System (Yard)_IFR
AB10 - P&IDs for Fire Fighting System (Yard)_IFA
AB10 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
AB10 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
AB10 - Escape Route Drawing_IFR
AB10 - Escape Route Drawing_IFC
AB10 - Fire Fighting System Layout Drawings (Yard)_IFR
AB10 - Fire Fighting System Layout Drawings (Yard)_IFC
AB10 - Fire Fighting System Layout Drawings (Building)_IFR
AB10 - Fire Fighting System Layout Drawings (Building)_IFC
AB20 - Escape Route Drawing_IFR
AB20 - Escape Route Drawing_IFC
AB20 - Fire Fighting System Layout Drawings (Yard)_IFR
AB20 - Fire Fighting System Layout Drawings (Yard)_IFC
AB30 - Escape Route Drawing_IFR
AB30 - Escape Route Drawing_IFC
AB30 - Fire Fighting System Layout Drawings (Yard)_IFR
AB30 - Fire Fighting System Layout Drawings (Yard)_IFC
Layout for Fire & Gas Detection/ Alarm System for Internal Information
Layout for Fire & Gas Detection/ Alarm System IF C
P&ID for Fire Fighting System for Internal Infomation
P&ID for Fire Fighting System IFC
Fire Main & Deluge Line Size & Route for Internal Information
Fire Main & Deluge Line Size & Route IFC
Layout for Fire Fighting System for Internal Information
Layout for Fire Fighting System IFC
AD00 - P&IDs for Fire Fighting System (Yard)_IFR
AD00 - P&IDs for Fire Fighting System (Yard)_IFA
AD00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
AD00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
AD00 - Escape Route Drawing_IFR
AD00 - Escape Route Drawing_IFC
AD00 - Fire Fighting System Layout Drawings (Yard)_IFR
AD00 - Fire Fighting System Layout Drawings (Yard)_IFC
AD00 - Fire Fighting System Layout Drawings (Building)_IFR
AD00 - Fire Fighting System Layout Drawings (Building)_IFC
AE00 - P&IDs for Fire Fighting System (Yard)_IFR
AE00 - P&IDs for Fire Fighting System (Yard)_IFA
AE00 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
AE00 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
AE00 - Escape Route Drawing_IFR
AE00 - Escape Route Drawing_IFC
AE00 - Fire Fighting System Layout Drawings (Yard)_IFR
AE00 - Fire Fighting System Layout Drawings (Yard)_IFC
AG00 - Escape Route Drawing_IFR
AG00 - Escape Route Drawing_IFC
B100 - P&IDs for Fire Fighting System (Yard)_IFR
B100 - P&IDs for Fire Fighting System (Yard)_IFA
B100 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
B100 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
B100 - Escape Route Drawing_IFR
B100 - Escape Route Drawing_IFC
B100 - Fire Fighting System Layout Drawings (Yard)_IFR
B100 - Fire Fighting System Layout Drawings (Yard)_IFC
B100 - Fire Fighting System Layout Drawings (Building)_IFR
B100 - Fire Fighting System Layout Drawings (Building)_IFC
B200 - P&IDs for Fire Fighting System (Yard)_IFR
B200 - P&IDs for Fire Fighting System (Yard)_IFA
B200 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
B200 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
B200 - Escape Route Drawing_IFR
B200 - Escape Route Drawing_IFC
B200 - Fire Fighting System Layout Drawings (Yard)_IFR
B200 - Fire Fighting System Layout Drawings (Yard)_IFC
B300 - P&IDs for Fire Fighting System (Yard)_IFR
B300 - P&IDs for Fire Fighting System (Yard)_IFA
B300 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
B300 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
B300 - Escape Route Drawing_IFR
B300 - Escape Route Drawing_IFC
B300 - Fire Fighting System Layout Drawings (Yard)_IFR
B300 - Fire Fighting System Layout Drawings (Yard)_IFC
B400 - P&IDs for Fire Fighting System (Yard)_IFR
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
B400 - P&IDs for Fire Fighting System (Yard)_IFC (w/ hold)
B400 - P&IDs for Fire Fighting System (Yard)_IFC (w/o hold)
B400 - Escape Route Drawing_IFR
B400 - Escape Route Drawing_IFC
B400 - Fire Fighting System Layout Drawings (Yard)_IFR
B400 - Fire Fighting System Layout Drawings (Yard)_IFC
B400 - Fire Fighting System Layout Drawings (Building)_IFR
B400 - Fire Fighting System Layout Drawings (Building)_IFC
B500 - Escape Route Drawing_IFR
B500 - Escape Route Drawing_IFC
Page 17 of 179
Actual Work
Remaining Work
B400 - P&IDs for Fire Fighting System (Yard)_IFA
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
SB500B4P41061
B500 - Fire Fighting System Layout Drawings (Yard)_IFR
78
55 05-Sep-13
31-Dec-13
SB500B4P41067
B500 - Fire Fighting System Layout Drawings (Yard)_IFC
112
55 02-Jan-14
13-Jun-14
C000-F/F P&ID for Yard-FR rev.A
136
30
129 10-Sep-13
60 10-Sep-13
31-Mar-14
28-Oct-13
Offsites Area
GC000B4P41020A
GC000B4P41020B
C000-F/F P&ID for Yard-Approval by Employer
10
60 29-Oct-13
11-Nov-13
GC000B4P41020C
C000-F/F P&ID for Yard-FA rev.B
35
60 12-Nov-13
31-Dec-13
GC000B4P41020D
C000-F/F P&ID for Yard -FC
35
129 11-Feb-14
31-Mar-14
GC000B4P41050A
C000-F/F Layout for Yard-FA
18
60 05-Dec-13
31-Dec-13
GC000B4P41050B
C000-F/F Layout for Yard-FC
Electrical Safety and Oper
Operability Review
Common Area
V0000B4P42001
Electrical Safety and Operability Review (Initial)
V0000B4P42002
HAZOP / SIL Study
HAZOP Study
Common Area
T0000B5P51001A
T0000B5P51002
Process Area
J0000B5P51010
Electrical Safety and Operability Review (Final)
HAZOP Review
Vendor HAZOP Review for Vendor Design (LLI Equipment & NHDS Fire Heater)
HAZOP Review
18
129 06-Mar-14
31-Mar-14
217
217
5
103 12-Mar-14
103 12-Mar-14
103 12-Mar-14
30-Jan-15
30-Jan-15
18-Mar-14
5
103 26-Jan-15
30-Jan-15
252
191
138
30
69
1
23
23
22-Oct-13
22-Oct-13
11-Nov-13
11-Nov-13
31-Mar-15
30-Sep-14
28-May-14
20-Dec-13
22
23 28-Apr-14
28-May-14
191
20
1 22-Oct-13
9 15-Nov-13
30-Sep-14
12-Dec-13
J0000B5P51020
Vendor HAZOP Review for Vendor Design
21
47 23-Apr-14
26-May-14
T0000B5P51001B
Prepare & Submit HAZOP Report
44
64 29-Nov-13
04-Feb-14
161
63
0 10-Feb-14
0 10-Feb-14
30-Sep-14
09-May-14
49
0 21-Jul-14
30-Sep-14
172
15
37 02-Dec-13
23 02-Dec-13
07-Aug-14
20-Dec-13
A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B5P51017
A500 - Detail HAZOP
SA500B5P51027
A500 - Vendor HAZOP
A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B5P51010A
A700-HAZOP Review for HMU
GA700B5P51010B
A700-HAZOP Report for HMU
15
129 08-Jan-14
28-Jan-14
GA700B5P51010C
A700-Vendor Pac kage HAZ OP Review for HMU
20
37 11-Jul-14
07-Aug-14
AA00 - Polypropylene U
Unit (PPU)
SAA00B5P51021
AA00 - Detail HAZOP
SAA00B5P51027
AA00 - Vendor HAZ OP
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B5P51021
AB10 - Detail HAZOP
SAB10B5P51027
AB10 - Vendor HAZ OP
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B5P51010
Hazop Study
159
58
0 06-Jan-14
0 06-Jan-14
22-Aug-14
28-Mar-14
54
0 09-Jun-14
22-Aug-14
169
68
0 06-Jan-14
0 06-Jan-14
05-Sep-14
11-Apr-14
54
0 23-Jun-14
05-Sep-14
107
13
27 22-Oct-13
38 22-Oct-13
02-Apr-14
08-Nov-13
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
B500 - Fire Fighting System Layout Drawings (Yard)_IFR
B500 - Fire Fighting System Layout Drawings (Yard)_IFC
C000-F/F P&ID for Yard-FR rev.A
C000-F/F P&ID for Yard-Approval by Employer
C000-F/F P&ID for Yard-FA rev.B
C000-F/F P&ID for Yard -FC
C000-F/F Layout for Yard-FA
C000-F/F Layout for Yard-FC
Electrical Safety and Operability Review (Initial)
Electrical Safety and Operability Review (Final)
HAZOP Review
Vendor HAZOP Review for Vendor Design (LLI Equipment & NHDS Fire Heater)
HAZOP Review
Vendor HAZOP Review for Vendor Design
Prepare & Submit HAZOP Report
A500 - Detail HAZOP
A500 - Vendor HAZOP
A700-HAZOP Review for HMU
A700-HAZOP Report for HMU
A700-Vendor Pac kage HAZ OP Review for HMU
AA00 - Detail HAZOP
AA00 - Vendor HAZ OP
AB10 - Detail HAZOP
AB10 - Vendor HAZ OP
Hazop Study
CAC00B5P51030
Vendor HAZOP Review
18
27 06-Feb-14
04-Mar-14
CAC00B5P51050
HAZOP Report
20
27 05-Mar-14
02-Apr-14
B400 - Detail HAZOP
196
196
51
0 02-Dec-13
0 02-Dec-13
0 02-Dec-13
15-Sep-14
15-Sep-14
14-Feb-14
B400 - Vendor HAZOP
115
0 31-Mar-14
15-Sep-14
B400 - Vendor HAZOP
C000-HAZOP Review for Flare/ETP/SWCT/Tankage
172
15
17 02-Dec-13
14 02-Dec-13
07-Aug-14
20-Dec-13
C000-HAZOP Review for Flare/ETP/SWCT/Tankage
5
16 06-Jan-14
10-Jan-14
Utilities Area
B400 - Steam & Power
SB400B5P51017
SB400B5P51027
Offsites Area
GC000B5P51010A1
GC000B5P51010A2
C000-HAZOP Review for Tankage
GC000B5P51010B
C000-HAZOP Report for Flare/ETP/SWCT/Tankage
15
96 27-Jan-14
18-Feb-14
GC000B5P51010C
C000-Vendor Package HAZOP Review for Flare/ETP/SWCT/Tankage
20
17 11-Jul-14
07-Aug-14
246
160
37
69 11-Nov-13
101 06-Jan-14
47 06-Jan-14
31-Mar-15
22-Aug-14
27-Feb-14
SIL Study
Common Area
T0000B5P52001A
SIL Classification Study
T0000B5P52001B
SIL Classification Study Report (FR)
25
83 28-Feb-14
03-Apr-14
T0000B5P52001C
SIL Classification Study Report (FC)
13
83 22-Apr-14
12-May-14
T0000B5P52001D
SIL Verification Report
60
101 29-May-14
22-Aug-14
SIL Classification Study
246
11
69 11-Nov-13
9 05-Dec-13
31-Mar-15
19-Dec-13
Process Area
J0000B5P52010
J0000B5P52020A
SIL Classification Study Report (FR)
23
74 27-Dec-13
05-Feb-14
J0000B5P52020B
SIL Classification Study Report (FC)
19
74 06-Feb-14
05-Mar-14
J0000B5P52030A
SIL Verification Report (FR)
27
42 27-Jun-14
05-Aug-14
J0000B5P52030A10
SIL Verification Report (FC)
21
42 06-Aug-14
03-Sep-14
T0000B5P52002A
Vendor SIL Review (LLI Equipment & NHDS Fire Heater)
10
64 10-Jul-14
23-Jul-14
T0000B5P52002B
Vendor SIL Classification Study Report (FC)
20
64 24-Jul-14
20-Aug-14
264
25
58 10-Mar-14
20 10-Mar-14
31-Mar-15
11-Apr-14
A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500B5P52012
A500 - SIL Classification Study
SA500B5P5203R
A500 - SIL Classification Study Report
23
20 14-Apr-14
16-May-14
SA500B5P52091
A500 - SIL Reliability Calculations_IFR
42
58 17-Nov-14
15-Jan-15
SA500B5P52097
A500 - SIL Reliability Calculations_IFC
50
58 16-Jan-15
31-Mar-15
A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700B5P52010A
A700-SIL Classification Study for HMU
224
10
101 06-Jan-14
136 06-Jan-14
27-Nov-14
17-Jan-14
GA700B5P52010B
A700-SIL Classification Report for HMU
15
136 05-Feb-14
25-Feb-14
GA700B5P52010C
A700-SIL Verification Report for HMU
15
101 07-Nov-14
27-Nov-14
266
25
83 23-Jan-14
24 23-Jan-14
16-Feb-15
28-Feb-14
AA00 - Polypropylene U
Unit (PPU)
SAA00B5P52012
AA00 - SIL Classification Study
SAA00B5P5201R
AA00 - SIL Classification Study Report
25
27 03-Mar-14
04-Apr-14
SAA00B5P52091
AA00 - SIL Reliability Calculations_IFR
44
61 15-Oct-14
15-Dec-14
SAA00B5P52097
AA00 - SIL Reliability Calculations_IFC
43
83 16-Dec-14
16-Feb-15
262
25
47 10-Feb-14
26 10-Feb-14
27-Feb-15
14-Mar-14
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10B5P52012
AB10 - SIL Classification Study
SAB10B5P5201R
AB10 - SIL Classification Study Report
25
26 17-Mar-14
18-Apr-14
SAB10B5P52091
AB10 - SIL Reliability Calculations_IFR
49
47 23-Oct-14
31-Dec-14
SAB10B5P52097
AB10 - SIL Reliability Calculations_IFC
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00B5P52010
SIL Classification Study
38
47 02-Jan-15
27-Feb-15
172
5
44 11-Nov-13
46 11-Nov-13
25-Jul-14
15-Nov-13
CAC00B5P52030
SIL Classification Study Report
21
46 18-Nov-13
16-Dec-13
CAC00B5P52040
SIL Verification Report
16
44 03-Jul-14
25-Jul-14
279
279
23
57 16-Dec-13
57 16-Dec-13
28 16-Dec-13
28-Jan-15
28-Jan-15
17-Jan-14
Utilities Area
B400 - Steam & Power
SB400B5P52012
B400 - SIL Classification Study
SB400B5P5201R
B400 - SIL Classification Study Report
23
28 20-Jan-14
21-Feb-14
SB400B5P52091
B400 - SIL Reliability Calculations_IFR
41
24 01-Oct-14
28-Nov-14
SB400B5P52097
B400 - SIL Reliability Calculations_IFC
41
57 01-Dec-14
28-Jan-15
224
10
33 06-Jan-14
110 06-Jan-14
27-Nov-14
17-Jan-14
Offsites Area
GC000B5P52010A
C000-SIL Classification Study for Flare/ETP/SWCT
GC000B5P52010A10
C000-SIL Classification Study for Tankage
10
102 16-Jan-14
29-Jan-14
GC000B5P52010B
C000-SIL Classification Report for Flare/ETP/SWCT/Tankage
15
102 17-Feb-14
07-Mar-14
GC000B5P52010C
C000-SIL Verification Report for Flare/ETP/SWCT/Tankage
15
33 07-Nov-14
27-Nov-14
Detail Engineering
Design Basis
Civil General
Common Area
T0000DB10010
Design Basis/Gen. Specs For Civil General (By JVD)
V0000DB100010A
Soil Survey - 1st Priority Areas (Crude Oil & IC Piperack)
V0000DB100010B
V0000DB100010C
564
180
180
129
24
12
174
101
10
31-Jan-13 A
31-Jan-13 A
31-Jan-13 A
23-Apr-13 A
23-Apr-13 A
24-Dec-15
31-Jan-14
31-Jan-14
31-Jan-14
28-May-13 A
Vendor HAZOP Review
HAZOP Report
B400 - Detail HAZOP
C000-HAZOP Review for Tankage
C000-HAZOP Report for Flare/ETP/SWCT/Tankage
C000-Vendor Package HAZOP Review for Flare/ETP/SWCT/Tankage
SIL Classification Study
SIL Classification Study Report (FR)
SIL Classification Study Report (FC)
SIL Verification Report
SIL Classification Study
SIL Classification Study Report (FR)
SIL Classification Study Report (FC)
SIL Verification Report (FR)
SIL Verification Report (FC)
Vendor SIL Review (LLI Equipment & NHDS Fire Heater)
Vendor SIL Classification Study Report (FC)
A500 - SIL Classification Study
A500 - SIL Classification Study Report
A500 - SIL Reliability Calculations_IFR
A500 - SIL Reliability Calculations_IFC
A700-SIL Classification Study for HMU
A700-SIL Classification Report for HMU
A700-SIL Verification Report for HMU
AA00 - SIL Classification Study
AA00 - SIL Classification Study Report
AA00 - SIL Reliability Calculations_IFR
AA00 - SIL Reliability Calculations_IFC
AB10 - SIL Classification Study
AB10 - SIL Classification Study Report
AB10 - SIL Reliability Calculations_IFR
AB10 - SIL Reliability Calculations_IFC
SIL Classification Study
SIL Classification Study Report
SIL Verification Report
B400 - SIL Classification Study
B400 - SIL Classification Study Report
B400 - SIL Reliability Calculations_IFR
B400 - SIL Reliability Calculations_IFC
C000-SIL Classification Study for Flare/ETP/SWCT
C000-SIL Classification Study for Tankage
C000-SIL Classification Report for Flare/ETP/SWCT/Tankage
C000-SIL Verification Report for Flare/ETP/SWCT/Tankage
Design Basis/Gen. Specs For Civil General (By JVD)
48
0 01-Jul-13 A
24-Aug-13
Soil Data Report Issued by Subcon - 1st Priority Areas (Crude Oil & IC Piperack)
11
0 26-Aug-13
07-Sep-13
Evaluation of Soil Data Report - 1st Priority Areas ( Crude Oil & IC Piperack)
36
0 09-Sep-13
31-Oct-13
V0000DB100010D
Soil Improvement Method Confirmed with NSRP - 1st Priority Areas (Crude Oil & IC Pip
39
0 01-Nov-13
27-Dec-13
V0000DB100020A
Soil Survey - 2nd Priority Areas (Other Tank Ar ea & B400)
57
0 01-Aug-13
07-Oct-13
V0000DB100020B
Soil Data Report Issued by Subcon - 2nd Priority Areas ( Other Tank Area & B400)
9
0 08-Oct-13
17-Oct-13
V0000DB100020C
Evaluation of Soil Data Report - 2nd Priority Areas (Other Tank Area & B400)
30
0 18-Oct-13
29-Nov-13
V0000DB100020D
Soil Improvement Method Confirmed with NSRP - 2nd Priority Areas (Other Tank Area &
19
0 02-Dec-13
27-Dec-13
V0000DB100030A
Soil Survey - 3rd Priority Areas (Proces s & Utilit y Areas)
48
27 03-Sep-13
28-Oct-13
Soil Survey - 3rd Priority Areas (Proces s & Utilit y Areas)
V0000DB100030B
Soil Data Report Issued by Subcon - 3rd Priority Areas (Process & Utility Areas)
20
27 10-Oct-13
01-Nov-13
Soil Data Report Issued by Subcon - 3rd Priority Areas (Process & Utility Areas)
V0000DB100030C
Evaluation of Soil Data Report - 3rd Priority Areas (Process & Utility Areas)
38
21 05-Nov-13
27-Dec-13
V0000DB100030D
Soil Improvement Method Confirmed with NSRP - 3rd Priority Areas (Process & Utility A
19
21 06-Jan-14
31-Jan-14
159
22
122 31-Jan-13 A
29-Mar-13 A
27-Nov-13
01-May-13 A
167
127
151 28-Mar-13 A
59 28-Mar-13 A
27-Nov-13
30-Sep-13
151 17-Oct-13
27-Nov-13
Process Area
J0000DB100010
Design Basis/Gen. Specs For Civil General
A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700DB400010A
A700-Design Basis / General Specs for Buildings-FR
GA700DB400010B
A700-Design Basis / General Specs for Buildings-FC
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB000010
Preparation of Procedures and Standard documentation
CAC00DB100030
Design Basis & General Specifications For Civil General
CAC00DD140004
JVD Soil Data Report Issued by S/C - 3rd Priority Area
Offsites Area
GC000DB400010A
C000-Design Basis / General Specs for Buildings-FR
30
187
73
20 31-Jan-13 A
31-Jan-13 A
31-Oct-13
20-May-13 A
33
20-Feb-13 A
08-Apr-13 A
0
167
127
20
31-Oct-13
34 28-Mar-13 A
12 28-Mar-13 A
27-Nov-13
30-Sep-13
Soil Survey - 1st Priority Areas (Crude Oil & IC Piperack)
Soil Data Report Issued by Subcon - 1st Priority Areas (Crude Oil & IC Piperack)
Evaluation of Soil Data Report - 1st Priority Areas ( Crude Oil & IC Piperack)
Soil Improvement Method Confirmed with NSRP - 1st Priority Areas (Crude Oil & IC Piperack)
Soil Survey - 2nd Priority Areas (Other Tank Ar ea & B400)
Soil Data Report Issued by Subcon - 2nd Priority Areas ( Other Tank Area & B400)
Evaluation of Soil Data Report - 2nd Priority Areas (Other Tank Area & B400)
Soil Improvement Method Confirmed with NSRP - 2nd Priority Areas (Other Tank Area & B400)
Evaluation of Soil Data Report - 3rd Priority Areas (Process & Utility Areas)
Soil Improvement Method Confirmed with NSRP - 3rd Priority Areas (Process & Utility Areas)
Design Basis/Gen. Specs For Civil General
A700-Design Basis / General Specs for Buildings-FR
A700-Design Basis / General Specs for Buildings-FC
Preparation of Procedures and Standard documentation
Design Basis & General Specifications For Civil General
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
C000-Design Basis / General Specs for Buildings-FR
Page 18 of 179
Actual Work
Remaining Work
JVD Soil Data Report Issued by S/C - 3rd Priority Area
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
GC000DB400010B
Concrete Structure
Common Area
T0000DB20010
Process Area
J0000DB200010
Process Area
J0000DB300010
Building
Common Area
T0000DB40010
Process Area
J0000DB400010
Design Basis/Gen. Specs For Concrete Structure (By JVD)
68
24
24
20-Feb-13 A
23-Apr-13 A
23-Apr-13 A
04-Jun-13 A
28-May-13 A
28-May-13 A
Design Basis/Gen. Specs For Concrete Structure
68
22
20-Feb-13 A
01-May-13 A
04-Jun-13 A
04-Jun-13 A
Design Basis/Gen. Specs For Concrete Structure
33
33
20-Feb-13 A
20-Feb-13 A
08-Apr-13 A
08-Apr-13 A
Design Basis & General Specifications For Concrete Structure
Design Basis/Gen. Specs For Steel Structure (By JVD)
68
24
24
20-Feb-13 A
23-Apr-13 A
23-Apr-13 A
04-Jun-13 A
28-May-13 A
28-May-13 A
Design Basis/Gen. Specs For Steel Structure
68
22
20-Feb-13 A
01-May-13 A
04-Jun-13 A
04-Jun-13 A
Design Basis/Gen. Specs For Steel Structure
33
33
20-Feb-13 A
20-Feb-13 A
08-Apr-13 A
08-Apr-13 A
Design Basis & General Specifications For Steel Structure
Design Basis/Gen. Specs For Buildings (By JVD)
68
24
24
20-Feb-13 A
23-Apr-13 A
23-Apr-13 A
04-Jun-13 A
28-May-13 A
28-May-13 A
Design Basis/Gen. Specs For Buildings (By JVD)
68
0
20-Feb-13 A
Design Basis/Gen. Specs For Buildings
04-Jun-13 A
04-Jun-13 A
Design Basis/Gen. Specs For Buildings
33
33
20-Feb-13 A
20-Feb-13 A
08-Apr-13 A
08-Apr-13 A
Design Basis & General Specifications For Building
140
43
22
27 20-Feb-13 A
20-Feb-13 A
26-Mar-13 A
31-Oct-13
24-Apr-13 A
24-Apr-13 A
33
33
20-Feb-13 A
20-Feb-13 A
08-Apr-13 A
08-Apr-13 A
55 02-May-13 A
02-May-13 A
31-Oct-13
31-May-13 A
55 01-Oct-13
31-Oct-13
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB400060
Design Basis & General Specifications For Building
Mechanical Equipment
Process Area
J0000DB500010
Design Basis/Gen. Specs For Equipment
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB500070
Design Basis & General Specifications For Equipment
27-Nov-13
Offsites Area
GC000DB500010A
C000-General Specs for Equipment-FR
122
20
GC000DB500010B
C000-General Specs for Equipment-FC
20
Design Basis / Piping Material Specification (By JVD)
91
94
74
20-Feb-13 A
01-Mar-13 A
01-Mar-13 A
12-Jul-13 A
12-Jul-13 A
14-Jun-13 A
Piping Material Specification (By JVD) - Review / Final
20
17-Jun-13 A
12-Jul-13 A
Design Basis/Piping Material Specification
68
22
20-Feb-13 A
01-May-13 A
04-Jun-13 A
04-Jun-13 A
33
33
20-Feb-13 A
20-Feb-13 A
08-Apr-13 A
08-Apr-13 A
Design Basis/Gen. Specs for Instrument
95
24
24
20-Feb-13 A
13-May-13 A
13-May-13 A
19-Jul-13 A
14-Jun-13 A
14-Jun-13 A
Design Basis/Gen. Specs for Instrument
95
12
20-Feb-13 A
02-Jul-13 A
19-Jul-13 A
19-Jul-13 A
33
33
20-Feb-13 A
20-Feb-13 A
08-Apr-13 A
08-Apr-13 A
115
24
24
60 20-Feb-13 A
115 22-Jul-13
115 22-Jul-13
50
0
20-Feb-13 A
07-May-13 A
07-May-13 A
33
33
20-Feb-13 A
20-Feb-13 A
08-Apr-13 A
08-Apr-13 A
125
36
36
56 20-Feb-13 A
115 26-Jul-13
115 26-Jul-13
33
33
33
20-Feb-13 A
20-Feb-13 A
20-Feb-13 A
125
36
36
56 20-Feb-13 A
115 26-Jul-13
115 26-Jul-13
33
33
33
20-Feb-13 A
20-Feb-13 A
20-Feb-13 A
Piping
Common Area
T0000DB60010A
T0000DB60010B
Process Area
J0000DB600010
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB600080
Design Basis & General Specifications For Piping Materials
Instrumentation
Common Area
T0000DB70010
Process Area
J0000DB700010
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB700090
Design Basis & General Specifications For Instrument
Electrical
Common Area
T0000DB80010
Process Area
J0000DB800010
Design Basis/Philosophy/Gen. Specs for Electrical (By JVD)
Design Basis/Gen. Specs for Electrical
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB800100
Design Basis & General Specifications For Electrical
Insulation
Common Area
T0000DB90010
Design Basis/Gen. Specs for Insulation (By JVD)
Process Area
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB900110
Design Basis & General Specifications For Insulation
Painting
Common Area
T0000DBA0010
Design Basis/Gen. Specs for Painting (By JVD)
Process Area
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DBA00120
Design Basis & General Specifications For Painting
Fire Proofing
Common Area
T0000DBB0010
Design Basis/Gen. Specs for Fire Proofing (By JVD)
Layout/Specifications/Data Sheet & Requisition
J0000DCZ20010A
Piping Layout (3D Modeling)
36
36
36
115 26-Jul-13
115 26-Jul-13
115 26-Jul-13
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
546
376
11 04-Mar-13 A
50 23-May-13 A
24-Dec-15
02-Dec-14
6 11-Dec-13
31-Jan-14
60% 3D Model Review
21
10 03-Jul-14
01-Aug-14
J0000DCZ20010D
90% 3D Model Review
10
46 07-Nov-14
20-Nov-14
30% 3D Model Review
277
281
13
46 08-Jul-13 A
67 04-Dec-13
14 04-Dec-13
19-Jan-15
19-Jan-15
20-Dec-13
TA000DCZ2001C
Piping Layout (3D Modeling) - 60%
97
15 15-Jan-14
02-Jun-14
TA000DCZ2001D
60 % 3D Model Review
15
15 03-Jun-14
23-Jun-14
TA000DCZ2001F
90% 3D Model Review
15
37 27-Nov-14
17-Dec-14
TA000DCZ2001G
Piping Layout (3D Modeling) - Balance
21
67 18-Dec-14
19-Jan-15
15 08-Jul-13 A
14 08-Jul-13 A
05-Dec-14
02-Dec-13
Process Area
TA000DCZ2001A
Piping Layout (3D Modeling) - 30%
262
101
TA000DCZ2001E
Piping Layout (3D Modeling) - 90%
105
37 24-Jun-14
25-Nov-14
280
103
43 01-Oct-13
14 01-Oct-13
14-Nov-14
28-Feb-14
SA100DCZ2001R
A100 - 3D Modeling (30%)_Issue for Model Review & Report
21
14 03-Mar-14
31-Mar-14
SA100DCZ2003M
A100 - 3D Modeling (60%)_Modeling Completion
83
14 03-Mar-14
30-Jun-14
SA100DCZ2003R
A100 - 3D Modeling (60%)_Issue for Model Review & Report
23
14 01-Jul-14
31-Jul-14
SA100DCZ2005M
A100 - 3D Modeling (90%)_Modeling Completion
72
37 01-Jul-14
15-Oct-14
SA100DCZ2005R
A100 - 3D Modeling (90%)_Issue for Model Review & Report
22
43 16-Oct-14
14-Nov-14
280
103
0 01-Oct-13
0 01-Oct-13
14-Nov-14
28-Feb-14
SA500DCZ2001R
A500 - 3D Modeling (30%)_Issue for Model Review & Report
21
0 03-Mar-14
31-Mar-14
SA500DCZ2003M
A500 - 3D Modeling (60%)_Modeling Completion
83
0 03-Mar-14
30-Jun-14
SA500DCZ2003R
A500 - 3D Modeling (60%)_Issue for Model Review & Report
23
0 01-Jul-14
31-Jul-14
SA500DCZ2005M
A500 - 3D Modeling (90%)_Modeling Completion
72
0 01-Jul-14
15-Oct-14
SA500DCZ2005R
A500 - 3D Modeling (90%)_Issue for Model Review & Report
22
0 16-Oct-14
14-Nov-14
280
103
19 01-Oct-13
14 01-Oct-13
14-Nov-14
28-Feb-14
SA600DCZ2001R
A600 - 3D Modeling (30%)_Issue for Model Review & Report
21
14 03-Mar-14
31-Mar-14
SA600DCZ2003M
A600 - 3D Modeling (60%)_Modeling Completion
83
14 03-Mar-14
30-Jun-14
SA600DCZ2003R
A600 - 3D Modeling (60%)_Issue for Model Review & Report
23
14 01-Jul-14
31-Jul-14
SA600DCZ2005M
A600 - 3D Modeling (90%)_Modeling Completion
72
19 01-Jul-14
15-Oct-14
SA600DCZ2005R
A600 - 3D Modeling (90%)_Issue for Model Review & Report
22
19 16-Oct-14
14-Nov-14
274
67
21 01-Nov-13
31 01-Nov-13
05-Dec-14
07-Feb-14
A700 - Hydrogen Manufacturing
Manuf
(HMU/HCDS)
GA700DCZ20020A
A700-3D Modeling Model(30%)
GA700DCZ20020B
A700-3D Modeling Model(60%)
65
28 20-Feb-14
23-May-14
GA700DCZ20020C
A700-3D Modeling Model(90%)
93
21 02-Jul-14
14-Nov-14
GA700DCZ20030A
A700-3D Model review(30%)
10
31 10-Feb-14
21-Feb-14
GA700DCZ20030B
A700-3D Model review(60%)
19
21 04-Jun-14
01-Jul-14
GA700DCZ20030C
A700-3D Model review(90%)
15
21 17-Nov-14
05-Dec-14
278
93
0 01-Oct-13
0 01-Oct-13
12-Nov-14
14-Feb-14
AA00 - Polypropylene U
Unit (PPU)
SAA00DCZ2001M
AA00 - 3D Modeling (30%)_Modeling Completion
SAA00DCZ2001R
AA00 - 3D Modeling (30%)_Issue for Model Review & Report
20
0 17-Feb-14
14-Mar-14
SAA00DCZ2003M
AA00 - 3D Modeling (60%)_Modeling Completion
83
0 18-Feb-14
17-Jun-14
SAA00DCZ2003R
AA00 - 3D Modeling (60%)_Issue for Model Review & Report
20
0 18-Jun-14
15-Jul-14
SAA00DCZ2005M
AA00 - 3D Modeling (90%)_Modeling Completion
72
0 01-Jul-14
15-Oct-14
SAA00DCZ2005R
AA00 - 3D Modeling (90%)_Issue for Model Review & Report
20
0 16-Oct-14
12-Nov-14
280
103
42 01-Oct-13
0 01-Oct-13
14-Nov-14
28-Feb-14
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DCZ2001M
AB10 - 3D Modeling (30%)_Modeling Completion
Design Basis & General Specifications For Equipment
C000-General Specs for Equipment-FR
C000-General Specs for Equipment-FC
Design Basis / Piping Material Specification (By JVD)
Piping Material Specification (By JVD) - Review / Final
Design Basis/Piping Material Specification
Design Basis & General Specifications For Piping Materials
Design Basis/Gen. Specs for Instrument
Design Basis/Gen. Specs for Instrument
Design Basis & General Specifications For Instrument
Design Basis/Philosophy/Gen. Specs for Electrical (By JVD)
Design Basis/Gen. Specs for Electrical
Design Basis & General Specifications For Electrical
Design Basis/Gen. Specs for Insulation (By JVD)
Design Basis & General Specifications For Insulation
Design Basis/Gen. Specs for Painting (By JVD)
Design Basis & General Specifications For Painting
18-Sep-13
18-Sep-13
18-Sep-13
J0000DCZ20010C
A600 - Tatoray/Sulfolane
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DCZ2001M
A600 - 3D Modeling (30%)_Modeling Completion
Design Basis/Gen. Specs For Equipment
18-Sep-13
18-Sep-13
18-Sep-13
31
A500 - Xylene Frac./Pare
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DCZ2001M
A500 - 3D Modeling (30%)_Modeling Completion
Design Basis/Gen. Specs For Steel Structure (By JVD)
18-Sep-13
18-Sep-13
18-Sep-13
30% 3D Model Review
A100 - No.1 Sour Water Stripper (1SWS)
SA100DCZ2001M
A100 - 3D Modeling (30%)_Modeling Completion
Design Basis/Gen. Specs For Concrete Structure (By JVD)
26-Aug-13
26-Aug-13
26-Aug-13
J0000DCZ20010B
3D Model
Common Area
TA000DCZ2001B
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
C000-Design Basis / General Specs for Buildings-FC
30
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB300050
Design Basis & General Specifications For Steel Structure
34 17-Oct-13
Finish
C000-Design Basis / General Specs for Buildings-FC
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DB200040
Design Basis & General Specifications For Concrete Structure
Steel Structure
Common Area
T0000DB30010
Original Total Float Start
Duration
SAB10DCZ2001R
AB10 - 3D Modeling (30%)_Issue for Model Review & Report
21
0 03-Mar-14
31-Mar-14
SAB10DCZ2003M
AB10 - 3D Modeling (60%)_Modeling Completion
83
0 03-Mar-14
30-Jun-14
SAB10DCZ2003R
AB10 - 3D Modeling (60%)_Issue for Model Review & Report
23
0 01-Jul-14
31-Jul-14
SAB10DCZ2005M
AB10 - 3D Modeling (90%)_Modeling Completion
72
0 01-Jul-14
15-Oct-14
SAB10DCZ2005R
AB10 - 3D Modeling (90%)_Issue for Model Review & Report
22
0 16-Oct-14
14-Nov-14
SAB20DCZ2001M
AB20 - 3D Modeling (30%)_Modeling Completion
103
14 01-Oct-13
28-Feb-14
Design Basis/Gen. Specs for Fire Proofing (By JVD)
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
60% 3D Model Review
90% 3D Model Review
30% 3D Model Review
Piping Layout (3D Modeling) - 60%
60 % 3D Model Review
90% 3D Model Review
Piping Layout (3D Modeling) - Balance
Piping Layout (3D Modeling) - 30%
Piping Layout (3D Modeling) - 90%
A100 - 3D Modeling (30%)_Modeling Completion
A100 - 3D Modeling (30%)_Issue for Model Review & Report
A100 - 3D Modeling (60%)_Modeling Completion
A100 - 3D Modeling (60%)_Issue for Model Review & Report
A100 - 3D Modeling (90%)_Modeling Completion
A100 - 3D Modeling (90%)_Issue for Model Review & Report
A500 - 3D Modeling (30%)_Modeling Completion
A500 - 3D Modeling (30%)_Issue for Model Review & Report
A500 - 3D Modeling (60%)_Modeling Completion
A500 - 3D Modeling (60%)_Issue for Model Review & Report
A500 - 3D Modeling (90%)_Modeling Completion
A500 - 3D Modeling (90%)_Issue for Model Review & Report
A600 - 3D Modeling (30%)_Modeling Completion
A600 - 3D Modeling (30%)_Issue for Model Review & Report
A600 - 3D Modeling (60%)_Modeling Completion
A600 - 3D Modeling (60%)_Issue for Model Review & Report
A600 - 3D Modeling (90%)_Modeling Completion
A600 - 3D Modeling (90%)_Issue for Model Review & Report
A700-3D Modeling Model(30%)
A700-3D Modeling Model(60%)
A700-3D Modeling Model(90%)
A700-3D Model review(30%)
A700-3D Model review(60%)
A700-3D Model review(90%)
AA00 - 3D Modeling (30%)_Modeling Completion
AA00 - 3D Modeling (30%)_Issue for Model Review & Report
AA00 - 3D Modeling (60%)_Modeling Completion
AA00 - 3D Modeling (60%)_Issue for Model Review & Report
AA00 - 3D Modeling (90%)_Modeling Completion
AA00 - 3D Modeling (90%)_Issue for Model Review & Report
AB10 - 3D Modeling (30%)_Modeling Completion
AB10 - 3D Modeling (30%)_Issue for Model Review & Report
AB10 - 3D Modeling (60%)_Modeling Completion
AB10 - 3D Modeling (60%)_Issue for Model Review & Report
AB10 - 3D Modeling (90%)_Modeling Completion
AB10 - 3D Modeling (90%)_Issue for Model Review & Report
AB20 - 3D Modeling (30%)_Modeling Completion
Page 19 of 179
Actual Work
Remaining Work
Piping Layout (3D Modeling)
30% 3D Model Review
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
SAB20DCZ2001R
AB20 - 3D Modeling (30%)_Issue for Model Review & Report
21
14 03-Mar-14
31-Mar-14
SAB20DCZ2003M
AB20 - 3D Modeling (60%)_Modeling Completion
83
14 03-Mar-14
30-Jun-14
SAB20DCZ2003R
AB20 - 3D Modeling (60%)_Issue for Model Review & Report
23
14 01-Jul-14
31-Jul-14
SAB20DCZ2005M
AB20 - 3D Modeling (90%)_Modeling Completion
72
42 01-Jul-14
15-Oct-14
SAB20DCZ2005R
AB20 - 3D Modeling (90%)_Issue for Model Review & Report
22
42 16-Oct-14
14-Nov-14
SAB30DCZ2001M
AB30 - 3D Modeling (30%)_Modeling Completion
103
14 01-Oct-13
28-Feb-14
SAB30DCZ2001R
AB30 - 3D Modeling (30%)_Issue for Model Review & Report
21
14 03-Mar-14
31-Mar-14
SAB30DCZ2003M
AB30 - 3D Modeling (60%)_Modeling Completion
83
14 03-Mar-14
30-Jun-14
SAB30DCZ2003R
AB30 - 3D Modeling (60%)_Issue for Model Review & Report
23
14 01-Jul-14
31-Jul-14
SAB30DCZ2005M
AB30 - 3D Modeling (90%)_Modeling Completion
72
38 01-Jul-14
15-Oct-14
SAB30DCZ2005R
AB30 - 3D Modeling (90%)_Issue for Model Review & Report
22
38 16-Oct-14
14-Nov-14
280
103
0 01-Oct-13
0 01-Oct-13
14-Nov-14
28-Feb-14
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00DCZ2001M
AD00 - 3D Modeling (30%)_Modeling Completion
SAD00DCZ2001R
AD00 - 3D Modeling (30%)_Issue for Model Review & Report
21
0 03-Mar-14
31-Mar-14
SAD00DCZ2003M
AD00 - 3D Modeling (60%)_Modeling Completion
83
0 03-Mar-14
30-Jun-14
SAD00DCZ2003R
AD00 - 3D Modeling (60%)_Issue for Model Review & Report
23
0 01-Jul-14
31-Jul-14
SAD00DCZ2005M
AD00 - 3D Modeling (90%)_Modeling Completion
72
0 01-Jul-14
15-Oct-14
SAD00DCZ2005R
AD00 - 3D Modeling (90%)_Issue for Model Review & Report
AE00 - Gas Oil Hydrosulphuriser
Hydrosul
(GOHDS)
SAE00DCZ2001M
AE00 - 3D Modeling (30%)_Modeling Completion
22
0 16-Oct-14
14-Nov-14
280
103
0 01-Oct-13
0 01-Oct-13
14-Nov-14
28-Feb-14
SAE00DCZ2001R
AE00 - 3D Modeling (30%)_Issue for Model Review & Report
21
0 03-Mar-14
31-Mar-14
SAE00DCZ2003M
AE00 - 3D Modeling (60%)_Modeling Completion
83
0 03-Mar-14
30-Jun-14
SAE00DCZ2003R
AE00 - 3D Modeling (60%)_Issue for Model Review & Report
23
0 01-Jul-14
31-Jul-14
SAE00DCZ2005M
AE00 - 3D Modeling (90%)_Modeling Completion
72
0 01-Jul-14
15-Oct-14
SAE00DCZ2005R
AE00 - 3D Modeling (90%)_Issue for Model Review & Report
22
0 16-Oct-14
14-Nov-14
227
71
49 01-Aug-13
0 01-Aug-13
02-Jul-14
15-Nov-13
22
0 18-Nov-13
17-Dec-13
134
0 18-Nov-13
30-May-14
22
49 02-Jun-14
02-Jul-14
308
308
115
27 01-Aug-13
27 01-Aug-13
0 01-Aug-13
30-Oct-14
30-Oct-14
20-Jan-14
AG00 - Common Piperack
Pipera
SAG00DCZ2001M
AG00 - 3D Modeling (30%)_Modeling Completion
SAG00DCZ2001R
AG00 - 3D Modeling (30%)_Issue for Model Review & Report
SAG00DCZ2003M
AG00 - 3D Modeling (60%)_Modeling Completion
SAG00DCZ2003R
AG00 - 3D Modeling (60%)_Issue for Model Review & Report
Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100DCZ2001M
B100 - 3D Modeling (30%)_Modeling Completion
SB100DCZ2001R
B100 - 3D Modeling (30%)_Issue for Model Review & Report
19
0 21-Jan-14
18-Feb-14
SB100DCZ2003M
B100 - 3D Modeling (60%)_Modeling Completion
90
0 21-Jan-14
30-May-14
SB100DCZ2003R
B100 - 3D Modeling (60%)_Issue for Model Review & Report
22
0 02-Jun-14
02-Jul-14
SB100DCZ2005M
B100 - 3D Modeling (90%)_Modeling Completion
83
16 02-Jun-14
30-Sep-14
SB100DCZ2005R
B100 - 3D Modeling (90%)_Issue for Model Review & Report
20
27 01-Oct-14
30-Oct-14
308
115
27 01-Aug-13
0 01-Aug-13
30-Oct-14
20-Jan-14
B200 - Service / Potable / Fire Water
SB200DCZ2001M
B200 - 3D Modeling (30%)_Modeling Completion
SB200DCZ2001R
B200 - 3D Modeling (30%)_Issue for Model Review & Report
19
0 21-Jan-14
18-Feb-14
SB200DCZ2003M
B200 - 3D Modeling (60%)_Modeling Completion
90
0 21-Jan-14
30-May-14
SB200DCZ2003R
B200 - 3D Modeling (60%)_Issue for Model Review & Report
22
0 02-Jun-14
02-Jul-14
SB200DCZ2005M
B200 - 3D Modeling (90%)_Modeling Completion
83
16 02-Jun-14
30-Sep-14
SB200DCZ2005R
B200 - 3D Modeling (90%)_Issue for Model Review & Report
20
27 01-Oct-14
30-Oct-14
308
115
27 01-Aug-13
0 01-Aug-13
30-Oct-14
20-Jan-14
B300 - Demine & Fuel
SB300DCZ2001M
B300 - 3D Modeling (30%)_Modeling Completion
SB300DCZ2001R
B300 - 3D Modeling (30%)_Issue for Model Review & Report
19
0 21-Jan-14
18-Feb-14
SB300DCZ2003M
B300 - 3D Modeling (60%)_Modeling Completion
90
0 21-Jan-14
30-May-14
SB300DCZ2003R
B300 - 3D Modeling (60%)_Issue for Model Review & Report
22
0 02-Jun-14
02-Jul-14
SB300DCZ2005M
B300 - 3D Modeling (90%)_Modeling Completion
83
16 02-Jun-14
30-Sep-14
SB300DCZ2005R
B300 - 3D Modeling (90%)_Issue for Model Review & Report
20
27 01-Oct-14
30-Oct-14
308
115
27 01-Aug-13
0 01-Aug-13
30-Oct-14
20-Jan-14
B400 - Steam & Power
SB400DCZ2001M
B400 - 3D Modeling (30%)_Modeling Completion
SB400DCZ2001R
B400 - 3D Modeling (30%)_Issue for Model Review & Report
19
0 21-Jan-14
18-Feb-14
SB400DCZ2003M
B400 - 3D Modeling (60%)_Modeling Completion
90
0 21-Jan-14
30-May-14
SB400DCZ2003R
B400 - 3D Modeling (60%)_Issue for Model Review & Report
22
0 02-Jun-14
02-Jul-14
SB400DCZ2005M
B400 - 3D Modeling (90%)_Modeling Completion
83
16 02-Jun-14
30-Sep-14
SB400DCZ2005R
B400 - 3D Modeling (90%)_Issue for Model Review & Report
20
27 01-Oct-14
30-Oct-14
308
115
27 01-Aug-13
16 01-Aug-13
30-Oct-14
20-Jan-14
B500 - Cooling Water
SB500DCZ2001M
B500 - 3D Modeling (30%)_Modeling Completion
SB500DCZ2001R
B500 - 3D Modeling (30%)_Issue for Model Review & Report
19
16 21-Jan-14
18-Feb-14
SB500DCZ2003M
B500 - 3D Modeling (60%)_Modeling Completion
90
16 21-Jan-14
30-May-14
SB500DCZ2003R
B500 - 3D Modeling (60%)_Issue for Model Review & Report
22
16 02-Jun-14
02-Jul-14
SB500DCZ2005M
B500 - 3D Modeling (90%)_Modeling Completion
83
16 02-Jun-14
30-Sep-14
SB500DCZ2005R
B500 - 3D Modeling (90%)_Issue for Model Review & Report
20
27 01-Oct-14
30-Oct-14
30 01-Nov-13
11 01-Nov-13
05-Dec-14
07-Feb-14
Offsites Area
GC000DCZ20020A
C000-3D Modeling Model(30%)
274
67
GC000DCZ20020B
C000-3D Modeling Model(60%)
65
14 20-Feb-14
23-May-14
GC000DCZ20020C
C000-3D Modeling Model(90%)
89
30 08-Jul-14
14-Nov-14
GC000DCZ20030A
C000-3D Model review(30%)
15
11 10-Feb-14
28-Feb-14
GC000DCZ20030B
C000-3D Model review(60%)
19
3 11-Jun-14
07-Jul-14
GC000DCZ20030C
C000-3D Model review(90%)
15
30 17-Nov-14
05-Dec-14
Spec/Req. for Piling (By JVD)
338
288
99
22
49
21
48
40
31-Dec-14
20-Aug-14
10-Mar-14
10-Mar-14
Civil General
Civil General - Common
Common Area
T0000DC14020
T0000DC15010
Specification for Earth Structure (By JVD)
TA900DC16010
A900 - Advance Underground Layout
Process Area
J0000DC16010
J0000DC17010
Conceptual UG Layout
Layout for Road & Paving
AC00 - Residue Hydrodesulphuriser
Hydrod
(RHDS)
CAC00DCZ20005
Set Up for 3D Model (Initial)
25-Mar-13 A
25-Mar-13 A
16-Oct-13
07-Feb-14
31
29 20-Dec-13
06-Feb-14
32
115 16-Oct-13
29-Nov-13
288
218
21 25-Mar-13 A
24 30-Sep-13
20-Aug-14
20-Aug-14
98 11-Dec-13
16-Apr-14
327
25
51 25-Mar-13 A
25-Mar-13 A
23-Jul-14
26-Apr-13 A
82
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
AB20 - 3D Modeling (30%)_Issue for Model Review & Report
AB20 - 3D Modeling (60%)_Modeling Completion
AB20 - 3D Modeling (60%)_Issue for Model Review & Report
AB20 - 3D Modeling (90%)_Modeling Completion
AB20 - 3D Modeling (90%)_Issue for Model Review & Report
AB30 - 3D Modeling (30%)_Modeling Completion
AB30 - 3D Modeling (30%)_Issue for Model Review & Report
AB30 - 3D Modeling (60%)_Modeling Completion
AB30 - 3D Modeling (60%)_Issue for Model Review & Report
AB30 - 3D Modeling (90%)_Modeling Completion
AB30 - 3D Modeling (90%)_Issue for Model Review & Report
AD00 - 3D Modeling (30%)_Modeling Completion
AD00 - 3D Modeling (30%)_Issue for Model Review & Report
AD00 - 3D Modeling (60%)_Modeling Completion
AD00 - 3D Modeling (60%)_Issue for Model Review & Report
AD00 - 3D Modeling (90%)_Modeling Completion
AD00 - 3D Modeling (90%)_Issue for Model Review & Report
AE00 - 3D Modeling (30%)_Modeling Completion
AE00 - 3D Modeling (30%)_Issue for Model Review & Report
AE00 - 3D Modeling (60%)_Modeling Completion
AE00 - 3D Modeling (60%)_Issue for Model Review & Report
AE00 - 3D Modeling (90%)_Modeling Completion
AE00 - 3D Modeling (90%)_Issue for Model Review & Report
AG00 - 3D Modeling (30%)_Modeling Completion
AG00 - 3D Modeling (30%)_Issue for Model Review & Report
AG00 - 3D Modeling (60%)_Modeling Completion
AG00 - 3D Modeling (60%)_Issue for Model Review & Report
B100 - 3D Modeling (30%)_Modeling Completion
B100 - 3D Modeling (30%)_Issue for Model Review & Report
B100 - 3D Modeling (60%)_Modeling Completion
B100 - 3D Modeling (60%)_Issue for Model Review & Report
B100 - 3D Modeling (90%)_Modeling Completion
B100 - 3D Modeling (90%)_Issue for Model Review & Report
B200 - 3D Modeling (30%)_Modeling Completion
B200 - 3D Modeling (30%)_Issue for Model Review & Report
B200 - 3D Modeling (60%)_Modeling Completion
B200 - 3D Modeling (60%)_Issue for Model Review & Report
B200 - 3D Modeling (90%)_Modeling Completion
B200 - 3D Modeling (90%)_Issue for Model Review & Report
B300 - 3D Modeling (30%)_Modeling Completion
B300 - 3D Modeling (30%)_Issue for Model Review & Report
B300 - 3D Modeling (60%)_Modeling Completion
B300 - 3D Modeling (60%)_Issue for Model Review & Report
B300 - 3D Modeling (90%)_Modeling Completion
B300 - 3D Modeling (90%)_Issue for Model Review & Report
B400 - 3D Modeling (30%)_Modeling Completion
B400 - 3D Modeling (30%)_Issue for Model Review & Report
B400 - 3D Modeling (60%)_Modeling Completion
B400 - 3D Modeling (60%)_Issue for Model Review & Report
B400 - 3D Modeling (90%)_Modeling Completion
B400 - 3D Modeling (90%)_Issue for Model Review & Report
B500 - 3D Modeling (30%)_Modeling Completion
B500 - 3D Modeling (30%)_Issue for Model Review & Report
B500 - 3D Modeling (60%)_Modeling Completion
B500 - 3D Modeling (60%)_Issue for Model Review & Report
B500 - 3D Modeling (90%)_Modeling Completion
B500 - 3D Modeling (90%)_Issue for Model Review & Report
C000-3D Modeling Model(30%)
C000-3D Modeling Model(60%)
C000-3D Modeling Model(90%)
C000-3D Model review(30%)
C000-3D Model review(60%)
C000-3D Model review(90%)
Spec/Req. for Piling (By JVD)
Specification for Earth Structure (By JVD)
A900 - Advance Underground Layout
Conceptual UG Layout
Layout for Road & Paving
Set Up for 3D Model (Initial)
CAC00DCZ20010
3D Model Development for Plot 3D Model
52
25 04-Jun-13 A
15-Aug-13
3D Model Development for Plot 3D Model
CAC00DCZ20015
Set-up for 3D Model (Official)
12
25 31-Jul-13
15-Aug-13
Set-up for 3D Model (Official)
CAC00DCZ20020
Plot 3D Model Review
6
25 16-Aug-13
23-Aug-13
CAC00DCZ20030
3D Model Development for 30% Model
35
25 22-Aug-13
11-Oct-13
CAC00DCZ20040
30% 3D Model Review
8
25 15-Oct-13
24-Oct-13
CAC00DCZ20050
3D Model Development for 60% Model
74
29 25-Oct-13
18-Feb-14
3D Model Development for 60% Model
CAC00DCZ20055
3D Model Internal Review for Piping / Civil
5
29 17-Feb-14
21-Feb-14
3D Model Internal Review for Piping / Civil
CAC00DCZ20060
60% 3D Model Review
12
29 03-Mar-14
18-Mar-14
CAC00DCZ20070
3D Model Development for 90% Model
74
52 19-Mar-14
04-Jul-14
CAC00DCZ20080
90% 3D Model Review
11
51 08-Jul-14
23-Jul-14
49
49
77
28
16-Oct-13
16-Oct-13
17-Mar-14
17-Mar-14
31-Dec-14
31-Dec-14
28-Nov-14
29-Aug-14
Sewer and Drainage
Process Area
A100 - No.1 Sour Water Stripper (1SWS)
SA100DC160121
A100 - Drainage Design and Calculations_IFR
SA100DC160127
224
224
177
116
A100 - Drainage Design and Calculations_IFC
61
77 01-Sep-14
28-Nov-14
A500 - Xylene Frac./Par
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DC160121
A500 - Drainage Design and Calculations_IFR
209
146
26 03-Mar-14
26 03-Mar-14
31-Dec-14
30-Sep-14
A500 - Drainage Design and Calculations_IFC
63
26 01-Oct-14
31-Dec-14
A600 - Tatoray/Sulfolan
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DC160121
A600 - Drainage Design and Calculations_IFR
209
146
48 03-Mar-14
48 03-Mar-14
31-Dec-14
30-Sep-14
63
48 01-Oct-14
31-Dec-14
32
32
74 16-Oct-13
74 16-Oct-13
29-Nov-13
29-Nov-13
100
63
40 01-May-14
40 01-May-14
25-Sep-14
31-Jul-14
AA00 - Drainage Design and Calculations_IFC
37
40 01-Aug-14
25-Sep-14
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DC160121
AB10 - Drainage Design and Calculations_IFR
177
116
98 17-Mar-14
28 17-Mar-14
28-Nov-14
29-Aug-14
AB10 - Drainage Design and Calculations_IFC
61
98 01-Sep-14
28-Nov-14
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00DC160121
AD00 - Drainage Design and Calculations_IFR
177
116
76 17-Mar-14
28 17-Mar-14
28-Nov-14
29-Aug-14
AD00 - Drainage Design and Calculations_IFC
61
76 01-Sep-14
28-Nov-14
AE00 - Gas Oil Hydrosulphuriser
Hydrosu
(GOHDS)
SAE00DC160121
AE00 - Drainage Design and Calculations_IFR
177
116
90 17-Mar-14
28 17-Mar-14
28-Nov-14
29-Aug-14
AE00 - Drainage Design and Calculations_IFC
61
90 01-Sep-14
28-Nov-14
AG00 - Common Piperack
Pipera
SAG00DC160121
AG00 - Drainage Design and Calculations_IFR
103
41
49 03-Feb-14
49 03-Feb-14
30-Jun-14
31-Mar-14
62
49 01-Apr-14
30-Jun-14
184
33 02-Dec-13
26-Aug-14
SA500DC160127
SA600DC160127
A600 - Drainage Design and Calculations_IFC
A800 - Naphtha Hydrodesulphurizer
Hydrod
/ CCR (NHDS/CCR)
TA800DC16010
A800 - Advance Underground Layout
AA00 - Polypropylene Unit
U
(PPU)
SAA00DC160121
AA00 - Drainage Design and Calculations_IFR
SAA00DC160127
SAB10DC160127
SAD00DC160127
SAE00DC160127
SAG00DC160127
AG00 - Drainage Design and Calculations_IFC
Utilities Area
Plot 3D Model Review
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
30% 3D Model Review
60% 3D Model Review
3D Model Development for 90% Model
90% 3D Model Review
A100 - Drainage Design and Calculations_IFR
A100 - Drainage Design and Calculations_IFC
A500 - Drainage Design and Calculations_IFR
A500 - Drainage Design and Calculations_IFC
A600 - Drainage Design and Calculations_IFR
A600 - Drainage Design and Calculations_IFC
A800 - Advance Underground Layout
AA00 - Drainage Design and Calculations_IFR
AA00 - Drainage Design and Calculations_IFC
AB10 - Drainage Design and Calculations_IFR
AB10 - Drainage Design and Calculations_IFC
AD00 - Drainage Design and Calculations_IFR
AD00 - Drainage Design and Calculations_IFC
AE00 - Drainage Design and Calculations_IFR
AE00 - Drainage Design and Calculations_IFC
AG00 - Drainage Design and Calculations_IFR
AG00 - Drainage Design and Calculations_IFC
Page 20 of 179
Actual Work
Remaining Work
3D Model Development for 30% Model
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
184
104
25 02-Dec-13
25 02-Dec-13
26-Aug-14
30-Apr-14
B100 - Drainage Design and Calculations_IFC
80
25 01-May-14
26-Aug-14
B200 - Service / Potable / Fire Water
SB200DC160121
B200 - Drainage Design and Calculations_IFR
103
41
57 03-Feb-14
57 03-Feb-14
30-Jun-14
31-Mar-14
B200 - Drainage Design and Calculations_IFC
62
57 01-Apr-14
30-Jun-14
B300 - Drainage Design and Calculations_IFR
103
63
67 03-Feb-14
67 03-Feb-14
30-Jun-14
30-Apr-14
B300 - Drainage Design and Calculations_IFC
40
67 01-May-14
30-Jun-14
B400 - Drainage Design and Calculations_IFR
123
83
73 02-Jan-14
60 02-Jan-14
30-Jun-14
30-Apr-14
B400 - Drainage Design and Calculations_IFC
40
73 01-May-14
30-Jun-14
B500 - Drainage Design and Calculations_IFR
143
81
44 02-Jan-14
44 02-Jan-14
28-Jul-14
28-Apr-14
B500 - Drainage Design and Calculations_IFC
62
44 29-Apr-14
28-Jul-14
141
61
61
84 16-Oct-13
39 16-Oct-13
39 16-Oct-13
08-May-14
13-Jan-14
13-Jan-14
24
24
24
84 04-Apr-14
49 04-Apr-14
49 04-Apr-14
08-May-14
08-May-14
08-May-14
A800 - DWG for Review (FR) Layout for Road & Paving
24
24
84 04-Apr-14
84 04-Apr-14
08-May-14
08-May-14
A900 - DWG for Review (FR) Layout for Road & Paving
B100 - Plant / Inst. Air & Nitrogen
SB100DC160121
B100 - Drainage Design and Calculations_IFR
SB100DC160127
SB200DC160127
B300 - Demine & Fuel
SB300DC160121
SB300DC160127
B400 - Steam & Power
SB400DC160121
SB400DC160127
B500 - Cooling Water
SB500DC160121
SB500DC160127
Road & Paving
Common Area
T0000DC17030
Specification for Road and Paving (By JVD)
Process Area
A800 - Naphtha Hydrodesulphurizer
Hydrod
/ CCR (NHDS/CCR)
TA800DC17010
A800 - DWG for Review (FR) Layout for Road & Paving
A900 - PENEX (PENX)
TA900DC17010
A900 - DWG for Review (FR) Layout for Road & Paving
Concrete Structure
Concrete Structure - Common
Com
Common Area
T0000DC20010
Prel. Design & Layout for Major Concrete Struct.
236
216
122
32
47
30
114
26
22-Aug-13
22-Aug-13
03-Sep-13
16-Oct-13
28-Nov-14
30-Sep-14
28-Feb-14
29-Nov-13
50
69 16-Oct-13
26-Dec-13
T0000DC20020
Spec/Req. for Anchor Bolts (For Frame Agreement)
T0000DC20070
Conceptual Design for Concrete Foundations and Structures
122
114 03-Sep-13
28-Feb-14
Prel. Design & Layout for Major Concrete Struct.
216
30
30 22-Aug-13
138 22-Aug-13
30-Sep-14
04-Oct-13
166
83
60 03-Feb-14
60 03-Feb-14
30-Sep-14
30-May-14
A100 - Concrete Structural Design Calculations_IFC
83
60 02-Jun-14
30-Sep-14
A500 - Xylene Frac./Par
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DC200201
A500 - Concrete Structural Design Calculations_IFR
176
124
21 16-Jan-14
21 16-Jan-14
30-Sep-14
15-Jul-14
A500 - Concrete Structural Design Calculations_IFC
52
21 16-Jul-14
30-Sep-14
A600 - Tatoray/Sulfolan
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DC200201
A600 - Concrete Structural Design Calculations_IFR
176
124
41 16-Jan-14
41 16-Jan-14
30-Sep-14
15-Jul-14
A600 - Concrete Structural Design Calculations_IFC
52
41 16-Jul-14
30-Sep-14
AA00 - Polypropylene Unit
U
(PPU)
SAA00DC200201
AA00 - Concrete Structural Design Calculations_IFR
144
61
60 04-Feb-14
60 04-Feb-14
28-Aug-14
29-Apr-14
AA00 - Concrete Structural Design Calculations_IFC
83
60 30-Apr-14
28-Aug-14
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DC200201
AB10 - Concrete Structural Design Calculations_IFR
166
83
54 03-Feb-14
54 03-Feb-14
30-Sep-14
30-May-14
Process Area
J0000DC200010
A100 - No.1 Sour Water Stripper (1SWS)
SA100DC200201
A100 - Concrete Structural Design Calculations_IFR
SA100DC200207
SA500DC200207
SA600DC200207
SAA00DC200207
SAB10DC200207
AB10 - Concrete Structural Design Calculations_IFC
83
54 02-Jun-14
30-Sep-14
SAB20DC200201
AB20 - Concrete Structural Design Calculations_IFR
83
36 03-Feb-14
30-May-14
SAB20DC200207
AB20 - Concrete Structural Design Calculations_IFC
83
36 02-Jun-14
30-Sep-14
SAB30DC200201
AB30 - Concrete Structural Design Calculations_IFR
83
40 03-Feb-14
30-May-14
SAB30DC200207
AB30 - Concrete Structural Design Calculations_IFC
83
40 02-Jun-14
30-Sep-14
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00DC200201
AD00 - Concrete Structural Design Calculations_IFR
166
83
54 03-Feb-14
54 03-Feb-14
30-Sep-14
30-May-14
AD00 - Concrete Structural Design Calculations_IFC
83
54 02-Jun-14
30-Sep-14
AE00 - Gas Oil Hydrosulphuriser
Hydrosu
(GOHDS)
SAE00DC200201
AE00 - Concrete Structural Design Calculations_IFR
166
83
54 03-Feb-14
54 03-Feb-14
30-Sep-14
30-May-14
83
54 02-Jun-14
30-Sep-14
Stack, Silo, Tank including
includin Foundation
Common Area
T0000DC22001A
Anchor Bolts and Nuts (2120001) - Update Specs / Data Sheet / Req (Progressively)
181
181
181
37 14-Feb-14
37 14-Feb-14
37 14-Feb-14
04-Nov-14
04-Nov-14
04-Nov-14
Foundation
Process Area
A100 - No.1 Sour Water Stripper (1SWS)
SA100DC230001
A100 - Foundations Design Calculations (for Piperack)_IFR
282
269
187
83
87
87
59
69
28-Nov-14
28-Nov-14
28-Nov-14
30-Jun-14
SAD00DC200207
SAE00DC200207
AE00 - Concrete Structural Design Calculations_IFC
15-Oct-13
01-Nov-13
03-Mar-14
03-Mar-14
SA100DC230007
A100 - Foundations Design Calculations (for Piperack)_IFC
43
78 01-Jul-14
29-Aug-14
SA100DC230011
A100 - Foundations Design Calculations (Equipment)_IFR
85
71 01-Apr-14
31-Jul-14
SA100DC230017
A100 - Foundations Design Calculations (Equipment)_IFC
49
71 01-Aug-14
15-Oct-14
SA100DC230021
A100 - Foundations Design Calculations (Other)_IFR
83
59 01-May-14
29-Aug-14
SA100DC230027
A100 - Foundations Design Calculations (Other)_IFC
A500 - Xylene Frac./Par
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DC230251
A500 - Foundations Design Calculations (for Equipments)_IFR
SA500DC230257
A500 - Foundations Design Calculations (for Equipments)_IFC
SA500DC230261
A500 - Foundations Design Calculations (for Others)_IFR
SA500DC230267
A500 - Foundations Design Calculations (for Others)_IFC
A600 - Tatoray/Sulfolan
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DC230251
A600 - Foundations Design Calculations (for Equipments)_IFR
SA600DC230257
A600 - Foundations Design Calculations (for Equipments)_IFC
SA600DC230261
A600 - Foundations Design Calculations (for Others)_IFR
SA600DC230267
A600 - Foundations Design Calculations (for Others)_IFC
AA00 - Polypropylene Unit
U
(PPU)
SAA00DC230241
AA00 - Foundations Design Calculations_IFR
SAA00DC230247
AA00 - Foundations Design Calculations_IFC
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DC230001
AB10 - Foundations Design Calculations (for Piperack)_IFR
B500 - Drainage Design and Calculations_IFC
Specification for Road and Paving (By JVD)
Prel. Design & Layout for Major Concrete Struct.
Spec/Req. for Anchor Bolts (For Frame Agreement)
Conceptual Design for Concrete Foundations and Structures
Prel. Design & Layout for Major Concrete Struct.
A100 - Concrete Structural Design Calculations_IFR
A100 - Concrete Structural Design Calculations_IFC
A500 - Concrete Structural Design Calculations_IFR
A500 - Concrete Structural Design Calculations_IFC
A600 - Concrete Structural Design Calculations_IFR
A600 - Concrete Structural Design Calculations_IFC
AA00 - Concrete Structural Design Calculations_IFR
AA00 - Concrete Structural Design Calculations_IFC
AB10 - Concrete Structural Design Calculations_IFR
AB10 - Concrete Structural Design Calculations_IFC
AB20 - Concrete Structural Design Calculations_IFR
AB20 - Concrete Structural Design Calculations_IFC
AB30 - Concrete Structural Design Calculations_IFR
AB30 - Concrete Structural Design Calculations_IFC
AD00 - Concrete Structural Design Calculations_IFR
AD00 - Concrete Structural Design Calculations_IFC
AE00 - Concrete Structural Design Calculations_IFR
AE00 - Concrete Structural Design Calculations_IFC
Anchor Bolts and Nuts (2120001) - Update Specs / Data Sheet / Req (Progressively)
A100 - Foundations Design Calculations (for Piperack)_IFR
A100 - Foundations Design Calculations (for Piperack)_IFC
A100 - Foundations Design Calculations (Equipment)_IFR
A100 - Foundations Design Calculations (Equipment)_IFC
A100 - Foundations Design Calculations (Other)_IFR
A500 - Foundations Design Calculations (for Equipments)_IFR
41
20 01-Sep-14
31-Oct-14
114
87 16-Apr-14
30-Sep-14
41
87 01-Oct-14
28-Nov-14
177
116
80 17-Mar-14
56 17-Mar-14
28-Nov-14
29-Aug-14
41
56 01-Sep-14
31-Oct-14
114
80 16-Apr-14
30-Sep-14
A500 - Foundations Design Calculations (for Equipments)_IFC
A500 - Foundations Design Calculations (for Others)_IFR
A500 - Foundations Design Calculations (for Others)_IFC
A600 - Foundations Design Calculations (for Equipments)_IFR
A600 - Foundations Design Calculations (for Equipments)_IFC
A600 - Foundations Design Calculations (for Others)_IFR
41
80 01-Oct-14
28-Nov-14
144
88
78 04-Feb-14
78 04-Feb-14
28-Aug-14
10-Jun-14
56
78 11-Jun-14
28-Aug-14
AA00 - Foundations Design Calculations_IFC
187
83
81 03-Mar-14
43 03-Mar-14
28-Nov-14
30-Jun-14
AB10 - Foundations Design Calculations (for Piperack)_IFR
AB10 - Foundations Design Calculations (Equipment)_IFR
85
70 01-Apr-14
31-Jul-14
AB10 - Foundations Design Calculations (Equipment)_IFC
49
70 01-Aug-14
15-Oct-14
SAB10DC230021
AB10 - Foundations Design Calculations (Other)_IFR
83
69 01-May-14
29-Aug-14
SAB10DC230027
AB10 - Foundations Design Calculations (Other)_IFC
61
69 01-Sep-14
28-Nov-14
SAB20DC230001
AB20 - Foundations Design Calculations (for Piperack)_IFR
83
65 03-Mar-14
30-Jun-14
SAB20DC230007
AB20 - Foundations Design Calculations (for Piperack)_IFC
43
78 01-Jul-14
29-Aug-14
SAB20DC230011
AB20 - Foundations Design Calculations (Equipment)_IFR
85
71 01-Apr-14
31-Jul-14
SAB20DC230017
AB20 - Foundations Design Calculations (Equipment)_IFC
49
71 01-Aug-14
15-Oct-14
SAB20DC230021
AB20 - Foundations Design Calculations (Other)_IFR
83
51 01-May-14
29-Aug-14
SAB20DC230027
AB20 - Foundations Design Calculations (Other)_IFC
61
51 01-Sep-14
28-Nov-14
SAB30DC230001
AB30 - Foundations Design Calculations (for Piperack)_IFR
83
51 03-Mar-14
30-Jun-14
SAB30DC230007
AB30 - Foundations Design Calculations (for Piperack)_IFC
43
51 01-Jul-14
29-Aug-14
SAB30DC230011
AB30 - Foundations Design Calculations (Equipment)_IFR
85
71 01-Apr-14
31-Jul-14
SAB30DC230017
AB30 - Foundations Design Calculations (Equipment)_IFC
49
71 01-Aug-14
15-Oct-14
SAB30DC230021
AB30 - Foundations Design Calculations (Other)_IFR
83
81 01-May-14
29-Aug-14
SAB30DC230027
AB30 - Foundations Design Calculations (Other)_IFC
61
81 01-Sep-14
28-Nov-14
187
83
70 03-Mar-14
21 03-Mar-14
28-Nov-14
30-Jun-14
SAD00DC230007
AD00 - Foundations Design Calculations (for Piperack)_IFC
43
41 01-Jul-14
29-Aug-14
SAD00DC230011
AD00 - Foundations Design Calculations (Equipment)_IFR
85
34 01-Apr-14
31-Jul-14
SAD00DC230017
AD00 - Foundations Design Calculations (Equipment)_IFC
49
34 01-Aug-14
15-Oct-14
SAD00DC230021
AD00 - Foundations Design Calculations (Other)_IFR
83
70 01-May-14
29-Aug-14
SAD00DC230027
AD00 - Foundations Design Calculations (Other)_IFC
61
70 01-Sep-14
28-Nov-14
187
83
86 03-Mar-14
21 03-Mar-14
28-Nov-14
30-Jun-14
SAE00DC230007
AE00 - Foundations Design Calculations (for Piperack)_IFC
43
87 01-Jul-14
29-Aug-14
SAE00DC230011
AE00 - Foundations Design Calculations (Equipment)_IFR
85
58 01-Apr-14
31-Jul-14
SAE00DC230017
AE00 - Foundations Design Calculations (Equipment)_IFC
49
58 01-Aug-14
15-Oct-14
SAE00DC230021
AE00 - Foundations Design Calculations (Other)_IFR
83
86 01-May-14
29-Aug-14
SAE00DC230027
AE00 - Foundations Design Calculations (Other)_IFC
61
86 01-Sep-14
28-Nov-14
103
72
51 01-Nov-13
51 01-Nov-13
31-Mar-14
14-Feb-14
AG00 - Foundations Design Calculations_IFC
31
51 17-Feb-14
31-Mar-14
Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100DC230241
B100 - Foundations Design Calculations_IFR
241
208
82
52 15-Oct-13
46 01-Nov-13
41 01-Nov-13
30-Sep-14
29-Aug-14
28-Feb-14
SB100DC230247
B100 - Foundations Design Calculations_IFC
106
66 03-Mar-14
31-Jul-14
SB100DC230251
B100 - Foundations Design Calculations (for Equipments)_IFR
125
46 01-Nov-13
30-Apr-14
SB100DC230257
B100 - Foundations Design Calculations (for Equipments)_IFC
83
46 01-May-14
29-Aug-14
220
72 16-Oct-13
29-Aug-14
A600 - Foundations Design Calculations (for Others)_IFC
AA00 - Foundations Design Calculations_IFR
AB10 - Foundations Design Calculations (for Piperack)_IFC
AB10 - Foundations Design Calculations (Equipment)_IFR
AB10 - Foundations Design Calculations (Equipment)_IFC
AB10 - Foundations Design Calculations (Other)_IFR
AB10 - Foundations Design Calculations (Other)_IFC
AB20 - Foundations Design Calculations (for Piperack)_IFR
AB20 - Foundations Design Calculations (for Piperack)_IFC
AB20 - Foundations Design Calculations (Equipment)_IFR
AB20 - Foundations Design Calculations (Equipment)_IFC
AB20 - Foundations Design Calculations (Other)_IFR
AB20 - Foundations Design Calculations (Other)_IFC
AB30 - Foundations Design Calculations (for Piperack)_IFR
AB30 - Foundations Design Calculations (for Piperack)_IFC
AB30 - Foundations Design Calculations (Equipment)_IFR
AB30 - Foundations Design Calculations (Equipment)_IFC
AB30 - Foundations Design Calculations (Other)_IFR
AB30 - Foundations Design Calculations (Other)_IFC
AD00 - Foundations Design Calculations (for Piperack)_IFR
AD00 - Foundations Design Calculations (for Piperack)_IFC
AD00 - Foundations Design Calculations (Equipment)_IFR
AD00 - Foundations Design Calculations (Equipment)_IFC
AD00 - Foundations Design Calculations (Other)_IFR
AD00 - Foundations Design Calculations (Other)_IFC
AE00 - Foundations Design Calculations (for Piperack)_IFR
AE00 - Foundations Design Calculations (for Piperack)_IFC
AE00 - Foundations Design Calculations (Equipment)_IFR
AE00 - Foundations Design Calculations (Equipment)_IFC
AE00 - Foundations Design Calculations (Other)_IFR
AE00 - Foundations Design Calculations (Other)_IFC
AG00 - Foundations Design Calculations_IFR
AG00 - Foundations Design Calculations_IFC
B100 - Foundations Design Calculations_IFR
B100 - Foundations Design Calculations_IFC
B100 - Foundations Design Calculations (for Equipments)_IFR
B100 - Foundations Design Calculations (for Equipments)_IFC
Page 21 of 179
Actual Work
Detail Engineering, Procurement, and
Critical Remaining Work
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
B500 - Drainage Design and Calculations_IFR
A100 - Foundations Design Calculations (Other)_IFC
SAB10DC230017
Milestone
B400 - Drainage Design and Calculations_IFC
28-Nov-14
29-Aug-14
SAB10DC230011
Remaining Work
B300 - Drainage Design and Calculations_IFC
B400 - Drainage Design and Calculations_IFR
28-Nov-14
29-Aug-14
B200 - Service / Potable / Fire Water
B300 - Drainage Design and Calculations_IFR
87 17-Mar-14
20 17-Mar-14
77 01-Jul-14
SAG00DC230247
B200 - Drainage Design and Calculations_IFC
59 01-Sep-14
43
AG00 - Common Piperack
Pipera
SAG00DC230241
AG00 - Foundations Design Calculations_IFR
B200 - Drainage Design and Calculations_IFR
61
AB10 - Foundations Design Calculations (for Piperack)_IFC
AE00 - Gas Oil Hydrosulphuriser
Hydrosu
(GOHDS)
SAE00DC230001
AE00 - Foundations Design Calculations (for Piperack)_IFR
B100 - Drainage Design and Calculations_IFC
177
116
SAB10DC230007
AD00 - Kerosene Hydro
Hydrodesulphuriser (KHDS)
SAD00DC230001
AD00 - Foundations Design Calculations (for Piperack)_IFR
B100 - Drainage Design and Calculations_IFR
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura
NSRP Complex Project
Title: Detail Engineering, Procurement, and Construction CPM Network Level-3
S-000-1133-1002V
Rev.3
ATTACHMENT - 1
Nghi Son Refinery and Petrochemical Complex Project
Activity ID
Activity Name
Original Total Float Start
Duration
Finish
SB200DC230251
B200 - Foundations Design Calculations (for Equipments)_IFR
94
41 16-Oct-13
28-Feb-14
SB200DC230257
B200 - Foundations Design Calculations (for Equipments)_IFC
126
72 03-Mar-14
29-Aug-14
B300 - Foundations Design Calculations_IFR
241
95
49 15-Oct-13
41 15-Oct-13
30-Sep-14
28-Feb-14
B300 - Demine & Fuel
SB300DC230241
SB300DC230247
B300 - Foundations Design Calculations_IFC
SB300DC230251
B300 - Foundations Design Calculations (for Equipments)_IFR
SB300DC230257
B300 - Foundations Design Calculations (for Equipments)_IFC
SB300DC230261
B300 - Foundations Design Calculations (for Others)_IFR
SB300DC230267
B300 - Foundations Design Calculations (for Others)_IFC
63
69 03-Mar-14
30-May-14
127
13 15-Oct-13
15-Apr-14
62
13 16-Apr-14
15-Jul-14
178
49 15-Oct-13
30-Jun-14
63
49 01-Jul-14
30-Sep-14
39 01-Nov-13
41 01-Nov-13
29-Aug-14
28-Feb-14
B400 - Foundations Design Calculations_IFR
208
82
SB400DC230247
B400 - Foundations Design Calculations_IFC
63
60 03-Mar-14
30-May-14
SB400DC230251
B400 - Foundations Design Calculations (for Equipments)_IFR
113
27 02-Dec-13
15-May-14
SB400DC230257
B400 - Foundations Design Calculations (for Equipments)_IFC
54
27 16-May-14
31-Jul-14
SB400DC230261
B400 - Foundations Design Calculations (for Others)_IFR
103
39 02-Jan-14
30-May-14
SB400DC230267
B400 - Foundations Design Calculations (for Others)_IFC
63
39 02-Jun-14
29-Aug-14
53 01-Nov-13
41 01-Nov-13
29-Aug-14
28-Feb-14
B400 - Steam & Power
SB400DC230241
B500 - Foundations Design Calculations_IFR
208
82
SB500DC230247
B500 - Foundations Design Calculations_IFC
83
96 03-Mar-14
30-Jun-14
SB500DC230251
B500 - Foundations Design Calculations (for Equipments)_IFR
145
53 01-Nov-13
30-May-14
SB500DC230257
B500 - Foundations Design Calculations (for Equipments)_IFC
63
53 02-Jun-14
29-Aug-14
57
57
57
77
24-Feb-15
24-Feb-15
24-Feb-15
19-Dec-13
B500 - Cooling Water
SB500DC230241
Steel Structure
Steel Structure - Common
Common Area
G0000DC300010
Requisition for Steel Structure for Blanket Order(only for GS)
249
249
239
10
01-Oct-13
01-Oct-13
31-Oct-13
06-Dec-13
T0000DC30001A
Shop Fabricated Structural Steel (2130001) - Update Specs / Data Sheet / Req
20
63 17-Mar-14
11-Apr-14
T0000DC30001B
Structural Steel MTO - Update / Release Progressively for Fabrication & Supply
235
63 17-Mar-14
24-Feb-15
T0000DC30001C
Shop Fabricated Structural Steel - Preliminary Requisition
29
57 31-Oct-13
10-Dec-13
270
187
83
59 01-Oct-13
39 03-Feb-14
20 03-Feb-14
31-Oct-14
31-Oct-14
30-May-14
83
60 02-Jun-14
30-Sep-14
106
40 03-Mar-14
31-Jul-14
Process Area
A100 - No.1 Sour Water Stripper (1SWS)
SA100DC300171
A100 - Structural Steelwork Design Calculations (for Piperack)_IFR
SA100DC300177
A100 - Structural Steelwork Design Calculations (for Piperack)_IFC
SA100DC300181
A100 - Structural Steelwork Design Calculations (Equipment)_IFR
SA100DC300187
A100 - Structural Steelwork Design Calculations (Equipment)_IFC
SA100DC300191
A100 - Structural Steelwork Design Calculations (Other)_IFR
SA100DC300197
A100 - Structural Steelwork Design Calculations (Other)_IFC
A500 - Xylene Frac./Par
Frac./Parex/Isomar (XYF/PX/ISOM)
SA500DC300171
A500 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFR
SA500DC300177
A500 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFC
SA500DC300181
A500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR
SA500DC300187
A500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC
A600 - Tatoray/Sulfolan
Tatoray/Sulfolane/BZ./TR. Frac (TA/SF/BT)
SA600DC300171
A600 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFR
SA600DC300177
A600 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFC
SA600DC300181
A600 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR
SA600DC300187
A600 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC
AA00 - Polypropylene Unit
U
(PPU)
SAA00DC300171
AA00 - Structural Steelwork Design Calculations_IFR
SAA00DC300177
AA00 - Structural Steelwork Design Calculations_IFC
AB00 - Crude Distillatio
Distillation Unit (CDU)
SAB10DC300171
AB10 - Structural Steelwork Design Calculations (for Piperack)_IFR
49
51 01-Aug-14
15-Oct-14
105
39 01-Apr-14
29-Aug-14
41
39 01-Sep-14
31-Oct-14
197
136
59 16-Jan-14
20 16-Jan-14
31-Oct-14
31-Jul-14
40
80 01-Aug-14
30-Sep-14
136
20 17-Feb-14
29-Aug-14
41
59 01-Sep-14
31-Oct-14
197
136
59 16-Jan-14
20 16-Jan-14
31-Oct-14
31-Jul-14
40
80 01-Aug-14
30-Sep-14
136
20 17-Feb-14
29-Aug-14
41
59 01-Sep-14
31-Oct-14
226
165
20 15-Nov-13
20 15-Nov-13
14-Oct-14
14-Jul-14
61
20 15-Jul-14
14-Oct-14
187
83
39 03-Feb-14
20 03-Feb-14
31-Oct-14
30-May-14
SAB10DC300177
AB10 - Structural Steelwork Design Calculations (for Piperack)_IFC
SAB10DC300181
AB10 - Structural Steelwork Design Calculations (Equipment)_IFR
SAB10DC300187
AB10 - Structural Steelwork Design Calculations (Equipment)_IFC
SAB10DC300191
AB10 - Structural Steelwork Design Calculations (Other)_IFR
SAB10DC300197
AB10 - Structural Steelwork Design Calculations (Other)_IFC
SAB20DC300171
AB20 - Structural Steelwork Design Calculations (for Piperack)_IFR
SAB20DC300177
AB20 - Structural Steelwork Design Calculations (for Piperack)_IFC
SAB20DC300181
AB20 - Structural Steelwork Design Calculations (Equipment)_IFR
SAB20DC300187
AB20 - Structural Steelwork Design Calculations (Equipment)_IFC
SAB20DC300191
AB20 - Structural Steelwork Design Calculations (Other)_IFR
SAB20DC300197
AB20 - Structural Steelwork Design Calculations (Other)_IFC
SAB30DC300171
AB30 - Structural Steelwork Design Calculations (for Piperack)_IFR
SAB30DC300177
AB30 - Structural Steelwork Design Calculations (for Piperack)_IFC
SAB30DC300191
AB30 - Structural Steelwork Design Calculations (Other)_IFR
SAB30DC300197
AB30 - Structural Steelwork Design Calculations (Other)_IFC
41
AD00 - Kerosene Hydrodesulphuriser
Hydro
(KHDS)
SAD00DC300171
AD00 - Structural Steelwork Design Calculations (for Piperack)_IFR
SAD00DC300177
AD00 - Structural Steelwork Design Calculations (for Piperack)_IFC
SAD00DC300181
AD00 - Structural Steelwork Design Calculations (Equipment)_IFR
SAD00DC300187
AD00 - Structural Steelwork Design Calculations (Equipment)_IFC
SAD00DC300191
AD00 - Structural Steelwork Design Calculations (Other)_IFR
SAD00DC300197
AD00 - Structural Steelwork Design Calculations (Other)_IFC
AE00 - Gas Oil Hydrosulphuriser
Hydrosu
(GOHDS)
SAE00DC300171
AE00 - Structural Steelwork Design Calculations (for Piperack)_IFR
83
60 02-Jun-14
30-Sep-14
106
40 03-Mar-14
31-Jul-14
49
51 01-Aug-14
15-Oct-14
105
39 01-Apr-14
29-Aug-14
41
39 01-Sep-14
31-Oct-14
83
20 03-Feb-14
30-May-14
83
60 02-Jun-14
30-Sep-14
106
40 03-Mar-14
31-Jul-14
49
51 01-Aug-14
15-Oct-14
105
39 01-Apr-14
29-Aug-14
41
39 01-Sep-14
31-Oct-14
83
20 03-Feb-14
30-May-14
83
40 02-Jun-14
30-Sep-14
105
39 01-Apr-14
29-Aug-14
39 01-Sep-14
31-Oct-14
187
83
39 03-Feb-14
20 03-Feb-14
31-Oct-14
30-May-14
83
60 02-Jun-14
30-Sep-14
106
40 03-Mar-14
31-Jul-14
49
51 01-Aug-14
15-Oct-14
105
39 01-Apr-14
29-Aug-14
41
39 01-Sep-14
31-Oct-14
187
83
39 03-Feb-14
20 03-Feb-14
31-Oct-14
30-May-14
SAE00DC300177
AE00 - Structural Steelwork Design Calculations (for Piperack)_IFC
83
60 02-Jun-14
30-Sep-14
SAE00DC300181
AE00 - Structural Steelwork Design Calculations (Equipment)_IFR
106
40 03-Mar-14
31-Jul-14
SAE00DC300187
AE00 - Structural Steelwork Design Calculations (Equipment)_IFC
49
51 01-Aug-14
15-Oct-14
SAE00DC300191
AE00 - Structural Steelwork Design Calculations (Other)_IFR
105
39 01-Apr-14
29-Aug-14
SAE00DC300197
AE00 - Structural Steelwork Design Calculations (Other)_IFC
AG00 - Common Piperack
Pipera
SAG00DC300071
AG00 - Requisitions for Structure_IFR
41
39 01-Sep-14
31-Oct-14
114
21
61 01-Oct-13
0 01-Nov-13
17-Mar-14
29-Nov-13
SAG00DC300077
AG00 - Requisitions for Structure_IFC
56
0 02-Dec-13
21-Feb-14
SAG00DC300095
AG00 - TBE Report for Structure
28
0 02-Jan-14
12-Feb-14
SAG00DC300171
AG00 - Structural Steelwork Design Calculations_IFR
98
61 01-Oct-13
21-Feb-14
SAG00DC300177
AG00 - Structural Steelwork Design Calculations_IFC
16
61 24-Feb-14
17-Mar-14
Utilities Area
B100 - Plant / Inst. Air & Nitrogen
SB100DC300171
B100 - Structural Steelwork Design Calculations_IFR
177
177
93
83 15-Nov-13
39 15-Nov-13
81 15-Nov-13
30-Jul-14
30-Jul-14
31-Mar-14
SB100DC300177
B100 - Structural Steelwork Design Calculations_IFC
42
81 01-Apr-14
30-May-14
SB100DC300191
B100 - Structural Steelwork Design Calculations ( for Others)_IFR
94
39 16-Dec-13
30-Apr-14
SB100DC300197
B100 - Structural Steelwork Design Calculations ( for Others)_IFC
62
39 01-May-14
30-Jul-14
B200 - Service / Potable / Fire Water
SB200DC300191
B200 - Structural Steelwork Design Calculations ( for Others)_IFR
166
104
83 02-Dec-13
83 02-Dec-13
30-Jul-14
30-Apr-14
62
83 01-May-14
30-Jul-14
B300 - Structural Steelwork Design Calculations_IFR
177
93
39 15-Nov-13
81 15-Nov-13
30-Jul-14
31-Mar-14
SB300DC300177
B300 - Structural Steelwork Design Calculations_IFC
42
81 01-Apr-14
30-May-14
SB300DC300191
B300 - Structural Steelwork Design Calculations ( for Others)_IFR
73
39 16-Jan-14
30-Apr-14
SB300DC300197
B300 - Structural Steelwork Design Calculations ( for Others)_IFC
SB200DC300197
B300 - Demine & Fuel
SB300DC300171
B200 - Structural Steelwork Design Calculations ( for Others)_IFC
62
39 01-May-14
30-Jul-14
39 15-Nov-13
81 15-Nov-13
30-Jul-14
31-Mar-14
B400 - Structural Steelwork Design Calculations_IFR
177
93
SB400DC300177
B400 - Structural Steelwork Design Calculations_IFC
42
81 01-Apr-14
30-May-14
SB400DC300191
B400 - Structural Steelwork Design Calculations ( for Others)_IFR
73
39 16-Jan-14
30-Apr-14
SB400DC300197
B400 - Structural Steelwork Design Calculations ( for Others)_IFC
B400 - Steam & Power
SB400DC300171
62
39 01-May-14
30-Jul-14
B500 - Structural Steelwork Design Calculations_IFR
166
82
80 02-Dec-13
82 02-Dec-13
30-Jul-14
31-Mar-14
SB500DC300177
B500 - Structural Steelwork Design Calculations_IFC
42
82 01-Apr-14
30-May-14
SB500DC300181
B500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR
83
80 02-Jan-14
30-Apr-14
SB500DC300187
B500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC
62
80 01-May-14
30-Jul-14
SB500DC300191
B500 - Structural Steelwork Design Calculations ( for Others)_IFR
63
80 03-Feb-14
30-Apr-14
SB500DC300197
B500 - Structural Steelwork Design Calculations ( for Others)_IFC
62
80 01-May-14
30-Jul-14
48
48
48
48
14-Jan-14
14-Jan-14
14-Jan-14
14-Jan-14
30-Jun-14
30-Jun-14
30-Jun-14
26-Mar-14
48 10-Apr-14
30-Jun-14
55
44
44
45
17-Jul-15
15-Dec-14
10-Dec-14
16-Oct-13
B500 - Cooling Water
SB500DC300171
Pipe Rack
Process Area
A700 - Hydrogen Manufacturing
Manu
(HMU/HCDS)
GA700DD310010A
A700-DWG for Piperack Structure-FR
GA700DD310010B
Building
Building - Common
Common Area
G0000DC400000A
A700-DWG for Piperack Structure-FC
Requisition for TR, LV SWGR/MCC & Distribution Board in Building for Frame Agreeme
115
115
115
50
55
383
238
318
30
22-Jul-13
29-Aug-13
29-Aug-13
29-Aug-13
G0000DC400000A2
Requisition for TR, LV SWGR/MCC & Distribution Board in Building-group1
10
45 23-Jun-14
04-Jul-14
G0000DC400000B
Requisition for TR, LV SWGR/MCC & Distribution Board in Building-group2
10
43 02-Jul-14
15-Jul-14
2013
2014
2015
2016
2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
-7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4 44 45 46 47 48 49
B200 - Foundations Design Calculations (for Equipments)_IFR
Detail Engineering, Procurement, and
Critical Remaining Work
Milestone
Construction CPM Network
Level - 3 Overall Schedule
A
R
D
014
2
N
R
I 12-MA
B300 - Foundations Design Calculations_IFC
B300 - Foundations Design Calculations (for Equipments)_IFR
B300 - Foundations Design Calculations (for Equipments)_IFC
B300 - Foundations Design Calculations (for Others)_IFR
B300 - Foundations Design Calculations (for Others)_IFC
B400 - Foundations Design Calculations_IFR
B400 - Foundations Design Calculations_IFC
B400 - Foundations Design Calculations (for Equipments)_IFR
B400 - Foundations Design Calculations (for Equipments)_IFC
B400 - Foundations Design Calculations (for Others)_IFR
B400 - Foundations Design Calculations (for Others)_IFC
B500 - Foundations Design Calculations_IFR
B500 - Foundations Design Calculations_IFC
B500 - Foundations Design Calculations (for Equipments)_IFR
B500 - Foundations Design Calculations (for Equipments)_IFC
Requisition for Steel Structure for Blanket Order(only for GS)
Shop Fabricated Structural Steel (2130001) - Update Specs / Data Sheet / Req
Structural Steel MTO - Update / Release Progressively for Fabrication & Supply
Shop Fabricated Structural Steel - Preliminary Requisition
A100 - Structural Steelwork Design Calculations (for Piperack)_IFR
A100 - Structural Steelwork Design Calculations (for Piperack)_IFC
A100 - Structural Steelwork Design Calculations (Equipment)_IFR
A100 - Structural Steelwork Design Calculations (Equipment)_IFC
A100 - Structural Steelwork Design Calculations (Other)_IFR
A100 - Structural Steelwork Design Calculations (Other)_IFC
A500 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFR
A500 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFC
A500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR
A500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC
A600 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFR
A600 - Structural Steelwork Design Calculations ( for Pipe Rack)_IFC
A600 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR
A600 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC
AA00 - Structural Steelwork Design Calculations_IFR
AA00 - Structural Steelwork Design Calculations_IFC
AB10 - Structural Steelwork Design Calculations (for Piperack)_IFR
AB10 - Structural Steelwork Design Calculations (for Piperack)_IFC
AB10 - Structural Steelwork Design Calculations (Equipment)_IFR
AB10 - Structural Steelwork Design Calculations (Equipment)_IFC
AB10 - Structural Steelwork Design Calculations (Other)_IFR
AB10 - Structural Steelwork Design Calculations (Other)_IFC
AB20 - Structural Steelwork Design Calculations (for Piperack)_IFR
AB20 - Structural Steelwork Design Calculations (for Piperack)_IFC
AB20 - Structural Steelwork Design Calculations (Equipment)_IFR
AB20 - Structural Steelwork Design Calculations (Equipment)_IFC
AB20 - Structural Steelwork Design Calculations (Other)_IFR
AB20 - Structural Steelwork Design Calculations (Other)_IFC
AB30 - Structural Steelwork Design Calculations (for Piperack)_IFR
AB30 - Structural Steelwork Design Calculations (for Piperack)_IFC
AB30 - Structural Steelwork Design Calculations (Other)_IFR
AB30 - Structural Steelwork Design Calculations (Other)_IFC
AD00 - Structural Steelwork Design Calculations (for Piperack)_IFR
AD00 - Structural Steelwork Design Calculations (for Piperack)_IFC
AD00 - Structural Steelwork Design Calculations (Equipment)_IFR
AD00 - Structural Steelwork Design Calculations (Equipment)_IFC
AD00 - Structural Steelwork Design Calculations (Other)_IFR
AD00 - Structural Steelwork Design Calculations (Other)_IFC
AE00 - Structural Steelwork Design Calculations (for Piperack)_IFR
AE00 - Structural Steelwork Design Calculations (for Piperack)_IFC
AE00 - Structural Steelwork Design Calculations (Equipment)_IFR
AE00 - Structural Steelwork Design Calculations (Equipment)_IFC
AE00 - Structural Steelwork Design Calculations (Other)_IFR
AE00 - Structural Steelwork Design Calculations (Other)_IFC
AG00 - Requisitions for Structure_IFR
AG00 - Requisitions for Structure_IFC
AG00 - TBE Report for Structure
AG00 - Structural Steelwork Design Calculations_IFR
AG00 - Structural Steelwork Design Calculations_IFC
B100 - Structural Steelwork Design Calculations_IFR
B100 - Structural Steelwork Design Calculations_IFC
B100 - Structural Steelwork Design Calculations ( for Others)_IFR
B100 - Structural Steelwork Design Calculations ( for Others)_IFC
B200 - Structural Steelwork Design Calculations ( for Others)_IFR
B200 - Structural Steelwork Design Calculations ( for Others)_IFC
B300 - Structural Steelwork Design Calculations_IFR
B300 - Structural Steelwork Design Calculations_IFC
B300 - Structural Steelwork Design Calculations ( for Others)_IFR
B300 - Structural Steelwork Design Calculations ( for Others)_IFC
B400 - Structural Steelwork Design Calculations_IFR
B400 - Structural Steelwork Design Calculations_IFC
B400 - Structural Steelwork Design Calculations ( for Others)_IFR
B400 - Structural Steelwork Design Calculations ( for Others)_IFC
B500 - Structural Steelwork Design Calculations_IFR
B500 - Structural Steelwork Design Calculations_IFC
B500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFR
B500 - Structural Steelwork Design Calculations ( for EQ Str.) _IFC
B500 - Structural Steelwork Design Calculations ( for Others)_IFR
B500 - Structural Steelwork Design Calculations ( for Others)_IFC
A700-DWG for Piperack Structure-FR
A700-DWG for Piperack Structure-FC
Requisition for TR, LV SWGR/MCC & Distribution Board in Building for Frame Agreement
Requisition for TR, LV SWGR/MCC & Distribution Board in Building-group1
Requisition for TR, LV SWGR/MCC & Distribution Board in Building-group2
Page 22 of 179
Actual Work
Remaining Work
B200 - Foundations Design Calculations (for Equipments)_IFC
B300 - Foundations Design Calculations_IFR
Date
31-Jul-13
22-Nov-13
02-Dec-13
20-Feb-14
10-Mar-14
Revision
1st Issue for Approval
2nd Issue for Approval - w/ Detailed Construction ...
Revised 22-Nov-13 Issued Schedule
Re-Issue for Baseline Schedule
Revised MH Loading for Marine
Checked
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
T. Hinohara
Approved
F. Kimura
F. Kimura
F. Kimura
F. Kimura
F. Kimura