CONCRETE powerpoint rev 12 2008

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (18.72 MB, 91 trang )


Presented By: Jason Lewis
Concrete and Composites Regional Manager


Deterioration
Grout Packing Injection
Repair

Foundation Repair
3

Furmanite Confidential - 1/9/04


Foundational Failure Is One Of The Most Common Factors
Leading To Vibration In Pump and Motor Basins

If Foundational Failures Are Not Addressed You May Experience
Significant Particle And Coupling Wear Which May Result In Premature
Replacement And Unscheduled Shut Downs

4

Furmanite Confidential - 1/9/04


Foundational failures can occur
from- Inferior Material
Composition at time of pour


- Cracked or Deteriorating
Grout Packing and
Concrete

5

Furmanite Confidential - 1/9/04


Foundational failures can occur
from-Corroding Reinforcing
Steel in the Basin

- Chemical Attack To The
Basin

6

Furmanite Confidential - 1/9/04


Deteriorating Grout Packing Is a Major Contributor
Of Motor And Pump Foundational Vibrations
-As Grout Packing deteriorates

it cracks and refines itself to
granules or dust due to
Vibration Transfer from the
Pump and Motor to the sole
plate


-This deterioration

Causes voids under the sole plate
creating foundational Instability and
Vibration

7

Furmanite Confidential - 1/9/04


-Combined with centrifugal force the Sole Plate

will lift from the Grout Packing allowing voids
to move linear

This will allow
Vibration to travel
throughout the Sole
Plate-

Including the Footpads & Anchor
Points transferring to the Motor ,
Pump and possibly the Pipe

8

Furmanite Confidential - 1/9/04



Equipment Tiedowns
Substantial amounts of Force Are Placed On
The Footpads And Equipment Anchor Points

These areas are usually the most
affected by Grout Packing
Deterioration Creating Voids and
an Unstable Foundation

9

Furmanite Confidential - 1/9/04


Previous Vibratory Solution Methods
Included Shimming the Anchor Areas
Although this method has been
widely accepted for aligning the
Pump and Motor and Specked by
some Manufactures, It may have
adverse affects when related to
Vibration
The Machine Level- Where the Pump and Motor
meet- Should be Laser aligned
If the Machine Level is out of alignment It is
recommended to Mill to near perfect conditions
This Method is only recommended if you have taken
steps to ensure the Foundation and Soul Plate are Sound


10

Furmanite Confidential - 1/9/04


Epoxy Injection Repair Method
Epoxies are a Composite that consist of
2 or more components to make a
material specifically designed for certain
Applications and Chemical Exposures
Epoxies used for Grout Pack
Solidification and Basin Injection have a
compressive strength ranging from
8,500 PSI (when applied at 73°F and 1
day cure) To 12,000 PSI (at 73°F and 28
day full cure)
The Injection Method Is Minimally
Invasive Only Requiring Holes to be
drilled in Hollowed Locations and can
be Pumped under High or Low
Pressure
11

Furmanite Confidential - 1/9/04


Epoxy Injection Repair Method
Where Can Epoxy Injection Can Be
Performed?
Pump Basins

Sole Plates
Exciter Basins
Concrete Foundations
Structural Reinforcement Applications
Reinforcing Steel Mitigation

12

Furmanite Confidential - 1/9/04


Steps For Epoxy Injection Repair Method
(Please Note That it is Best That The Pump And Motor Are Removed Prior to Injection for
access to the Interior Sides of the Footpads)

1-Perform Acoustic Testing Of Entire Sole
Plate to Determine the Hollowed Areas
2-Mark Hollowed Areas To Be Drilled
3- Drill areas marked with 1/8 Bit
4- Place Injectors in Drilled Holes and Apply
High Modulus Epoxy Gel around Injectors to
secure in place and coat any potential leak
sources and allow to cure for 1 hour

13

Furmanite Confidential - 1/9/04


Steps For Epoxy Injection Repair Method

(Please Note That it is Best That The Pump And Motor Are Removed Prior to Injection for
access to the Interior Sides of the Footpads)

5- Begin Injecting Epoxies under desired
pressure ( not to exceed 25 PSI)
6- Transfer of Materials Under Pressure will
Travel the path of least resistance do to
Viscosity ( around 200 cps)
7-When Product is Visibly flowing out of a
port, the port that is being injected will be
capped and the Injector valve will be moved
to the flowing port to ensure product
movement linearly

14

Furmanite Confidential - 1/9/04


Steps For Epoxy Injection Repair Method
(Please Note That is Best That The Pump And Motor Are Removed Prior to Injection for
access to the Interior Sides of the Footpads)

8- Once product has Visibly been seen
flowing out of all installed Ports and then
capped, the operator will flow product to the
maximum 25 PSI to test resistance, if none is
found, the final port will be capped and
Materials will be allowed to Cure


15

Furmanite Confidential - 1/9/04


Foundational Repair

16

Furmanite Confidential - 1/9/04


Foundational Repair
Foundational repairs are
required when the stability
of the structure has been
compromised by Chemical
Exposure, Rebar
Expansion, Concrete
Spawling or other
Environmental or
Mechanical factors

17

Furmanite Confidential - 1/9/04


Foundational Repair
Concrete breathes or expands and contracts do to the

Environmental or Chemical elements it is subjected to
This allows water,
moisture vapors and
gases to permeate
through the structure
attacking the
reinforcing steel
within it
Even the smallest of
cracks in the structure
will allow absorption of
moisture providing a
direct path to the
reinforcing steel
18

Furmanite Confidential - 1/9/04


Foundational Repair
Once the
reinforcing steel
had has be
compromised it
is paramount
that steps be
taken to
mitigate any
future corrosion


19

Furmanite Confidential - 1/9/04


Foundational Repair
If steps are not taken
to mitigate corrosion
the reinforcing steel
will absorb the
moisture, expand and
create a spawl
weakening the
structure
This will also allow the
corrosion to move linear
through the steel creating
significant damage which
may result in total failure of
the basin
20

Furmanite Confidential - 1/9/04


Foundational Repair
Repairs can include:
1- Cement Repair
2-Pressure Grouting
3- Epoxy Mortar Repair

4- Epoxy Injection Method

21

Furmanite Confidential - 1/9/04


AGENDA
Our Mission and History
Safety Discipline
Where We Operate Today
Our Concrete & Composite Repair Solutions
Why Choose Furmanite?

22

Furmanite Confidential - 1/9/04


Maximizing Asset Uptime
Everything we do
centers around keeping
your assets operational
Furmanite s definition
of an Asset anything and
everything that can impact
a customer s bottom line
Furmanite s definition of
Uptime keeping the Asset
productive and

profitable at all times
23

Furmanite Confidential - 1/9/04


Hot-Tapping and Line Stopping
OEM for World Class Tapping and Stopping Machines
Engineering Services
Online Leak Sealing
On-Site Machining and Bolting
Valve Repair

Shop or On-site

Trevitest On-line
Valve Testing
Tank Roof Repair
Concrete and Composite Repairs
Heat Treatment Services

24

Furmanite Confidential - 1/9/04


FURMANITE S
HISTORY & EXPERTISE
Since 1929, Furmanite has
maintained its leadership role in

the research and development of
on-site repair and maintenance
2006, Furmanite purchases the
Global Services Group (GSG) of
Flowserve
Furmanite is the single most
authoritative source for all of
your global industrial services
needs

25

Furmanite Confidential - 1/9/04