MƠ HÌNH 4D-BIM
Chun ngành:
02
2014
-HCM
:
:
(Gh
:
Tr
ngày 15 tháng 02
Thành ph n H i
ng
i h c Bách Khoa, HQG Tp. HCM
2014
ng
nh giá lu n v n th c s g m:
(Ghi
c aH i
ng ch m b o v lu n v n th c s )
1.
2.
3.
5.
Xác nh n c a Ch t ch H i
ngành sau khi lu n v n ã
ng
h giá LV và
c s a ch a (n u có).
lý chuyên
-
-
MSHV:12083053
02/04/1988
sinh:
Chun ngành:
I.
: 605890
Mơ hình 4D-
.
II.
-
cao
;
III.
:
IV. NGÀY H
V.
:
:
Tp. HCM, ngày tháng
quan
-
mơ hình 4D
.
ABSTRACT
With the aid from Information Technology (IT), productivity and performance
quality have been enhanced significantly in many fields. Construction is also in
that trend as more and more products of IT appear in almost all phases of the
thesis aims at developing a computerized - 4D model
integrating project schedule into 3D model to support planning and organizing
high-rise building projects. In order to build the 4D model, a repetitive
scheduling module using the proposed scheduling method is developed and
integrated under an add-in form in Revit Structure Software. The new method
precedence between activities within the same
unit, but also covers vertical relationships between activities belonging to
different units. Several main features of the 4D model including construction
plan visualization and automatically quantity take-off are highlighted at the end
of this thesis.
Keywords: Repetitive scheduling method, 4D model
MƠ HÌNH 4D-
các
22 tháng 11
2013
M CL C
.......................................................................................................... i
..................................................................... iv
........................................................................ v
................................................................................. 1
............................................................................... 1
...................................................... 2
............................................ 4
-BIM ................................................. 5
1.5
................................................................. 6
.................................................................................. 7
.............................................................................. 9
................................................ 9
2.1.1.
............................................................... 9
2.1.2.
a ....................................................................... 11
2.1.3. Line of Balance (LOB) .......................................................................... 12
2.2. Repetitive Scheduling Method (RSM) ..................................................... 13
2.3. Building Information Modeling (BIM) .................................................... 14
2.3.1. BIM là gì? .............................................................................................. 14
2.3.2. BIM 2.3.3.
y (IPD) ........................ 15
............................................................. 16
2.3.4.
i
.......................................................................................................................... 16
2.3.5.
....................................................... 17
2.3.6.
.......................................................................... 17
-
......................... 19
....... 21
3.1. Gi
.................................................................................................. 21
........................................... 22
........................ 23
.............................................................................. 23
.............................................................................................. 26
................................................... 27
3.6.1.
......................................................... 27
3.6.2.
............................................................. 28
3.6.3.
........................................................ 28
3.6.4.
....................... 29
3.6.5.
................................................................ 29
........................................................................... 30
3.7.1.
.................................................................................................. 30
3.7.2.
..................................... 31
3.7.3.
............................ 33
.............................................. 34
3.8.1.
............................ 35
3.8.2.
.................................................... 35
ii
......................................................................................... 37
MƠ HÌNH 4D BIM .................................................................... 41
............................................................... 41
4.1.1.
-
-BIM ............................................ 41
4.1.2.
-
.......................... 42
4.1.3.
-
-
BIM .................................................................................................................. 44
4.1.4.
........................................................................ 50
4.1.5. Gia
....... 51
4.1.6.
-BIM ........................................................ 52
......................................................................................... 55
4.2.1.
4.2.2.
4.2.3.
...................................................................................... 55
-
-Planning ..................... 57
................................................................................................... 61
-BIM ........................................................ 64
4.3.1.
........................................................ 64
4.3.2.
................................................................. 66
................................................................................ 68
..................................................................................................... 68
.................................................................... 70
............................................................................... 72
iii
DANH M C CÁC B NG BI U
.......................................................................................................................... 11
BIM (BIM and Construction Authority, 2012)................................................ 17
.. 20
................................................... 37
................... 49
................................................... 57
iv
DANH M C CÁC HÌNH NH
......... 2
..................... 3
................................................................. 10
OB (Arditi và
Albulak, 1986) ................................................................................................. 12
......................... 14
..................................................... 23
........................... 26
............................ 27
....................................... 32
.................................................. 33
............................................ 34
................................................................................... 35
................................................. 38
.............................................. 38
......................... 39
........... 40
.................................. 42
.............................................................. 43
Hình 4.3 Phân chia các phân khu thi công....................................................... 44
-BIM ............. 45
............................................. 45
v
............................................................................. 46
.............................................................................. 46
Hình 4.8
.................................................... 47
...................... 47
.............................................. 49
................................... 50
-BIM............................. 54
........................................................................ 55
....................................................................... 56
..................................................................................... 58
hân khu............................................................ 59
............................................. 60
................................. 61
................................... 61
................................................................. 62
....................................................... 62
. 63
....................... 64
............................. 65
vi
GI I THI U
Ch
-
1.1.
m c a d án l p
các
p
công nhân
.
Quá trình làm
1
Hình 1.1
m ng truy n th ng cho d án l p (Huang và Sun, 2006)
liên
(Learning
curve effects).
(Thabet và
Beliveau, 1994).
1.2.
p ti
d án l p
(O'Brien et al., 1985)
2
Hình 1.2
(Reda, 1990, Yamín và Harmelink, 2001).
trí
Production Method (
m Velocity Diagram (Roech, 1972), Vertical
), Line of Balance (Arditi và Albulak, 1986,
Carr và Meyer, 1974), Linear Scheduling Method (Chrzanowski Jr và Johnston,
1986), Repetitive Project Scheduling (Reda, 1990).
Harris
và Ioannou (1998)
3
Method
Liu et al. (2005), Hijazi (1989), Srisuwanrat và Ioannou
(2007), Srisuwanrat et al. (2008).
1.3. H n ch c
p ti
l p
nêu trên v
2
cơng tác khác nhau (
B1)
theo
(
, A1 và A2)
(xem Hình 1.1). Trong khi
2
2 cơng tác khác nhau
hai phân khu khác nhau.
Hình 1.2
2 công tác khác nhau (
tên nét
).
Thabet và Beliveau (1994). Tuy nhiên,
4
là
.
p
q
Tuy nhiên,
1.4. Kh
có
ng d ng c a mơ hình 4D-BIM
ơng vào mơ hình 3D thơng
.
d
,c
(Russell et al., 2009).
í uy tín.
5
Mơ hình này
n
ng án
.
-BIM
(Mahalingam et al., 2010).
,
mơ hình 4D
Tuy nhiên,
sau.
(Russell et al., 2009).
,
,
ngành
ng
. Theo Mahalingam et al. (2010)
1.5. Quy mô và m c tiêu nghiên c u
6
(1)
tác khi mà tà
(2)
mơ hình 4D-BIM.
1.6. C u trúc c a lu
.
liên quan
các
tíc
-
BIM
thành mơ
7
hình 4D.
ur
8
T NG QUAN
-BIM
2.1.
2.1.1.
p ti
cho d án l p
m ng CPM
R. Walke
-
-
công tác
9
Hình 2.1
. Do
Hình 2.1
, các cơng tác A, B và
khi 2 công tác C và E
sang phân khu 2.
10
2.1
(Huang và Sun,
2006)
thi công
Carr
và
(1974)
Meyer LOB
VPM
Selinger (1980)
Const. planning
Johnston (1981)
LSM
Stradal và Cacha Time space
(1982)
scheduling
Arditi và Albulak LOB
(1986)
Chrzanowski
và LSM
Johnston (1986)
Reda (1990)
RPM
El-Rays và Moselhi Resource driven
(1998)
scheduling
Harmelink
và Linear
Rowings (1998)
Scheduling
Model
Harris và Ioanou RSM
(1998)
Hegazy và Wassef Repetitive
(2001)
nonserial activity
scheduling
2.1.2.
nguyên
các công
N
công tác
N
N
Y
Y
Y
N
N
N
N
Y
Y
N
N
Y
Y
N
Y
N
Y
N
N
Y
N
N
N
Y
Y
N
N
N
N
N
Y
h a
khác nhau
2.1,
.
11
khác nhau.
2.1.3. Line of Balance (LOB)
Hình 2.2.
:
khu.
Hình 2.2 Ti
c bi u di
Albulak, 1986)
(Arditi và12