Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (61.14 KB, 1 trang )
PB-Nr: M10
Data analysis
Issued by Date of release version Page
Hr. Bauer 0
1/1
Process owner: Hr. Bauer
Process purpose and
targetl:
Definition of the methods for data evaluations and the
necessary scope to the examination of the processes
and procedures in the Tiger factory
Monitoring/characteristic numbers
Quality:
Environment:
Flow/process documentation/competence
The necessary range of the data evaluation and the methods needed for it are
determined by each process owner in its area of responsibility. It must be guaranteed
by the methods that necessary process security can be achieved and proven in such
a way that if necessary in time suitable improvements can be in-slid.